Competency-Based
HR Management
Imagination

Knowledge

By: Atif Choudhary
EastWestArabia Consultant
E-mail: atif.choudhary@gmail.com
HP: +966 50 978 5770

Skills
Imagination

Introduction



Knowledge








Skills



Electronics Engineer
MBA Marketing (CSU, Australia)
BBA Marketing
ADMM (Advanced Diploma in Marketing Management), University of Wales, UK
Marketing Development Manger, AHCSC – Olayan Group
Country Marketing Manager, FMS, Saudi and Gulf
Division Manager (MCC), FMS, Saudi Arabia
Business Manager, Academy Manager, General Electric Healthcare
Training Center Manager, Dräger Medical

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 2
Imagination

Why Imagination, Knowledge and Skills?

Knowledge

Imagination at work (GE)

Imagination is more important than knowledge (Einstein)

Knowledge is Power (Anonymous)

Skills

Competency is Knowledge, Skills and Imagination with Right Attitude
and Behavior. (AIC)

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 3
Imagination
Knowledge

“Live out of your IMAGINATION not your history”

Skills

-Stephen R. Covey-

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 4
Imagination

Agenda


Knowledge







Skills



Introduction
Framework for Building Competency-based HR Management
System
Developing competency Model
Competency-based Interview Method
Competency-based Career Planning
Competency-based Training & Development
Competency-based Performance Management

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 5
I
FRAMEWORKS
AND
CHALLENGES

V
EMPLOYEE
RELATIONS
AND
ASSESSMENT

Knowledge

Imagination

HR Framework

Skills

IV
COMPENSATION
AND
PROTECTION

2014

II
PREPARATION
AND
SELECTION

III
DEVELOPMENT
AND
EVALUATION

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 6
Imagination
Skills

Knowledge

Vacant Position

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 7
Imagination

Vacant Position
What?

Whom?

Knowledge

Why?

How?
When?

Who?

Skills

Where?

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 8
Imagination

Conventional Way

HR Planning

Knowledge

Compiling List
(Department Requirements)

Selection
Conventional Interview
(Looking Within the CV)

Skills

Job Description
Typical Copy Paste

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 9
Imagination

Challenges

Knowledge

What Kind Of People?

Where To Find Them?

Skills

How To Get The Right People?

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 10
Imagination

The Value Chain
Porter 1985

Firm Infrastructure
Human Resources Management

Procurement

Marketing

Sales

Outbound
Logistics

Operation

Inbound
Logistics

Gross Sales

Knowledge

Technology Development

Gross Sales

Skills

Support Activities
Primary Activities

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 11
Imagination

The Value Chain
Firm Infrastructure

Knowledge
Skills

Marketing

Sales

Outbound
Logistics

Operation

Gross Sales

Procurement

Business Results

Technology Development

Inbound
Logistics

Business Strategy

Human Resources Management

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 12
Imagination

AIC Model
People Makes it Happen

Brand Equity

Business Strategy

Skills

1- Competencies
2- Resources
3- Business Processes

Business Results

People Utilizing, Interacting and
Optimizing
Networking

Knowledge

Code of Conduct

Core Values

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 13
Imagination

Competency Based Selection
Business Model

Building Blocks

Knowledge

Job Analysis

HR Planning

Identify Competencies

Job Design

Competencies Criteria

Job Specification

Matching
Competencies

Selection
Job Description

Searching
Competencies

Skills

Interview Design

Specific Job Orientation and Further Development
2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 14
Imagination

Business Model

Knowledge

INFRASTRUCTURE

PARTNER
NETWORK

CORE
CAPABILITIES

OFFER

CUSTOMER
RELATIONSHIPS

VALUE
PROPOSITION
VALUE
CONFIGURATION

CUSTOMER
SEGMENTS
DISTRIBUTION
CHANNELS

FINANCE

REVENUE
STREAMS

Skills

COST
STRUCTURE

CUSTOMER

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 15
Imagination

1
2

Knowledge

3

OG

Skills

BO/MP

• Business Strategy

• Products & Solutions

Unique Value
Proposition/Innovatio
n/ Differentiation

QT

Projects

• Vision & Mission

Tenders

Orders

OP

PM

Service

2014

OF

WH

BO/MP

16
Entire Contents © 2014, Atif Choudhary. All Rights Reserved
Imagination

What do you think about this?



Knowledge







Business Model (Define Your Business Model)
Organizational Architecture (Building Blocks)
Job Analysis
(Roles and Responsibilities)
Job Design
Job Objectives (With Set KPIs)
Job Specifications (Identify the Competencies Required to Perform Job)
Job Description (A broad, general, and written statement of a specific job, based

Skills

on the findings of a job analysis. It generally includes duties, purpose, responsibilities,
scope, and working conditions of a job along with the job's title, and the name or
designation of the person to whom the employee reports. Job description usually
forms the basis of job specification)

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 17
Imagination
Knowledge

Competency-Based HR Management

Skills

A FRAMEWORK

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 18
Imagination
Knowledge
Skills

Harvard HRM Framework
Shareholder Interests:

•
•
•
•
•

Shareholders
Management
Employee
Government
unions

Situational Factors:
• Workforce
Characteristics
• Business strategy and
conditions
• Management
philosophy
• Labor market
• Unions
• Task technology
• Law and social values
2014

HRM Policy
Choices:
• Employee
influence
• Human resources
flow
• Reward systems
• Work systems

HR Outcomes:
• Commitment
• Congruence
• Costeffectiveness

Long-Term
Consequences:
• Individual wellbeing
• Organizational
effectiveness
• Societal wellbeing

The Harvard Framework for Human Resources Management (1984)
Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 19
Imagination

