Big Data Architectural Series:
Creating a Next-Generation Big Data Architecture
facebook.com/perficient twitter.com/Perficientlinkedin.com/company/perficient
2
Perficient is a leading information technology consulting firm serving clients throughout
North America.
We help clients implement business-driven technology solutions that integrate business
processes, improve worker productivity, increase customer loyalty and create a more agile
enterprise to better respond to new business opportunities.
About Perficient
3
• Founded in 1997
• Public, NASDAQ: PRFT
• 2013 revenue $373 million
• Major market locations:
• Allentown, Atlanta, Boston, Charlotte, Chicago, Cincinnati,
Columbus, Dallas, Denver, Detroit, Fairfax, Houston,
Indianapolis, Lafayette, Minneapolis, New York City,
Northern California, Oxford (UK), Philadelphia, Southern
California, St. Louis, Toronto, Washington, D.C.
• Global delivery centers in China and India
• >2,200 colleagues
• Dedicated solution practices
• ~90% repeat business rate
• Alliance partnerships with major technology vendors
• Multiple vendor/industry technology and growth awards
Perficient Profile
BUSINESS SOLUTIONS
Business Intelligence
Business Process Management
Customer Experience and CRM
Enterprise Performance Management
Enterprise Resource Planning
Experience Design (XD)
Management Consulting
TECHNOLOGY SOLUTIONS
Business Integration/SOA
Cloud Services
Commerce
Content Management
Custom Application Development
Education
Information Management
Mobile Platforms
Platform Integration
Portal & Social
Our Solutions Expertise
Our Speaker
Bill Busch
Sr. Solutions Architect, Enterprise Information Solutions, Perficient
• Leads Perficient's enterprise data practice
• Specializes in business-enabling BI solutions that enable the agile
enterprise
• Responsible for executive data strategy, roadmap development, and
the delivery of high-impact solutions that enable organizations to
leverage enterprise data
• Bill has over 15 years of experience in executive leadership, business
intelligence, data warehousing, data governance, master data
management, information/data architecture and analytics
Perficient’s Big Data Architectural Series
Business
Case
Next
Generation
Architecture
Future Topics
• Data Integration
• Stream
Processing
• NoSQL
• SQL on Hadoop
• Data Quality
• Governance
• Use Cases &
Case Studies
Today’s
Webinar
Today’s Objectives
5
Architectural
Roles For
Hadoop
Hadoop
Ecosystem
Potential
vs. Reality
Realizing A
Hadoop
Centric
Architecture
Today’s Objectives
5
Architectural
Roles For
Hadoop
Hadoop
Ecosystem
Potential
vs. Reality
Realizing A
Hadoop
Centric
Architecture
“Big Data is high-volume, high-velocity and high-
variety information assets that demand cost-effective,
innovative forms of information processing for
enhanced insight and decision making.”
Convergence of structured, unstructured,
and dark data
Big Data is the evolution of data creating similar data
management issues that IT has struggled to address
for the last 20+ years.
Three Views of Big Data
“Big Data is high-volume, high-velocity and high-
variety information assets that demand cost-
effective, innovative forms of information
processing for enhanced insight and decision
making.”
Convergence of structured, unstructured, and dark
data
Big Data is the evolution of data creating similar
data management issues that IT has struggled to
address for the last 20+ years.
Three Views of Big Data
Common Big Data Business Use Cases
Improve Strategic
Decision Making
Customer
Experience
Analysis
Operational
Optimization
Risk and Fraud
Reduction
Data Monetization
Security Event
Detection and
Analysis
IT Cost
Management
Expanding Data Ecosystem
• Customer
Intelligence
• Operations
• Risk& Fraud
• Data
Monetization
• Strategic
Development
• Security
Intelligence
• IT Optimization
Structured Data
(5-20% of Total)
Point-of-Sale
Text Messages
Contracts &
Regulatory
Preferences &
Emotions
Security AccessWeather
Machine Data
Automobile
Mobile
Communications
Geospatial
Social
Data
Ecosystem
Enterprise Data Architecture
Next Generation
The Promise
Data Architecture Simplification
Data Integration
Data Hub
Analytics
Stream Processing
Data Warehouse
Operational Data
Hadoop
Cluster
The Reality
Maturity Limits the Use Cases
• Realize the potential of Hadoop
• Multi-tenancy is in its infancy
• Hadoop 2.0 and YARN
• Most third-party applications are just
moving to YARN
• Hive (and other SQL on Hadoop
solutions) maturing
• Robust enterprise functionality is
evolving
• Security
• High Availability
Different Types of “Open Source Hadoop”
Apache
Projects
Only
Proprietary
Value Add & Re-
Development
Apache
Projects +
Proprietary
Add-ons
Packaged and
Online Solutions
• IBM Big Insights
• Oracle Big Data
Appliance
• HDInsight
• Many others!
