CURRICULAM VITAE
Name : Ravi Kant
Present Employer : Mott MacDonald, Abu Dhabi, UAE
Present Employment Title : Sr. Engineer- Cost Estimation
Proposed Project Job Title : Suitable Position
Date of Birth : 05-06-1979
Nationality : Indian
Education Qualification/ Institution/
Year / % of marks:
:
M.Tech (Chemical) ,Institute of Technology-Banaras Hindu
University, Varanasi (India) / 2004 / 73%
:
B.Tech (Chemical) ,Institute of Engineering & Technology,
Lucknow(India) / 2001 / 76%
Email : ravikant12002@yahoo.co.in
Mob: :
+971 56 3843484,+971 2 6588208, +919457055488 ,
+918756309410 (India)
Current Address : 1501A, Sahara Apartment, Liwa Street, Abu Dhabi
Permanent Address : 2A/54, Awas Vikas, Farrukhabad, U.P. (India)
PROFESSIONAL EXPERIENCE
Total Experience: 12 Years
FIELDS OF EXPERIENCE
 OFFSHORE : Cost Estimates, Cost Planning, Plant Economics for New Platforms,
Modification Works in existing Platforms for Various Clients like KGOC, Saudi Aramco,
ZADCO, ADMA OPCO etc.
 ONSHORE : Cost Estimates, Cost Planning, Plant Economics for Brownfield projects for
Various Clients like GASCO, KJO, QP, BOROUGE etc.
 DOWNSTREAM: Cost Estimates, Cost Control, Cost Planning for Grass root Refineries,
Brownfield Projects for various client like ORPIC, KNPC,HPCL, IOCL, BPCL, BORL,
KRPL, HMEL etc.
 PIPELINES : GASCO, QP, ADOC, HPCL
 CAPTIVE POWER PLANTS
 UTILITIES & OFFSITES
NAME: RAVI KANT Pg. 1 of 7
CURRICULAM VITAE
WORK HISTORY
Mott MacDonald, Abu Dhabi : May 2014 To Present
Oil, Gas and Petrochemicals Unit, Abu Dhabi
Job Title : Sr. Engineer- Cost Estimation, Projects Control
RESPONSIBLITIES:
 Preparation of Cost Estimation Methodologies and Guidelines.
 Engineering, Procurement, Construction & Commissioning Cost estimate Preparation for
multi discipline like Mechanical Equipment, Piping Items, Pipeline, Electrical,
Instrumentation, Civil & Structural Works, Building / Architectural Works, Telecom, HVAC,
HSE & Other Misc. items.
 Plan, organize, prioritize, control, and execute the estimating effort in accordance with
company policies and procedures in a business-like, efficient, productive and organized
manner.
 Compilation of material take- off / Bill of Quantities based on drawings, data- sheets, P&ID,
basic design, standards etc.
 Prepare estimates for the assessment of change both in terms of cost and resources.
 Prepare cost estimates in verification of Contractor's estimates
 Verification of Contract Trend Notice (CTN) submitted by EPC contractor.
 Preparation of Scope of work for Tenders.
 Contingency Risk Calculation based on Monte Carlo Simulation @Risk Software.
 Life Cycle Cost Calculation for Equipment.
 Cost Monitoring and Control Activities.
 Validate Cost Estimates prepared by other Consultants
 Feasibility Studies including carrying out NPV / IRR, Financial Analysis
 Carrying out all cost related activities such as Conceptual, Preliminary, Study, Feed and
Definitive Estimates at various stages of the Project
 Licensor’s Evaluation, Value engineering Calculation for New Projects
 Preparation of in house software, training programmes and cost data base for various
equipment, bulk materials, erection works etc.
 Review scope of work, project specifications and other contract documents & prepare cost
estimate as per Scope of Work.
 Estimate of resources like man-hours, equipment, tools, consumables etc.