Performance Management as
an Integrating Force
Performance
Management

Skills

Reward

Commitment

Knowledge

Performance
Improvement

Motivation

Employee
Development

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 20
Imagination

Use of Competencies as an
Integrating Force

Knowledge

Use of
Competencies

Skills

Development

Reward

Recruitment

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 21
Imagination

Competency-Based
HR Management Framework

Recruitment &
Selection
Training &
Development

Business
Strategy

Performance
Management
Competency
Framework

Reward
Management

Skills

Knowledge

Competency-Based People Strategy

2014

Business
Results

Career
Management

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 22
I
FRAMEWORKS
AND
CHALLENGES

V
EMPLOYEE
RELATIONS
AND
ASSESSMENT

Knowledge

Imagination

HR Framework

Skills

IV
COMPENSATION
AND
PROTECTION

2014

II
PREPARATION
AND
SELECTION

III
DEVELOPMENT
AND
EVALUATION

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 23
Competency

Knowledge

Imagination

What is Competency?
• A combination of skills, job attitude, and
knowledge which is reflected in job
behavior that can be observed,
measured and evaluated.
• Competency is a determining factor for
successful performance.
• The focus of competency is behavior
which is an application of skills, job
attitude and knowledge.

Skills

Competency is the ability of an individual to do a job properly. A competency is
a set of defined behaviors that provide a structured guide enabling the
identification, evaluation and development of the behaviors in individual
employees.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 24
Imagination

Defining the Jargons

Knowledge

Behavior

•
•
•
•
•

The manner of conducting oneself
Anything that an organism does involving action and response to stimulation
The response of an individual, group, or species to its environment
The way in which someone behaves; also: an instance of such behavior
The way in which something functions or operates

Competency

Is the ability of an individual to do a job properly. A competency is a set of defined
behaviors that provide a structured guide enabling the identification, evaluation and
development of the behaviors in individual employees.

Skills

Attitude

•The arrangement of the parts of a body or figure: posture
•A position assumed for a specific purpose <a threatening attitude>
•A ballet position similar to the arabesque in which the raised leg is bent at the knee
•A mental position with regard to a fact or state <a helpful attitude>
•A feeling or emotion toward a fact or state
The position of an aircraft or spacecraft determined by the relationship between its
axes and a reference datum (as the horizon or a particular star)

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 25
Imagination

What is Competency?
Skill
Job Attitude
Knowledge

Knowledge

Competency
Observable Behavior

Skills

Job Performance

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 26
Imagination

Competency and Job Description




Skills

Knowledge



Job description looks at what, whereas competency model focuses
on how.
Traditional job description analysis looks at elements of the job
and defines the job into sequences of tasks necessary to perform
the job.
Competency studies the people who do the job well, and defines
the job in terms of the characteristics and behaviors of these
people.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 27
Imagination

Types of Competency

Knowledge

Managerial Competency (soft competency)
This type of competency relates to the ability to manage job and
develop an interaction with other persons. For example: problem
solving, leadership, communication, etc.
Functional Competency (hard competency)

Skills

This type of competency relates to the functional capacity of work. It
mainly deals with the technical aspect of the job. For example:
market research, financial analysis, electrical engineering, etc.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 28
Imagination

Competency Identification Process

Competency
Identification

Generate
Competency
Model

Knowledge

Clarify
Organizational
Strategy and
Context

Validate,
Refine and
Implement

Skills

• Analyze Work Role and Process
• Gather Data through Behavior
Event Interview and Focus Group
• Conduct Benchmark Study

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 29
Imagination

Examples of Competency


Definition

Knowledge





Key Behavior




Skills



2014

Adaptability: Maintaining effectiveness when priorities change and new tasks
are encountered, and when dealing with individuals who have different views and
approaches. Effective performing in different environments, cultures, and
locations, and when working with different technologies and levels of individuals.
Seeking understanding: Makes efforts to better understand changes in the
environment; actively seeks
Information or attempts to understand nature of individual differences, logic, or
basis for change in tasks and situations.
Embracing Change: Approaches change or newness with a positive orientation;
views change or newness as a learning or growth opportunity.
Making accommodations: Makes accommodations in approach, attitudes, or
behaviors in response to changing environmental requirements.

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 30
Imagination

Examples of Competency


Definition

Knowledge





Key Behavior



Skills





2014

Analysis/Problem Assessment: Securing relevant information and identifying
key issues and relationships from a base of information; relating and comparing
data from different sources; identifying cause-effect relationships.

Identifying issues and problems: Recognizing major issues; identifying key
facts, trends, and issues; separating relevant from irrelevant data.
Seeking information: Identifying/Recognizing information gaps or the need for
additional information; obtaining information by clearly describing what needs to
be known and the means to obtain it; questioning clearly and specifically to verify
facts and obtain the necessary information.
Seeing relationships: Organizing information and data to identify/explain
trends, problems, and their causes; comparing, contrasting, and combining
information; seeing associations between seemingly independent problems or
events to recognize trends, problems and possible cause-effect relationships.
Performing data analysis: Organizing and manipulating quantitative data to
identify/explain trends, problems, and their causes.
Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 31
Imagination

Benefits of Using Competency Model


For Managers, the benefits are:


Knowledge



Skills



Identify performance criteria to improve the accuracy and ease of the
hiring and selection process.
Clarify standards of excellence for easier communication of
performance expectations to direct reports.
Provide a clear foundation for dialogue to occur between the manager
and employee about performance, development, and career-related
issues.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 32
Imagination

Benefits of Using Competency Model


For Employees, the benefits are:


Knowledge



Skills



Identify the success criteria (i.e., behavioral standards of performance
excellence) required to be successful in their role.
Support a more specific and objective assessment of their strengths and
specific targeted areas for professional development.
Provide development tools and methods for enhancing their skills.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 33
1. Alignment: Competencies impact systems that actively support the
organization’s vision, strategy, and key capabilities.
2. Integration: Competency initiatives that produce the most
significant change are applied systemically across a range of HR
development processes.
3. Distribution: Competency standards alone produce little effect.
They must be actively and relentlessly communicated and installed
with users.

