PRODUCT CHECKLIST
Project name insert project name
Release Draft/Final
Date:
PRINCE2
Author:
Owner:
Client:
Document Number:
productchecklist-150722070001-lva1-app6891.doc insert project name
Date:
Document History
Document
Loca
tion
This document is only valid on the day it was printed.
The source of the document will be found in the appropriate Plans section.
Revision
Histo
ry
Date of next revision:
Revision
date
Previous
revision date
Summary of Changes Changes
marked
Approvals This document requires the following approvals.
Signed approval forms are filed in the project files.
Name Signature Title Date of
Issue
Version
Distribution This document has been distributed to:
Name Title Date of
Issue
Version
Page 2
productchecklist-150722070001-lva1-app6891.doc insert project name
Date:
Purpose
To list the products to be produced within a Stage Plan, together with key
status dates.
Contents This publication contains the following topics:
Topic See Page
Plan identification
Product names
Planned and actual dates
Plan
ident
ificat
ion
Key dates:
Product Draft Ready Quality Check Approval
Plan Actual Plan Actual Plan Actual
Page 3

Prince 2: project managment Document Product checklist

  • 1.
    PRODUCT CHECKLIST Project nameinsert project name Release Draft/Final Date: PRINCE2 Author: Owner: Client: Document Number:
  • 2.
    productchecklist-150722070001-lva1-app6891.doc insert projectname Date: Document History Document Loca tion This document is only valid on the day it was printed. The source of the document will be found in the appropriate Plans section. Revision Histo ry Date of next revision: Revision date Previous revision date Summary of Changes Changes marked Approvals This document requires the following approvals. Signed approval forms are filed in the project files. Name Signature Title Date of Issue Version Distribution This document has been distributed to: Name Title Date of Issue Version Page 2
  • 3.
    productchecklist-150722070001-lva1-app6891.doc insert projectname Date: Purpose To list the products to be produced within a Stage Plan, together with key status dates. Contents This publication contains the following topics: Topic See Page Plan identification Product names Planned and actual dates Plan ident ificat ion Key dates: Product Draft Ready Quality Check Approval Plan Actual Plan Actual Plan Actual Page 3