Choosing A Hadoop Distribution
 Company Philosophy
 Current Relationships
 Acceptable Risk
 Specialized Functionality
Quick Primer on YARN
What is Yarn?
• Yet Another Resource Manager
• Sometimes referred as
MapReduce 2.0
• Data operating system
• Fault-Tolerance
Why is this important?
• Enables multi-tendency on
Hadoop
• Moves processing to the data
*Image Provided by HortonWorks
Today’s Objectives
5
Architectural
Roles For
Hadoop
Hadoop
Ecosystem
Potential
vs. Reality
Realizing A
Hadoop
Centric
Architecture
Hadoop
Analytics
Data
Warehouse
Stream
Processing
Data Factory
Transactional
Data Store
Five Common Architectural Roles
Hadoop Big Data Use Cases
Enterprise Data Architecture
Next Generation
Hadoop
Analytics
Data
Warehouse
Stream
Processing
Data Factory
Transactional
Data Store
Five Common Architectural Roles
Hadoop Big Data Use Cases
Analytical Processing
Source Wrangle Data Model & Tune Operationalize1 2 3 4
• Data Ingestion
• Metadata
Management
• Data Access
• Data Preparation
Tools
• Data Discovery
&Visualization
• Data Wrangling
Tools
• Business Glossary
& Search
• Data Access
• Data Discovery &
Visualization
• Analytical Tools
• Analytical
Sandbox
• Business Created
Reporting
• Model Execution &
Management
• Knowledge
Management
(Portal)
Analytical
Process
Architectural
Capabilities
Analytical Processing
Source Wrangle Data Model & Tune Operationalize1 2 3 4
• Data Ingestion
• Metadata
Management
• Data Access
• Data Preparation
Tools
• Data Discovery
&Visualization
• Data Wrangling
Tools
• Business Glossary
& Search
• Data Access
• Data Discovery &
Visualization
• Analytical Tools
• Analytical
Sandbox
• Business Created
Reporting
• Model Execution &
Management
• Knowledge
Management
(Portal)
Analytical
Process
Architectural
Capabilities
Data Access
• There are many methods
to accessing Big Data
• Direct HDFS
• NoSQL / Connector
• Hive/ SQL On Hadoop
• Align tool to access
methods and file types
• Data Preparation
• Analytics Source
Files/Data
Tidy Data
Data
Preparation
Tool
Analytics
Tool
Analytical
Result
Read Access
Write Access
Key
Hadoop Cluster
Hadoop
Analytics
Data
Warehouse
Stream
Processing
Data Factory
Transactional
Data Store
Five Common Architectural Roles
Hadoop Big Data Use Cases
Data Warehouse Roles
• Two models for splitting
processing
• Hot – Cold
• Data Warehouse Layer
• Push high user loads to
traditional data
warehouses
• Fully investigate DW-
Hadoop connector
functionality
• Leverage opportunity to
use in-memory
database solutions
Data Warehouse Layer Approach
Hadoop Cluster Traditional DW/DM
Hot – Cold Data Warehouse
Cold Data
Hadoop Cluster Traditional DW/DM
Hot Data
Data Warehouse
Organize Your Data
• Types of data stored on
cluster
• Analytical sandboxes
• Team
• Individual
• Quotas
• Potential to replace
information lifecycle
management solutions
• No right answer – clearly
define usage
Consolidated
Data
Streaming
Queues
Delta’s
(Incremental)
Common Data (Dimensions, Master Data)
Improved / Modeled Data
Published, Analytical and Aggregates
Sandbox Zone
Raw Data Processed Data
Hadoop Cluster
Archived Data
Hadoop
Analytics
Data
Warehouse
Stream
Processing
Data Factory
Transactional
Data Store
Five Common Architectural Roles
Hadoop Big Data Use Cases
Stream and Event Processing
• Dedicated vs. Shared Model
• Persistence of messages, logs, etc.