NAME: RAVI KANT Pg. 2 of 7
CURRICULAM VITAE
 Liaise with procurement department for the material/equipment/sub contract prices
Projects Handled:
 Preparation of Class 3 (±15% Accuracy) EPC Cost Estimate for Expansion Project EPC-1 &
EPC-2 at Mubarraz Island & AR Site, UAE. Client: Abu Dhabi Oil Company (ADOC),
Japan.
 Conceptual Study & EPC Cost Estimate for Replacement of offshore pedestal cranes at CC,
ACPT-1 & 2, NSP, SSP and WSP Platform. Client: ZADCO
 RE-FEED for upgrade of Power Generation System at Umm Al-Dalkh-CPC Offshore
Platform. (Class 3, EPC Cost Estimate,±15% Accuracy) Client: ZADCO.
 Contract Trend Notice (CTN) Review for Power Generation Units Retirement Project of
ASAB & Buhasa area. Client: GASCO, EPC Contractor: ETA.
 FEED Cost Estimation for Taweelah Gas Compression Station. (Class 3, EPC Cost Estimate,
±15% Accuracy) Client: GASCO
 FEED Estimation for construction of Desalination Plant MED Units – M102 G1&2 for Al-
Khafji Project. (Class 3, EPC Cost Estimate,±15% Accuracy) Client: KJO (Joint Venture of
Kuwait Gulf Oil Company & Saudi Aramco)
 CAPEX & OPEX Calculation for Feasibility & Concept Optimization for Phase 1 & Phase 2
for Dukhan Production Facilities upgrade of Produced Water System, Compressor Station,
Degassing System & Lift Gas Facilities. (Class 4, EPC Cost Estimate,±40% & 25%
Accuracy) Client: Qatar Petroleum.
 FEED Estimation & Life Cycle Cost Analysis for Gas Turbine Replacement Project Phase-I,
ASAB & BUHASA Area. Client: GASCO
 FEED Estimation for installation of two new offshore Platform IWJ8 & IWJ9 for Al-Khafji
Joint Operation. Client: KJO (Joint Venture of Kuwait Gulf Oil Company & Saudi Aramco)
 Feed for Installation of 17 Nos. of New Risers in the existing Offshore Platform of Y1B &
Y2B, KHAFJI, Saudi Arabia. Client: KJO (Joint Venture of Kuwait Gulf Oil Company &
Saudi Aramco).
 FEED for Upgrade of Power Generation System at UMM AL-DALKH-CPC. Client: ZADCO
 FEED for Desalinated Water Distribution Network & Extension of Sea Water Fire Water
Back up Network for Downstream Industries in RLIC. Client: Qatar Petroleum.
 Concept Study for Elevation of Flow Line 200 M Adjacent to Station Battery Limits for
ASAB, Bu-Hasa & BAB Area. Client : Abu Dhabi company for Onshore Operation (ADCO)
 FEED Estimation for Installation of Coriolis Wet Gas Flow Meter- Client: Qatar Petroleum.
NAME: RAVI KANT Pg. 3 of 7
CURRICULAM VITAE
 FEED Estimation for 30 Nos. Oil Well Gas Lift Station, Buhasa Phase 1 – Client : Abu Dhabi
company for Onshore Operation (ADCO)
 FEED Estimation for installation of Spheres in Borouge Petrochemical Complex, Ruwais -
Client: BOROUGE
PREVIOUS WORK HISTORY
Kuwait National Petroleum Company, Kuwait: April 2013 To May 2014
Job Title : Engineer-Costing, Project Department
RESPONSIBLITIES:
 Prepare / review cost estimates of project (study / capital) proposals.
 Validate Cost Estimates prepared by other Consultants.
 Preparation of Budget for New Projects.
 Preparation of Monthly Status Report for all Ongoing Projects.
 Negotiation with Vendors / Contractors, Mentoring sub-ordinates
 Preparation of Project Executive Summary Report (Planning Report), Environmental Report
for Ongoing Projects on monthly basis with the help of Site Engineers of Co-ordination
Groups.
