LEVEL 1 – SCHEMATIC SUMMARY PROGRAM
PROGRAM TYPE: Schematic Program
REQUIRED: Tender Final Review; At Project Baseline
Establishment; Updated Monthly in line with L3 IMP.
PROGRAM PURPOSE: Key high level document to
communicate overall project execution strategy and critical /
near critical paths as captured in the L3 IMP
PROGRAM RELATIONSHIP: Dependent on Level 3 program
RESPONSIBILITY: Planner
FORMAT: 1 Page, project specific, schematic with annotations.
P6/Excel/PowerPoint/Visio/Time Chainage.
TYPICALLY DEVELOPED BY: Planner
LEVEL 3 – INTEGRATED MASTER PROGRAM
PROGRAM TYPE: Integrated Master Program
REQUIRED: Tender Final Review; At Project Baseline Establishment; Updated for Monthly Contract Review
PROGRAM PURPOSE: Cross functional strategic program to project completion
PROGRAM RELATIONSHIP: Underpins forecast final cost. Sets framework for Level 4 and Level 5
RESPONSIBILITY: Planner
FORMAT: Bar Charts using Primavera P6 and Key Production Measure S-Curves / Histograms generated using
Primavera P6 / MS Excel
TYPICALLY DEVELOPED BY: Planner in consultation with functional leads (e.g. Design, Procurement,
Construction).
LEVEL 5 – EXECUTION PROGRAMS
PROGRAM TYPE: Functional Execution Program
REQUIRED: Prior to commencement of associated works;
Updated Weekly
PROGRAM PURPOSE: Short term 4 week look-ahead to enable
coordination of construction activities on site.
PROGRAM RELATIONSHIP: Detailed L5 CEP to achieve L4
CEP targets. Planning parameters set by L4 Execution
Programs.
RESPONSIBILITY: SPE / Project Engineer
FORMAT: P6/ MSP/Excel
TYPICALLY DEVELOPED BY: Project Engineer(s), Site
Engineer(s), Design Team Leader(s)
LEVEL 4 – EXECUTION PROGRAMS
PROGRAM TYPE: Functional Execution
Program
REQUIRED: Prior to commencement of
associated works; Updated Monthly
PROGRAM PURPOSE: Package / Area level
planning to support the coordination and
delivery of logistics (e.g. Approvals, design,
procurement, materials, labour, etc) to
enable field execution of construction.
PROGRAM RELATIONSHIP: Planning
parameters set by L3 IMP. May
incorporate more aggressive targets.
RESPONSIBILITY: Execution Teams
FORMAT: Primavera P6 / MSP
TYPICALLY DEVELOPED BY:
Functional leads (e.g. Design,
Procurement, Construction), with
support from Planner as
required.
LEVEL 5 – PROGRAM ANALYSIS
ANALYSIS TYPE: Performance Trending
REQUIRED: Weekly
ANALYSIS PURPOSE: Trends impacting program targets.
PROGRAM RELATIONSHIP: Track achievements of L5
program and Causes of Slippage.
RESPONSIBILITY: Planner
FORMAT: Trend Charts (MS Excel)
TYPICALLY DEVELOPED BY: Planner
LEVEL
4
Construction
Execution
Program
(CEP)
LEVEL
5
Construction
Execution
Program
(CEP)
LEVEL
3
Integrated
Master
Program
(IMP)
LEVEL
1
Schematic
Summary
Program
(SSP)
LEVEL
2
Summary
Reporting
Program
(SRP)
CONTROLS & PLANNING MANAGEMENT PLAN
[INSERT PROJECT NO. – PROJECT NAME] / (TENDER / DELIVERY) PHASE
LEVEL 2 –SUMMARY REPORTING PROGRAM
PROGRAM TYPE: Selective Summary Program
REQUIRED: Tender Final Review; At Project Baseline
Establishment; Updated Monthly
PROGRAM PURPOSE: Reporting planned and actual dates for
project at summary level.
PROGRAM RELATIONSHIP: Dependent on Level 3 program
RESPONSIBILITY: Planner
FORMAT: Primavera P6. Selectively Summarised L3 IMP
TYPICALLY DEVELOPED BY: Planner in consultation with
senior project team.
R [insert Position from Org Chart]
A [insert Position from Org Chart]
C [insert Position(s) from Org Chart]
I [insert Position(s) from Org Chart]
R [insert Position Title from Org Chart on P2]
A [insert Position Title from Org Chart on P2]
C [insert Position Title(s) from Org Chart on P2]
I [insert Position Title (s) from Org Chart on P2]
R [insert Position from Org Chart]
A [insert Position from Org Chart]
C [insert Position(s) from Org Chart]
I [insert Position(s) from Org Chart]
R