Imagination
Skills

Knowledge

Key Characteristics of Successful
Implementation

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 34
4. Self-Directed Application: Competency systems frequently fail
because they are too complex or require an unsustainable level of
sponsorship or program support. Implementations that work best
focus on the development of “tools” that can produce results for
users with relatively little ongoing support.
5. Acculturation: In competency systems that work, they become
part of the culture and the mindset of leaders through repeated
application and refinement over a significant period of time.

Imagination
Skills

Knowledge

Key Characteristics of Successful
Implementation

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 35
Imagination
Knowledge
Skills

COMPETENCY-BASED INTERVIEW FOR
SELECTION

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 36
Imagination

Types of Interview

Knowledge

Conventional Interview

Skills

Competency-Based Interview

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 37
Imagination

Conventional Interview


Unstructured:


Knowledge







Has low reliability and validity—there is no accuracy in predicting
performance.
Susceptible to bias and subjectivity (gut feeling)

Skills



Is a type of interview where the questions are not designed
systematically and not properly structured.
There is no standard format to follow, therefore the process of
interviewing can go in any direction.
Is seldom equipped with formal guidelines regarding the system of
rating/scoring the interview.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 38
Imagination

Competency-Based Interview (CBI)


Structured:


Knowledge







Has a high level of validity and reliability.
Equipped with a standard scoring system which refers to behavior
indicators.

Skills



Is a structured type of interview. The questions and focused on
disclosing examples of behavior in the past.
The process of interview is intended to disclose specifically and in detail
examples of behavior in the past.
Is designed based on the principle: past behavior predicts future
behavior (candidates are most likely to repeat these behaviors in similar
situation s in the future).

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 39
Imagination

Approach in Competency-Based Interview

What was the Task you needed to accomplish?

A

What Action(s) did you take?

R

What Results did you achieve?

Skills

What was the Situation in which you were involved?

T

Knowledge

S

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 40
Imagination

Approach in Competency-Based Interview


Situation



Knowledge



Skills



Can you explain the situation?
Were and when did the situation happened?
What events led us to it?
Who was involved in the situation (work colleagues, supervisor,
customers)?

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 41
Imagination

Approach in Competency-Based Interview


Tasks/Actions



Knowledge




Skills



What tasks were you supposed to do at that time?
What did you actually do at that time?
How did you do it?
What specific steps did you take?
Who was involved?

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 42
Imagination

Approach in Competency-Based Interview


Results



Skills

Knowledge



What was the outcome?
Can you tell me the results of taking such actions?
What specific outcome was produced by your action?

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 43
Imagination

Sample Questions in CBI
Sample Question

Persistence

In the process of selling, we are sometimes not
successful in securing a new transaction. Can you
tell me about one or two situations where you
repeatedly failed to get a new client?

Knowledge

Competency

What specific steps did you take? What was the
result?
Can you describe one or two cases in your effort to
obtain new customers? What did you do? What was
the result?

Skills

Influencing
Others

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 44
Imagination

Sample Questions in CBI
Competency

Sample Question

Interpersonal
Understanding

Can you tell me about a situation where you faced a
client who was disappointed with your product?

Knowledge

What was the situation like? What specific steps did
you take? What was the result?
In working, we often face a number of priorities that
must be tackled at the same time. Can you tell me
about one or two actual cases where you had to
face such a situation? What did you do? What was
the consequences?

Skills

Planning &
Organizing

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 45
Imagination
Knowledge

Bias in the Interview Process

Skills

First
Impressions

An interviewer might make a snap judgment
about someone based on their first
impression – positive or negative – that
clouds the entire interview.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 46
Imagination
Knowledge

Bias in the Interview Process

For instance, knowing someone went to a
particular university might be looked upon
favorably. Everything the applicant says
during the interview is seen in this light.

Skills

Halo
Effect

The “halo” effect occurs when an interviewer
allows one strong point about the candidate
to overshadow or have an effect on
everything else.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 47
Imagination
Knowledge

Bias in the Interview Process

Contrast
Effect

Strong(er) candidates who interview after
weak(er) ones may appear more qualified
than they are because of the contrast
between the two.

Skills

Note taking during the interview and a
reasonable period of time between
interviews may alleviate this.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 48
Imagination
Knowledge
Skills

COMPETENCY-BASED CAREER PLANNING

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 49
Imagination

Career Planning Flow

Knowledge

Career Planning
System

Career Path Design

Analysis of Employees
Future Plan

Skills

Implementation of
Development Program

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 50
Imagination
Knowledge

What is Career Path?

The “path” is based on the position
competency profile that an employee must
have to be able to hold a certain position.

Skills

What is
Career Path?

Career Path is a series of positions that one
must go through in order to achieve a certain
position in the company.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 51
Analyzing a
position or job
based on the
competency
required

Knowledge

Imagination

Defining Career Path

Categorizing the
positions into a
job family

Identifying career
paths based on
the job family

• Career Path:
Vertical, Lateral
and Diagonal
• Mandatory
Training

Skills

Competency
profile (Functional
and Management
competency) Per
Position

Categorizing the
positions that
require similar
competencies into
one job family

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 52
Imagination

Assessing Employee Career Plan
Employee
Career Needs

Organization
Career Needs

• Assessment of the
competency profile
required by the
position
• Assessment of the
organization’s need of
manpower planning

Skills

Knowledge

• Assessment of the
career type of the
employee
• Assessment of the
employee competency
level (for example
through assessment
center)

Match?

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 53
Imagination

Employee Development Program

Knowledge

Employee
Career Needs

Match?

