SlideShare a Scribd company logo
1 of 9
Download to read offline
CURRICULUM VITAE
Page 1 of 9
P E R S O N A L P A R T I C U L A R S
Name : Mohd Nor Firdaus bin Mohd Salleh
Address : No.35, Jalan USJ 13/5F, USJ 13, 46730 Subang Jaya, Selangor
Mobile No : 019-6649323
Email : mnfirdaus@yahoo.com
Nationality : Malaysian
Date of Birth : 28th August 1985
Place of Birth : Nenasi, Pahang
Marital Status : Single
P R O F I L E S U M M A R Y
A highly analytical, knowledge-driven engineering professional with seven (7) years of experience working
in the engineering field in a consultant firm specialized in process engineering design in oil and gas industry
for both offshore platform and onshore petrochemical plant. The nature of activities performed include
document and drawing review for study of various engineering stages such as Conceptual, Front End
Engineering Design (FEED), Detailed Design (DD) and Independent Design Assessment for Greenfield and
Brownfield projects, Document Specifications, Technical Requisitions, Vendor Data Review, Operation
Procedures Manual and design calculations. Always willing to learn to improve for personal career growth
and looking forward to new engineering challenges to be one of the pioneers in engineering technology.
T E C H N I C A L E X P E R T I S E
Engineering: Piping, Equipment and process design , material specification and knowledge in
codes/standards
Softwares: HYSYS Aspen Plus Flarenet AutoCAD
PipeSim Microsoft Office Flaresim
A F F I L I A T I O N S & C E R T I F I C A T E S
• Registered Graduate Engineer, Board of Engineers Malaysia (BEM).
• Basic Offshore & Safety Training (BOSEIT) with OPITO at SMTC Miri, Malaysia (valid until Sept-
2019).
• Oil & Gas Safety Passport Level 1 (OGSP) (valid until Mar-2017).
• Aspen HYSYS Upstream: Modeling Oil & Gas Production Facilities.
P E R S O N A L S T R E N G T H
• Self-motivated, energetic, hardworking, quick to learn, creative and strategic thinking person.
• Good in planning, excellent communication skills and able to work with people of all levels.
• Great sense of responsibility, knowledge-enthusiast and capable of working under pressure.
Process Engineer,
with 7 years of
experience in oil
and gas industry
Mohd Nor Firdaus Bin Mohd Salleh Process Engineer
mnfirdaus@yahoo.com [019 664 9323]
Page 2 of 9
P R E S E N T P L A C E M E N T
Petrofac – rnz [April 2011 – May 2016]
Position: Process Engineer II
Work description/Task assigned:
• Client’s Name: SapuraKencana Energy Sarawak Inc. [2015/2016]
Project Name: SK310 B15 Development Project
Scope of Work:
o Developed Process and Instrument Drawings (P&ID) for greenfield based on goby
project to achieve excellent design.
o Developed various of sizing calculations and data sheets for the platform
equipments.
o Developed process simulation report.
o Participating in project HAZOP, HAZID and LDR meeting.
o Represent Process team to liaise with client side.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2015]
Project Name: Provision of Installation for New Flowline and Gaslift line at TBG-A
Scope of Work:
o Developed as built process Drawings (P&ID) based on Brownfield modification
scopes.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2015]
Project Name: Feasibility Study of Low Pressure Production System for SUDP-A
Scope of Work:
o Developed a comprehensive Process Flow Diagram (PFD) and Utility Flow Diagram
(UFD) for the new system.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2015]
Project Name: Provision of Detail Engineering Services for Kinarut Workover
Scope of Work:
o Developed as built process Drawings (P&ID) based on modification scopes –
SIPROD mode.
o Developed and finalized facilities design consideration report.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014/2015]
Project Name: Installation of Low Pressure System (LPS) at TBG-B
Scope of Work:
o Developed as built process Drawings (P&ID) based on Brownfield modification
scopes.
o Developed process simulation, blowdown and dispersion study report.
o Performed HYSYS simulation for the whole system.
o Performed FLARENET and PHAST simulation for radiation and dispersion
contour.
o Lead Design team for the Project HAZOP meeting.
o Designed and simulate separator sizing
o Developed pump sizing calculations.
Mohd Nor Firdaus Bin Mohd Salleh Process Engineer
mnfirdaus@yahoo.com [019 664 9323]
Page 3 of 9
o Developed pressure control valve calculation and sizing.
o Developed relief valve sizing calculations.
o Developed hydraulic calculation for new lines.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014]
Project Name: Installation of Sand Jetting at SUPG-B (V-1010, V-1020 & V-1310)
Scope of Work:
o Developed as built process Drawings (P&ID) based on Brownfield modification
scopes.
o Developed and finalized process design report.
o Performed the hydraulic calculation for new line.
o Developed pump sizing calculations.
o Developed pressure control valve calculation and sizing.
