Prepared by – Abhishek Raj
Strategies to Improve Profitability in Garment
Industry
2
 Factors affecting the cost at Material Level –
• Improve Material Consumption (Fabric & Trims).
• Proper Fabric Segregation.
• Proper Purchasing of Material.
• On Time Arrival of Material.
• Energy Saving.
Cost Reduction - Material
3
Improve Material Consumption (Fabric & Trims)
66%
12%
12%
10%
Cost Distribution
Raw Material
Production Cost
Worker Wages &
Salaries
Overheads &
Adminstrative Expense
4
 Fabric Consumption:
 Fabric represents around 60-65% of the total garment cost.
 It is the most important component in costing.
 Trims Consumption:
 Thread consumption will affect the garment cost significantly.
 Wrong calculations of thread consumption will lead to excess ordering of the thread.
 Less ordering will lead to interruption in production.
Improve Material Consumption (Fabric & Trims)
5
 Parameters need to consider for fabric consumption:
• GSM
• Width of the fabric
• Grain Line Orientation
• Length of the fabric roll
• Shrinkage of the fabric
• Type of fabric
Improve Material Consumption (Fabric & Trims)
6
 Trims consumption:
• Thread consumption
‐ The factors that affect the thread consumption are –
 Seam and fabric thickness
 Stitch and seam class
 Seam strength requirements
 SPI
 Thread count
 Machine used for stitching
 Production system followed
 Operation break-down of the garment
• Thread Consumption Ratios
‐ The easier method is to use the generally applicable Thread Consumption Ratios for the various
stitch types. By relating these ratios to the length of seams using each stitch type, total thread
consumption can be easily calculated.
Improve Material Consumption (Fabric & Trims)
7
 Just like a group of persons is more likely to achieve a common goal rather than individuals working
independently; Grouping of fabric is more likely to prevent wastage thus achieving the goal of optimum
fabric utilisation.
 There are 3 major parameters of grouping:
• Shade
• Width
• Shrinkage
Proper Fabric Segregation
8
 Width – Markers in production are made to fit the cuttable width of the fabric. Cuttable width can be
defined as the usable area width of the fabric excluding selvedge.
• Marker width = Fabric width – Selvedge width
• Width grouping ensures a potential rise in fabric utilization, and complete use of available fabric area.
Proper Fabric Width Segregation
9
 What happens when you don’t segregate your fabric rolls width-wise?
 This action would result in a heavy loss of fabric. How? Let us take a simple example to illustrate this:
• Before grouping:
‐ Cutting width = least width = 1.43m
‐ Total Cutting Area = 572 sq m
• After grouping:
‐ Group A – Roll #1, Roll #2, Roll #4
‐ Cutting width = 1.47 m
‐ Group B – Roll #3
‐ Cutting width = 1.43 m
‐ Total Cutting Area = 584 sq m
• Thus, in one go width grouping gives you 2.09% fabric saving.
Proper Fabric Segregation
10
 Sourcing fabric is one the most important and challenging jobs in the apparel industry. Even a little mistake
can cost thousands of dollars.
 It is a difficult job as the planner has to calculate accurate consumptions with inaccurate numbers or
estimates. He end up buying too much or too little. You either have yards of dead stock or huge losses in
short shipment.
 Major problems facing while buying fabric/materials –
• No Size Breakup
• No Information of Incoming Fabric
• Arriving at Consumption per Garment
• Addition of Process Loss
• Too Many Orders
Proper Oredering of Material
11
 No Size Breakup –
• Buying of fabric happens much prior to actual execution of order on the floor owing to the large lead
times. More than often, fabric is bought even before actual size breakup is given by buyer. An order
with more requirement of the larger sizes is bound to require more fabric than an order with more
requirement of smaller sizes despite having the same total order quantity. This makes ordering fabric
buying a tricky task.
 No Information of Incoming Fabric –
• A manufacturer has very little control over the fabric incoming from the mills. Despite guidelines for
the fabric to vendor, variations are inevitable. There is no knowledge of the accurate widths and
shrinkages of the fabric.1000 m of fabric in 155cm width will be more than 1000 m in 145cm width.
This leads to hidden wastages and inaccurate buying.
Proper Purchasing of Material
12