Organization
Career Needs

Development Program and Interventions
Apprenticeship in
Other Company

Training/Workshop

Executive
Development Program

On the Job
Development

Presentation
Assignment

Monitoring

Job Enrichment

Desk Study

Skills

Special Assignment

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 54
Imagination
Knowledge
Skills

COMPETENCY-BASED
TRAINING & DEVELOPMENT

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 55
Imagination

Competency-Based Training Framework
Finding the Gap in the Competencies

Knowledge

Training &
Development
Program

Skills

Competency
Gap

Required
competency
level for certain
position

Competency
Assessment

Current
competency
level of the
employee

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 56
Imagination

Competency Profile Per Position

Communication Skills
Public Speaking
Leadership
Training Need Analysis
Material Development
Training Evaluation

Recruitment
Supervisor

Reqired Level
2
3
4

Communication Skills
Interview Skills
Analytical Thinking
Understand Selection Tools
Teamwork
Customer Orientation

1

5

Skills

Required Competency

Training &
Development
Manager

Knowledge

Position

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 57
Imagination
Knowledge

Competency Profile Per Position

Position

Competency
Requirement
Leadership

Supervisor
Skills

Ahievement
Orientation

2014

Relevant Training Module
Leadership I
Communication Skill I
The Art of Motivating Employee
Providing Effective Feedback
Goal Setting Technique
Work Motivation
Planning & Organizing
Continuous Self Improvement

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 58
Skills

Supervisor

Manager

2014

Communication Skills
Leadership
Teamwork
Achievement Orientation
Customer Focus
Job Functional Skills
Communication Skills
Leadership
Teamwork
Achievement Orientation
Customer Focus
Strategic Thinking
Problem Solving & Decision
Making
Job Functional Skills

Professional Seminar
Series

Building Productive
Teamwork

Strategic Management

Creative Problem
Solving

Achievement
Motivation Training

Service Excellence for
Customer

On Becoming Leader 2

On Becoming Effective
Leader 1

Knowledge

Position

Training Title /
Managerial
Competency

Productive
Communication Series

Imagination

Training Matrix for
Competency Development

V
V
V
V
V
V

V
V
V
V
V

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

V
V
V
Slide 59
Imagination
Knowledge
Skills

COMPETENCY-BASED
PERFORMANCE MANAGEMENT

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 60
Imagination

Individual Performance Element

Knowledge

1. Performance Results: Hard or
quantitative aspects of
performance (result)

Individual Performance
elements has tow main
categories:

Skills

2. Competencies: It represents soft
or quantitative aspects of
performance (process)

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 61
Imagination

Individual Performance Element

Knowledge

1. Performance Results Score

Overall Score

2. Competencies Score

Skills

Will determine the
employee’s career
movement, and also the
reward to be earned

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 62
Imagination

Element # 1: Performance Results
No.

Main Performance Target

Target to be Achieved

All employees submit their performance
assessment form on time

Improve the system for performance
assessment

Target: completed 100%

3

Conduct training activitie

Target: to conduct 6 training modules in
one year

4

Skills

Conduct an assessment of the
employee's performance

2

Knowledge

1

Carry out on the job training activities

Target: 90% of the total employees who
attend the training
experience an increase
in skill and knowledge

Target should be measurable and specific

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 63
Imagination

Element # 2: Competency
Competency: Collaboration
Basic

Intermediate

Advance

Expert

Actively listen, and clarifies
understanding where required, in
order to learn form others.

Actively listen, and clarifies
understanding where required, in
order to learn form others.

Actively listen, and clarifies understanding
where required, in order to learn form
others.

Empathies with audience and
formulate message accordingly.

Empathies with audience and
formulate message accordingly.

Empathies with audience and
formulate message accordingly.

Empathies with audience and formulate
message accordingly.

Share resources and information.

Share resources and information.

Share resources and information.

Share resources and information.

Responds promptly to other team
members’ needs.

Balance complementary strengths
in teams and seek diverse
contributions and perspectives.

Actively builds internal and
external networks.

Builds internal and external networks and
uses them to efficiently to create value.

Involves teams in decisions that
effect them.

Uses cross functional teams to
draw upon skills and knowledge
throughout the organization.

Uses cross functional teams to draw upon
skills and knowledge throughout the
organization.

Encourages co-operation rather
than competition within the team
and with key stakeholders.

Knowledge

Actively listen, and clarifies
understanding where required, in
order to learn form others.

Build and maintain relationships
across the company.

Drives and leads key relationship groups
across the company.
Manages alliance relationships through
complex issues such as points of competing
interest.

Skills

Ensures events and systems, e.g. IT, for
collaboration are in place and used.
Draws upon the full range of relationships
(internal, external, cross the company) at
critical points in marketing and negotiations.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 64
Imagination

Assessing Competency through
Assessment Center
Assessment Center Characteristics:





A standardized evaluation of behavior based on multiple inputs.
Multiple trained observers and techniques are used.
Judgments about behavior are made, in major part, from specifically
developed assessment simulations.
These judgments are pooled in a meeting among the assessors or
by a statistical integration process.

Skills

Knowledge



2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 65
Imagination

Types of Test in Assessment Center

Role
Simulation

• In a play, you are given a particular role to assume for a
certain task. The task will be involve dealing with a role
player in a certain way, and there will be an assessor
watching the role play.

Skills

Knowledge

In-Basket
Exercise

• In-trays or in-baskets involve working from the contents
of a manager’s in-tray, with typically consists of letters,
memos and background information. You may be asked
to deal with paperwork and make decisions, balancing
the volume of work against a tight schedule.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 66
Imagination

Types of Test in Assessment Center

Knowledge

Presentation

• In a fact-finding exercise, you may be asked to reach a
decision starting from only partial knowledge. Your task
is to decide what additional information you need to
make the decision, and sometimes also to question the
assessor to obtain this information.