o Developed relief valve sizing calculation.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014]
Project Name: Detailed Design for SSGP Gas Bypass Line to Domestic Users Project
Scope of Work:
o Developed as built process Drawings (P&ID) based on Brownfield modification
scopes.
o Performed HYSYS Simulation for the system.
o Lead Design office for project HAZOP meeting.
o Developed bypass line design report.
o Performed the hydraulic calculation for new bypass line.
o Developed restriction orifice (RO) calculation.
o Developed pressure control valve calculation and sizing.
• Client’s Name: Langsutra Sdn. Bhd. [2014]
Project Name: Detail Engineering Design of Foam Upgrading System at Sabah Gas Terminal
(SBGAST)
Scope of Work:
o Developed as built process Drawings (P&ID) based on Brownfield modification
scopes.
o Developed and finalized Design Basis drawing and report for the Foam Upgrading
System and Foam System Adequacy Check.
o Developed restriction orifice (RO) calculation.
o Developed relief valve calculations and data sheets.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014]
Project Name: Detailed Engineering Design for SMJT-C 86 Coil Tubing Drilling (CTD)
Scope of Work:
o Developed site visit checklist, performed the site visit and completing site visit
report based on the site findings.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014]
Project Name: Detailed Engineering Design for Firewater System Modification at GRT1 and GRT2
Project
Scope of Work:
Mohd Nor Firdaus Bin Mohd Salleh Process Engineer
mnfirdaus@yahoo.com [019 664 9323]
Page 4 of 9
o Developed as built process Drawings (P&ID) based on Brownfield modification
scopes.
o Developed firewater modification design verification report.
o Performed firewater demand calculation together with the nozzle requirement.
o Performed firewater pump supply adequacy check.
o Performed the hydraulic calculation for new firewater ringmain.
o Developed site visit checklist, performed site visit and completing site visit report
based on PML site findings.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014]
Project Name: Conceptual Study for SUPG-B Living Quarters Upgrading Project
Scope of Work:
o Process lead in the conceptual study.
o Developed the site visit checklist, performed site visit and completing the site visit
report based on the site findings.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014]
Project Name: Detailed Engineering Design for Firewater System Modification at Identified
Location at LGAST 1 and LGAST 2
Scope of Work:
o Developed as built Process Drawings (P&ID) based on Brownfield modifications
scopes.
o Developed firewater modification design verification report.
o Developed firewater demand calculation and firewater pump supply adequacy
check.
o Performed hydraulic calculation for new firewater ringman.
o Developed and finalized the site visit checklist, performed site visit and completing
site visit report based on the LGAST site findings.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014]
Project Name: TBG-A/B casing Blowdown Lines Installtion Project
Scope of Work:
o Developed as built Process Drawings (P&ID) based on Brownfield modifications
scopes.
o Prepared blowdown and hydraulic studies for casing blowdown and line installation
report.
o Developed HYSYS simulation for study and analyse the blowdown operation
maximum rate and temperature check of new casing blowdown lines.
o Performed hydraulic calculation and verify the new casing blowdown lines sizing.
o Performed the backpressure calculation and tail pipe sizing.
o Developed and finalized the site visit checklist, performed site visit and completing
site visit report based on the TBG-A/B site findings.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014]
Project Name: Reinstatement of LGAST Portable Water Instrumentation System Project
Scope of Work:
o Developed as built Process Drawings (P&ID) based on Brownfield modifications
scopes.
o Developed and finalized the portable water system reinstatement report.
Mohd Nor Firdaus Bin Mohd Salleh Process Engineer
mnfirdaus@yahoo.com [019 664 9323]
Page 5 of 9
o Performed hydraulic study for portable water system.
o Performed sizing for portable water vessel.
o Developed the line sizing calculation for the process line and update the LGAST line
list.
o Prepared and finalized the site visit check list, performed site visit and completing
site visit report based on the LGAST site findings.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014]
Project Name: PRV System Modification (6 Nos.) at Sabah Gas Terminal (SBGAST) Project
Scope of Work:
o Developed as built Process Drawings (P&ID) based on Brownfield modifications
proposed.
o Performed Hysys Simulation for every case for sizing calculations.
o Performed adequacy check report of the existing PRV size.
o Developed pressure relief valve (PRV) sizing and PRV data sheets.
