CONFIGURATION MANAGEMENT PLAN
Project name insert project name
Release Draft/Final
Date:
PRINCE2
Author:
Owner:
Client:
Document Number:
configurationmanagementplan-150722065957-lva1-app6892.doc insert project name
Date:
Document History
Document
Loca
tion
This document is only valid on the day it was printed.
The source of the document will be found in the Quality File.
Revision
Histo
ry
Date of next revision:
Revision
date
Previous
revision date
Summary of Changes Changes
marked
Approvals This document requires the following approvals.
Signed approval forms are filed in the project files.
Name Signature Title Date of
Issue
Version
Distribution This document has been distributed to:
Name Title Date of
Issue
Version
Page 2
configurationmanagementplan-150722065957-lva1-app6892.doc insert project name
Date:
Overview
Purpose To identify how and by whom the project's products will be controlled and
protected.
Contents This plan contains the following topics:
Topic See Page
Configuration Management Method
Configuration Management Systems or tools
Filing System/structure
Product Identification scheme
Filing & retrieval security
Configuration Librarian
Configuration Management Method
Configuration Management System or tools
Reference to any CM systems or tools to be used or with which links will be
necessary
Filing System/structure
Storage
Retrieval
Page 3
configurationmanagementplan-150722065957-lva1-app6892.doc insert project name
Date:
Identification
Filing & retrieval security
Should cover product submission, issue and back-up procedures
Configuration Librarian
Page 4

Configuration management plan

  • 1.
    CONFIGURATION MANAGEMENT PLAN Projectname insert project name Release Draft/Final Date: PRINCE2 Author: Owner: Client: Document Number:
  • 2.
    configurationmanagementplan-150722065957-lva1-app6892.doc insert projectname Date: Document History Document Loca tion This document is only valid on the day it was printed. The source of the document will be found in the Quality File. Revision Histo ry Date of next revision: Revision date Previous revision date Summary of Changes Changes marked Approvals This document requires the following approvals. Signed approval forms are filed in the project files. Name Signature Title Date of Issue Version Distribution This document has been distributed to: Name Title Date of Issue Version Page 2
  • 3.
    configurationmanagementplan-150722065957-lva1-app6892.doc insert projectname Date: Overview Purpose To identify how and by whom the project's products will be controlled and protected. Contents This plan contains the following topics: Topic See Page Configuration Management Method Configuration Management Systems or tools Filing System/structure Product Identification scheme Filing & retrieval security Configuration Librarian Configuration Management Method Configuration Management System or tools Reference to any CM systems or tools to be used or with which links will be necessary Filing System/structure Storage Retrieval Page 3
  • 4.
    configurationmanagementplan-150722065957-lva1-app6892.doc insert projectname Date: Identification Filing & retrieval security Should cover product submission, issue and back-up procedures Configuration Librarian Page 4