Skills

Fact Finding
Exercise

• You may be required to make a formal presentation to a
number of assessors. In some cases this will mean
preparing a presentation in advance on a given topic. In
other cases, you may be asked to interpret and analyze
given information, and present a case to support a
decision.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 67
Imagination
Knowledge

Types of Test in Assessment Center

Skills

Group
Discussion

• Group exercises are timed discussions, where a group of
participants work together to tackle a work-related
problem. Sometimes you are given a particular role
within a team, for example sales manager or personnel
manager. Other times there will be no roles allocated.
You are observed by assessors, who are not looking for
right or wrong answers, but for how you interact with
your colleagues in the team.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 68
Results of
Observation
Through the
Assessment Center

Competency Score

Skills

Knowledge

Imagination

Competency Assessment Rating

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 69
Imagination

Further Readings


Skills

Knowledge



Paul Green, Building Robust Competency, John Wiley and Sons
David Dubois, Competency-Based HR Management, Black
Publishing.

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 70
Imagination
Skills

Knowledge

Any Question?

2014

Entire Contents © 2014, Atif Choudhary. All Rights Reserved

Slide 71

Competency based hr with aic model

  • 1.
    Competency-Based HR Management Imagination Knowledge By: AtifChoudhary EastWestArabia Consultant E-mail: atif.choudhary@gmail.com HP: +966 50 978 5770 Skills
  • 2.
    Imagination Introduction   Knowledge       Skills  Electronics Engineer MBA Marketing(CSU, Australia) BBA Marketing ADMM (Advanced Diploma in Marketing Management), University of Wales, UK Marketing Development Manger, AHCSC – Olayan Group Country Marketing Manager, FMS, Saudi and Gulf Division Manager (MCC), FMS, Saudi Arabia Business Manager, Academy Manager, General Electric Healthcare Training Center Manager, Dräger Medical 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 2
  • 3.
    Imagination Why Imagination, Knowledgeand Skills? Knowledge Imagination at work (GE) Imagination is more important than knowledge (Einstein) Knowledge is Power (Anonymous) Skills Competency is Knowledge, Skills and Imagination with Right Attitude and Behavior. (AIC) 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 3
  • 4.
    Imagination Knowledge “Live out ofyour IMAGINATION not your history” Skills -Stephen R. Covey- 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 4
  • 5.
    Imagination Agenda  Knowledge      Skills  Introduction Framework for BuildingCompetency-based HR Management System Developing competency Model Competency-based Interview Method Competency-based Career Planning Competency-based Training & Development Competency-based Performance Management 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 5
  • 6.
  • 7.
    Imagination Skills Knowledge Vacant Position 2014 Entire Contents© 2014, Atif Choudhary. All Rights Reserved Slide 7
  • 8.
  • 9.
    Imagination Conventional Way HR Planning Knowledge CompilingList (Department Requirements) Selection Conventional Interview (Looking Within the CV) Skills Job Description Typical Copy Paste 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 9
  • 10.
    Imagination Challenges Knowledge What Kind OfPeople? Where To Find Them? Skills How To Get The Right People? 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 10
  • 11.
    Imagination The Value Chain Porter1985 Firm Infrastructure Human Resources Management Procurement Marketing Sales Outbound Logistics Operation Inbound Logistics Gross Sales Knowledge Technology Development Gross Sales Skills Support Activities Primary Activities 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 11
  • 12.
    Imagination The Value Chain FirmInfrastructure Knowledge Skills Marketing Sales Outbound Logistics Operation Gross Sales Procurement Business Results Technology Development Inbound Logistics Business Strategy Human Resources Management 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 12
  • 13.
    Imagination AIC Model People Makesit Happen Brand Equity Business Strategy Skills 1- Competencies 2- Resources 3- Business Processes Business Results People Utilizing, Interacting and Optimizing Networking Knowledge Code of Conduct Core Values 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 13
  • 14.
    Imagination Competency Based Selection BusinessModel Building Blocks Knowledge Job Analysis HR Planning Identify Competencies Job Design Competencies Criteria Job Specification Matching Competencies Selection Job Description Searching Competencies Skills Interview Design Specific Job Orientation and Further Development 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 14
  • 15.
  • 16.
    Imagination 1 2 Knowledge 3 OG Skills BO/MP • Business Strategy •Products & Solutions Unique Value Proposition/Innovatio n/ Differentiation QT Projects • Vision & Mission Tenders Orders OP PM Service 2014 OF WH BO/MP 16 Entire Contents © 2014, Atif Choudhary. All Rights Reserved
  • 17.
    Imagination What do youthink about this?   Knowledge      Business Model (Define Your Business Model) Organizational Architecture (Building Blocks) Job Analysis (Roles and Responsibilities) Job Design Job Objectives (With Set KPIs) Job Specifications (Identify the Competencies Required to Perform Job) Job Description (A broad, general, and written statement of a specific job, based Skills on the findings of a job analysis. It generally includes duties, purpose, responsibilities, scope, and working conditions of a job along with the job's title, and the name or designation of the person to whom the employee reports. Job description usually forms the basis of job specification) 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 17
  • 18.
    Imagination Knowledge Competency-Based HR Management Skills AFRAMEWORK 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 18
  • 19.
    Imagination Knowledge Skills Harvard HRM Framework ShareholderInterests: • • • • • Shareholders Management Employee Government unions Situational Factors: • Workforce Characteristics • Business strategy and conditions • Management philosophy • Labor market • Unions • Task technology • Law and social values 2014 HRM Policy Choices: • Employee influence • Human resources flow • Reward systems • Work systems HR Outcomes: • Commitment • Congruence • Costeffectiveness Long-Term Consequences: • Individual wellbeing • Organizational effectiveness • Societal wellbeing The Harvard Framework for Human Resources Management (1984) Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 19
  • 20.
    Imagination Performance Management as anIntegrating Force Performance Management Skills Reward Commitment Knowledge Performance Improvement Motivation Employee Development 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 20
  • 21.
    Imagination Use of Competenciesas an Integrating Force Knowledge Use of Competencies Skills Development Reward Recruitment 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 21
  • 22.
    Imagination Competency-Based HR Management Framework Recruitment& Selection Training & Development Business Strategy Performance Management Competency Framework Reward Management Skills Knowledge Competency-Based People Strategy 2014 Business Results Career Management Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 22
  • 23.
  • 24.