o Performed the line sizing calculation and update the line list for SBGAST.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2013/2014]
Project Name: Provision Of Detailed Engineering (Phase 1) And Front End Engineering Design
(Feed)(Phase 2) For Baram Delta Gas Gathering-2 (Bardegg-2) And Baronia
Enhanced Oil Recovery (Eor) Develoment Project
Scope of Work:
o Developed as built Process Drawings (P&ID) based on Brownfield modifications
proposed.
o Performed Hysys Simulation for overall system with the group team.
o Developed the line sizing calculation for the process lines (Gas, Liquid, and
Aqueous).
o Developed site visit check list and performed site visit at Baronia Complex-A.
o Developed and finalized the site visit report based on Baronia Complex-A site visit
findings.
o Developed and finalized the line list of BARDEGG project.
• Client’s Name: INSTEP (Institut Teknologi Petroleum Petronas) [2012/2013]
Project Name: Engineering, Procurement, Construction and Commissioning (EPCC)
of Upstream and Downstream Theme Park
Scope of Work:
o To prepare pressure safety valve (PSV) sizing and PSV data sheet.
o To input the process data into the control valve datasheet.
o Prepared the line sizing calculation for the process lines (Gas, Liquid, and
Aqueous).
o Prepared the Cause and Effect Matrix.
• Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2012]
Project Name: Engineering, Procurement, Construction, Installation and
Commissioning (EPCIC) for Bekok-C Restoration project
Scope of Work:
o Involved in updating of Process Drawings (P&ID) based on modifications proposed.
Mohd Nor Firdaus Bin Mohd Salleh Process Engineer
mnfirdaus@yahoo.com [019 664 9323]
Page 6 of 9
o Reviewed the compressor vendor data for modification of Piping and
Instrumentation Diagram (P&ID).
o Prepared and updated the line list of Bekok-C Restoration project.
• Client’s Name: Petronas Carigali Sdn. Bhd. – Sabah Operation (SBO) [2011/2012]
Project Name: Provision of Detailed Design For Samarang Pipeline PL112
Rehabilitation Project.
Scope of Work:
o Prepared the site visit check list and performed site visit at Samarang SMJT-D and
SMJT-C.
o Prepare the site visit report based on Samarang SMJT-D and SMJT-C site visit
findings.
o Prepared the pipeline simulation (PIPESIM) for RTP Insertion in PL-112 based on
the various options and prepared report for data comparison.
• Client’s Name: Carigali Hess [2011/2012]
Project Name: Vapor Recovery System Modification
Scope of Work:
o Prepared the site visit check list and performed site visit at Cakerawala Processing
Platform (CKP).
o Prepare the site visit report based on Cakerawala Processing Platform (CKP) site
visit finding.
o Performed the feasibility study for Vapor Recovery Modification to provide options
on enhancing the vapor recovery.
o Prepared the Process Drawings (P&ID) based on the options proposed.
o Performed Gas Scrubber sizing calculation based on the options proposed.
• Client’s Name: Petrofac Malaysian Limited (PML) [2011/2012]
Project Name: Refurbishment, Life Extension and Upgrading of the West Desaru
MOPU
Scope of Work:
o Produced and updated the process drawing (P&ID) for Water Injection System.
o Performed instrument sizing and datasheet (PSV and control valve).
• Client’s Name: Petronas Carigali Sdn. Bhd. [2011]
Project Name: Provision of Basis Engineering Design services for Bekok-B Infill
Scope of Work:
o Performed site visit at Bekok-B platform.
o Prepared site visit report based on Bekok-B site visit findings.
• Client’s Name: Petroleum Investigation Research & Engineering Co. (PIRE Co)/ [2010/2012]
PARS Oil and Gas Company (POGC)
Project Name: Provision of Basis Design, Front End Engineering Design (FEED) and
Detailed Design Services for South Pars Gas Development Phases 22,
23 &24.
Scope of Work:
Mohd Nor Firdaus Bin Mohd Salleh Process Engineer
mnfirdaus@yahoo.com [019 664 9323]
Page 7 of 9
o Prepared the equipment and instrument calculation and data sheets for Chemical
Injection System (Methanol, Demulsifier, Reverse Demulsifier, Antifoam and
Corrosion Inhibitor).
o Reviewed various vendor data equipments with the inhouse process datahseet.
o Updated the process drawing (P&ID) and process datasheets based on the vendor
data information.
o Updated the Operation Manual (OPM) based on the vendor data information
received.
o Compiled the Calculation Book for submission.
P R E V I O U S P L A C E M E N T
Kuala Lumpur Valve & Fitting (M) Sdn. Bhd. [December 2010 – March 2011]
(SWAGELOK)
Position: Application Engineer
Work description/Task assigned:
• To increase sales for all Swagelok products and to achieve maximum sales volume from
all customers in assigned area.
• To develop good relations with new and existing customers to accelerate and increas
the sales of Swagelok products.
• To understand the range of Swagelok products to ensure efficient and good quality
services provided to the customers.
RWNA ENGINEERING SDN. BHD [April 2009 – November 2010]
Position: Project Coordinator