 Arriving at Consumption per Garment –
• Varying methods are used in various factories in order to calculate the consumption per garment for an
order. Some factories use historical data while others create estimated markers to arrive at this
consumption which are far from the final production plans. However, none of these give an accurate
consumption for buying resulting in variation between floor requirement and actual fabric ordered.
 Addition of Process Loss –
• An additional buffer is added to the final consumption to accommodate the process losses faced in the
factory. This is an umbrella percentage. Several times this process loss percentage leads to excess or
short buying as the merchandiser does not know what is the exact wastage percentage for a particular
fabric, fir or style.
 Too Many Orders –
• In most factories, buying happens in bulk. Fabric for thousands of orders is required to be ordered
simultaneously. This is a long, tedious and time consuming process prone to mistakes owing the
manual calculations.
Proper Purchasing of Material
13
 The concept of supply chain in a manufacturing organization can be defined as the interrelation of
activities involved in the delivery of products or services to the customer.
 It is a chain because it links together the activities that are needed in order to accomplish the final goal,
which is the final delivery of the goods or services.
 If a supplier that does not deliver goods to the company exactly on time and in the correct amounts could
seriously impact the production process.
 On time delivery can also help to reduce the Lead Time.
On Time Arrival of Material
14
 Delivery Schedule Achievement (DSA) –
• DSA analyses how well a supplier delivers what the customer wants and when they want it. The goal is
to achieve 100% on-time delivery without any special deliveries or overtime payments, which only
increase the delivery cost. DSA measures the actual delivery performance against the planned delivery
schedule. Failed deliveries include:
 "Not on time" deliveries - both late and early.
 "Incorrect quantity deliveries".
 Both "not on time" and "incorrect quantity deliveries".
On Time Arrival of Material
15
 Rising energy costs and environmental concerns put factory managers under constant pressure to optimise their
facility’s energy performance. This doesn’t need to be a daunting task.
 Following methods can help in Energy Saving –
• Install energy efficient lighting
• Optimize air compressors and fix leaks
• Overhaul or replace aging HVAC systems
• Create an energy management team
• Reschedule usage of high powered electric machinery
• Continuous improvement strategy
• Conduct an energy assessment
• Use Energy Star equipment
• Embrace natural lighting
• Unplug computers over the weekend
• Invest in good insulation
Energy Saving
16
 When analysing how the factory works to find ideas to save electricity, there are three main directions you
can take:
 Optimise the use of resources - The lighting system offers great opportunities for savings: adopting the
latest high efficiency fluorescent tubes and installing occupancy detection and variable output systems,
will ensure that only occupied areas are lit and light levels exactly match what is required by the activities
in each specific area. No energy is wasted lighting empty areas or providing more light than is necessary.
 Eliminate waste - Small inefficiencies can result in energy waste that can build up unnoticed. A weekly
audit at the end of the day can allow you to find them and fix them quickly, minimising energy waste. As
you analyse the workings of your facility, you can further improve its energy performance by identifying
and fixing similar inefficiencies that at first sight appear insignificant but can result in a build-up of
unnecessary electricity use.
 Reuse waste - Is there any waste that you could use to reduce your facility’s energy requirements? For
example, in winter you could reclaim excess heat at high levels and recirculate it at ground level, reducing
load on space heaters, so you would need fewer. This can be achieved with destratification fans or by
fitting recirculation modules on roof mounted air inlet systems.
Energy Saving
17
 Textile Today, Jan-2014
 Stitch Diary, Oct-2015
 Stitch Diary, Dec-2015
 Colt Blog, Nov-2012
 https://en.wikipedia.org/wiki/Quality,_cost,_delivery
References