 Prepare and submit study budget (financial requirements) for study projects and capital carry-
over & additional carry over budgets for capital projects to Corporate Planning / Finance
Department respectively, based on the inputs from project coordination groups, for handled
by Projects Departments.
 Prepare and provide cost details such as cost breakdown and phasing of expenditure for
preparation of study / capital budget and performing activities required for approval of
budget.
 Coordinate with Finance Department for Job Number, approval of Appropriation for
Expenditure (AFE) and release of funds from study budget.
 Inform concerned project coordination groups regarding approval of study projects / capital
projects, funds and action required by them.
 Provide input to concerned Senior Engineer, Costing on various costing related issues.
 Monitor and control the cost of projects from approval stage until their completion. Analyze
the reasons for cost over-run / under-run and suggest possible remedial actions.
 Prepare cost monitoring report for each quarter and issue to the management, based on actual
expenditure and commitment from Oracle Project Accounting system and inputs from project
NAME: RAVI KANT Pg. 4 of 7
CURRICULAM VITAE
coordination groups. Coordinate with Corporate Planning for approval of Supplementary /
Contingency budgets.
 Prepare and submit forecast for “Capex spent locally” to Corporate Planning, based on Five
Year Plan provided by them.
 Prepare and submit forecast for “Depreciation” to Finance Department, for projects expected
to complete in next five years based on input from coordination groups.
 Maintain in-house cost data based on latest awarded purchase orders and contracts.
 Coordinate with Refinery for projects funded from Hazop budget.
 Review and process loaned personnel invoices to Accounts for payment.
 Maintain latest cost data for KNPC & Secondment manpower man-hour rates
Engineers India Limited, New Delhi : May 2008 To March 2013
Refineries, Oil and Gas processing, Captive Power Plants, Utilities and offsite
Job Title : Sr. Cost Engineer , Project Services
Worked as a Sr. Cost Engineer in New Delhi office and was responsible for carrying out all cost
related activities such as conceptual, preliminary, study, feed and definitive estimates at various stages
of the Project, preparation of Estimation Methodologies and Guidelines, Cost Monitoring and Control
Activities, Licensor’s Evaluation, Variation Estimates, Feasibility Studies including carrying out
Financial Analysis, Risk Analysis, Sensitivity Analysis etc. Validate cost estimate prepared by other
consultants, negotiation with the Vendors / Contractors, Preparing Budget, Report, Mentoring
Subordinates etc.
Major jobs handled are as under:
 Preparation of Pre-Feasibility Report (PFR) & Detail Feasibility Report (DFR) of various
alternatives for Rajasthan Refinery Project. Client: Hindustan Petroleum Corporation
Company, India.
 Preparation of Pre-Feasibility Report (PFR) & Detail Feasibility Report (DFR) of various
alternatives for Maharastra Refinery Project. Client: Hindustan Petroleum Corporation
Company, India.
 Project Cost Estimate for Equipment, Bulk materials, Tenders for Guru Govind Singh
Refinery Project, Bhatinda. Client: HPCL Mittal Energy Limited, India
 Licensor Evaluation for Once through Hydrocracker (OHCU), Solvent De-asphalting unit
(SDA) & Sulphur Recovery Unit (SRU) in Sohar Refinery Petrochemical Complex. Client:
Oman Refineries & Petrochemical Complex, Oman
 Licensor Evaluation for Mild Hydrocracker (MHCU) for HPCL Vizag Refinery.
NAME: RAVI KANT Pg. 5 of 7
CURRICULAM VITAE
 Licensor Evaluation for Catalytic Reforming Unit (CCR), Diesel Hydrotreater Unit (DHDT),
Hydrocracker Unit (HCU), Hydrogen Generation Unit (HGU), Isomerisation Unit (ISOM) &
Sulfur Recovery Unit with TGTU in Kenya Refinery & Petrochemical Complex. Client:
Kenya Refineries & Petrochemical Limited, Mombassa, Kenya.