[insert Position from
Org Chart]
A
[insert Position from
Org Chart]
C
[insert Position(s) from
Org Chart]
I
[insert Position(s) from
Org Chart]
R [insert Position from Org Chart]
A [insert Position from Org Chart]
C [insert Position(s) from Org Chart]
I [insert Position(s) from Org Chart]
R [insert Position from Org Chart]
A [insert Position from Org Chart]
C [insert Position(s) from Org Chart]
I [insert Position(s) from Org Chart]
Page 1 of 2
Revision No. XX____________
Issue Date XX____________
Prepared By XX____________
Approved By XX____________
<Using roles from
Simplified Org Chart on P2,
assign R/A/C/I>
<Projects can modify standard C&P
Management Plan (areas in red
text) for each Level to suit project
intentions>
Instructions: The red text identifies the areas for completion.
Also see prompts in callouts.
CONTROLS & PLANNING MANAGEMENT PLAN
[INSERT PROJECT NO. – PROJECT NAME] / (TENDER / DELIVERY) PHASE
Page 2 of 2
Revision No. XX____________
Issue Date XX____________
Prepared By XX____________
Approved By XX____________
FUNCTIONAL ORGANISATION CHART
SHOWS ALL POSITIONS THAT HAVE A C&P R.A.C.I
CRA/PCA Ref Item CRA/PCR Comment
XX XXXXX XXXXX
C&P MONTHLY TIMETABLE
Project
Manager
Controls
Manager
Lead Planner
Scheduler
Construction
Manager
Area SPE’s x
3
Project
Engineers
Direct
Supervision
Area Planner
Design
Manager
Area Design
Coordinator’s
x 3
Design Leads
Design
Planner
Procurement
and Logistics
Manager
Logistics
Planner
Procurement
Expediters
Suppliers
KEY PERFORMANCE MEASURES C&P CONTRACTUAL REQUIREMENTS
KPM Level Unit of Measure
Accommodation Level 3 Beds
Earthworks Level 3 BCM
(Cut/Fill/Import)
INTERNAL REPORTING REQUIREMENTS
Report Title Program
Level and
Frequency
Responsible
KPM S-Curves Level 3
Monthly
Lead Planner
KPM S-Curves Level 4
Weekly
Area Planner
Design Planner
Logistics Planner
Schedule
Performance
Level 3
Monthly
Lead Planner
Production
Analysis
Level 5 Area Planner
C&P FTE XX
C&P % IND XX
EXTERNAL REPORTING REQUIREMENTS
Report Title Program
Level and
Frequency
Responsible
XX XXXXX XXXXX
<Review
Relevant
CRA/PCR
sections
and
note
relevant
CRA/PCR
comments
in
this
table>
<
CRA
sections
>
•Part
B
–
Section
1
–
Contract
Type;
Date
/
Period
for
(Practical)
Completion
•Part
D
–
Section
1
–
Time
and
Cost
Entitlements
(EOT’s)
•Part
D
–
Section
4
–
Late
Completion
Damages
(LD’s)
•Part
E
–
Section
2
–
LCPL
Business
Standard
Risk
Issues
•(1/15
Delay;
1/24
Design
.2
Client
Review
.5
Proceed
at
LCPL
Risk
1/33.3
Work
Rosters)
<
PCR
sections
>
•Part
B
–
Section
1
–
Time
and
Cost
Entitlements;
Section
5
Liquidated
Damages;
Section
7
Liability
•Part
C
–
Sections
1-4;
Section
10
&
11
•Part
E
–
Sections
3-5;
Section
12
<Review
Client/External
Reporting
Requirements
and
list
major
/
summarised
requirements
in
this
table>
Identify
all
KPMs
across
all
phases
to
ensure
adequate
performance
management
coverage
over
the
project
life
and
list
in
this
table>
<Insert
a
‘simplified’
partial
org
chart
that
shows
all
C&P
roles
and
all
functional
roles
that
have
a
C&P
related
R/A/C.
Use
these
roles
in
the
‘Responsibility
columns
of
tables
on
this
page
and
in
the
R/A/C/I
tables
on
page
1>
<Review
LCPL
and
BU
Reporting
Requirements
and
list
major
/
summarised
requirements
in
this
table.
Note
which
Level
it
relates
to
and
who
has
the
responsibility
using
the
position
title
from
the
simplified
org
chart>
<Insert
a
schematic
month
end
progress
cycle
for
C&P,
noting
when
each
Program
Level
is
taken
through
the
‘Execute’
and
‘Control’
stages
of
the
C&P
Process>
<Enter
the
number
of
Full
Time
Equivalent
C&P
Roles
(e.g.
Lead
Planner,
Scheduler,
Area
Planner,
etc
but
excluding
those
with
L4
and
L5
responsibility).
Calculate
C&P
FTE
as
%
of
total
indirect
FTE>
Instructions: The red text identifies the areas for completion.
Also see prompts in callouts.

