The document discusses software configuration management. It describes version 1.0 and 1.1 of a software engineering document released on February 2, 2012 and June 2, 2012 respectively by author Kittitouch S. Version 1.1 added details on software configuration versions, tools for managing configuration, and a software configuration management plan. The document then discusses software configuration, management, and control as well as accurate versioning. It describes configuration items, versions, and numerating conventions. The summary provides an overview of the key topics and changes covered in the document.
“What is thecorrect version of the software
module that I have to continue its coding?”
“Who can provide me with an accurate copy of last
year’s version 4.1 of the TMY software system?”
“What version of the design document matches the
software version we are currently adapting to a new
customer’s requirements?”
6.
“What version ofthe software system is
installed at ABC Industries?”
“Where can I find the full list of customers that
use version 6.8 of our software?”
“Can we be sure that the version installed at
Top Com Ltd. does not include
undocumented changes
(and changes that have not been approved)?”
1. Reduces confusionand establishes order.
2. Organizes the activities necessary to maintain
product integrity.
3. Ensures correct product configurations.
4. Limits legal liability by providing a record of actions.
5. Reduces life-cycle costs.
6. Enables consistent conformance with requirements.
7. Provides a stable working environment.
8. Enhances compliance with standards.
9. Enhances status accounting.
9.
Software configuration management(SCM)
is the SQA component assigned to manage
changes and supply accurate answers to
inquiries of the types mentioned above.
SCM is stressed by ISO 9000–3 standards
10.
Software configuration item(SCI) or
configuration item (CI)
An approved unit of software code, a document or
piece of hardware that is designed for
configuration management and treated as a
distinct entity in the software configuration
management process.
11.
SCI version
Theapproved state of an SCI at any given point of
time during the development or maintenance
process.
Software configuration version
An approved selected set of documented SCI
versions that constitute a software system or
document at a given point of time.
The tasks ofsoftware configuration management
Control software change
Release of SCI and software configuration versions
Provision of SCM information services
Verification of compliance to SCM procedures.
17.
Software change managementcontrols the process
of introducing changes mainly by doing the
following:
Examining change requests and approving
implementation of appropriate requests.
Assuring the quality of each new version of software
configuration before it becomes operational.
18.
Types of softwareconfiguration releases
Baseline versions-Baseline software configuration
versions are planned early, during a system’s
development or operating stage.
Baseline versions serve as milestones in the
software system’s life cycle, and represent the
foundations for further system development.
19.
Intermediate versions-When problems arise
that require immediate attention – such as
the need to correct defects identified in an
important SCI, or perform immediate
adaptations as defined in a contract with a
new customer
– an intermediate version of the software is
often prepared.
20.
Revisions-Revisions introduceminor changes
and corrections to a given software
configuration version. In some cases, several
successive revisions are released before a
new baseline version is released.
21.
Numeration conventionsfor identification
of SCI and software versions
-Numeration conventions have been formulated to
identify SCIs; the most commonly used is decimal
numeration, which indicates the successive version
and revision numbers and is registered accordingly.
Example- SRS Ver.1.0 ,SRS Ver.1.1
23.
SCMP usually includes:
An overview of the software development project
or existing software system.
A list of scheduled baseline version releases.
A list of SCIs (documents, code, etc.) to be
included in each version.
A table identifying the relationship of software
development project plans and maintenance
plans to scheduled releases of new SCIs or SCI
versions.
24.
A listof assumptions about the resources required
to perform the various activities required by the
SCMP.
Estimates of the human resources and budget
needed to perform the SCMP.
25.
Based on theproject plan, the SCMP sets the
release dates of baseline versions, which
usually coincide with the conclusion of one or
more of the following three events:
Design stage
Coding stage
System test stage
26.
During the operation(maintenance) stage, further releases
of software baseline versions are required in order to
introduce improved software versions released after
accumulation of SCI changes made during regular customer
use.
The plan generally schedules new baseline releases
periodically, either annually, semi-annually, or according to
the anticipated number of accumulated changes in SCIs.
27.
SCI version document–a template
Identification
▪ SCI Version number
▪ Name(s) of software engineer(s) who implemented the
change
▪ Date the new version was completed and approved
28.
Changes inthe new version
▪ Former SCI version number
▪ Short description of the introduced changes
▪ List of other SCIs that had to be changed as a result of
the current changes
▪ List of SCOs (Software change orders)included in the
new version
▪ List of software problem reports resolved by the new
version
▪ Operational as well as other implications of the changes
introduced in the new version
29.
The computerized SCMtools also operate the
mechanisms coordinating the work on an SCI’s
changes and prevent different teams from
simultaneously introducing changes in the same
SCI.
30.
An additional benefitof the use of a computerized
SCM system is the high security level it is able to
provide:
It secures the code version and documentation files
versions by protecting them from any changes,
deletions and other damages.
It activates back-up procedures required for safe
SCM file storage.