More Related Content

What's hot

Presentation on Garments Cutting
Presentation on Garments CuttingPresentation on Garments Cutting
Presentation on Garments Cutting
Amanuzzaman Aman
 
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionStudy on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments Production
Momin Uddin
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industry
Tanmoy Antu
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
Disha Pawar
 
Advance apparel manufacturing technology
Advance apparel manufacturing technologyAdvance apparel manufacturing technology
Advance apparel manufacturing technology
Universal institute of fashion technology
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
Khairul Bashar
 
Garment production systems
Garment production systemsGarment production systems
Garment production systems
Dr.S.Kathirvelu Subramanian
 
Garments production system
Garments production systemGarments production system
Garments production systemamnapervaiz14
 
Textile flow chart
Textile flow chart Textile flow chart
Textile flow chart
Md. Azizul Haque Juel
 
Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...
Mazedul Islam Soyeb
 
Quality assurance department (sop)
Quality assurance department (sop)Quality assurance department (sop)
Quality assurance department (sop)
Mizan Rahman
 
Waste Management in Garment Industries
Waste Management in Garment IndustriesWaste Management in Garment Industries
Waste Management in Garment IndustriesShubha Brota Raha
 
Sewing Department
Sewing DepartmentSewing Department
Sewing Department
Mickey00Fahad
 
Product Analysis & Development
Product Analysis & DevelopmentProduct Analysis & Development
Product Analysis & DevelopmentRajeev Sharan
 
fabric spreading
fabric spreading fabric spreading
fabric spreading
Farhan ullah baig
 
Garments related abbreviations
Garments related abbreviationsGarments related abbreviations
Garments related abbreviations
Bangladeshi Bangladeshi
 
Garments Inspection
Garments InspectionGarments Inspection
Garments Inspection
Takbir Ahmed
 

What's hot (20)

Presentation on Garments Cutting
Presentation on Garments CuttingPresentation on Garments Cutting
Presentation on Garments Cutting
 
Quality Control Of Garment
Quality Control Of Garment Quality Control Of Garment
Quality Control Of Garment
 
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionStudy on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments Production
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industry
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Advance apparel manufacturing technology
Advance apparel manufacturing technologyAdvance apparel manufacturing technology
Advance apparel manufacturing technology
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
 
Garment production systems
Garment production systemsGarment production systems
Garment production systems
 
Garments production system
Garments production systemGarments production system
Garments production system
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 
Textile flow chart
Textile flow chart Textile flow chart
Textile flow chart
 
Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...
 
Quality assurance department (sop)
Quality assurance department (sop)Quality assurance department (sop)
Quality assurance department (sop)
 
Waste Management in Garment Industries
Waste Management in Garment IndustriesWaste Management in Garment Industries
Waste Management in Garment Industries
 
Sewing Department
Sewing DepartmentSewing Department
Sewing Department
 
Product Analysis & Development
Product Analysis & DevelopmentProduct Analysis & Development
Product Analysis & Development
 
IE working procedure
IE working procedureIE working procedure
IE working procedure
 
fabric spreading
fabric spreading fabric spreading
fabric spreading
 
Garments related abbreviations
Garments related abbreviationsGarments related abbreviations
Garments related abbreviations
 
Garments Inspection
Garments InspectionGarments Inspection
Garments Inspection
 

Similar to Cost Reduction Strategies

What are the factors that affect fabric consumption in apparel industry?
What are the factors that affect fabric consumption in apparel industry?What are the factors that affect fabric consumption in apparel industry?
What are the factors that affect fabric consumption in apparel industry?
ThreadSol
 
Top Cost-Saving Tips for Product Packaging
Top Cost-Saving Tips for Product PackagingTop Cost-Saving Tips for Product Packaging
Top Cost-Saving Tips for Product Packaging
Mespack India
 
Production of goods and services - Copy.pptx
Production of goods and services - Copy.pptxProduction of goods and services - Copy.pptx
Production of goods and services - Copy.pptx
MuhammedFaheem19
 
Apparel production and sourcong
Apparel production and sourcongApparel production and sourcong
Apparel production and sourcongsarprajkatre
 
Web2 cc energy_waste_16.10.2013_ss
Web2 cc energy_waste_16.10.2013_ssWeb2 cc energy_waste_16.10.2013_ss
Web2 cc energy_waste_16.10.2013_ssJulie's Bicycle
 