Work description/Task assigned:
Projects Involved:
• BraderoShaw/ Petronas – Anode Installation Kumang Cluster Development Project.
• PPSC/ Shell Oil & Gas – Gumusut Kakap Deep Water Shallow line (3 Coat Syatem).
• BraderoShaw/ Nippon Steel Eng. Co. Ltd. – PTTEP Bongkot Field Development Project
Phase 3H & 4A. (Anode Installation)
• BraderoShaw/ Sarawak Shell Berhad – F28 Gas Development Project.(Anode
Installation)
• BraderoShaw/ Sarawak Shell Berhad (SSB) – St. Joseph Re-development. (Anode
Installation)
• BraderoShaw/ Petronas Carigali Sdn. Bhd. – Samarang Pipieline Development (PL111,
PL113, PL125 & PL139) (Anode Installation)
• BraderoShaw/ Exxonmobil Exploration & Production Malaysia Inc. (EMEPMI) –
Guntong B – Guntong A.(Anode Installation)
• BraderoShaw/ Sabah Shell Petroleum Company (SSPC) – Gumusut Oil Export Pipeline
Project. (Anode Installation, Pin Brazing & Solid Polyurethane Application)
• CUEL Limited/ MITA – Special Pipeline South West Gas II Project. (Anode
Installation)
• BrederoShaw/ AGIP – Kashagan Field Development Experimental Project. (anode
Installation & Pin Brazing)
Mohd Nor Firdaus Bin Mohd Salleh Process Engineer
mnfirdaus@yahoo.com [019 664 9323]
Page 8 of 9
• BraderoShaw/ Shell Oil & Gas – Cilipadi & Selasih Pipeline and Bend Project (Solid
Polyurethane Application)
• BrederoShaw/ Brunei Shell Berhad – Selangkir Iron Duke (SKID) Project.(Anode
Installation)
• CUEL Limited – Arthik 1C Project. (Anode Installation)
• BraderoShaw/ Nippon Steel Eng. Co. Ltd. – PTTEP Bongkot Field Development Project
Phase 3H & 4A. (Solid Polyurethane Application)
• BrederoShaw/ COLT – CPOC 18” MDD Pipelines Project. (Anode Installation)
• BrederoShaw/ EMEPMI – Seligi & Semangkok 12” CRA Pipelines Project (Anode
Installation and Tack Welding on Double Jointing pipeline)
• BrederoShaw/ Mitsui Co. Ltd – PNG LNG Project
Scope of Work:
• Report to the Operation Director and Project Manager regarding all the issue arised
and daily work execution.
• Liaised with client’s representatives periodically to identify/secure future jobs.
• Prepared the Project Estimation Plan for Project Manager approval and submission to
client.
• Prepared the Quotation/ Tender submission to client.
• Coordinated project scheduling with client’s representative.
• Coordinated Welding Procedure Specification (WPS) and Welder Qualification.
• Team as coordinator and work with the supervisor, to coordinate/recruit qualified
manpower inclusive of welders, fitters and helpers.
• Monitor and control project progress to meet the project schedule.
• Assisted the HSE manager in audit the work area/ space to meet the requirement and
standard.
• Assisted the QA/HSE Manager in preparation of:
o Project Procedure/ Work instruction.
o Inspection and Test Plan.
o Welding Procedure Specification.
rnz integrated (m) sdn. Bhd. [Jun 2008 – November 2008]
Position: Internship Trainee
Project Involved:
• Provision of Conceptual, Front End Engineering Design (FEED) and Detailed Design
Services for Kinabalu Non Associated Gas (NAG) Project for PETRONAS Carigali Sdn
Bhd (PCSB) (KNJT-C) & (KNPG-B)
Scope of Work:
• Prepared the instrument and equipment datasheets.
• Reviewed the past documents for understanding of how the equipments are sized.
• Assist engineer in mark-up of the documents related to the project (datasheets,
drawing-P&ID, PFDs.etc)
• Checked the line list and the line continuities in the P&IDs.
Area of Development:
Mohd Nor Firdaus Bin Mohd Salleh Process Engineer
mnfirdaus@yahoo.com [019 664 9323]
Page 9 of 9
• To become a professional engineer that is able to utilize my skills and promote growth
for mastery of both theoretical orientation and practical solutions with professional
commitment in the business environment of my prospective workplace.
E D U C A T I O N B A C K G R O U N D
A D D I T I O N A L I N F O R M A T I O N
Willing to Travel : Yes
Willing to Relocate : Yes
Possess Own Transport : Yes
Availability : Immediate
R E F E R E N C E S
Name : Ir. Fairus Bin Ramli
Current Position: Senior Process Engineer
Company Address: Petrofac - RNZ
Level 17 Menara Great Eastern,
303 Jalan Ampang, 50450 Kuala Lumpur
Office No.: 03-42642600
Name : Mohammad Sofi Bin Nurdin
Current Position: Process Senior Engineer I
Company Address: Petrofac - RNZ
Level 11, Wisma Great Eastern, No.65 Jalan Gaya,
88000 Kota Kinabalu, Sabah
Office No.: 088-230715
Highest Education
Name Of University: Universiti Malaysia Pahang
Location: Gambang, Kuantan, Pahang
Level: Bachelor of Chemical Engineering (Hons.)
Education Field: Chemical Engineering
Major: Gas Technology
Graduation Date: Jan-2009
Cumulative GPA: 3.12
Second Highest Education
Name Of College: Kolej Matrikulasi Pahang
Location: Gambang, Kuantan, Pahang
Level: Certificate
Education Field: Physical Science
Graduation Date: 2003
Cumulative GPA: 3.41
Sijil Pelajaran
Malaysia
Name Of School: Sekolah Menegah Kebangsaan Tanjung Gemok
Course: Science Stream
Result: Grade 1

