Mutlaq Mohammed Hamed Al-Busaidi
Mobile : 99177817
E-mail : mutlaqalbusaidi@gmail.com
Address : P.O. Box 423, P.C. 154
AL-Mudhaibi, Sultanate of Oman.
Education:
Bachelors of Science in Mechanical Engineering (graduated fall 2008), College of Engineering,
Sultan Qaboos University (SQU), Muscat, Oman.
College:
Fluid Mechanics, Heat Transfer, Thermodynamics, Machine Design, Dynamics, Internal
Combustion Engine, Computer Integrated manufacturing, Decision maker and design, economy
and management.
Final year project:
Copper Dust Formation in Desalination Plant Which is about formation of corrosion in
condensate pipes at multi stage flash plants. The subject was to study, analyse, simulate the
plant in the lab and come out with suggested solutions which will help to solve and avoid this
phenomenon.
Trainings:
 Five weeks of summer training in Petroleum Development of Oman (PDO) in Dhulaima
Summer Course and it was about the main steps which oil production goes through.
 Tow weeks of Industrial training at Sultan Qaboos University (Workshop) between
semesters 6 and 7 of the academic year of (2006/2007)
 Working at height training
 SAP training.
 EHC (energy Hazard Control) training for electrical and mechanical isolation.
Career Summary: (Total 7 years of experience)
 Septemper 2015 up to date as Lead Project Engineer.
 July-2011 till Septemper-2105 working as project & HVAC engineer in Tebodin(PDO,
EMC contract).
 August 2009 to July 2011 working in Bahwan Engineering Company as HVAC
engineer.
Experience in Sohar Aluminium (Sep-2015 up to date):
 Initial project planning
 Evaluate options/opportunities review.
 Work on benefits matrix scores for (EHSQ,offensive, maintenance, cost,project effort
and confidence).
 Prepare G0 (with budgetary cost) presentation for internal review and for (IC-
Investement Commity approval).
 Write project charter (agreement between client and engineering)
 Provide MOC (management of change) for the addition or replacement of any assets
owned by the company.
 Write full SOW in terms of technical,schduling,execution and safety requirement.
 Prepare Technical Bid Evaluation Sheets.
 Prepare project presenatation G3 (with firm quote) to get (IC) approval.
 Prepare project schedule using microsoft project.
 Creating PR (Purchase Requisition) using SAP.
 Write and review Risk Assessment and Work Method statement with contractor and
client.
 Initiate KOM and site establishment meeting.
 Follow up with contractors during execution stage with daily walkdown to worksite.
 Resolve any requirements from the contractor during execution.
 Creating Service Entry for the final payment after project completion.
 Prepare complete close out document and lesson learned.
 Prepare benefits and realisation form to evaluate the project after 6-months.
 Provide mechanical support wherever needed from operation
 Provide consultation for HVAC requirement.
 Present lean safety presentation every morning and provide safety feedback for my
sites.
 Calculate NPV and IRR.
Experience in Tebodin as Project Engineer (2011-2015):
 Preperaing new project proposals and estimate man hours.
 Provide forecast estimate after award of the PO.
 Prepare PCAP list for each project.
 Implement, manage and drive the project from scoping phase to final handover
(Commissioning).
 Manage project budget and implement appropriate project execution strategy.
 Arrange of SOW clarification KOM & Preparation of CTR , Schedule &Project
Execution Plan.
 Preparation of Daily, Weekly & Monthly Progress reports, Updated schedule, Look
Ahead Schedule etc.
 Preparations for progress presentation, Progress review meetings, (Weekly &
monthly) drafting of MOM and distribution.
 Preparation of Recovery Plan with respect to variations & Change Orders.
 To liaise with the client for necessary approvals on the scope changes/work
completed.
 Conduct site visit and evaluate timely completion of the project.
 Preparation of Subcontractor Service & payment.
 Engineering / Site queries follow up with Client/Vendors.
 Quantity Estimation and requisition of Project materials.
 Reviewing in conjunction with the Project Manager or Construction Manager any
potential changes, and in turn measuring where possible future saving or additional
costs can be identified.
Technical Experience:
Experience in Tebodin as HVAC engineer in designing and planning segment in HVAC
department
 Reviewing technical data from vendor submittals.
 Performing load calculations.
 Perform equipment selection.
 Perform site visit.
 Coordinate with other disciplines.
 Sizing child water piping
 Generate heat load calculation using HAP
 Full Design of laboratory HVAC system.
 Design of HVAC system for commercial and Oilfield facilities.
 Chilled water pump technical evaluation
 Full Design of HVAC system
 implement Psychrometric chart in HVAC unit’s selection.
 CTR (Cost Time Resources) for HVAC.
Projects
 Part of EMC HVAC Team for (EMC) Engineering Maintenance Contract , major
maintenance project for the next seven years for PDO.