Apparel production process
Apparel production processApparel production process
Apparel production process
ravi kishore
 
Quality control
Quality controlQuality control
Quality control
zaman parvez
 
BravoConnect 2014: Sourcing a complex category
BravoConnect 2014: Sourcing a complex categoryBravoConnect 2014: Sourcing a complex category
BravoConnect 2014: Sourcing a complex category
BravoSolution
 
21-Inventory Management-2.pdf
21-Inventory Management-2.pdf21-Inventory Management-2.pdf
21-Inventory Management-2.pdf
Munaza21
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
gerlyn bonus
 
A Configure-to-Order System Heuristic Model Production Scheduling for Textile...
A Configure-to-Order System Heuristic Model Production Scheduling for Textile...A Configure-to-Order System Heuristic Model Production Scheduling for Textile...
A Configure-to-Order System Heuristic Model Production Scheduling for Textile...
International Journal of Business Marketing and Management (IJBMM)
 
Supply chain management
Supply chain management Supply chain management
Supply chain management
ARif Khan
 
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
dezyneecole
 
Waste Mgt.pptx
Waste Mgt.pptxWaste Mgt.pptx
Waste Mgt.pptx
siddanthjain5
 
PPC-4.pdf
PPC-4.pdfPPC-4.pdf
PPC-4.pdf
MdHasanSheikh1
 
13.jajajajajajajajjajajajqjajqjajqjajjaajppt
13.jajajajajajajajjajajajqjajqjajqjajjaajppt13.jajajajajajajajjajajajqjajqjajqjajjaajppt
13.jajajajajajajajjajajajqjajqjajqjajjaajppt
doremonlovers365
 
Lecture Intranets and supply chain management.pptx
Lecture Intranets and supply chain management.pptxLecture Intranets and supply chain management.pptx
Lecture Intranets and supply chain management.pptx
SamaLexalexis
 

Similar to Cost Reduction Strategies (20)

What are the factors that affect fabric consumption in apparel industry?
What are the factors that affect fabric consumption in apparel industry?What are the factors that affect fabric consumption in apparel industry?
What are the factors that affect fabric consumption in apparel industry?
 
Top Cost-Saving Tips for Product Packaging
Top Cost-Saving Tips for Product PackagingTop Cost-Saving Tips for Product Packaging
Top Cost-Saving Tips for Product Packaging
 
Production of goods and services - Copy.pptx
Production of goods and services - Copy.pptxProduction of goods and services - Copy.pptx
Production of goods and services - Copy.pptx
 
Apparel production and sourcong
Apparel production and sourcongApparel production and sourcong
Apparel production and sourcong
 
Web2 cc energy_waste_16.10.2013_ss
Web2 cc energy_waste_16.10.2013_ssWeb2 cc energy_waste_16.10.2013_ss
Web2 cc energy_waste_16.10.2013_ss
 
Apparel production process
Apparel production processApparel production process
Apparel production process
 
Quality control
Quality controlQuality control
Quality control
 
Cost Control
Cost ControlCost Control
Cost Control
 
BravoConnect 2014: Sourcing a complex category
BravoConnect 2014: Sourcing a complex categoryBravoConnect 2014: Sourcing a complex category
BravoConnect 2014: Sourcing a complex category
 
21-Inventory Management-2.pdf
21-Inventory Management-2.pdf21-Inventory Management-2.pdf
21-Inventory Management-2.pdf
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
 
A Configure-to-Order System Heuristic Model Production Scheduling for Textile...
A Configure-to-Order System Heuristic Model Production Scheduling for Textile...A Configure-to-Order System Heuristic Model Production Scheduling for Textile...
A Configure-to-Order System Heuristic Model Production Scheduling for Textile...
 