More Related Content

What's hot

TAN CHUN CHIA resume 2016.01
TAN CHUN CHIA resume 2016.01TAN CHUN CHIA resume 2016.01
TAN CHUN CHIA resume 2016.01Tan Chun Chia
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul A'mal Mohd Hanafiah
 
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CVzetiengg
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerWan Sazali
 
ibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOCibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOCIbrahim Moustafa Farag
 
Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekar ramamurthy
 
_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)hitesh desai
 
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015PRADIP SAHA,CEng MIGEM
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
Jha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CVJha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CVAjachi Jha
 

What's hot (20)

TAN CHUN CHIA resume 2016.01
TAN CHUN CHIA resume 2016.01TAN CHUN CHIA resume 2016.01
TAN CHUN CHIA resume 2016.01
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
 
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)
 
Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Nirmal_Resume
 
CV_Vijaya Kumar
CV_Vijaya KumarCV_Vijaya Kumar
CV_Vijaya Kumar
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping Designer
 
ibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOCibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOC
 
Resume for Pipeline Designer
Resume for Pipeline DesignerResume for Pipeline Designer
Resume for Pipeline Designer
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
hdebelenjr-latest-CV
hdebelenjr-latest-CVhdebelenjr-latest-CV
hdebelenjr-latest-CV
 
Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.Designer
 
_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)
 
R K MISHRA CV
R K MISHRA CVR K MISHRA CV
R K MISHRA CV
 
Senthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress EngineerSenthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress Engineer
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
Jha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CVJha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CV
 

Similar to MNFirdaus Resume

Similar to MNFirdaus Resume (20)

Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 
CV-Balamurugan.
CV-Balamurugan.CV-Balamurugan.
CV-Balamurugan.
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
mahadev prasad resume_feb2016
mahadev prasad resume_feb2016mahadev prasad resume_feb2016
mahadev prasad resume_feb2016
 
Perumal_CV_PD_Jan 2017
Perumal_CV_PD_Jan 2017Perumal_CV_PD_Jan 2017
Perumal_CV_PD_Jan 2017
 
Ukeje CV
Ukeje CVUkeje CV
Ukeje CV
 
Ahmad Faiz_Resume 2016
Ahmad Faiz_Resume 2016Ahmad Faiz_Resume 2016
Ahmad Faiz_Resume 2016
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
 
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
CV Muhammad Afi Hassan 2015
CV Muhammad Afi Hassan 2015CV Muhammad Afi Hassan 2015
CV Muhammad Afi Hassan 2015
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
SomkiatC
SomkiatCSomkiatC
SomkiatC
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
CV of Feri Noviardi (Mechanical)
CV of Feri Noviardi (Mechanical)CV of Feri Noviardi (Mechanical)
CV of Feri Noviardi (Mechanical)
 
BASEEM
BASEEMBASEEM
BASEEM
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
Project Engineer_Ravi
Project Engineer_RaviProject Engineer_Ravi
Project Engineer_Ravi
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.
 

