PROFILE
Around six years of experience in Project Planning; from development to delivery
encompassing initiation, planning, execution, monitoring, controlling and close-out phases
of project lifecycle, overall inter-discipline co-ordination & administration and resource
planning in Oil & Gas and Energy sector.
Key clients served in my tenure include;
• Fatima Energy Limited- EPCC of 120 MW coal based power plant (Client’s side; on-
going)
• MOL Pakistan (EPCC Project)
• Pakistan Petroleum Limited (EPCC Project)
• Mari Gas Company Limited (Supply of TPS)
• Saipem (for S. Aramco on Manifa project)
• Technip (for SATORP on Jubail Export refinery project)
• Sadaf (SABIC subsidiary - Turnaround project)
• Petro Kemya (SABIC subsidiary - For fabrication of HE)
OBJECTIVE
To advance career in the field of Project Management while working in challenging
environment of a reputable and result oriented organization that seeks an ambitious and
career conscious person, where acquired skills and education will be utilized toward
continued growth and advancement.
EDUCATIONAL & PROFESSIONAL QUALIFICATIONS / TRAININGS
• BE Mechanical Engineering from GIKI
• Planning and Scheduling with Primavera Project Planner- P6 training
• SAP (PS module) training
• Training on Oil and gas processing systems
KEY SKILLS
• Project Planning, Monitoring & Tracking Progress
• Cost & Resource Loading
• Look ahead schedules, Critical Path Analysis, Variance Analysis
• PV, EV & AC Updating & Reporting
• SV, CV, SPI & CPI Analysis
• S-Curves development and monitoring
• Generating Risk & Cost Management Reports
• Extension of time claim preparation
EMPLOYMENT SUMMARY
 FATIMA ENERGY LIMITED
Duration : April 2015- till date
Designation : Planning Engineer
Serving as Planning Engineer and dealing with projects in energy sector. Dealing
with Engineering, Procurement, Construction and Commissioning phases of power
plant projects. On-going project in FEL include:
• EPC of Coal/Bagasse fired Power Plant of 120 MW (over $250 mil)
• Engineering and Construction of Housing colony for power plant
• EPC of Transmission line of 35km
Responsibilities:
• Review Contractor planning schedule for effective utilization of
time.
• Scheduling programs and updating on weekly and monthly basis.
• Preparing weekly and monthly progress reports including
demonstration of project progress through presentations to top
management.
• Updating and alerting project managers on delays and suggesting
ways to expedite progress and catch up delays.
• SV, SPI Analysis
• Making latest forecast plans on the basis of project reports
• Liaison with contractors & consultants for various issues at site
regarding work progress & for issues impacting activities on the
critical path.
 PRESSON DESCON INTERNATIONAL LIMITED (PDIL)
Duration : July 2012 – April 2015
Designation : Planning Engineer
Served as Planning Engineer and dealing with projects in Oil & Gas sector. Dealt
with Engineering, Procurement, Construction and Commissioning phases of Oil &
Gas projects. Projects during working with PDIL include;
• EPCC of Makori field development project for MOL (over $220 mil)
• EPCC of Adhi LPG and NGL recovery Plant III for PPL (over $105 mil)
• EPCC of Gambat South Gas processing facilities for PPL (over $150
mil)
• EPC and Supply of Three phase separator for MGCL
• EPC and Supply of Two phase separator for PPL
Responsibilities:
• Preparation of Baseline project plan at Proposal Submission Stage
• Review Sub Contractor planning schedule for effective utilization of
time & cost.
• Review and approve / comment on the Construction schedules as
submitted by the nominated Sub Contractor’s.
• Scheduling programs and updating on weekly and monthly basis.
• Preparing daily, weekly and monthly progress reports including
demonstration of project progress through presentations to both
client and the top management.
• Updating and alerting project managers on delays and suggesting
ways to expedite progress and catch up delays.
• Cost & Resource Loading
• PV, EV & AC Updating & Reporting
• SV, CV, SPI & CPI Analysis
• Evaluating & reporting schedule variances & delays to the
management and identifying the remedial action plans
• Making latest forecast plans on the basis of project reports
• Liaison with client & consultants for various issues at site regarding
work progress & for issues impacting activities on the critical path.
 UNILEVER PAKISTAN
Duration : November 2011-June 2012
Designation : Lead PMO-Planning Engineer
Served as lead PMO engineer for Unilever Pakistan. The short stint was on 3rd
party
consultant type, aimed to develop and manage Project Management Office (PMO)
for Unilever Pakistan.
Developed an Enterprise breakdown of Unilever Pakistan with a portfolio of each
factories of Unilever containing all projects plans, budgeted amounts and
expenditures and schedules.
 OLAYAN DESCON INDUSTRIAL COMPANY (ODICO-Saudi Arabia)
Duration : December 2009 – April 2011
Designation : Planning Engineer
Internally transferred to:
DESCON ENGINEERING LIMITED, LAHORE MANUFACTURING WORKS (Pakistan)
Duration : May 2011 – November 2011
Designation : Planning Engineer
Served as Planning Engineer in ODICO dealing with Oil & Gas Equipment Supplies
and onsite Erection to include Pressure Vessels, Heat Exchangers, Storage Tanks,
Hoppers. Major projects include;
• Design, Fabrication and Supply of Shell and Tube H.E. (55 no.) for
Saipem on Manifa AH Crude Program
• Design, Fabrication & Supply of Hoppers for Technip on Jubail
Export Refinery Project.
• Fabrication & Supply of Three Heat Exchanger Bundles for SABIC-
Sadaf on Annual Turnaround of 2010.
• Design, Fabrication and Supply of VCM Cooler for Petro Kemya
(SABIC)
• Fabrication & Supply of Heat Exchangers Project for Al-Bayroni
(SABIC)
• Fabrication & Supply of Ethane Super Heater for Jubail United
Petroleum Company
• Fabrication & Supply of Heat Exchangers Project for Ibn-Zahr
(SABIC)
• Fabrication & Supply of Heat Exchangers Project for OGDCL
Responsibilities:
Project Planning using project management softwares Primavera P3, P6 & Microsoft
Project (MSP)
• Monitoring and track actual progress, comparison to baseline and
reporting progress against schedule.
• Recommend the corrective action against the factors affecting the
progress.
• Analysis and reporting of productivity and progress trends using S-
curve.
• Cost control of all project heads using Earned Value Management
(EVM) Technique.
• Project Reporting & Correspondence (Both with Client as well as In-
House) on daily / fortnightly basis.
• Liaison with client & consultants for various issues at site regarding
work progress & for issues impacting activities on the critical path.
SOFTWARE SKILLS
• Primavera Project Planner P6 / P3
• MS Project 2006 / 2010
• MS Office Enterprise
INTERESTS / EXTRA CURRICULAR ACTIVITIES
• Swimming, badminton and cricket
• Travelling & Exploring New Sites / Locations
PERSONAL INFORMATION
 Name Hassan Ahmad Khawaja
 Date of Birth 18/10/1986
 Sex Male
 Marital Status Married
 Languages Known English, Urdu, Punjabi
 Nationality Pakistani
REFERENCES
REFERENCE 1
• Name Rauf Hameed
• Employer Presson Descon International Limited
• Designation Senior Engineer-Project Controls
• Phone +923004463279
REFERENCE 2
• Name Faraz Hussain Mirza
• Employer Fatima Energy Limited
• Designation Department Manager Project Planning and Controls
• Phone 00923008467494
• Employer Fatima Energy Limited
• Designation Department Manager Project Planning and Controls
• Phone 00923008467494