Supply chain management
Supply chain management Supply chain management
Supply chain management
 
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
 
Waste Mgt.pptx
Waste Mgt.pptxWaste Mgt.pptx
Waste Mgt.pptx
 
Planning optimisation
Planning optimisationPlanning optimisation
Planning optimisation
 
PPC-4.pdf
PPC-4.pdfPPC-4.pdf
PPC-4.pdf
 
13.jajajajajajajajjajajajqjajqjajqjajjaajppt
13.jajajajajajajajjajajajqjajqjajqjajjaajppt13.jajajajajajajajjajajajqjajqjajqjajjaajppt
13.jajajajajajajajjajajajqjajqjajqjajjaajppt
 
Lecture Intranets and supply chain management.pptx
Lecture Intranets and supply chain management.pptxLecture Intranets and supply chain management.pptx
Lecture Intranets and supply chain management.pptx
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 

More from Abhishek Raj

Digital Garment Printing
Digital Garment PrintingDigital Garment Printing
Digital Garment Printing
Abhishek Raj
 
Green Industry Initiative - Sustainable Production
Green Industry Initiative - Sustainable ProductionGreen Industry Initiative - Sustainable Production
Green Industry Initiative - Sustainable Production
Abhishek Raj
 
Quality Control in Garment Manufacturing
Quality Control in Garment ManufacturingQuality Control in Garment Manufacturing
Quality Control in Garment Manufacturing
Abhishek Raj
 
Costing of Sewing Accessories
Costing of Sewing AccessoriesCosting of Sewing Accessories
Costing of Sewing Accessories
Abhishek Raj
 
OSHA Regulations - Ergonomics
OSHA Regulations - ErgonomicsOSHA Regulations - Ergonomics
OSHA Regulations - Ergonomics
Abhishek Raj
 
Maintenance Management - Project
Maintenance Management - ProjectMaintenance Management - Project
Maintenance Management - Project
Abhishek Raj
 
5s Implementation - Case Study
5s Implementation - Case Study5s Implementation - Case Study
5s Implementation - Case Study
Abhishek Raj
 
OSHA Regulations - Ergonomics
OSHA Regulations - ErgonomicsOSHA Regulations - Ergonomics
OSHA Regulations - Ergonomics
Abhishek Raj
 
Factory Layout 1500 m/c Option 3
Factory Layout 1500 m/c   Option 3Factory Layout 1500 m/c   Option 3
Factory Layout 1500 m/c Option 3
Abhishek Raj
 
Brandix Apparel India - Apparel Internship Report
Brandix Apparel India - Apparel Internship ReportBrandix Apparel India - Apparel Internship Report
Brandix Apparel India - Apparel Internship Report
Abhishek Raj
 
Study on Exports T-Shirts Manufacturing Units in Tirupur
Study on Exports T-Shirts Manufacturing Units in TirupurStudy on Exports T-Shirts Manufacturing Units in Tirupur
Study on Exports T-Shirts Manufacturing Units in Tirupur
Abhishek Raj
 
Study on Exports T-Shirts Manufacturing Units in Tirupur
Study on Exports T-Shirts Manufacturing Units in TirupurStudy on Exports T-Shirts Manufacturing Units in Tirupur
Study on Exports T-Shirts Manufacturing Units in Tirupur
Abhishek Raj
 
Factory Layout 1500 m/c Option 1
Factory Layout 1500 m/c   Option 1Factory Layout 1500 m/c   Option 1
Factory Layout 1500 m/c Option 1
Abhishek Raj
 
T-Shirt Manufacturing - Plant Layout
T-Shirt Manufacturing - Plant LayoutT-Shirt Manufacturing - Plant Layout
T-Shirt Manufacturing - Plant Layout
Abhishek Raj
 
Brandix Apparel India - Apparel Internship
Brandix Apparel India - Apparel InternshipBrandix Apparel India - Apparel Internship
Brandix Apparel India - Apparel Internship
Abhishek Raj
 
Factory Layout 500 m/c
Factory Layout 500 m/cFactory Layout 500 m/c
Factory Layout 500 m/c
Abhishek Raj
 
Factory Layout 1500 m/c Option 2
Factory Layout 1500 m/c   Option 2Factory Layout 1500 m/c   Option 2
Factory Layout 1500 m/c Option 2
Abhishek Raj
 