 Project Cost Estimate for Equipment, Bulk materials, Tenders for Numaligarh Refinery Wax
Project, Assam. Client: Indian Oil Corporation Limited, India
 Preparation of Pre Feasibility Report (PFR) of various alternatives for Rajasthan Refinery
Project. Client: Oil & Natural Gas Corporation Limited, India.
 Project Cost Estimate for Equipment, Bulk materials, Tenders for Panipat Refinery Additional
Expansion Project, Panipat . Client: Indian Oil Corporation Limited, India
JUBILANT ORGANOSYS LTD. GAJRAULA (INDIA) & others: Nov. 2004 TO April 2008
Chemicals / Fine chemicals/Pharmaceuticals
Job Title : Project Engineer Period : 42 Months
Project phase : Project Engineer
Process Calculation, PFD, UFD, Line Sizing, CAPEX, OPEX calculation, Checking of Billing
Breakup, Extra claim, Preparation of commitment status report etc.
EXPECTED SALARY: As Per Company Standards.
LOCATION : Anywhere
NOTICE PERIOD : 1 Month
COMPUTER SKILLS:
MAXIMO, ORACLE (ERP System), CONTINGENCY RISK ANALYSIS @RISK 6, ASPEN
CAPITAL COST ESTIMATOR (ACCE), SAP, PMIS, DIMS, BAAN (ERP System), MS Project, MS
WORLD, MS EXCEL, POWER POINT, PRIMAVERA.
PERSONAL INFORMATION:
• FATHER’S NAME : SHRI SRIKRISHAN MAURYA
• DATE OF BIRTH : JUNE 5, 1979.
• PLACE OF BIRTH : FARRUKHABAD, INDIA.
NAME: RAVI KANT Pg. 6 of 7
CURRICULAM VITAE
• NATIONALITY : INDIAN
• LANGUAGES KNOWN : HINDI, ENGLISH.
• HOBBIES : READING, LISTENING MUSIC
• MARTIAL STATUS : MARRIED
• NO. OF CHILDREN : 2
• PASSPORT NO. : H4007768
DATE:
PLACE: (RAVI KANT)
NAME: RAVI KANT Pg. 7 of 7

CV_Cost Engineer

  • 1.
    CURRICULAM VITAE Name :Ravi Kant Present Employer : Mott MacDonald, Abu Dhabi, UAE Present Employment Title : Sr. Engineer- Cost Estimation Proposed Project Job Title : Suitable Position Date of Birth : 05-06-1979 Nationality : Indian Education Qualification/ Institution/ Year / % of marks: : M.Tech (Chemical) ,Institute of Technology-Banaras Hindu University, Varanasi (India) / 2004 / 73% : B.Tech (Chemical) ,Institute of Engineering & Technology, Lucknow(India) / 2001 / 76% Email : ravikant12002@yahoo.co.in Mob: : +971 56 3843484,+971 2 6588208, +919457055488 , +918756309410 (India) Current Address : 1501A, Sahara Apartment, Liwa Street, Abu Dhabi Permanent Address : 2A/54, Awas Vikas, Farrukhabad, U.P. (India) PROFESSIONAL EXPERIENCE Total Experience: 12 Years FIELDS OF EXPERIENCE  OFFSHORE : Cost Estimates, Cost Planning, Plant Economics for New Platforms, Modification Works in existing Platforms for Various Clients like KGOC, Saudi Aramco, ZADCO, ADMA OPCO etc.  ONSHORE : Cost Estimates, Cost Planning, Plant Economics for Brownfield projects for Various Clients like GASCO, KJO, QP, BOROUGE etc.  DOWNSTREAM: Cost Estimates, Cost Control, Cost Planning for Grass root Refineries, Brownfield Projects for various client like ORPIC, KNPC,HPCL, IOCL, BPCL, BORL, KRPL, HMEL etc.  PIPELINES : GASCO, QP, ADOC, HPCL  CAPTIVE POWER PLANTS  UTILITIES & OFFSITES NAME: RAVI KANT Pg. 1 of 7
  • 2.
