Broad, diverse experience in Major Energy (Fossil and Nuclear) and Manufacturing sectors on major
projects valued from $20 million to $4 billion dollars. Served in Project Cost Engineering capacities,
Managed Project performance per Key Performance Indicators (SPI, CPI, etc.), progress versus
schedule, variances to budget and forecast, extra work and change order review, etc., Also skilled in
Electrical and I&C Work Planning, and Technical Writing.
Brief Summary of Education and Skills:
Education: B.S. in Accounting, Indiana University, completed Industrial 4-year Instrument
Apprenticeship, completed Nuclear Instrumentation certification, previous AEP Certified
Energy Manager, Primavera V-5 training, various employer courses in Technical Writing and
Corrective Action Investigation and Reporting, Veteran – Military Electronics.
Cost Engineer: Cost Analyst / Engineer for major Nuclear, Manufacturing, and Fossil Power Projects
valued at $100M to $4B dollars.
Work Control Planner: Planner for Major Electrical and I&C projects including Fukushima upgrades.
Project Engineer: Administrative Project Engineer in Nuclear Project Engineering Dept.,
responsible for project processing, senior management approval, budgeting, and progress
tracking /forecasting on annual plant O&M and Capital projects.
Major Accounts Manager: Manager of large commercial / industrial accounts for electric utility,
responsible for Consultant on tariffs, Billing, Energy Efficiency, Power Quality, etc.
Technical Writing: Developed and/or enhanced power plant Instrumentation-related and
Engineering - related procedures.
Corrective Actions: Completed employer-supplied courses in Root Cause Investigation / Analysis,
and event Reporting.
Instrumentation: Instrument Technician / Supervisor in Manufacturing, Fossil-Power, and
Nuclear Power.
Employment Summary:
Cost Engineering:
Bechtel Power, Cost /Trending Engineer, $4B new fossil power construction, 2009-2010
Developed work breakdown structure of each contract, assigning costs for each line item related
to earnable labor hours and materials. Responsible for monitoring subcontracts valued at for
$650M. Utilized EVMS techniques to track actual costs versus budget and forecast. Provided
weekly report to senior managers via key performance indicators (CPI, KPI). Explained variances
in material, labor, and productivity costs with resulting corrective actions and revised forecast.
Reviewed contractor extra work order requests to determine whether extra payment is valid and
labor and commodity bids were reasonable. Wrote contract change order requests when
additional contract funding was warranted. Reviewed milestone payments for each contract to
ensure that correct work completion had been met. Reviewed contract invoices against approved
milestones. Bechtel cost accounting software utilized with Primavera V-3 (P3).
URS/Washington Group, Sr. Cost Engineer, $1B Holcim cement plant construction, 2008-2009
Developed work breakdown structure of each contract, assigning costs for each line item related
to earnable labor hours and materials. Utilized EVMS techniques to track actual costs versus
budget and forecast. Provided weekly report to senior managers via key performance indicators
(CPI, KPI). Explained variances in material, labor, and productivity costs with resulting corrective
actions and revised forecast. Reviewed contractor extra work order requests to determine
whether extra payment is valid and labor and commodity bids were reasonable. Wrote contract
change order requests when additional contract funding was warranted. Reviewed milestone
payments for each contract to ensure that correct work completion had been met. Reviewed
contract invoices against approved milestones. Prolog, Prism, and P3 project software utilized.
Sun Technical Srvcs, AEP Coal Plant, Cost Engineer, $500M FGD/SCR environmental
upgrade, 2007-2008. Field Cost Engineer for Conesville, Ohio coal-fired power plant.
Developed work breakdown structure of each contract, assigning costs for each line item related
to earnable labor hours and materials. Utilized EVMS techniques to track actual costs versus
budget and forecast. Provided weekly report to senior managers via key performance indicators
(CPI, KPI). Explained variances in material, labor, and productivity costs with resulting corrective