• Long-term storage
• Queuing
• Pre-load (HDFS) vs. Post-load
processing
• Micro-Batch vs. One-at-a-Time
• Programing language support
• Processing guarantee
• At most once
• At least once
• Exactly once
Let business requirements drive need for streaming solutions. It is acceptable to use more
than one solution as long as the roles / purposes of each are clearly defined.
Hadoop
Analytics
Data
Warehouse
Stream
Processing
Data Factory
Transactional
Data Store
Five Common Architectural Roles
Hadoop Big Data Use Cases
The Data Integration Challenge
Key Point: Hadoop and Hadoop-related technologies can address these challenges.
However, they must be architected and governed properly
Volume, variety, and
velocity create unique
challenges for data
integration
10,000+ unique entities
(or file groups) may have
to be managed
Batch windows are still
the same or shrinking
The Challenge
Data Factory & Integration
Hadoop Distributed
Tools
Data Integration
Packages
Hybrid (Both Hadoop
and Data Integration
Package)
• Leverages tools included in
the Hadoop Distribution and
programing languages
• Scoop, Flume, Spark, Java,
MapReduce are examples
• Tools can be implemented in
many different modes
• Hand-coded/scripted
• Runtime Configured
• Generated
• Based on use case
leverages both Hadoop and
COTs tools to move and
transform data
• Leverage commercial data
integration packages to
move and transform data
• IBM Infosphere Big Insights,
Informatica are examples
• Key questions, where is
processing taking place and
does the tool use YARN
resource manger?
Approaches to Big Data Integration
Define Pipelines and Stages
Sqoop
Cloud
Sources
RDBMS
File
Hub
FTP
Packaged
Tool
Object
DBMS
ETL Tool
Log
Data
FTP
Stream/
Message
Bus
Kafta
Sqoop
Storm
Extract
HDFS Load &
Formatting
Scraping&
Normalization
MCF
Storm
Cleansing ,
Aggregation
Transformation
Package
ETL Tool
Storm
Data Distribution
Data Access &
Distribution
RDBMS/DW
/IMDB
Hive
Hbase
File
Extracts
NoSQL
Stream
Output
Custom
Sqoop
Custom
Custom
Message
Bus
ETL
Tool ETL Tool
Big Data Integration Framework
Typical Services
Key Guidance:
• In lieu of using a ETL product, consider building a Big
Data Integration framework
• Apache Falcon provides pipeline management
• Focus is on making all components run-time
configurable with metadata
• Can offer significant cost savings over the long run
Load UtilityMetadata
Collection Metadata
Pipeline
Config
Files
Metadata
Config Files
Pipeline Utilities
Parser
(Delimiter)
Data
Standardization
HIVE
Publishing
MF Coding
Converters
File Joiner &
Transport
Logging
Checksum
Retention
Replication
Late Arriving
Data
Exception
Handling
Pipeline Master (ex. Falcon)
DB Copy
Archival
Audit
Sqoop Flume
HDFS Shell
Hadoop
Analytics
Data
Warehouse
Stream
Processing
Data Factory
Transactional
Data Store
Five Common Architectural Roles
Hadoop Big Data Use Cases
SQL on Hadoop
• SQL on Hadoop is changing
• Historically focused on read
functionality for analytics
• New breed of SQL on Hadoop
• BI and operational
reporting
• Transaction Processing
*Image Provided by Splice Machine
Transactions In Hive
Today’s Objectives
5
Architectural
Roles For
Hadoop
Hadoop
Ecosystem
Potential
vs. Reality
Realizing A
Hadoop
Centric
Architecture
Common Big Data Business Use Cases
Improve Strategic
Decision Making
Customer
Experience
Analysis
Operational
Optimization
Risk and Fraud
Reduction
Data Monetization
Security Event
Detection and
Analysis
IT Cost
Management
Architectural Scenarios
Architecture
Role
Business Use Case Analytics
Data
Warehouse
Stream
Processing Data Factory
Transactional
Data Store*
Strategic Decision
Making P s
Customer Experience P s P s
Operational
Optimization P s s s
Risk and Fraud
Reduction P s P
Data Monetization s s P
Security Event
Detection and Analysis P s s s
IT Cost Management P s P P
* Capability is just emerging within the Hadoop
ecosystem. Consider this use case for isolated
business cases and early adopters.