MNFirdaus Resume

  • 1. CURRICULUM VITAE Page 1 of 9 P E R S O N A L P A R T I C U L A R S Name : Mohd Nor Firdaus bin Mohd Salleh Address : No.35, Jalan USJ 13/5F, USJ 13, 46730 Subang Jaya, Selangor Mobile No : 019-6649323 Email : mnfirdaus@yahoo.com Nationality : Malaysian Date of Birth : 28th August 1985 Place of Birth : Nenasi, Pahang Marital Status : Single P R O F I L E S U M M A R Y A highly analytical, knowledge-driven engineering professional with seven (7) years of experience working in the engineering field in a consultant firm specialized in process engineering design in oil and gas industry for both offshore platform and onshore petrochemical plant. The nature of activities performed include document and drawing review for study of various engineering stages such as Conceptual, Front End Engineering Design (FEED), Detailed Design (DD) and Independent Design Assessment for Greenfield and Brownfield projects, Document Specifications, Technical Requisitions, Vendor Data Review, Operation Procedures Manual and design calculations. Always willing to learn to improve for personal career growth and looking forward to new engineering challenges to be one of the pioneers in engineering technology. T E C H N I C A L E X P E R T I S E Engineering: Piping, Equipment and process design , material specification and knowledge in codes/standards Softwares: HYSYS Aspen Plus Flarenet AutoCAD PipeSim Microsoft Office Flaresim A F F I L I A T I O N S & C E R T I F I C A T E S • Registered Graduate Engineer, Board of Engineers Malaysia (BEM). • Basic Offshore & Safety Training (BOSEIT) with OPITO at SMTC Miri, Malaysia (valid until Sept- 2019). • Oil & Gas Safety Passport Level 1 (OGSP) (valid until Mar-2017). • Aspen HYSYS Upstream: Modeling Oil & Gas Production Facilities. P E R S O N A L S T R E N G T H • Self-motivated, energetic, hardworking, quick to learn, creative and strategic thinking person. • Good in planning, excellent communication skills and able to work with people of all levels. • Great sense of responsibility, knowledge-enthusiast and capable of working under pressure. Process Engineer, with 7 years of experience in oil and gas industry
  • 2. Mohd Nor Firdaus Bin Mohd Salleh Process Engineer mnfirdaus@yahoo.com [019 664 9323] Page 2 of 9 P R E S E N T P L A C E M E N T Petrofac – rnz [April 2011 – May 2016] Position: Process Engineer II Work description/Task assigned: • Client’s Name: SapuraKencana Energy Sarawak Inc. [2015/2016] Project Name: SK310 B15 Development Project Scope of Work: o Developed Process and Instrument Drawings (P&ID) for greenfield based on goby project to achieve excellent design. o Developed various of sizing calculations and data sheets for the platform equipments. o Developed process simulation report. o Participating in project HAZOP, HAZID and LDR meeting. o Represent Process team to liaise with client side. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2015] Project Name: Provision of Installation for New Flowline and Gaslift line at TBG-A Scope of Work: o Developed as built process Drawings (P&ID) based on Brownfield modification scopes. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2015] Project Name: Feasibility Study of Low Pressure Production System for SUDP-A Scope of Work: o Developed a comprehensive Process Flow Diagram (PFD) and Utility Flow Diagram (UFD) for the new system. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2015] Project Name: Provision of Detail Engineering Services for Kinarut Workover Scope of Work: o Developed as built process Drawings (P&ID) based on modification scopes – SIPROD mode. o Developed and finalized facilities design consideration report. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014/2015] Project Name: Installation of Low Pressure System (LPS) at TBG-B Scope of Work: o Developed as built process Drawings (P&ID) based on Brownfield modification scopes. o Developed process simulation, blowdown and dispersion study report. o Performed HYSYS simulation for the whole system. o Performed FLARENET and PHAST simulation for radiation and dispersion contour. o Lead Design team for the Project HAZOP meeting. o Designed and simulate separator sizing o Developed pump sizing calculations.
  • 3. Mohd Nor Firdaus Bin Mohd Salleh Process Engineer mnfirdaus@yahoo.com [019 664 9323] Page 3 of 9 o Developed pressure control valve calculation and sizing. o Developed relief valve sizing calculations. o Developed hydraulic calculation for new lines. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014] Project Name: Installation of Sand Jetting at SUPG-B (V-1010, V-1020 & V-1310) Scope of Work: o Developed as built process Drawings (P&ID) based on Brownfield modification scopes. o Developed and finalized process design report. o Performed the hydraulic calculation for new line. o Developed pump sizing calculations. o Developed pressure control valve calculation and sizing. o Developed relief valve sizing calculation. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014] Project Name: Detailed Design for SSGP Gas Bypass Line to Domestic Users Project Scope of Work: o Developed as built process Drawings (P&ID) based on Brownfield modification scopes. o Performed HYSYS Simulation for the system. o Lead Design office for project HAZOP meeting. o Developed bypass line design report. o Performed the hydraulic calculation for new bypass line. o Developed restriction orifice (RO) calculation. o Developed pressure control valve calculation and sizing. • Client’s Name: Langsutra Sdn. Bhd. [2014] Project Name: Detail Engineering Design of Foam Upgrading System at Sabah Gas Terminal (SBGAST) Scope of Work: o Developed as built process Drawings (P&ID) based on Brownfield modification scopes. o Developed and finalized Design Basis drawing and report for the Foam Upgrading System and Foam System Adequacy Check. o Developed restriction orifice (RO) calculation. o Developed relief valve calculations and data sheets. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014] Project Name: Detailed Engineering Design for SMJT-C 86 Coil Tubing Drilling (CTD) Scope of Work: o Developed site visit checklist, performed the site visit and completing site visit report based on the site findings. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014] Project Name: Detailed Engineering Design for Firewater System Modification at GRT1 and GRT2 Project Scope of Work:
  • 4. Mohd Nor Firdaus Bin Mohd Salleh Process Engineer mnfirdaus@yahoo.com [019 664 9323] Page 4 of 9 o Developed as built process Drawings (P&ID) based on Brownfield modification scopes. o Developed firewater modification design verification report. o Performed firewater demand calculation together with the nozzle requirement. o Performed firewater pump supply adequacy check. o Performed the hydraulic calculation for new firewater ringmain. o Developed site visit checklist, performed site visit and completing site visit report based on PML site findings. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014] Project Name: Conceptual Study for SUPG-B Living Quarters Upgrading Project Scope of Work: o Process lead in the conceptual study. o Developed the site visit checklist, performed site visit and completing the site visit report based on the site findings. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014] Project Name: Detailed Engineering Design for Firewater System Modification at Identified Location at LGAST 1 and LGAST 2 Scope of Work: o Developed as built Process Drawings (P&ID) based on Brownfield modifications scopes. o Developed firewater modification design verification report. o Developed firewater demand calculation and firewater pump supply adequacy check. o Performed hydraulic calculation for new firewater ringman. o Developed and finalized the site visit checklist, performed site visit and completing site visit report based on the LGAST site findings. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014] Project Name: TBG-A/B casing Blowdown Lines Installtion Project Scope of Work: o Developed as built Process Drawings (P&ID) based on Brownfield modifications scopes. o Prepared blowdown and hydraulic studies for casing blowdown and line installation report. o Developed HYSYS simulation for study and analyse the blowdown operation maximum rate and temperature check of new casing blowdown lines. o Performed hydraulic calculation and verify the new casing blowdown lines sizing. o Performed the backpressure calculation and tail pipe sizing. o Developed and finalized the site visit checklist, performed site visit and completing site visit report based on the TBG-A/B site findings. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014] Project Name: Reinstatement of LGAST Portable Water Instrumentation System Project Scope of Work: o Developed as built Process Drawings (P&ID) based on Brownfield modifications scopes. o Developed and finalized the portable water system reinstatement report.
  • 5. Mohd Nor Firdaus Bin Mohd Salleh Process Engineer mnfirdaus@yahoo.com [019 664 9323] Page 5 of 9 o Performed hydraulic study for portable water system. o Performed sizing for portable water vessel. o Developed the line sizing calculation for the process line and update the LGAST line list. o Prepared and finalized the site visit check list, performed site visit and completing site visit report based on the LGAST site findings. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2014] Project Name: PRV System Modification (6 Nos.) at Sabah Gas Terminal (SBGAST) Project Scope of Work: o Developed as built Process Drawings (P&ID) based on Brownfield modifications proposed. o Performed Hysys Simulation for every case for sizing calculations. o Performed adequacy check report of the existing PRV size. o Developed pressure relief valve (PRV) sizing and PRV data sheets. o Performed the line sizing calculation and update the line list for SBGAST. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2013/2014] Project Name: Provision Of Detailed Engineering (Phase 1) And Front End Engineering Design (Feed)(Phase 2) For Baram Delta Gas Gathering-2 (Bardegg-2) And Baronia Enhanced Oil Recovery (Eor) Develoment Project Scope of Work: o Developed as built Process Drawings (P&ID) based on Brownfield modifications proposed. o Performed Hysys Simulation for overall system with the group team. o Developed the line sizing calculation for the process lines (Gas, Liquid, and Aqueous). o Developed site visit check list and performed site visit at Baronia Complex-A. o Developed and finalized the site visit report based on Baronia Complex-A site visit findings. o Developed and finalized the line list of BARDEGG project. • Client’s Name: INSTEP (Institut Teknologi Petroleum Petronas) [2012/2013] Project Name: Engineering, Procurement, Construction and Commissioning (EPCC) of Upstream and Downstream Theme Park Scope of Work: o To prepare pressure safety valve (PSV) sizing and PSV data sheet. o To input the process data into the control valve datasheet. o Prepared the line sizing calculation for the process lines (Gas, Liquid, and Aqueous). o Prepared the Cause and Effect Matrix. • Client’s Name: Petronas Carigali Sdn. Bhd. (PCSB) [2012] Project Name: Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) for Bekok-C Restoration project Scope of Work: o Involved in updating of Process Drawings (P&ID) based on modifications proposed.
  • 6. Mohd Nor Firdaus Bin Mohd Salleh Process Engineer mnfirdaus@yahoo.com [019 664 9323] Page 6 of 9 o Reviewed the compressor vendor data for modification of Piping and Instrumentation Diagram (P&ID). o Prepared and updated the line list of Bekok-C Restoration project. • Client’s Name: Petronas Carigali Sdn. Bhd. – Sabah Operation (SBO) [2011/2012] Project Name: Provision of Detailed Design For Samarang Pipeline PL112 Rehabilitation Project. Scope of Work: o Prepared the site visit check list and performed site visit at Samarang SMJT-D and SMJT-C. o Prepare the site visit report based on Samarang SMJT-D and SMJT-C site visit findings. o Prepared the pipeline simulation (PIPESIM) for RTP Insertion in PL-112 based on the various options and prepared report for data comparison. • Client’s Name: Carigali Hess [2011/2012] Project Name: Vapor Recovery System Modification Scope of Work: o Prepared the site visit check list and performed site visit at Cakerawala Processing Platform (CKP). o Prepare the site visit report based on Cakerawala Processing Platform (CKP) site visit finding. o Performed the feasibility study for Vapor Recovery Modification to provide options on enhancing the vapor recovery. o Prepared the Process Drawings (P&ID) based on the options proposed. o Performed Gas Scrubber sizing calculation based on the options proposed. • Client’s Name: Petrofac Malaysian Limited (PML) [2011/2012] Project Name: Refurbishment, Life Extension and Upgrading of the West Desaru MOPU Scope of Work: o Produced and updated the process drawing (P&ID) for Water Injection System. o Performed instrument sizing and datasheet (PSV and control valve). • Client’s Name: Petronas Carigali Sdn. Bhd. [2011] Project Name: Provision of Basis Engineering Design services for Bekok-B Infill Scope of Work: o Performed site visit at Bekok-B platform. o Prepared site visit report based on Bekok-B site visit findings. • Client’s Name: Petroleum Investigation Research & Engineering Co. (PIRE Co)/ [2010/2012] PARS Oil and Gas Company (POGC) Project Name: Provision of Basis Design, Front End Engineering Design (FEED) and Detailed Design Services for South Pars Gas Development Phases 22, 23 &24. Scope of Work:
  • 7. Mohd Nor Firdaus Bin Mohd Salleh Process Engineer mnfirdaus@yahoo.com [019 664 9323] Page 7 of 9 o Prepared the equipment and instrument calculation and data sheets for Chemical Injection System (Methanol, Demulsifier, Reverse Demulsifier, Antifoam and Corrosion Inhibitor). o Reviewed various vendor data equipments with the inhouse process datahseet. o Updated the process drawing (P&ID) and process datasheets based on the vendor data information. o Updated the Operation Manual (OPM) based on the vendor data information received. o Compiled the Calculation Book for submission. P R E V I O U S P L A C E M E N T Kuala Lumpur Valve & Fitting (M) Sdn. Bhd. [December 2010 – March 2011] (SWAGELOK) Position: Application Engineer Work description/Task assigned: • To increase sales for all Swagelok products and to achieve maximum sales volume from all customers in assigned area. • To develop good relations with new and existing customers to accelerate and increas the sales of Swagelok products. • To understand the range of Swagelok products to ensure efficient and good quality services provided to the customers. RWNA ENGINEERING SDN. BHD [April 2009 – November 2010] Position: Project Coordinator Work description/Task assigned: Projects Involved: • BraderoShaw/ Petronas – Anode Installation Kumang Cluster Development Project. • PPSC/ Shell Oil & Gas – Gumusut Kakap Deep Water Shallow line (3 Coat Syatem). • BraderoShaw/ Nippon Steel Eng. Co. Ltd. – PTTEP Bongkot Field Development Project Phase 3H & 4A. (Anode Installation) • BraderoShaw/ Sarawak Shell Berhad – F28 Gas Development Project.(Anode Installation) • BraderoShaw/ Sarawak Shell Berhad (SSB) – St. Joseph Re-development. (Anode Installation) • BraderoShaw/ Petronas Carigali Sdn. Bhd. – Samarang Pipieline Development (PL111, PL113, PL125 & PL139) (Anode Installation) • BraderoShaw/ Exxonmobil Exploration & Production Malaysia Inc. (EMEPMI) – Guntong B – Guntong A.(Anode Installation) • BraderoShaw/ Sabah Shell Petroleum Company (SSPC) – Gumusut Oil Export Pipeline Project. (Anode Installation, Pin Brazing & Solid Polyurethane Application) • CUEL Limited/ MITA – Special Pipeline South West Gas II Project. (Anode Installation) • BrederoShaw/ AGIP – Kashagan Field Development Experimental Project. (anode Installation & Pin Brazing)
  • 8. Mohd Nor Firdaus Bin Mohd Salleh Process Engineer mnfirdaus@yahoo.com [019 664 9323] Page 8 of 9 • BraderoShaw/ Shell Oil & Gas – Cilipadi & Selasih Pipeline and Bend Project (Solid Polyurethane Application) • BrederoShaw/ Brunei Shell Berhad – Selangkir Iron Duke (SKID) Project.(Anode Installation) • CUEL Limited – Arthik 1C Project. (Anode Installation) • BraderoShaw/ Nippon Steel Eng. Co. Ltd. – PTTEP Bongkot Field Development Project Phase 3H & 4A. (Solid Polyurethane Application) • BrederoShaw/ COLT – CPOC 18” MDD Pipelines Project. (Anode Installation) • BrederoShaw/ EMEPMI – Seligi & Semangkok 12” CRA Pipelines Project (Anode Installation and Tack Welding on Double Jointing pipeline) • BrederoShaw/ Mitsui Co. Ltd – PNG LNG Project Scope of Work: • Report to the Operation Director and Project Manager regarding all the issue arised and daily work execution. • Liaised with client’s representatives periodically to identify/secure future jobs. • Prepared the Project Estimation Plan for Project Manager approval and submission to client. • Prepared the Quotation/ Tender submission to client. • Coordinated project scheduling with client’s representative. • Coordinated Welding Procedure Specification (WPS) and Welder Qualification. • Team as coordinator and work with the supervisor, to coordinate/recruit qualified manpower inclusive of welders, fitters and helpers. • Monitor and control project progress to meet the project schedule. • Assisted the HSE manager in audit the work area/ space to meet the requirement and standard. • Assisted the QA/HSE Manager in preparation of: o Project Procedure/ Work instruction. o Inspection and Test Plan. o Welding Procedure Specification. rnz integrated (m) sdn. Bhd. [Jun 2008 – November 2008] Position: Internship Trainee Project Involved: • Provision of Conceptual, Front End Engineering Design (FEED) and Detailed Design Services for Kinabalu Non Associated Gas (NAG) Project for PETRONAS Carigali Sdn Bhd (PCSB) (KNJT-C) & (KNPG-B) Scope of Work: • Prepared the instrument and equipment datasheets. • Reviewed the past documents for understanding of how the equipments are sized. • Assist engineer in mark-up of the documents related to the project (datasheets, drawing-P&ID, PFDs.etc) • Checked the line list and the line continuities in the P&IDs. Area of Development:
  • 9. Mohd Nor Firdaus Bin Mohd Salleh Process Engineer mnfirdaus@yahoo.com [019 664 9323] Page 9 of 9 • To become a professional engineer that is able to utilize my skills and promote growth for mastery of both theoretical orientation and practical solutions with professional commitment in the business environment of my prospective workplace. E D U C A T I O N B A C K G R O U N D A D D I T I O N A L I N F O R M A T I O N Willing to Travel : Yes Willing to Relocate : Yes Possess Own Transport : Yes Availability : Immediate R E F E R E N C E S Name : Ir. Fairus Bin Ramli Current Position: Senior Process Engineer Company Address: Petrofac - RNZ Level 17 Menara Great Eastern, 303 Jalan Ampang, 50450 Kuala Lumpur Office No.: 03-42642600 Name : Mohammad Sofi Bin Nurdin Current Position: Process Senior Engineer I Company Address: Petrofac - RNZ Level 11, Wisma Great Eastern, No.65 Jalan Gaya, 88000 Kota Kinabalu, Sabah Office No.: 088-230715 Highest Education Name Of University: Universiti Malaysia Pahang Location: Gambang, Kuantan, Pahang Level: Bachelor of Chemical Engineering (Hons.) Education Field: Chemical Engineering Major: Gas Technology Graduation Date: Jan-2009 Cumulative GPA: 3.12 Second Highest Education Name Of College: Kolej Matrikulasi Pahang Location: Gambang, Kuantan, Pahang Level: Certificate Education Field: Physical Science Graduation Date: 2003 Cumulative GPA: 3.41 Sijil Pelajaran Malaysia Name Of School: Sekolah Menegah Kebangsaan Tanjung Gemok Course: Science Stream Result: Grade 1