More Related Content

Similar to Controls___Planning_Management_Plan_Short_Form_v4.pptx

PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docxPLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
infantsuk
 
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docxPLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
stilliegeorgiana
 
Major proj term3
Major proj term3Major proj term3
Major proj term3
hccit
 

Similar to Controls___Planning_Management_Plan_Short_Form_v4.pptx (20)

Oracle Primavera contractor
Oracle Primavera  contractorOracle Primavera  contractor
Oracle Primavera contractor
 
Scrum With Ms Project
Scrum With Ms ProjectScrum With Ms Project
Scrum With Ms Project
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides
 
PMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptxPMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptx
 
The simplified project management process it-toolkits
The simplified project management process   it-toolkitsThe simplified project management process   it-toolkits
The simplified project management process it-toolkits
 
IMP IMS overview
IMP IMS overviewIMP IMS overview
IMP IMS overview
 
ROPMS - Results-Oriented Project Management System
ROPMS - Results-Oriented Project Management SystemROPMS - Results-Oriented Project Management System
ROPMS - Results-Oriented Project Management System
 
Primavera # M.S project
Primavera # M.S projectPrimavera # M.S project
Primavera # M.S project
 
Updated CV
Updated CVUpdated CV
Updated CV
 
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docxPLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
 
SE chapters 24-25
SE chapters 24-25SE chapters 24-25
SE chapters 24-25
 
Planning
PlanningPlanning
Planning
 
STAF/ICGT 2018 Introduction to graph-oriented programming
STAF/ICGT 2018 Introduction to graph-oriented programmingSTAF/ICGT 2018 Introduction to graph-oriented programming
STAF/ICGT 2018 Introduction to graph-oriented programming
 
Slides chapters 24-25
Slides chapters 24-25Slides chapters 24-25
Slides chapters 24-25
 
Road Project Schedule M S Project.ppt
Road Project Schedule M S Project.pptRoad Project Schedule M S Project.ppt
Road Project Schedule M S Project.ppt
 
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docxPLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
 
Major proj term3
Major proj term3Major proj term3
Major proj term3
 
Ch5ProjectPlanning.ppt
Ch5ProjectPlanning.pptCh5ProjectPlanning.ppt
Ch5ProjectPlanning.ppt
 

More from khalidalkhudhir

More from khalidalkhudhir (7)

422465858-دورة-في-أساليب-حل-المشكلات-وأنماط-أتخاذ-القرار-د-منير-جمال.pptx
422465858-دورة-في-أساليب-حل-المشكلات-وأنماط-أتخاذ-القرار-د-منير-جمال.pptx422465858-دورة-في-أساليب-حل-المشكلات-وأنماط-أتخاذ-القرار-د-منير-جمال.pptx
422465858-دورة-في-أساليب-حل-المشكلات-وأنماط-أتخاذ-القرار-د-منير-جمال.pptx
 
نظريات القيادة النظريات التقليدية والحديثة.pptx
نظريات القيادة النظريات التقليدية والحديثة.pptxنظريات القيادة النظريات التقليدية والحديثة.pptx
نظريات القيادة النظريات التقليدية والحديثة.pptx
 
نظريات الادارة مفهوم النظرية التعاريف.ppsx
نظريات الادارة مفهوم النظرية التعاريف.ppsxنظريات الادارة مفهوم النظرية التعاريف.ppsx
نظريات الادارة مفهوم النظرية التعاريف.ppsx
 
الادارة التعليمية - عرض تقديمي لمقرر.pptx
الادارة التعليمية - عرض تقديمي لمقرر.pptxالادارة التعليمية - عرض تقديمي لمقرر.pptx
الادارة التعليمية - عرض تقديمي لمقرر.pptx
 
Sample Pert Chart - project management
Sample Pert Chart  -  project managementSample Pert Chart  -  project management
Sample Pert Chart - project management
 
Crisis management structure - project management
Crisis management structure - project managementCrisis management structure - project management
Crisis management structure - project management
 
bubble-map-template-16.doc
bubble-map-template-16.docbubble-map-template-16.doc
bubble-map-template-16.doc
 

Recently uploaded

internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 
Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7
Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7
Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7
ickkoo5
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 