P = Primary Use Case s = Secondary Use case
Integrating Hadoop into the Enterprise
Determine
Business Use
Cases
Understand
Current Tools
& Architecture
Align Business
Use Case
Priorities
Build
Roadmap
Specify
Solution
Architecture
Update &
Maintain
Roadmap
Implement
Roadmap
Final Thoughts
Do
• Match the business use case to the big data role
• Clearly define a roadmap
• Establish clear architectural standards to drive
• Consistency
• Re-use of resources
• Homework when defining a solution architecture
Don’t
• Select an initial use case that relies on immature
Hadoop functionality
• Leverage tools that move data off the cluster for
processing then storing the data back on the cluster
• Assume all Hadoop technologies integrate well together
As a reminder, please submit your
questions in the chat box.
We will get to as many as possible.
Daily unique content
about content
management, user
experience, portals
and other enterprise
information technology
solutions across a
variety of industries.
Perficient.com/SocialMedia
Facebook.com/Perficient
Twitter.com/Perficient
Thank you for your participation today.
Please fill out the survey at the close of this session.

Creating a Next-Generation Big Data Architecture

  • 1.
    Big Data ArchitecturalSeries: Creating a Next-Generation Big Data Architecture facebook.com/perficient twitter.com/Perficientlinkedin.com/company/perficient
  • 2.
    2 Perficient is aleading information technology consulting firm serving clients throughout North America. We help clients implement business-driven technology solutions that integrate business processes, improve worker productivity, increase customer loyalty and create a more agile enterprise to better respond to new business opportunities. About Perficient
  • 3.
    3 • Founded in1997 • Public, NASDAQ: PRFT • 2013 revenue $373 million • Major market locations: • Allentown, Atlanta, Boston, Charlotte, Chicago, Cincinnati, Columbus, Dallas, Denver, Detroit, Fairfax, Houston, Indianapolis, Lafayette, Minneapolis, New York City, Northern California, Oxford (UK), Philadelphia, Southern California, St. Louis, Toronto, Washington, D.C. • Global delivery centers in China and India • >2,200 colleagues • Dedicated solution practices • ~90% repeat business rate • Alliance partnerships with major technology vendors • Multiple vendor/industry technology and growth awards Perficient Profile
  • 4.
    BUSINESS SOLUTIONS Business Intelligence BusinessProcess Management Customer Experience and CRM Enterprise Performance Management Enterprise Resource Planning Experience Design (XD) Management Consulting TECHNOLOGY SOLUTIONS Business Integration/SOA Cloud Services Commerce Content Management Custom Application Development Education Information Management Mobile Platforms Platform Integration Portal & Social Our Solutions Expertise
  • 5.
    Our Speaker Bill Busch Sr.Solutions Architect, Enterprise Information Solutions, Perficient • Leads Perficient's enterprise data practice • Specializes in business-enabling BI solutions that enable the agile enterprise • Responsible for executive data strategy, roadmap development, and the delivery of high-impact solutions that enable organizations to leverage enterprise data • Bill has over 15 years of experience in executive leadership, business intelligence, data warehousing, data governance, master data management, information/data architecture and analytics
  • 6.
    Perficient’s Big DataArchitectural Series Business Case Next Generation Architecture Future Topics • Data Integration • Stream Processing • NoSQL • SQL on Hadoop • Data Quality • Governance • Use Cases & Case Studies Today’s Webinar
  • 7.
  • 8.
  • 9.
    “Big Data ishigh-volume, high-velocity and high- variety information assets that demand cost-effective, innovative forms of information processing for enhanced insight and decision making.” Convergence of structured, unstructured, and dark data Big Data is the evolution of data creating similar data management issues that IT has struggled to address for the last 20+ years. Three Views of Big Data
  • 10.
    “Big Data ishigh-volume, high-velocity and high- variety information assets that demand cost- effective, innovative forms of information processing for enhanced insight and decision making.” Convergence of structured, unstructured, and dark data Big Data is the evolution of data creating similar data management issues that IT has struggled to address for the last 20+ years. Three Views of Big Data
  • 11.