    CURRICULAM VITAE WORK HISTORY MottMacDonald, Abu Dhabi : May 2014 To Present Oil, Gas and Petrochemicals Unit, Abu Dhabi Job Title : Sr. Engineer- Cost Estimation, Projects Control RESPONSIBLITIES:  Preparation of Cost Estimation Methodologies and Guidelines.  Engineering, Procurement, Construction & Commissioning Cost estimate Preparation for multi discipline like Mechanical Equipment, Piping Items, Pipeline, Electrical, Instrumentation, Civil & Structural Works, Building / Architectural Works, Telecom, HVAC, HSE & Other Misc. items.  Plan, organize, prioritize, control, and execute the estimating effort in accordance with company policies and procedures in a business-like, efficient, productive and organized manner.  Compilation of material take- off / Bill of Quantities based on drawings, data- sheets, P&ID, basic design, standards etc.  Prepare estimates for the assessment of change both in terms of cost and resources.  Prepare cost estimates in verification of Contractor's estimates  Verification of Contract Trend Notice (CTN) submitted by EPC contractor.  Preparation of Scope of work for Tenders.  Contingency Risk Calculation based on Monte Carlo Simulation @Risk Software.  Life Cycle Cost Calculation for Equipment.  Cost Monitoring and Control Activities.  Validate Cost Estimates prepared by other Consultants  Feasibility Studies including carrying out NPV / IRR, Financial Analysis  Carrying out all cost related activities such as Conceptual, Preliminary, Study, Feed and Definitive Estimates at various stages of the Project  Licensor’s Evaluation, Value engineering Calculation for New Projects  Preparation of in house software, training programmes and cost data base for various equipment, bulk materials, erection works etc.  Review scope of work, project specifications and other contract documents & prepare cost estimate as per Scope of Work.  Estimate of resources like man-hours, equipment, tools, consumables etc. NAME: RAVI KANT Pg. 2 of 7
  • 3.
    CURRICULAM VITAE  Liaisewith procurement department for the material/equipment/sub contract prices Projects Handled:  Preparation of Class 3 (±15% Accuracy) EPC Cost Estimate for Expansion Project EPC-1 & EPC-2 at Mubarraz Island & AR Site, UAE. Client: Abu Dhabi Oil Company (ADOC), Japan.  Conceptual Study & EPC Cost Estimate for Replacement of offshore pedestal cranes at CC, ACPT-1 & 2, NSP, SSP and WSP Platform. Client: ZADCO  RE-FEED for upgrade of Power Generation System at Umm Al-Dalkh-CPC Offshore Platform. (Class 3, EPC Cost Estimate,±15% Accuracy) Client: ZADCO.  Contract Trend Notice (CTN) Review for Power Generation Units Retirement Project of ASAB & Buhasa area. Client: GASCO, EPC Contractor: ETA.  FEED Cost Estimation for Taweelah Gas Compression Station. (Class 3, EPC Cost Estimate, ±15% Accuracy) Client: GASCO  FEED Estimation for construction of Desalination Plant MED Units – M102 G1&2 for Al- Khafji Project. (Class 3, EPC Cost Estimate,±15% Accuracy) Client: KJO (Joint Venture of Kuwait Gulf Oil Company & Saudi Aramco)  CAPEX & OPEX Calculation for Feasibility & Concept Optimization for Phase 1 & Phase 2 for Dukhan Production Facilities upgrade of Produced Water System, Compressor Station, Degassing System & Lift Gas Facilities. (Class 4, EPC Cost Estimate,±40% & 25% Accuracy) Client: Qatar Petroleum.  FEED Estimation & Life Cycle Cost Analysis for Gas Turbine Replacement Project Phase-I, ASAB & BUHASA Area. Client: GASCO  FEED Estimation for installation of two new offshore Platform IWJ8 & IWJ9 for Al-Khafji Joint Operation. Client: KJO (Joint Venture of Kuwait Gulf Oil Company & Saudi Aramco)  Feed for Installation of 17 Nos. of New Risers in the existing Offshore Platform of Y1B & Y2B, KHAFJI, Saudi Arabia. Client: KJO (Joint Venture of Kuwait Gulf Oil Company & Saudi Aramco).  FEED for Upgrade of Power Generation System at UMM AL-DALKH-CPC. Client: ZADCO  FEED for Desalinated Water Distribution Network & Extension of Sea Water Fire Water Back up Network for Downstream Industries in RLIC. Client: Qatar Petroleum.  Concept Study for Elevation of Flow Line 200 M Adjacent to Station Battery Limits for ASAB, Bu-Hasa & BAB Area. Client : Abu Dhabi company for Onshore Operation (ADCO)  FEED Estimation for Installation of Coriolis Wet Gas Flow Meter- Client: Qatar Petroleum. NAME: RAVI KANT Pg. 3 of 7
  • 4.