    Competency Knowledge Imagination What is Competency? •A combination of skills, job attitude, and knowledge which is reflected in job behavior that can be observed, measured and evaluated. • Competency is a determining factor for successful performance. • The focus of competency is behavior which is an application of skills, job attitude and knowledge. Skills Competency is the ability of an individual to do a job properly. A competency is a set of defined behaviors that provide a structured guide enabling the identification, evaluation and development of the behaviors in individual employees. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 24
  • 25.
    Imagination Defining the Jargons Knowledge Behavior • • • • • Themanner of conducting oneself Anything that an organism does involving action and response to stimulation The response of an individual, group, or species to its environment The way in which someone behaves; also: an instance of such behavior The way in which something functions or operates Competency Is the ability of an individual to do a job properly. A competency is a set of defined behaviors that provide a structured guide enabling the identification, evaluation and development of the behaviors in individual employees. Skills Attitude •The arrangement of the parts of a body or figure: posture •A position assumed for a specific purpose <a threatening attitude> •A ballet position similar to the arabesque in which the raised leg is bent at the knee •A mental position with regard to a fact or state <a helpful attitude> •A feeling or emotion toward a fact or state The position of an aircraft or spacecraft determined by the relationship between its axes and a reference datum (as the horizon or a particular star) 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 25
  • 26.
    Imagination What is Competency? Skill JobAttitude Knowledge Knowledge Competency Observable Behavior Skills Job Performance 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 26
  • 27.
    Imagination Competency and JobDescription   Skills Knowledge  Job description looks at what, whereas competency model focuses on how. Traditional job description analysis looks at elements of the job and defines the job into sequences of tasks necessary to perform the job. Competency studies the people who do the job well, and defines the job in terms of the characteristics and behaviors of these people. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 27
  • 28.
    Imagination Types of Competency Knowledge ManagerialCompetency (soft competency) This type of competency relates to the ability to manage job and develop an interaction with other persons. For example: problem solving, leadership, communication, etc. Functional Competency (hard competency) Skills This type of competency relates to the functional capacity of work. It mainly deals with the technical aspect of the job. For example: market research, financial analysis, electrical engineering, etc. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 28
  • 29.
    Imagination Competency Identification Process Competency Identification Generate Competency Model Knowledge Clarify Organizational Strategyand Context Validate, Refine and Implement Skills • Analyze Work Role and Process • Gather Data through Behavior Event Interview and Focus Group • Conduct Benchmark Study 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 29
  • 30.
    Imagination Examples of Competency  Definition Knowledge   KeyBehavior    Skills  2014 Adaptability: Maintaining effectiveness when priorities change and new tasks are encountered, and when dealing with individuals who have different views and approaches. Effective performing in different environments, cultures, and locations, and when working with different technologies and levels of individuals. Seeking understanding: Makes efforts to better understand changes in the environment; actively seeks Information or attempts to understand nature of individual differences, logic, or basis for change in tasks and situations. Embracing Change: Approaches change or newness with a positive orientation; views change or newness as a learning or growth opportunity. Making accommodations: Makes accommodations in approach, attitudes, or behaviors in response to changing environmental requirements. Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 30
  • 31.
    Imagination Examples of Competency  Definition Knowledge   KeyBehavior   Skills   2014 Analysis/Problem Assessment: Securing relevant information and identifying key issues and relationships from a base of information; relating and comparing data from different sources; identifying cause-effect relationships. Identifying issues and problems: Recognizing major issues; identifying key facts, trends, and issues; separating relevant from irrelevant data. Seeking information: Identifying/Recognizing information gaps or the need for additional information; obtaining information by clearly describing what needs to be known and the means to obtain it; questioning clearly and specifically to verify facts and obtain the necessary information. Seeing relationships: Organizing information and data to identify/explain trends, problems, and their causes; comparing, contrasting, and combining information; seeing associations between seemingly independent problems or events to recognize trends, problems and possible cause-effect relationships. Performing data analysis: Organizing and manipulating quantitative data to identify/explain trends, problems, and their causes. Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 31
  • 32.
    Imagination Benefits of UsingCompetency Model  For Managers, the benefits are:  Knowledge  Skills  Identify performance criteria to improve the accuracy and ease of the hiring and selection process. Clarify standards of excellence for easier communication of performance expectations to direct reports. Provide a clear foundation for dialogue to occur between the manager and employee about performance, development, and career-related issues. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 32
  • 33.
    Imagination Benefits of UsingCompetency Model  For Employees, the benefits are:  Knowledge  Skills  Identify the success criteria (i.e., behavioral standards of performance excellence) required to be successful in their role. Support a more specific and objective assessment of their strengths and specific targeted areas for professional development. Provide development tools and methods for enhancing their skills. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 33
  • 34.
    1. Alignment: Competenciesimpact systems that actively support the organization’s vision, strategy, and key capabilities. 2. Integration: Competency initiatives that produce the most significant change are applied systemically across a range of HR development processes. 3. Distribution: Competency standards alone produce little effect. They must be actively and relentlessly communicated and installed with users. Imagination Skills Knowledge Key Characteristics of Successful Implementation 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 34
  • 35.
    4. Self-Directed Application:Competency systems frequently fail because they are too complex or require an unsustainable level of sponsorship or program support. Implementations that work best focus on the development of “tools” that can produce results for users with relatively little ongoing support. 5. Acculturation: In competency systems that work, they become part of the culture and the mindset of leaders through repeated application and refinement over a significant period of time. Imagination Skills Knowledge Key Characteristics of Successful Implementation 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 35