actions and revised forecast. Reviewed contractor extra work order requests to determine
whether extra payment is valid and labor and commodity bids were reasonable. Wrote contract
change order requests when additional contract funding was warranted. Reviewed milestone
payments for each contract to ensure that correct work completion had been met. Reviewed
contract invoices against approved milestones. Excel, Passport, Prism, and P3 project software
utilized.
Sun Technical Srvcs, AEP Cook Nuclear Power, Cost Engineer for Nuclear License extension
projects valued at $100M. Developed work breakdown structure of each contract, assigning costs
for each line item related to earnable labor hours and materials. Utilized EVMS techniques to
track actual costs versus budget and forecast. Provided weekly report to senior managers via key
performance indicators (CPI, KPI). Explained variances in material, labor, and productivity costs
with resulting corrective actions and revised forecast. Reviewed contractor extra work order
requests to determine whether extra payment is valid and labor and commodity bids were
reasonable. Wrote contract change order requests when additional contract funding was
warranted. Reviewed milestone payments for each contract to ensure that correct work
completion had been met. Reviewed contract invoices against approved milestones. Passport
and P3 project software utilized. Also served as Tech.Writer, I&C Planner, 2002-2007.
AEP D.C. Cook Nuclear, Staff Project Engineer / NuclearSpecialist. Responsible for receipt
and processing of project proposals. Working with Engineering sponsor, determined basis of
proposal, ie, safety, efficiency, NRC mandated, etc. Determined cost and rate of return on
investment, where applicable. With sponsor, presented proposal to senior plant management for
approval. Once approved, prioritized project in relation to other approved projects to determine
when implementation could occur within annual O&M or capital budget, usually $20-30M. Once
started, monitored labor and material charges to project in relation to schedule, forecasted costs.
Reported on variances which could affect implementation of other approved projects. Utilized
Excel and Microsoft Project softwares.
Electrical / I&C Planning:
Day & Zimmermann, TVA Nuclear Electrical Planner, Fukushima Projects, 2012 – Present
2012-13 Browns Ferry Plant- Electrical Planning of major electrical component replacement
projects, such as Main GSU transformers, Transformer oil quality instrumentation, Generator
hydrogen instrumentation, etc. 2013-Present, Sequoyah Nuclear Plant – Electrical Planning of
Fukushima-related plant safety system enhancement projects such as additional diesel
generators, emergency pumps, redundant spent fuel pool level instrumentation, etc.
Sun Tech.Srvcs, D.C. Cook Nuclear Electrical Planner for Main GSU Transformer
Replacement, Project 2011-2012, replacing ABB transformers with Mitsubishi.
Sun Technical Srvcs, Watts Bar Nuclear Electrical Planner, Unit 2 Completion, 2010-2011
Electrical planner for major equipment replacement projects required for completion of Unit 2.
Sun Technical Srvcs, D.C.Cook Nuclear I&C Planner, Maintenance Work Plans, 2002-2003
I&C Maintenance Planning in support of scheduled outage, predictive, corrective, and periodic
maintenance work.
Technical Writing:
Quadrex, Inc., Perry Nuclear Plant, I&C Technical Writer, 1985-1987
Nuclear Energy Srvcs, River Bend Nuclear Plant, I&C Technical Writer, 1984-1985
Instrumentation:
AEP D.C. Cook Nuclear, Instrument Technician 1987-1990
Cataract, LaSalle County Nuclear Unit 2 Completion, I&C ConstructionSupervisor,1982-1984
Washington Public Power, Units 1 & 2, Richland, Wa, Construction I&C Technician,1981-1982
Installation and calibration of new instrument systems during construction of Units 1 and 2.
PP&L, Jim Bridger Fossil Plant, I&C Technician, 1980-1981
Troubleshooting, repair, and calibration of instruments at this 4-unit fossil plant.
U.S. Steel, Gary Works, I&C Technician, 1974-1980
Completed 4-year instrumentation apprenticeship, worked in plant fossil power station.
Other Skills:
Experienced in Maximo, Passport, Prolog and Prism work control applications, as well as most
Microsoft Office products. Primavera V-5. Dependable, trustworthy, team player.