    CURRICULAM VITAE  FEEDEstimation for 30 Nos. Oil Well Gas Lift Station, Buhasa Phase 1 – Client : Abu Dhabi company for Onshore Operation (ADCO)  FEED Estimation for installation of Spheres in Borouge Petrochemical Complex, Ruwais - Client: BOROUGE PREVIOUS WORK HISTORY Kuwait National Petroleum Company, Kuwait: April 2013 To May 2014 Job Title : Engineer-Costing, Project Department RESPONSIBLITIES:  Prepare / review cost estimates of project (study / capital) proposals.  Validate Cost Estimates prepared by other Consultants.  Preparation of Budget for New Projects.  Preparation of Monthly Status Report for all Ongoing Projects.  Negotiation with Vendors / Contractors, Mentoring sub-ordinates  Preparation of Project Executive Summary Report (Planning Report), Environmental Report for Ongoing Projects on monthly basis with the help of Site Engineers of Co-ordination Groups.  Prepare and submit study budget (financial requirements) for study projects and capital carry- over & additional carry over budgets for capital projects to Corporate Planning / Finance Department respectively, based on the inputs from project coordination groups, for handled by Projects Departments.  Prepare and provide cost details such as cost breakdown and phasing of expenditure for preparation of study / capital budget and performing activities required for approval of budget.  Coordinate with Finance Department for Job Number, approval of Appropriation for Expenditure (AFE) and release of funds from study budget.  Inform concerned project coordination groups regarding approval of study projects / capital projects, funds and action required by them.  Provide input to concerned Senior Engineer, Costing on various costing related issues.  Monitor and control the cost of projects from approval stage until their completion. Analyze the reasons for cost over-run / under-run and suggest possible remedial actions.  Prepare cost monitoring report for each quarter and issue to the management, based on actual expenditure and commitment from Oracle Project Accounting system and inputs from project NAME: RAVI KANT Pg. 4 of 7
  • 5.