More Related Content

What's hot

Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerageKhalid Pervez
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - LatestPeter White
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul A'mal Mohd Hanafiah
 
Mahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CVMahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CVMahmoud Makram
 
Sarah Melendrez Resume Current
Sarah Melendrez Resume CurrentSarah Melendrez Resume Current
Sarah Melendrez Resume CurrentSarah Melendrez
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016Abi Joseph
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP Robert Romero
 
guptapranay20072016
guptapranay20072016guptapranay20072016
guptapranay20072016Pranay Gupta
 

What's hot (20)

KHURRAM ASHFAQ KHAN CV updated
KHURRAM ASHFAQ KHAN  CV updatedKHURRAM ASHFAQ KHAN  CV updated
KHURRAM ASHFAQ KHAN CV updated
 
Resume of Hariom
Resume of HariomResume of Hariom
Resume of Hariom
 
Project Controller
Project ControllerProject Controller
Project Controller
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
 
Maaden Exp.
Maaden Exp.Maaden Exp.
Maaden Exp.
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
 
CV at 2015 Aug
CV at 2015 AugCV at 2015 Aug
CV at 2015 Aug
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
 
Mahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CVMahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CV
 
DEE
DEEDEE
DEE
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
Peter White CV
Peter White CV Peter White CV
Peter White CV
 