Quality Management System - ISO 9001-2015
Quality Management System - ISO 9001-2015Quality Management System - ISO 9001-2015
Quality Management System - ISO 9001-2015
Abhishek Raj
 
HMRS - Human Resource Management System (VB.Net)
HMRS - Human Resource Management System (VB.Net)HMRS - Human Resource Management System (VB.Net)
HMRS - Human Resource Management System (VB.Net)
Abhishek Raj
 
Garment Printing Solutions
Garment Printing SolutionsGarment Printing Solutions
Garment Printing Solutions
Abhishek Raj
 

More from Abhishek Raj (20)

Digital Garment Printing
Digital Garment PrintingDigital Garment Printing
Digital Garment Printing
 
Green Industry Initiative - Sustainable Production
Green Industry Initiative - Sustainable ProductionGreen Industry Initiative - Sustainable Production
Green Industry Initiative - Sustainable Production
 
Quality Control in Garment Manufacturing
Quality Control in Garment ManufacturingQuality Control in Garment Manufacturing
Quality Control in Garment Manufacturing
 
Costing of Sewing Accessories
Costing of Sewing AccessoriesCosting of Sewing Accessories
Costing of Sewing Accessories
 
OSHA Regulations - Ergonomics
OSHA Regulations - ErgonomicsOSHA Regulations - Ergonomics
OSHA Regulations - Ergonomics
 
Maintenance Management - Project
Maintenance Management - ProjectMaintenance Management - Project
Maintenance Management - Project
 
5s Implementation - Case Study
5s Implementation - Case Study5s Implementation - Case Study
5s Implementation - Case Study
 
OSHA Regulations - Ergonomics
OSHA Regulations - ErgonomicsOSHA Regulations - Ergonomics
OSHA Regulations - Ergonomics
 
Factory Layout 1500 m/c Option 3
Factory Layout 1500 m/c   Option 3Factory Layout 1500 m/c   Option 3
Factory Layout 1500 m/c Option 3
 
Brandix Apparel India - Apparel Internship Report
Brandix Apparel India - Apparel Internship ReportBrandix Apparel India - Apparel Internship Report
Brandix Apparel India - Apparel Internship Report
 
Study on Exports T-Shirts Manufacturing Units in Tirupur
Study on Exports T-Shirts Manufacturing Units in TirupurStudy on Exports T-Shirts Manufacturing Units in Tirupur
Study on Exports T-Shirts Manufacturing Units in Tirupur
 
Study on Exports T-Shirts Manufacturing Units in Tirupur
Study on Exports T-Shirts Manufacturing Units in TirupurStudy on Exports T-Shirts Manufacturing Units in Tirupur
Study on Exports T-Shirts Manufacturing Units in Tirupur
 
Factory Layout 1500 m/c Option 1
Factory Layout 1500 m/c   Option 1Factory Layout 1500 m/c   Option 1
Factory Layout 1500 m/c Option 1
 
T-Shirt Manufacturing - Plant Layout
T-Shirt Manufacturing - Plant LayoutT-Shirt Manufacturing - Plant Layout
T-Shirt Manufacturing - Plant Layout
 
Brandix Apparel India - Apparel Internship
Brandix Apparel India - Apparel InternshipBrandix Apparel India - Apparel Internship
Brandix Apparel India - Apparel Internship
 
Factory Layout 500 m/c
Factory Layout 500 m/cFactory Layout 500 m/c
Factory Layout 500 m/c
 
Factory Layout 1500 m/c Option 2
Factory Layout 1500 m/c   Option 2Factory Layout 1500 m/c   Option 2
Factory Layout 1500 m/c Option 2
 
Quality Management System - ISO 9001-2015
Quality Management System - ISO 9001-2015Quality Management System - ISO 9001-2015
Quality Management System - ISO 9001-2015
 
HMRS - Human Resource Management System (VB.Net)
HMRS - Human Resource Management System (VB.Net)HMRS - Human Resource Management System (VB.Net)
HMRS - Human Resource Management System (VB.Net)
 