  • 36.
    Imagination Knowledge Skills COMPETENCY-BASED INTERVIEW FOR SELECTION 2014 EntireContents © 2014, Atif Choudhary. All Rights Reserved Slide 36
  • 37.
    Imagination Types of Interview Knowledge ConventionalInterview Skills Competency-Based Interview 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 37
  • 38.
    Imagination Conventional Interview  Unstructured:  Knowledge    Has lowreliability and validity—there is no accuracy in predicting performance. Susceptible to bias and subjectivity (gut feeling) Skills  Is a type of interview where the questions are not designed systematically and not properly structured. There is no standard format to follow, therefore the process of interviewing can go in any direction. Is seldom equipped with formal guidelines regarding the system of rating/scoring the interview. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 38
  • 39.
    Imagination Competency-Based Interview (CBI)  Structured:  Knowledge    Hasa high level of validity and reliability. Equipped with a standard scoring system which refers to behavior indicators. Skills  Is a structured type of interview. The questions and focused on disclosing examples of behavior in the past. The process of interview is intended to disclose specifically and in detail examples of behavior in the past. Is designed based on the principle: past behavior predicts future behavior (candidates are most likely to repeat these behaviors in similar situation s in the future). 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 39
  • 40.
    Imagination Approach in Competency-BasedInterview What was the Task you needed to accomplish? A What Action(s) did you take? R What Results did you achieve? Skills What was the Situation in which you were involved? T Knowledge S 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 40
  • 41.
    Imagination Approach in Competency-BasedInterview  Situation   Knowledge  Skills  Can you explain the situation? Were and when did the situation happened? What events led us to it? Who was involved in the situation (work colleagues, supervisor, customers)? 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 41
  • 42.
    Imagination Approach in Competency-BasedInterview  Tasks/Actions   Knowledge   Skills  What tasks were you supposed to do at that time? What did you actually do at that time? How did you do it? What specific steps did you take? Who was involved? 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 42
  • 43.
    Imagination Approach in Competency-BasedInterview  Results   Skills Knowledge  What was the outcome? Can you tell me the results of taking such actions? What specific outcome was produced by your action? 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 43
  • 44.
    Imagination Sample Questions inCBI Sample Question Persistence In the process of selling, we are sometimes not successful in securing a new transaction. Can you tell me about one or two situations where you repeatedly failed to get a new client? Knowledge Competency What specific steps did you take? What was the result? Can you describe one or two cases in your effort to obtain new customers? What did you do? What was the result? Skills Influencing Others 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 44
  • 45.
    Imagination Sample Questions inCBI Competency Sample Question Interpersonal Understanding Can you tell me about a situation where you faced a client who was disappointed with your product? Knowledge What was the situation like? What specific steps did you take? What was the result? In working, we often face a number of priorities that must be tackled at the same time. Can you tell me about one or two actual cases where you had to face such a situation? What did you do? What was the consequences? Skills Planning & Organizing 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 45
  • 46.
    Imagination Knowledge Bias in theInterview Process Skills First Impressions An interviewer might make a snap judgment about someone based on their first impression – positive or negative – that clouds the entire interview. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 46
  • 47.
    Imagination Knowledge Bias in theInterview Process For instance, knowing someone went to a particular university might be looked upon favorably. Everything the applicant says during the interview is seen in this light. Skills Halo Effect The “halo” effect occurs when an interviewer allows one strong point about the candidate to overshadow or have an effect on everything else. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 47
  • 48.
    Imagination Knowledge Bias in theInterview Process Contrast Effect Strong(er) candidates who interview after weak(er) ones may appear more qualified than they are because of the contrast between the two. Skills Note taking during the interview and a reasonable period of time between interviews may alleviate this. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 48
  • 49.
    Imagination Knowledge Skills COMPETENCY-BASED CAREER PLANNING 2014 EntireContents © 2014, Atif Choudhary. All Rights Reserved Slide 49
  • 50.
    Imagination Career Planning Flow Knowledge CareerPlanning System Career Path Design Analysis of Employees Future Plan Skills Implementation of Development Program 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 50
  • 51.
    Imagination Knowledge What is CareerPath? The “path” is based on the position competency profile that an employee must have to be able to hold a certain position. Skills What is Career Path? Career Path is a series of positions that one must go through in order to achieve a certain position in the company. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 51
  • 52.
    Analyzing a position orjob based on the competency required Knowledge Imagination Defining Career Path Categorizing the positions into a job family Identifying career paths based on the job family • Career Path: Vertical, Lateral and Diagonal • Mandatory Training Skills Competency profile (Functional and Management competency) Per Position Categorizing the positions that require similar competencies into one job family 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 52
  • 53.
    Imagination Assessing Employee CareerPlan Employee Career Needs Organization Career Needs • Assessment of the competency profile required by the position • Assessment of the organization’s need of manpower planning Skills Knowledge • Assessment of the career type of the employee • Assessment of the employee competency level (for example through assessment center) Match? 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 53
  • 54.
    Imagination Employee Development Program Knowledge Employee CareerNeeds Match? Organization Career Needs Development Program and Interventions Apprenticeship in Other Company Training/Workshop Executive Development Program On the Job Development Presentation Assignment Monitoring Job Enrichment Desk Study Skills Special Assignment 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 54
  • 55.
    Imagination Knowledge Skills COMPETENCY-BASED TRAINING & DEVELOPMENT 2014 EntireContents © 2014, Atif Choudhary. All Rights Reserved Slide 55
  • 56.
    Imagination Competency-Based Training Framework Findingthe Gap in the Competencies Knowledge Training & Development Program Skills Competency Gap Required competency level for certain position Competency Assessment Current competency level of the employee 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 56
  • 57.