More Related Content

What's hot

What's hot (20)

CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EE
 
CV _ Azhar Ansari
CV _ Azhar AnsariCV _ Azhar Ansari
CV _ Azhar Ansari
 
Mailhot Resume_2016
Mailhot Resume_2016Mailhot Resume_2016
Mailhot Resume_2016
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Comprehensive resume online version
Comprehensive resume   online versionComprehensive resume   online version
Comprehensive resume online version
 
My project list - James W. Kendrick
My project list - James W. KendrickMy project list - James W. Kendrick
My project list - James W. Kendrick
 
Roger Berryment Resume
Roger Berryment ResumeRoger Berryment Resume
Roger Berryment Resume
 
RRV CV
RRV CVRRV CV
RRV CV
 
Cost Estimator and Consultant
Cost Estimator and ConsultantCost Estimator and Consultant
Cost Estimator and Consultant
 
SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEER
 
Mechanical Engg_CV
Mechanical Engg_CVMechanical Engg_CV
Mechanical Engg_CV
 
Mark_Peterson_Jr_resume
Mark_Peterson_Jr_resumeMark_Peterson_Jr_resume
Mark_Peterson_Jr_resume
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP Engineer
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
cv 2015
cv 2015cv 2015
cv 2015
 
IssakakishC.V
IssakakishC.VIssakakishC.V
IssakakishC.V
 
omarPro updated lates 2016
omarPro updated lates 2016omarPro updated lates 2016
omarPro updated lates 2016
 

Viewers also liked

Infographics claim settlement
Infographics claim settlementInfographics claim settlement
Infographics claim settlementBayzat
 
Electrochimiapentruunmediucurat
ElectrochimiapentruunmediucuratElectrochimiapentruunmediucurat
ElectrochimiapentruunmediucuratPetrica Radulescu
 
Benefits of tax filing
Benefits of tax filingBenefits of tax filing
Benefits of tax filingpayalshah1993
 
NAFIS Presentation
NAFIS Presentation NAFIS Presentation
NAFIS Presentation Nafis Kenya
 
Income tax benefits session 2015
Income tax benefits session 2015Income tax benefits session 2015
Income tax benefits session 2015payalshah1993
 
Takaful insurance
Takaful insuranceTakaful insurance
Takaful insuranceBayzat
 
Instalacion de sistemas operativos windows y linux
Instalacion de sistemas operativos windows y linuxInstalacion de sistemas operativos windows y linux
Instalacion de sistemas operativos windows y linuxsupernova2015
 
Basics of health insurance
Basics of health insuranceBasics of health insurance
Basics of health insuranceBayzat
 

Viewers also liked (11)

Infographics claim settlement
Infographics claim settlementInfographics claim settlement
Infographics claim settlement
 
Food security
Food securityFood security
Food security
 
Electrochimiapentruunmediucurat
ElectrochimiapentruunmediucuratElectrochimiapentruunmediucurat
Electrochimiapentruunmediucurat
 
Benefits of tax filing
Benefits of tax filingBenefits of tax filing
Benefits of tax filing
 
ENG.Khaled CV
ENG.Khaled CVENG.Khaled CV
ENG.Khaled CV
 
NAFIS Presentation
NAFIS Presentation NAFIS Presentation
NAFIS Presentation
 
Income tax benefits session 2015
Income tax benefits session 2015Income tax benefits session 2015
Income tax benefits session 2015
 
Takaful insurance
Takaful insuranceTakaful insurance
Takaful insurance
 
Instalacion de sistemas operativos windows y linux
Instalacion de sistemas operativos windows y linuxInstalacion de sistemas operativos windows y linux
Instalacion de sistemas operativos windows y linux
 
Basics of health insurance
Basics of health insuranceBasics of health insurance
Basics of health insurance
 
Magazines
MagazinesMagazines
Magazines
 

Similar to Resume3

Similar to Resume3 (20)

CV_Cost Engineer
CV_Cost EngineerCV_Cost Engineer
CV_Cost Engineer
 
Shiva-CV
Shiva-CVShiva-CV
Shiva-CV
 
Peter Khalil CV
Peter Khalil CVPeter Khalil CV
Peter Khalil CV
 
Ketan Shah Resume const
Ketan Shah Resume constKetan Shah Resume const
Ketan Shah Resume const
 
Jordan Dorwart, P.E. - Resume
Jordan Dorwart, P.E. - ResumeJordan Dorwart, P.E. - Resume
Jordan Dorwart, P.E. - Resume
 
Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
Caro, Jose J 11 9
Caro, Jose J 11 9Caro, Jose J 11 9
Caro, Jose J 11 9
 
Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11
 
Tyler Coughenour Resume
Tyler Coughenour ResumeTyler Coughenour Resume
Tyler Coughenour Resume
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
PETER CRAMER CV April 2016
PETER CRAMER CV April 2016PETER CRAMER CV April 2016
PETER CRAMER CV April 2016
 