Sarah Melendrez Resume Current
Sarah Melendrez Resume CurrentSarah Melendrez Resume Current
Sarah Melendrez Resume Current
 
Resume Acc
Resume AccResume Acc
Resume Acc
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
 
alaa soliman cv
alaa soliman cvalaa soliman cv
alaa soliman cv
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP
 
Final TEAM SLIDE PRESENTATION (1)
Final TEAM  SLIDE PRESENTATION (1)Final TEAM  SLIDE PRESENTATION (1)
Final TEAM SLIDE PRESENTATION (1)
 
guptapranay20072016
guptapranay20072016guptapranay20072016
guptapranay20072016
 

Similar to CV - Hassan-Planning

Similar to CV - Hassan-Planning (20)

CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
selva-cv
selva-cvselva-cv
selva-cv
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)
 
Topside
TopsideTopside
Topside
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Project Management Specialist
Project Management SpecialistProject Management Specialist
Project Management Specialist
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
CV-2015 Rev 0
CV-2015 Rev 0CV-2015 Rev 0
CV-2015 Rev 0
 
CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16
 
Mohammed vasil k.
Mohammed vasil k.Mohammed vasil k.
Mohammed vasil k.
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 

CV - Hassan-Planning

  • 1. HASSAN AHMAD KHAWAJA Planning Engineer (EPC- Power and Oil & Gas Sector) Jan Rubber Industries, Kot Kamboh, Bata Pur, G.T. Road Lahore, Pakistan : +92 300 8046 085 : hassan_khj@yahoo.com Skype: Hassan.ahmad.khawaja Linkedin: https://pk.linkedin.com/pub/hassan- khawaja/1b/477/96b PROFILE Around six years of experience in Project Planning; from development to delivery encompassing initiation, planning, execution, monitoring, controlling and close-out phases of project lifecycle, overall inter-discipline co-ordination & administration and resource planning in Oil & Gas and Energy sector. Key clients served in my tenure include; • Fatima Energy Limited- EPCC of 120 MW coal based power plant (Client’s side; on- going) • MOL Pakistan (EPCC Project) • Pakistan Petroleum Limited (EPCC Project) • Mari Gas Company Limited (Supply of TPS) • Saipem (for S. Aramco on Manifa project) • Technip (for SATORP on Jubail Export refinery project) • Sadaf (SABIC subsidiary - Turnaround project) • Petro Kemya (SABIC subsidiary - For fabrication of HE) OBJECTIVE To advance career in the field of Project Management while working in challenging environment of a reputable and result oriented organization that seeks an ambitious and career conscious person, where acquired skills and education will be utilized toward continued growth and advancement. EDUCATIONAL & PROFESSIONAL QUALIFICATIONS / TRAININGS • BE Mechanical Engineering from GIKI • Planning and Scheduling with Primavera Project Planner- P6 training • SAP (PS module) training • Training on Oil and gas processing systems KEY SKILLS • Project Planning, Monitoring & Tracking Progress • Cost & Resource Loading • Look ahead schedules, Critical Path Analysis, Variance Analysis • PV, EV & AC Updating & Reporting • SV, CV, SPI & CPI Analysis
  • 2. • S-Curves development and monitoring • Generating Risk & Cost Management Reports • Extension of time claim preparation EMPLOYMENT SUMMARY  FATIMA ENERGY LIMITED Duration : April 2015- till date Designation : Planning Engineer Serving as Planning Engineer and dealing with projects in energy sector. Dealing with Engineering, Procurement, Construction and Commissioning phases of power plant projects. On-going project in FEL include: • EPC of Coal/Bagasse fired Power Plant of 120 MW (over $250 mil) • Engineering and Construction of Housing colony for power plant • EPC of Transmission line of 35km Responsibilities: • Review Contractor planning schedule for effective utilization of time. • Scheduling programs and updating on weekly and monthly basis. • Preparing weekly and monthly progress reports including demonstration of project progress through presentations to top management. • Updating and alerting project managers on delays and suggesting ways to expedite progress and catch up delays. • SV, SPI Analysis • Making latest forecast plans on the basis of project reports • Liaison with contractors & consultants for various issues at site regarding work progress & for issues impacting activities on the critical path.  PRESSON DESCON INTERNATIONAL LIMITED (PDIL) Duration : July 2012 – April 2015 Designation : Planning Engineer Served as Planning Engineer and dealing with projects in Oil & Gas sector. Dealt with Engineering, Procurement, Construction and Commissioning phases of Oil & Gas projects. Projects during working with PDIL include; • EPCC of Makori field development project for MOL (over $220 mil) • EPCC of Adhi LPG and NGL recovery Plant III for PPL (over $105 mil) • EPCC of Gambat South Gas processing facilities for PPL (over $150 mil) • EPC and Supply of Three phase separator for MGCL • EPC and Supply of Two phase separator for PPL Responsibilities: • Preparation of Baseline project plan at Proposal Submission Stage • Review Sub Contractor planning schedule for effective utilization of time & cost.