    CURRICULAM VITAE coordination groups.Coordinate with Corporate Planning for approval of Supplementary / Contingency budgets.  Prepare and submit forecast for “Capex spent locally” to Corporate Planning, based on Five Year Plan provided by them.  Prepare and submit forecast for “Depreciation” to Finance Department, for projects expected to complete in next five years based on input from coordination groups.  Maintain in-house cost data based on latest awarded purchase orders and contracts.  Coordinate with Refinery for projects funded from Hazop budget.  Review and process loaned personnel invoices to Accounts for payment.  Maintain latest cost data for KNPC & Secondment manpower man-hour rates Engineers India Limited, New Delhi : May 2008 To March 2013 Refineries, Oil and Gas processing, Captive Power Plants, Utilities and offsite Job Title : Sr. Cost Engineer , Project Services Worked as a Sr. Cost Engineer in New Delhi office and was responsible for carrying out all cost related activities such as conceptual, preliminary, study, feed and definitive estimates at various stages of the Project, preparation of Estimation Methodologies and Guidelines, Cost Monitoring and Control Activities, Licensor’s Evaluation, Variation Estimates, Feasibility Studies including carrying out Financial Analysis, Risk Analysis, Sensitivity Analysis etc. Validate cost estimate prepared by other consultants, negotiation with the Vendors / Contractors, Preparing Budget, Report, Mentoring Subordinates etc. Major jobs handled are as under:  Preparation of Pre-Feasibility Report (PFR) & Detail Feasibility Report (DFR) of various alternatives for Rajasthan Refinery Project. Client: Hindustan Petroleum Corporation Company, India.  Preparation of Pre-Feasibility Report (PFR) & Detail Feasibility Report (DFR) of various alternatives for Maharastra Refinery Project. Client: Hindustan Petroleum Corporation Company, India.  Project Cost Estimate for Equipment, Bulk materials, Tenders for Guru Govind Singh Refinery Project, Bhatinda. Client: HPCL Mittal Energy Limited, India  Licensor Evaluation for Once through Hydrocracker (OHCU), Solvent De-asphalting unit (SDA) & Sulphur Recovery Unit (SRU) in Sohar Refinery Petrochemical Complex. Client: Oman Refineries & Petrochemical Complex, Oman  Licensor Evaluation for Mild Hydrocracker (MHCU) for HPCL Vizag Refinery. NAME: RAVI KANT Pg. 5 of 7
  • 6.
    CURRICULAM VITAE  LicensorEvaluation for Catalytic Reforming Unit (CCR), Diesel Hydrotreater Unit (DHDT), Hydrocracker Unit (HCU), Hydrogen Generation Unit (HGU), Isomerisation Unit (ISOM) & Sulfur Recovery Unit with TGTU in Kenya Refinery & Petrochemical Complex. Client: Kenya Refineries & Petrochemical Limited, Mombassa, Kenya.  Project Cost Estimate for Equipment, Bulk materials, Tenders for Numaligarh Refinery Wax Project, Assam. Client: Indian Oil Corporation Limited, India  Preparation of Pre Feasibility Report (PFR) of various alternatives for Rajasthan Refinery Project. Client: Oil & Natural Gas Corporation Limited, India.  Project Cost Estimate for Equipment, Bulk materials, Tenders for Panipat Refinery Additional Expansion Project, Panipat . Client: Indian Oil Corporation Limited, India JUBILANT ORGANOSYS LTD. GAJRAULA (INDIA) & others: Nov. 2004 TO April 2008 Chemicals / Fine chemicals/Pharmaceuticals Job Title : Project Engineer Period : 42 Months Project phase : Project Engineer Process Calculation, PFD, UFD, Line Sizing, CAPEX, OPEX calculation, Checking of Billing Breakup, Extra claim, Preparation of commitment status report etc. EXPECTED SALARY: As Per Company Standards. LOCATION : Anywhere NOTICE PERIOD : 1 Month COMPUTER SKILLS: MAXIMO, ORACLE (ERP System), CONTINGENCY RISK ANALYSIS @RISK 6, ASPEN CAPITAL COST ESTIMATOR (ACCE), SAP, PMIS, DIMS, BAAN (ERP System), MS Project, MS WORLD, MS EXCEL, POWER POINT, PRIMAVERA. PERSONAL INFORMATION: • FATHER’S NAME : SHRI SRIKRISHAN MAURYA • DATE OF BIRTH : JUNE 5, 1979. • PLACE OF BIRTH : FARRUKHABAD, INDIA. NAME: RAVI KANT Pg. 6 of 7
  • 7.
    CURRICULAM VITAE • NATIONALITY: INDIAN • LANGUAGES KNOWN : HINDI, ENGLISH. • HOBBIES : READING, LISTENING MUSIC • MARTIAL STATUS : MARRIED • NO. OF CHILDREN : 2 • PASSPORT NO. : H4007768 DATE: PLACE: (RAVI KANT) NAME: RAVI KANT Pg. 7 of 7