Steven Longman Resume 2016
Steven Longman Resume 2016Steven Longman Resume 2016
Steven Longman Resume 2016
 
F. CV
F. CVF. CV
F. CV
 
DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516
 
DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516
 
DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516
 
DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516
 
DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516
 
DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516
 
Sachin_Kumar_CV_Instrument
Sachin_Kumar_CV_InstrumentSachin_Kumar_CV_Instrument
Sachin_Kumar_CV_Instrument
 

Resume3

  • 1. Joseph E. Trader II jetrader@tva.gov 423-843-8313 2349 Barron Ave., Lanesville, IN 47136 josephtraderii@yahoo.com 219-363-7048 Professional Qualifications: Broad, diverse experience in Major Energy (Fossil and Nuclear) and Manufacturing sectors on major projects valued from $20 million to $4 billion dollars. Served in Project Cost Engineering capacities, Managed Project performance per Key Performance Indicators (SPI, CPI, etc.), progress versus schedule, variances to budget and forecast, extra work and change order review, etc., Also skilled in Electrical and I&C Work Planning, and Technical Writing. Brief Summary of Education and Skills: Education: B.S. in Accounting, Indiana University, completed Industrial 4-year Instrument Apprenticeship, completed Nuclear Instrumentation certification, previous AEP Certified Energy Manager, Primavera V-5 training, various employer courses in Technical Writing and Corrective Action Investigation and Reporting, Veteran – Military Electronics. Cost Engineer: Cost Analyst / Engineer for major Nuclear, Manufacturing, and Fossil Power Projects valued at $100M to $4B dollars. Work Control Planner: Planner for Major Electrical and I&C projects including Fukushima upgrades. Project Engineer: Administrative Project Engineer in Nuclear Project Engineering Dept., responsible for project processing, senior management approval, budgeting, and progress tracking /forecasting on annual plant O&M and Capital projects. Major Accounts Manager: Manager of large commercial / industrial accounts for electric utility, responsible for Consultant on tariffs, Billing, Energy Efficiency, Power Quality, etc. Technical Writing: Developed and/or enhanced power plant Instrumentation-related and Engineering - related procedures. Corrective Actions: Completed employer-supplied courses in Root Cause Investigation / Analysis, and event Reporting. Instrumentation: Instrument Technician / Supervisor in Manufacturing, Fossil-Power, and Nuclear Power. Employment Summary: Cost Engineering: Bechtel Power, Cost /Trending Engineer, $4B new fossil power construction, 2009-2010 Developed work breakdown structure of each contract, assigning costs for each line item related to earnable labor hours and materials. Responsible for monitoring subcontracts valued at for $650M. Utilized EVMS techniques to track actual costs versus budget and forecast. Provided weekly report to senior managers via key performance indicators (CPI, KPI). Explained variances in material, labor, and productivity costs with resulting corrective actions and revised forecast. Reviewed contractor extra work order requests to determine whether extra payment is valid and labor and commodity bids were reasonable. Wrote contract change order requests when additional contract funding was warranted. Reviewed milestone payments for each contract to ensure that correct work completion had been met. Reviewed contract invoices against approved milestones. Bechtel cost accounting software utilized with Primavera V-3 (P3).
  • 2. URS/Washington Group, Sr. Cost Engineer, $1B Holcim cement plant construction, 2008-2009 Developed work breakdown structure of each contract, assigning costs for each line item related to earnable labor hours and materials. Utilized EVMS techniques to track actual costs versus budget and forecast. Provided weekly report to senior managers via key performance indicators (CPI, KPI). Explained variances in material, labor, and productivity costs with resulting corrective actions and revised forecast. Reviewed contractor extra work order requests to determine whether extra payment is valid and labor and commodity bids were reasonable. Wrote contract change order requests when additional contract funding was warranted. Reviewed milestone payments for each contract to ensure that correct work completion had been met. Reviewed contract invoices against approved milestones. Prolog, Prism, and P3 project software utilized. Sun Technical Srvcs, AEP Coal Plant, Cost Engineer, $500M FGD/SCR environmental upgrade, 2007-2008. Field Cost Engineer for Conesville, Ohio