 Design of the HVAC system of Transient Building at Mina AL-Fahal (Chilled Water
System)
 Procure & Install HVAC Chillers,AHU’s,ACCU’s at FAHUD (Evaluation and
assessment of chilled water system)
 IInstall CCTV digital survelliance system in GGP (Government Gas Plant)
 Obra Project (Survey study for PDO facilities in desert covered ( Saih Rawl , Yibal
and Saih Nehyida).
 NATIH C&A UPGRADE WITH NEW ELECTRICAL SUBSTATION.
 Construction of bakery building at Qarn Alam
 Laboratory Building at OLNG (Sur)
 Laboratory Building at PDO.
 Saih Rawl Camp Project at Qarn Alam ( Chilled Water System)
 Renovation of Office Building at MAF Area (Cilled water system)
 Design a VRV system for (Fahud Mosque , Fahud Airport Shed , Qarn Alam Airport
shed )
 Daleel Petroleum , Upgrade of WI and WT Facility.
 LPS Main Access Relocation & PTW Office Building
 QAL Aircraft Firefighting Simulation for Yibal , Qarn Alam and Lekhwair.
 YIBAL Field permenant GPS Monuments construction.
BEC (2009-2011):
One and half year experience at Bahwan Engineering Company as Mechanical engineer in
designing and planning segment in HVAC department
 Coordinate with consultants for submission of drawing , Material .
 Coordinate with other contractors during the construction stage
 Revise shop drawing before send it to consultants
 Prepare material approval sheets (MAS)
 Go through BOQ and compare it with tender drawing
 Measure the capacity of equipment for each project
 Make schematic drawing for pipes distribution inside building
 AHU carrier selection
Projects:
 EMC-3 ( Engineering Main Contract ) at Muscat Airport
 Infinity showroom for Suhail Bahwan Group (District Cooling Plant).
 District Cooling Plant at wave muscat (7500 Tons).
 New Amouage (Perfume Manufacturer) Offices at AL-Mawleh.
 Nizwa LULU Hypermarket.
 Tilal Muscat In AL-Kuwhier
Training Courses Attended:
 One month Training for HVAC engineers at BEC (Bahwan Engineerin Company)
Languages Known:
Speaking Reading Writing
English Very Good Very Good Very Good
Arabic Excellent Excellent Excellent
General Skills:
 Work well under pressure
 Work well individually or as a member in a team
 Good in writing reports and doing presentations.
Languages:
 Arabic (mother language).
 English (very good in reading, writing and Speaking).
Computer Software:
 Auto Cad , mat lab and C++
 ASHREA (ESP Calculation).
 Microsoft Office (outlook , Excel and word)
 Hap (hourly analyses program) for heat load calculation.
 Psychometrics Software.
 Microsoft project
 SAP

Mutlaq AL-Busaidi

  • 1.
    Mutlaq Mohammed HamedAl-Busaidi Mobile : 99177817 E-mail : mutlaqalbusaidi@gmail.com Address : P.O. Box 423, P.C. 154 AL-Mudhaibi, Sultanate of Oman. Education: Bachelors of Science in Mechanical Engineering (graduated fall 2008), College of Engineering, Sultan Qaboos University (SQU), Muscat, Oman. College: Fluid Mechanics, Heat Transfer, Thermodynamics, Machine Design, Dynamics, Internal Combustion Engine, Computer Integrated manufacturing, Decision maker and design, economy and management. Final year project: Copper Dust Formation in Desalination Plant Which is about formation of corrosion in condensate pipes at multi stage flash plants. The subject was to study, analyse, simulate the plant in the lab and come out with suggested solutions which will help to solve and avoid this phenomenon. Trainings:  Five weeks of summer training in Petroleum Development of Oman (PDO) in Dhulaima Summer Course and it was about the main steps which oil production goes through.  Tow weeks of Industrial training at Sultan Qaboos University (Workshop) between semesters 6 and 7 of the academic year of (2006/2007)  Working at height training  SAP training.  EHC (energy Hazard Control) training for electrical and mechanical isolation. Career Summary: (Total 7 years of experience)  Septemper 2015 up to date as Lead Project Engineer.  July-2011 till Septemper-2105 working as project & HVAC engineer in Tebodin(PDO, EMC contract).  August 2009 to July 2011 working in Bahwan Engineering Company as HVAC engineer. Experience in Sohar Aluminium (Sep-2015 up to date):  Initial project planning  Evaluate options/opportunities review.  Work on benefits matrix scores for (EHSQ,offensive, maintenance, cost,project effort and confidence).  Prepare G0 (with budgetary cost) presentation for internal review and for (IC- Investement Commity approval).  Write project charter (agreement between client and engineering)  Provide MOC (management of change) for the addition or replacement of any assets owned by the company.  Write full SOW in terms of technical,schduling,execution and safety requirement.  Prepare Technical Bid Evaluation Sheets.  Prepare project presenatation G3 (with firm quote) to get (IC) approval.
  • 2.