Garment Printing Solutions
Garment Printing SolutionsGarment Printing Solutions
Garment Printing Solutions
 

Recently uploaded

Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Jos Voskuil
 
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
Kumar Satyam
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
HajeJanKamps
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
PaulBryant58
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 

Recently uploaded (20)

Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
 
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 

Cost Reduction Strategies

  • 1. 1 Prepared by – Abhishek Raj Strategies to Improve Profitability in Garment Industry
  • 2. 2  Factors affecting the cost at Material Level – • Improve Material Consumption (Fabric & Trims). • Proper Fabric Segregation. • Proper Purchasing of Material. • On Time Arrival of Material. • Energy Saving. Cost Reduction - Material
  • 3. 3 Improve Material Consumption (Fabric & Trims) 66% 12% 12% 10% Cost Distribution Raw Material Production Cost Worker Wages & Salaries Overheads & Adminstrative Expense
  • 4. 4  Fabric Consumption:  Fabric represents around 60-65% of the total garment cost.  It is the most important component in costing.  Trims Consumption:  Thread consumption will affect the garment cost significantly.  Wrong calculations of thread consumption will lead to excess ordering of the thread.  Less ordering will lead to interruption in production. Improve Material Consumption (Fabric & Trims)
  • 5. 5  Parameters need to consider for fabric consumption: • GSM • Width of the fabric • Grain Line Orientation • Length of the fabric roll • Shrinkage of the fabric • Type of fabric Improve Material Consumption (Fabric & Trims)
  • 6. 6  Trims consumption: • Thread consumption ‐ The factors that affect the thread consumption are –  Seam and fabric thickness  Stitch and seam class  Seam strength requirements  SPI  Thread count  Machine used for stitching  Production system followed  Operation break-down of the garment • Thread Consumption Ratios ‐ The easier method is to use the generally applicable Thread Consumption Ratios for the various stitch types. By relating these ratios to the length of seams using each stitch type, total thread consumption can be easily calculated. Improve Material Consumption (Fabric & Trims)
  • 7. 7  Just like a group of persons is more likely to achieve a common goal rather than individuals working independently; Grouping of fabric is more likely to prevent wastage thus achieving the goal of optimum fabric utilisation.  There are 3 major parameters of grouping: • Shade • Width • Shrinkage Proper Fabric Segregation
  • 8. 8  Width – Markers in production are made to fit the cuttable width of the fabric. Cuttable width can be defined as the usable area width of the fabric excluding selvedge. • Marker width = Fabric width – Selvedge width • Width grouping ensures a potential rise in fabric utilization, and complete use of available fabric area. Proper Fabric Width Segregation
  • 9. 9  What happens when you don’t segregate your fabric rolls width-wise?  This action would result in a heavy loss of fabric. How? Let us take a simple example to illustrate this: • Before grouping: ‐ Cutting width = least width = 1.43m ‐ Total Cutting Area = 572 sq m • After grouping: ‐ Group A – Roll #1, Roll #2, Roll #4 ‐ Cutting width = 1.47 m ‐ Group B – Roll #3 ‐ Cutting width = 1.43 m ‐ Total Cutting Area = 584 sq m • Thus, in one go width grouping gives you 2.09% fabric saving. Proper Fabric Segregation
  • 10. 10  Sourcing fabric is one the most important and challenging jobs in the apparel industry. Even a little mistake can cost thousands of dollars.  It is a difficult job as the planner has to calculate accurate consumptions with inaccurate numbers or estimates. He end up buying too much or too little. You either have yards of dead stock or huge losses in short shipment.  Major problems facing while buying fabric/materials – • No Size Breakup • No Information of Incoming Fabric • Arriving at Consumption per Garment • Addition of Process Loss • Too Many Orders Proper Oredering of Material
  • 11. 11  No Size Breakup – • Buying of fabric happens much prior to actual execution of order on the floor owing to the large lead times. More than often, fabric is bought even before actual size breakup is given by buyer. An order with more requirement of the larger sizes is bound to require more fabric than an order with more requirement of smaller sizes despite having the same total order quantity. This makes ordering fabric buying a tricky task.  No Information of Incoming Fabric – • A manufacturer has very little control over the fabric incoming from the mills. Despite guidelines for the fabric to vendor, variations are inevitable. There is no knowledge of the accurate widths and shrinkages of the fabric.1000 m of fabric in 155cm width will be more than 1000 m in 145cm width. This leads to hidden wastages and inaccurate buying. Proper Purchasing of Material