coal-fired power plant. Developed work breakdown structure of each contract, assigning costs for each line item related to earnable labor hours and materials. Utilized EVMS techniques to track actual costs versus budget and forecast. Provided weekly report to senior managers via key performance indicators (CPI, KPI). Explained variances in material, labor, and productivity costs with resulting corrective actions and revised forecast. Reviewed contractor extra work order requests to determine whether extra payment is valid and labor and commodity bids were reasonable. Wrote contract change order requests when additional contract funding was warranted. Reviewed milestone payments for each contract to ensure that correct work completion had been met. Reviewed contract invoices against approved milestones. Excel, Passport, Prism, and P3 project software utilized. Sun Technical Srvcs, AEP Cook Nuclear Power, Cost Engineer for Nuclear License extension projects valued at $100M. Developed work breakdown structure of each contract, assigning costs for each line item related to earnable labor hours and materials. Utilized EVMS techniques to track actual costs versus budget and forecast. Provided weekly report to senior managers via key performance indicators (CPI, KPI). Explained variances in material, labor, and productivity costs with resulting corrective actions and revised forecast. Reviewed contractor extra work order requests to determine whether extra payment is valid and labor and commodity bids were reasonable. Wrote contract change order requests when additional contract funding was warranted. Reviewed milestone payments for each contract to ensure that correct work completion had been met. Reviewed contract invoices against approved milestones. Passport and P3 project software utilized. Also served as Tech.Writer, I&C Planner, 2002-2007. AEP D.C. Cook Nuclear, Staff Project Engineer / NuclearSpecialist. Responsible for receipt and processing of project proposals. Working with Engineering sponsor, determined basis of proposal, ie, safety, efficiency, NRC mandated, etc. Determined cost and rate of return on investment, where applicable. With sponsor, presented proposal to senior plant management for approval. Once approved, prioritized project in relation to other approved projects to determine when implementation could occur within annual O&M or capital budget, usually $20-30M. Once started, monitored labor and material charges to project in relation to schedule, forecasted costs. Reported on variances which could affect implementation of other approved projects. Utilized Excel and Microsoft Project softwares. Electrical / I&C Planning: Day & Zimmermann, TVA Nuclear Electrical Planner, Fukushima Projects, 2012 – Present 2012-13 Browns Ferry Plant- Electrical Planning of major electrical component replacement projects, such as Main GSU transformers, Transformer oil quality instrumentation, Generator hydrogen instrumentation, etc. 2013-Present, Sequoyah Nuclear Plant – Electrical Planning of Fukushima-related plant safety system enhancement projects such as additional diesel generators, emergency pumps, redundant spent fuel pool level instrumentation, etc. Sun Tech.Srvcs, D.C. Cook Nuclear Electrical Planner for Main GSU Transformer Replacement, Project 2011-2012, replacing ABB transformers with Mitsubishi.
  • 3. Sun Technical Srvcs, Watts Bar Nuclear Electrical Planner, Unit 2 Completion, 2010-2011 Electrical planner for major equipment replacement projects required for completion of Unit 2. Sun Technical Srvcs, D.C.Cook Nuclear I&C Planner, Maintenance Work Plans, 2002-2003 I&C Maintenance Planning in support of scheduled outage, predictive, corrective, and periodic maintenance work. Technical Writing: Quadrex, Inc., Perry Nuclear Plant, I&C Technical Writer, 1985-1987 Nuclear Energy Srvcs, River Bend Nuclear Plant, I&C Technical Writer, 1984-1985 Instrumentation: AEP D.C. Cook Nuclear, Instrument Technician 1987-1990 Cataract, LaSalle County Nuclear Unit 2 Completion, I&C ConstructionSupervisor,1982-1984 Washington Public Power, Units 1 & 2, Richland, Wa, Construction I&C Technician,1981-1982 Installation and calibration of new instrument systems during construction of Units 1 and 2. PP&L, Jim Bridger Fossil Plant, I&C Technician, 1980-1981 Troubleshooting, repair, and calibration of instruments at this 4-unit fossil plant. U.S. Steel, Gary Works, I&C Technician, 1974-1980 Completed 4-year instrumentation apprenticeship, worked in plant fossil power station. Other Skills: Experienced in Maximo, Passport, Prolog and Prism work control applications, as well as most Microsoft Office products. Primavera V-5. Dependable, trustworthy, team player.