    Imagination Competency Profile PerPosition Communication Skills Public Speaking Leadership Training Need Analysis Material Development Training Evaluation Recruitment Supervisor Reqired Level 2 3 4 Communication Skills Interview Skills Analytical Thinking Understand Selection Tools Teamwork Customer Orientation 1 5 Skills Required Competency Training & Development Manager Knowledge Position 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 57
  • 58.
    Imagination Knowledge Competency Profile PerPosition Position Competency Requirement Leadership Supervisor Skills Ahievement Orientation 2014 Relevant Training Module Leadership I Communication Skill I The Art of Motivating Employee Providing Effective Feedback Goal Setting Technique Work Motivation Planning & Organizing Continuous Self Improvement Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 58
  • 59.
    Skills Supervisor Manager 2014 Communication Skills Leadership Teamwork Achievement Orientation CustomerFocus Job Functional Skills Communication Skills Leadership Teamwork Achievement Orientation Customer Focus Strategic Thinking Problem Solving & Decision Making Job Functional Skills Professional Seminar Series Building Productive Teamwork Strategic Management Creative Problem Solving Achievement Motivation Training Service Excellence for Customer On Becoming Leader 2 On Becoming Effective Leader 1 Knowledge Position Training Title / Managerial Competency Productive Communication Series Imagination Training Matrix for Competency Development V V V V V V V V V V V Entire Contents © 2014, Atif Choudhary. All Rights Reserved V V V Slide 59
  • 60.
  • 61.
    Imagination Individual Performance Element Knowledge 1.Performance Results: Hard or quantitative aspects of performance (result) Individual Performance elements has tow main categories: Skills 2. Competencies: It represents soft or quantitative aspects of performance (process) 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 61
  • 62.
    Imagination Individual Performance Element Knowledge 1.Performance Results Score Overall Score 2. Competencies Score Skills Will determine the employee’s career movement, and also the reward to be earned 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 62
  • 63.
    Imagination Element # 1:Performance Results No. Main Performance Target Target to be Achieved All employees submit their performance assessment form on time Improve the system for performance assessment Target: completed 100% 3 Conduct training activitie Target: to conduct 6 training modules in one year 4 Skills Conduct an assessment of the employee's performance 2 Knowledge 1 Carry out on the job training activities Target: 90% of the total employees who attend the training experience an increase in skill and knowledge Target should be measurable and specific 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 63
  • 64.
    Imagination Element # 2:Competency Competency: Collaboration Basic Intermediate Advance Expert Actively listen, and clarifies understanding where required, in order to learn form others. Actively listen, and clarifies understanding where required, in order to learn form others. Actively listen, and clarifies understanding where required, in order to learn form others. Empathies with audience and formulate message accordingly. Empathies with audience and formulate message accordingly. Empathies with audience and formulate message accordingly. Empathies with audience and formulate message accordingly. Share resources and information. Share resources and information. Share resources and information. Share resources and information. Responds promptly to other team members’ needs. Balance complementary strengths in teams and seek diverse contributions and perspectives. Actively builds internal and external networks. Builds internal and external networks and uses them to efficiently to create value. Involves teams in decisions that effect them. Uses cross functional teams to draw upon skills and knowledge throughout the organization. Uses cross functional teams to draw upon skills and knowledge throughout the organization. Encourages co-operation rather than competition within the team and with key stakeholders. Knowledge Actively listen, and clarifies understanding where required, in order to learn form others. Build and maintain relationships across the company. Drives and leads key relationship groups across the company. Manages alliance relationships through complex issues such as points of competing interest. Skills Ensures events and systems, e.g. IT, for collaboration are in place and used. Draws upon the full range of relationships (internal, external, cross the company) at critical points in marketing and negotiations. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 64
  • 65.
    Imagination Assessing Competency through AssessmentCenter Assessment Center Characteristics:    A standardized evaluation of behavior based on multiple inputs. Multiple trained observers and techniques are used. Judgments about behavior are made, in major part, from specifically developed assessment simulations. These judgments are pooled in a meeting among the assessors or by a statistical integration process. Skills Knowledge  2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 65
  • 66.
    Imagination Types of Testin Assessment Center Role Simulation • In a play, you are given a particular role to assume for a certain task. The task will be involve dealing with a role player in a certain way, and there will be an assessor watching the role play. Skills Knowledge In-Basket Exercise • In-trays or in-baskets involve working from the contents of a manager’s in-tray, with typically consists of letters, memos and background information. You may be asked to deal with paperwork and make decisions, balancing the volume of work against a tight schedule. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 66
  • 67.
    Imagination Types of Testin Assessment Center Knowledge Presentation • In a fact-finding exercise, you may be asked to reach a decision starting from only partial knowledge. Your task is to decide what additional information you need to make the decision, and sometimes also to question the assessor to obtain this information. Skills Fact Finding Exercise • You may be required to make a formal presentation to a number of assessors. In some cases this will mean preparing a presentation in advance on a given topic. In other cases, you may be asked to interpret and analyze given information, and present a case to support a decision. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 67
  • 68.
    Imagination Knowledge Types of Testin Assessment Center Skills Group Discussion • Group exercises are timed discussions, where a group of participants work together to tackle a work-related problem. Sometimes you are given a particular role within a team, for example sales manager or personnel manager. Other times there will be no roles allocated. You are observed by assessors, who are not looking for right or wrong answers, but for how you interact with your colleagues in the team. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 68
  • 69.
    Results of Observation Through the AssessmentCenter Competency Score Skills Knowledge Imagination Competency Assessment Rating 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 69
  • 70.
    Imagination Further Readings  Skills Knowledge  Paul Green,Building Robust Competency, John Wiley and Sons David Dubois, Competency-Based HR Management, Black Publishing. 2014 Entire Contents © 2014, Atif Choudhary. All Rights Reserved Slide 70
  • 71.
    Imagination Skills Knowledge Any Question? 2014 Entire Contents© 2014, Atif Choudhary. All Rights Reserved Slide 71