Recently uploaded (15)

Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
Group work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and ImportanceGroup work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and Importance
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7
Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7
Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7
 
Internal Reconstruction Corporate accounting by bhumika Garg
Internal Reconstruction Corporate accounting by bhumika GargInternal Reconstruction Corporate accounting by bhumika Garg
Internal Reconstruction Corporate accounting by bhumika Garg
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
thesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholarsthesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholars
 
Spring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical ReviewSpring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical Review
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 

Controls___Planning_Management_Plan_Short_Form_v4.pptx

  • 1. L1 &L2 SUMMARY L3 INTEGRATED MASTER PROGRAM L5 EXECUTION PROGRAMS L4 EXECUTION PROGRAMS LEVEL 1 – SCHEMATIC SUMMARY PROGRAM PROGRAM TYPE: Schematic Program REQUIRED: Tender Final Review; At Project Baseline Establishment; Updated Monthly in line with L3 IMP. PROGRAM PURPOSE: Key high level document to communicate overall project execution strategy and critical / near critical paths as captured in the L3 IMP PROGRAM RELATIONSHIP: Dependent on Level 3 program RESPONSIBILITY: Planner FORMAT: 1 Page, project specific, schematic with annotations. P6/Excel/PowerPoint/Visio/Time Chainage. TYPICALLY DEVELOPED BY: Planner LEVEL 3 – INTEGRATED MASTER PROGRAM PROGRAM TYPE: Integrated Master Program REQUIRED: Tender Final Review; At Project Baseline Establishment; Updated for Monthly Contract Review PROGRAM PURPOSE: Cross functional strategic program to project completion PROGRAM RELATIONSHIP: Underpins forecast final cost. Sets framework for Level 4 and Level 5 RESPONSIBILITY: Planner FORMAT: Bar Charts using Primavera P6 and Key Production Measure S-Curves / Histograms generated using Primavera P6 / MS Excel TYPICALLY DEVELOPED BY: Planner in consultation with functional leads (e.g. Design, Procurement, Construction). LEVEL 5 – EXECUTION PROGRAMS PROGRAM TYPE: Functional Execution Program REQUIRED: Prior to commencement of associated works; Updated Weekly PROGRAM PURPOSE: Short term 4 week look-ahead to enable coordination of construction activities on site. PROGRAM RELATIONSHIP: Detailed L5 CEP to achieve L4 CEP targets. Planning parameters set by L4 Execution Programs. RESPONSIBILITY: SPE / Project Engineer FORMAT: P6/ MSP/Excel TYPICALLY DEVELOPED BY: Project Engineer(s), Site Engineer(s), Design Team Leader(s) LEVEL 4 – EXECUTION PROGRAMS PROGRAM TYPE: Functional Execution Program REQUIRED: Prior to commencement of associated works; Updated Monthly PROGRAM PURPOSE: Package / Area level planning to support the coordination and delivery of logistics (e.g. Approvals, design, procurement, materials, labour, etc) to enable field execution of construction. PROGRAM RELATIONSHIP: Planning parameters set by L3 IMP. May incorporate more aggressive targets. RESPONSIBILITY: Execution Teams FORMAT: Primavera P6 / MSP TYPICALLY DEVELOPED BY: Functional leads (e.g. Design, Procurement, Construction), with support from Planner as required. LEVEL 5 – PROGRAM ANALYSIS ANALYSIS TYPE: Performance Trending REQUIRED: Weekly ANALYSIS PURPOSE: Trends impacting program targets. PROGRAM RELATIONSHIP: Track achievements of L5 program and Causes of Slippage. RESPONSIBILITY: Planner FORMAT: Trend Charts (MS Excel) TYPICALLY DEVELOPED BY: Planner LEVEL 4 Construction Execution Program (CEP) LEVEL 5 Construction Execution Program (CEP) LEVEL 3 Integrated Master Program (IMP) LEVEL 1 Schematic Summary Program (SSP) LEVEL 2 Summary Reporting Program (SRP) CONTROLS & PLANNING MANAGEMENT PLAN [INSERT PROJECT NO. – PROJECT NAME] / (TENDER / DELIVERY) PHASE LEVEL 2 –SUMMARY REPORTING PROGRAM PROGRAM TYPE: Selective Summary Program REQUIRED: Tender Final Review; At Project Baseline Establishment; Updated Monthly PROGRAM PURPOSE: Reporting planned and actual dates for project at summary level. PROGRAM RELATIONSHIP: Dependent on Level 3 program RESPONSIBILITY: Planner FORMAT: Primavera P6. Selectively