    Common Big DataBusiness Use Cases Improve Strategic Decision Making Customer Experience Analysis Operational Optimization Risk and Fraud Reduction Data Monetization Security Event Detection and Analysis IT Cost Management
  • 12.
    Expanding Data Ecosystem •Customer Intelligence • Operations • Risk& Fraud • Data Monetization • Strategic Development • Security Intelligence • IT Optimization Structured Data (5-20% of Total) Point-of-Sale Text Messages Contracts & Regulatory Preferences & Emotions Security AccessWeather Machine Data Automobile Mobile Communications Geospatial Social Data Ecosystem
  • 13.
  • 14.
    The Promise Data ArchitectureSimplification Data Integration Data Hub Analytics Stream Processing Data Warehouse Operational Data Hadoop Cluster
  • 15.
    The Reality Maturity Limitsthe Use Cases • Realize the potential of Hadoop • Multi-tenancy is in its infancy • Hadoop 2.0 and YARN • Most third-party applications are just moving to YARN • Hive (and other SQL on Hadoop solutions) maturing • Robust enterprise functionality is evolving • Security • High Availability
  • 16.
    Different Types of“Open Source Hadoop” Apache Projects Only Proprietary Value Add & Re- Development Apache Projects + Proprietary Add-ons Packaged and Online Solutions • IBM Big Insights • Oracle Big Data Appliance • HDInsight • Many others! Choosing A Hadoop Distribution  Company Philosophy  Current Relationships  Acceptable Risk  Specialized Functionality
  • 17.
    Quick Primer onYARN What is Yarn? • Yet Another Resource Manager • Sometimes referred as MapReduce 2.0 • Data operating system • Fault-Tolerance Why is this important? • Enables multi-tendency on Hadoop • Moves processing to the data *Image Provided by HortonWorks
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
    Analytical Processing Source WrangleData Model & Tune Operationalize1 2 3 4 • Data Ingestion • Metadata Management • Data Access • Data Preparation Tools • Data Discovery &Visualization • Data Wrangling Tools • Business Glossary & Search • Data Access • Data Discovery & Visualization • Analytical Tools • Analytical Sandbox • Business Created Reporting • Model Execution & Management • Knowledge Management (Portal) Analytical Process Architectural Capabilities
  • 23.
    Analytical Processing Source WrangleData Model & Tune Operationalize1 2 3 4 • Data Ingestion • Metadata Management • Data Access • Data Preparation Tools • Data Discovery &Visualization • Data Wrangling Tools • Business Glossary & Search • Data Access • Data Discovery & Visualization • Analytical Tools • Analytical Sandbox • Business Created Reporting • Model Execution & Management • Knowledge Management (Portal) Analytical Process Architectural Capabilities
  • 24.
    Data Access • Thereare many methods to accessing Big Data • Direct HDFS • NoSQL / Connector • Hive/ SQL On Hadoop • Align tool to access methods and file types • Data Preparation • Analytics Source Files/Data Tidy Data Data Preparation Tool Analytics Tool Analytical Result Read Access Write Access Key Hadoop Cluster
  • 25.
  • 26.
    Data Warehouse Roles •Two models for splitting processing • Hot – Cold • Data Warehouse Layer • Push high user loads to traditional data warehouses • Fully investigate DW- Hadoop connector functionality • Leverage opportunity to use in-memory database solutions Data Warehouse Layer Approach Hadoop Cluster Traditional DW/DM Hot – Cold Data Warehouse Cold Data Hadoop Cluster Traditional DW/DM Hot Data
  • 27.
    Data Warehouse Organize YourData • Types of data stored on cluster • Analytical sandboxes • Team • Individual • Quotas • Potential to replace information lifecycle management solutions • No right answer – clearly define usage Consolidated Data Streaming Queues Delta’s (Incremental) Common Data (Dimensions, Master Data) Improved / Modeled Data Published, Analytical and Aggregates Sandbox Zone Raw Data Processed Data Hadoop Cluster Archived Data
  • 28.
  • 29.
    Stream and EventProcessing • Dedicated vs. Shared Model • Persistence of messages, logs, etc. • Long-term storage • Queuing • Pre-load (HDFS) vs. Post-load processing • Micro-Batch vs. One-at-a-Time • Programing language support • Processing guarantee • At most once • At least once • Exactly once Let business requirements drive need for streaming solutions. It is acceptable to use more than one solution as long as the roles / purposes of each are clearly defined.