  • 12. 12  Arriving at Consumption per Garment – • Varying methods are used in various factories in order to calculate the consumption per garment for an order. Some factories use historical data while others create estimated markers to arrive at this consumption which are far from the final production plans. However, none of these give an accurate consumption for buying resulting in variation between floor requirement and actual fabric ordered.  Addition of Process Loss – • An additional buffer is added to the final consumption to accommodate the process losses faced in the factory. This is an umbrella percentage. Several times this process loss percentage leads to excess or short buying as the merchandiser does not know what is the exact wastage percentage for a particular fabric, fir or style.  Too Many Orders – • In most factories, buying happens in bulk. Fabric for thousands of orders is required to be ordered simultaneously. This is a long, tedious and time consuming process prone to mistakes owing the manual calculations. Proper Purchasing of Material
  • 13. 13  The concept of supply chain in a manufacturing organization can be defined as the interrelation of activities involved in the delivery of products or services to the customer.  It is a chain because it links together the activities that are needed in order to accomplish the final goal, which is the final delivery of the goods or services.  If a supplier that does not deliver goods to the company exactly on time and in the correct amounts could seriously impact the production process.  On time delivery can also help to reduce the Lead Time. On Time Arrival of Material
  • 14. 14  Delivery Schedule Achievement (DSA) – • DSA analyses how well a supplier delivers what the customer wants and when they want it. The goal is to achieve 100% on-time delivery without any special deliveries or overtime payments, which only increase the delivery cost. DSA measures the actual delivery performance against the planned delivery schedule. Failed deliveries include:  "Not on time" deliveries - both late and early.  "Incorrect quantity deliveries".  Both "not on time" and "incorrect quantity deliveries". On Time Arrival of Material
  • 15. 15  Rising energy costs and environmental concerns put factory managers under constant pressure to optimise their facility’s energy performance. This doesn’t need to be a daunting task.  Following methods can help in Energy Saving – • Install energy efficient lighting • Optimize air compressors and fix leaks • Overhaul or replace aging HVAC systems • Create an energy management team • Reschedule usage of high powered electric machinery • Continuous improvement strategy • Conduct an energy assessment • Use Energy Star equipment • Embrace natural lighting • Unplug computers over the weekend • Invest in good insulation Energy Saving
  • 16. 16  When analysing how the factory works to find ideas to save electricity, there are three main directions you can take:  Optimise the use of resources - The lighting system offers great opportunities for savings: adopting the latest high efficiency fluorescent tubes and installing occupancy detection and variable output systems, will ensure that only occupied areas are lit and light levels exactly match what is required by the activities in each specific area. No energy is wasted lighting empty areas or providing more light than is necessary.  Eliminate waste - Small inefficiencies can result in energy waste that can build up unnoticed. A weekly audit at the end of the day can allow you to find them and fix them quickly, minimising energy waste. As you analyse the workings of your facility, you can further improve its energy performance by identifying and fixing similar inefficiencies that at first sight appear insignificant but can result in a build-up of unnecessary electricity use.  Reuse waste - Is there any waste that you could use to reduce your facility’s energy requirements? For example, in winter you could reclaim excess heat at high levels and recirculate it at ground level, reducing load on space heaters, so you would need fewer. This can be achieved with destratification fans or by fitting recirculation modules on roof mounted air inlet systems. Energy Saving
  • 17. 17  Textile Today, Jan-2014  Stitch Diary, Oct-2015  Stitch Diary, Dec-2015  Colt Blog, Nov-2012  https://en.wikipedia.org/wiki/Quality,_cost,_delivery References