Summarised L3 IMP TYPICALLY DEVELOPED BY: Planner in consultation with senior project team. R [insert Position from Org Chart] A [insert Position from Org Chart] C [insert Position(s) from Org Chart] I [insert Position(s) from Org Chart] R [insert Position Title from Org Chart on P2] A [insert Position Title from Org Chart on P2] C [insert Position Title(s) from Org Chart on P2] I [insert Position Title (s) from Org Chart on P2] R [insert Position from Org Chart] A [insert Position from Org Chart] C [insert Position(s) from Org Chart] I [insert Position(s) from Org Chart] R [insert Position from Org Chart] A [insert Position from Org Chart] C [insert Position(s) from Org Chart] I [insert Position(s) from Org Chart] R [insert Position from Org Chart] A [insert Position from Org Chart] C [insert Position(s) from Org Chart] I [insert Position(s) from Org Chart] R [insert Position from Org Chart] A [insert Position from Org Chart] C [insert Position(s) from Org Chart] I [insert Position(s) from Org Chart] Page 1 of 2 Revision No. XX____________ Issue Date XX____________ Prepared By XX____________ Approved By XX____________ <Using roles from Simplified Org Chart on P2, assign R/A/C/I> <Projects can modify standard C&P Management Plan (areas in red text) for each Level to suit project intentions> Instructions: The red text identifies the areas for completion. Also see prompts in callouts.
  • 2. CONTROLS & PLANNING MANAGEMENT PLAN [INSERT PROJECT NO. – PROJECT NAME] / (TENDER / DELIVERY) PHASE Page 2 of 2 Revision No. XX____________ Issue Date XX____________ Prepared By XX____________ Approved By XX____________ FUNCTIONAL ORGANISATION CHART SHOWS ALL POSITIONS THAT HAVE A C&P R.A.C.I CRA/PCA Ref Item CRA/PCR Comment XX XXXXX XXXXX C&P MONTHLY TIMETABLE Project Manager Controls Manager Lead Planner Scheduler Construction Manager Area SPE’s x 3 Project Engineers Direct Supervision Area Planner Design Manager Area Design Coordinator’s x 3 Design Leads Design Planner Procurement and Logistics Manager Logistics Planner Procurement Expediters Suppliers KEY PERFORMANCE MEASURES C&P CONTRACTUAL REQUIREMENTS KPM Level Unit of Measure Accommodation Level 3 Beds Earthworks Level 3 BCM (Cut/Fill/Import) INTERNAL REPORTING REQUIREMENTS Report Title Program Level and Frequency Responsible KPM S-Curves Level 3 Monthly Lead Planner KPM S-Curves Level 4 Weekly Area Planner Design Planner Logistics Planner Schedule Performance Level 3 Monthly Lead Planner Production Analysis Level 5 Area Planner C&P FTE XX C&P % IND XX EXTERNAL REPORTING REQUIREMENTS Report Title Program Level and Frequency Responsible XX XXXXX XXXXX <Review Relevant CRA/PCR sections and note relevant CRA/PCR comments in this table> < CRA sections > •Part B – Section 1 – Contract Type; Date / Period for (Practical) Completion •Part D – Section 1 – Time and Cost Entitlements (EOT’s) •Part D – Section 4 – Late Completion Damages (LD’s) •Part E – Section 2 – LCPL Business Standard Risk Issues •(1/15 Delay; 1/24 Design .2 Client Review .5 Proceed at LCPL Risk 1/33.3 Work Rosters) < PCR sections > •Part B – Section 1 – Time and Cost Entitlements; Section 5 Liquidated Damages; Section 7 Liability •Part C – Sections 1-4; Section 10 & 11 •Part E – Sections 3-5; Section 12 <Review Client/External Reporting Requirements and list major / summarised requirements in this table> Identify all KPMs across all phases to ensure adequate performance management coverage over the project life and list in this table> <Insert a ‘simplified’ partial org chart that shows all C&P roles and all functional roles that have a C&P related R/A/C. Use these roles in the ‘Responsibility columns of tables on this page and in the R/A/C/I tables on page 1> <Review LCPL and BU Reporting Requirements and list major / summarised requirements in this table. Note which Level it relates to and who has the responsibility using the position title from the simplified org chart> <Insert a schematic month end progress cycle for C&P, noting when each Program Level is taken through the ‘Execute’ and ‘Control’ stages of the C&P Process> <Enter the number of Full Time Equivalent C&P Roles (e.g. Lead Planner, Scheduler, Area Planner, etc but excluding those with L4 and L5 responsibility). Calculate C&P FTE as % of total indirect FTE> Instructions: The red text identifies the areas for completion. Also see prompts in callouts.