  • 3. • Review and approve / comment on the Construction schedules as submitted by the nominated Sub Contractor’s. • Scheduling programs and updating on weekly and monthly basis. • Preparing daily, weekly and monthly progress reports including demonstration of project progress through presentations to both client and the top management. • Updating and alerting project managers on delays and suggesting ways to expedite progress and catch up delays. • Cost & Resource Loading • PV, EV & AC Updating & Reporting • SV, CV, SPI & CPI Analysis • Evaluating & reporting schedule variances & delays to the management and identifying the remedial action plans • Making latest forecast plans on the basis of project reports • Liaison with client & consultants for various issues at site regarding work progress & for issues impacting activities on the critical path.  UNILEVER PAKISTAN Duration : November 2011-June 2012 Designation : Lead PMO-Planning Engineer Served as lead PMO engineer for Unilever Pakistan. The short stint was on 3rd party consultant type, aimed to develop and manage Project Management Office (PMO) for Unilever Pakistan. Developed an Enterprise breakdown of Unilever Pakistan with a portfolio of each factories of Unilever containing all projects plans, budgeted amounts and expenditures and schedules.  OLAYAN DESCON INDUSTRIAL COMPANY (ODICO-Saudi Arabia) Duration : December 2009 – April 2011 Designation : Planning Engineer Internally transferred to: DESCON ENGINEERING LIMITED, LAHORE MANUFACTURING WORKS (Pakistan) Duration : May 2011 – November 2011 Designation : Planning Engineer Served as Planning Engineer in ODICO dealing with Oil & Gas Equipment Supplies and onsite Erection to include Pressure Vessels, Heat Exchangers, Storage Tanks, Hoppers. Major projects include; • Design, Fabrication and Supply of Shell and Tube H.E. (55 no.) for Saipem on Manifa AH Crude Program • Design, Fabrication & Supply of Hoppers for Technip on Jubail Export Refinery Project. • Fabrication & Supply of Three Heat Exchanger Bundles for SABIC- Sadaf on Annual Turnaround of 2010. • Design, Fabrication and Supply of VCM Cooler for Petro Kemya (SABIC) • Fabrication & Supply of Heat Exchangers Project for Al-Bayroni (SABIC) • Fabrication & Supply of Ethane Super Heater for Jubail United Petroleum Company
  • 4. • Fabrication & Supply of Heat Exchangers Project for Ibn-Zahr (SABIC) • Fabrication & Supply of Heat Exchangers Project for OGDCL Responsibilities: Project Planning using project management softwares Primavera P3, P6 & Microsoft Project (MSP) • Monitoring and track actual progress, comparison to baseline and reporting progress against schedule. • Recommend the corrective action against the factors affecting the progress. • Analysis and reporting of productivity and progress trends using S- curve. • Cost control of all project heads using Earned Value Management (EVM) Technique. • Project Reporting & Correspondence (Both with Client as well as In- House) on daily / fortnightly basis. • Liaison with client & consultants for various issues at site regarding work progress & for issues impacting activities on the critical path. SOFTWARE SKILLS • Primavera Project Planner P6 / P3 • MS Project 2006 / 2010 • MS Office Enterprise INTERESTS / EXTRA CURRICULAR ACTIVITIES • Swimming, badminton and cricket • Travelling & Exploring New Sites / Locations PERSONAL INFORMATION  Name Hassan Ahmad Khawaja  Date of Birth 18/10/1986  Sex Male  Marital Status Married  Languages Known English, Urdu, Punjabi  Nationality Pakistani REFERENCES REFERENCE 1 • Name Rauf Hameed • Employer Presson Descon International Limited • Designation Senior Engineer-Project Controls • Phone +923004463279 REFERENCE 2 • Name Faraz Hussain Mirza
  • 5. • Employer Fatima Energy Limited • Designation Department Manager Project Planning and Controls • Phone 00923008467494
  • 6. • Employer Fatima Energy Limited • Designation Department Manager Project Planning and Controls • Phone 00923008467494