  • 30.
  • 31.
    The Data IntegrationChallenge Key Point: Hadoop and Hadoop-related technologies can address these challenges. However, they must be architected and governed properly Volume, variety, and velocity create unique challenges for data integration 10,000+ unique entities (or file groups) may have to be managed Batch windows are still the same or shrinking The Challenge
  • 32.
    Data Factory &Integration Hadoop Distributed Tools Data Integration Packages Hybrid (Both Hadoop and Data Integration Package) • Leverages tools included in the Hadoop Distribution and programing languages • Scoop, Flume, Spark, Java, MapReduce are examples • Tools can be implemented in many different modes • Hand-coded/scripted • Runtime Configured • Generated • Based on use case leverages both Hadoop and COTs tools to move and transform data • Leverage commercial data integration packages to move and transform data • IBM Infosphere Big Insights, Informatica are examples • Key questions, where is processing taking place and does the tool use YARN resource manger? Approaches to Big Data Integration
  • 33.
    Define Pipelines andStages Sqoop Cloud Sources RDBMS File Hub FTP Packaged Tool Object DBMS ETL Tool Log Data FTP Stream/ Message Bus Kafta Sqoop Storm Extract HDFS Load & Formatting Scraping& Normalization MCF Storm Cleansing , Aggregation Transformation Package ETL Tool Storm Data Distribution Data Access & Distribution RDBMS/DW /IMDB Hive Hbase File Extracts NoSQL Stream Output Custom Sqoop Custom Custom Message Bus ETL Tool ETL Tool
  • 34.
    Big Data IntegrationFramework Typical Services Key Guidance: • In lieu of using a ETL product, consider building a Big Data Integration framework • Apache Falcon provides pipeline management • Focus is on making all components run-time configurable with metadata • Can offer significant cost savings over the long run Load UtilityMetadata Collection Metadata Pipeline Config Files Metadata Config Files Pipeline Utilities Parser (Delimiter) Data Standardization HIVE Publishing MF Coding Converters File Joiner & Transport Logging Checksum Retention Replication Late Arriving Data Exception Handling Pipeline Master (ex. Falcon) DB Copy Archival Audit Sqoop Flume HDFS Shell
  • 35.
  • 36.
    SQL on Hadoop •SQL on Hadoop is changing • Historically focused on read functionality for analytics • New breed of SQL on Hadoop • BI and operational reporting • Transaction Processing *Image Provided by Splice Machine
  • 37.
  • 38.
  • 39.
    Common Big DataBusiness Use Cases Improve Strategic Decision Making Customer Experience Analysis Operational Optimization Risk and Fraud Reduction Data Monetization Security Event Detection and Analysis IT Cost Management
  • 40.
    Architectural Scenarios Architecture Role Business UseCase Analytics Data Warehouse Stream Processing Data Factory Transactional Data Store* Strategic Decision Making P s Customer Experience P s P s Operational Optimization P s s s Risk and Fraud Reduction P s P Data Monetization s s P Security Event Detection and Analysis P s s s IT Cost Management P s P P * Capability is just emerging within the Hadoop ecosystem. Consider this use case for isolated business cases and early adopters. P = Primary Use Case s = Secondary Use case
  • 41.
    Integrating Hadoop intothe Enterprise Determine Business Use Cases Understand Current Tools & Architecture Align Business Use Case Priorities Build Roadmap Specify Solution Architecture Update & Maintain Roadmap Implement Roadmap
  • 42.
    Final Thoughts Do • Matchthe business use case to the big data role • Clearly define a roadmap • Establish clear architectural standards to drive • Consistency • Re-use of resources • Homework when defining a solution architecture Don’t • Select an initial use case that relies on immature Hadoop functionality • Leverage tools that move data off the cluster for processing then storing the data back on the cluster • Assume all Hadoop technologies integrate well together
  • 43.
    As a reminder,please submit your questions in the chat box. We will get to as many as possible.
  • 44.
    Daily unique content aboutcontent management, user experience, portals and other enterprise information technology solutions across a variety of industries. Perficient.com/SocialMedia Facebook.com/Perficient Twitter.com/Perficient
  • 45.
    Thank you foryour participation today. Please fill out the survey at the close of this session.