     Prepare projectschedule using microsoft project.  Creating PR (Purchase Requisition) using SAP.  Write and review Risk Assessment and Work Method statement with contractor and client.  Initiate KOM and site establishment meeting.  Follow up with contractors during execution stage with daily walkdown to worksite.  Resolve any requirements from the contractor during execution.  Creating Service Entry for the final payment after project completion.  Prepare complete close out document and lesson learned.  Prepare benefits and realisation form to evaluate the project after 6-months.  Provide mechanical support wherever needed from operation  Provide consultation for HVAC requirement.  Present lean safety presentation every morning and provide safety feedback for my sites.  Calculate NPV and IRR. Experience in Tebodin as Project Engineer (2011-2015):  Preperaing new project proposals and estimate man hours.  Provide forecast estimate after award of the PO.  Prepare PCAP list for each project.  Implement, manage and drive the project from scoping phase to final handover (Commissioning).  Manage project budget and implement appropriate project execution strategy.  Arrange of SOW clarification KOM & Preparation of CTR , Schedule &Project Execution Plan.  Preparation of Daily, Weekly & Monthly Progress reports, Updated schedule, Look Ahead Schedule etc.  Preparations for progress presentation, Progress review meetings, (Weekly & monthly) drafting of MOM and distribution.  Preparation of Recovery Plan with respect to variations & Change Orders.  To liaise with the client for necessary approvals on the scope changes/work completed.  Conduct site visit and evaluate timely completion of the project.  Preparation of Subcontractor Service & payment.  Engineering / Site queries follow up with Client/Vendors.  Quantity Estimation and requisition of Project materials.  Reviewing in conjunction with the Project Manager or Construction Manager any potential changes, and in turn measuring where possible future saving or additional costs can be identified. Technical Experience: Experience in Tebodin as HVAC engineer in designing and planning segment in HVAC department  Reviewing technical data from vendor submittals.  Performing load calculations.  Perform equipment selection.  Perform site visit.  Coordinate with other disciplines.  Sizing child water piping  Generate heat load calculation using HAP  Full Design of laboratory HVAC system.  Design of HVAC system for commercial and Oilfield facilities.
  • 3.
     Chilled waterpump technical evaluation  Full Design of HVAC system  implement Psychrometric chart in HVAC unit’s selection.  CTR (Cost Time Resources) for HVAC. Projects  Part of EMC HVAC Team for (EMC) Engineering Maintenance Contract , major maintenance project for the next seven years for PDO.  Design of the HVAC system of Transient Building at Mina AL-Fahal (Chilled Water System)  Procure & Install HVAC Chillers,AHU’s,ACCU’s at FAHUD (Evaluation and assessment of chilled water system)  IInstall CCTV digital survelliance system in GGP (Government Gas Plant)  Obra Project (Survey study for PDO facilities in desert covered ( Saih Rawl , Yibal and Saih Nehyida).  NATIH C&A UPGRADE WITH NEW ELECTRICAL SUBSTATION.  Construction of bakery building at Qarn Alam  Laboratory Building at OLNG (Sur)  Laboratory Building at PDO.  Saih Rawl Camp Project at Qarn Alam ( Chilled Water System)  Renovation of Office Building at MAF Area (Cilled water system)  Design a VRV system for (Fahud Mosque , Fahud Airport Shed , Qarn Alam Airport shed )  Daleel Petroleum , Upgrade of WI and WT Facility.  LPS Main Access Relocation & PTW Office Building  QAL Aircraft Firefighting Simulation for Yibal , Qarn Alam and Lekhwair.  YIBAL Field permenant GPS Monuments construction. BEC (2009-2011): One and half year experience at Bahwan Engineering Company as Mechanical engineer in designing and planning segment in HVAC department  Coordinate with consultants for submission of drawing , Material .  Coordinate with other contractors during the construction stage  Revise shop drawing before send it to consultants  Prepare material approval sheets (MAS)  Go through BOQ and compare it with tender drawing  Measure the capacity of equipment for each project  Make schematic drawing for pipes distribution inside building  AHU carrier selection Projects:  EMC-3 ( Engineering Main Contract ) at Muscat Airport  Infinity showroom for Suhail Bahwan Group (District Cooling Plant).  District Cooling Plant at wave muscat (7500 Tons).  New Amouage (Perfume Manufacturer) Offices at AL-Mawleh.  Nizwa LULU Hypermarket.  Tilal Muscat In AL-Kuwhier Training Courses Attended:
  • 4.
     One monthTraining for HVAC engineers at BEC (Bahwan Engineerin Company) Languages Known: Speaking Reading Writing English Very Good Very Good Very Good Arabic Excellent Excellent Excellent General Skills:  Work well under pressure  Work well individually or as a member in a team  Good in writing reports and doing presentations. Languages:  Arabic (mother language).  English (very good in reading, writing and Speaking). Computer Software:  Auto Cad , mat lab and C++  ASHREA (ESP Calculation).  Microsoft Office (outlook , Excel and word)  Hap (hourly analyses program) for heat load calculation.  Psychometrics Software.  Microsoft project  SAP