• By the year 2030 it is estimated 47% of the world's population will
face severe water shortages. Organization for Economic Co-operation and Development 2008
•82% of the U.S. population reside in urban areas
•50-75% of the U.S population rely on undeveloped forested
watersheds to produce adequate water supplies. Forest Ecology and
Management 258 (2009) 2269–2281
•The key hydrological function of forested watersheds is infiltration
•Impervious area in U.S. is projected to increase by over 36% by
2030 compared to 2000. JOURNAL OF HYDROLOGIC ENGINEERING © ASCE / APRIL 2009
•6 of the 20 fastest developing metro areas in the U.S. are located
in the Piedmont plateau.USDA, Natural Resource Inventory (NRI) database
•Dominant soils of the Piedmont are clay like. The Center for Environmental
Informatics (CEI)
•The dominant soils series of the Piedmont is Cecil
INTRODUCTION - STATISTICS
2
11/2/2015 © Copyright Estes Design Inc. 2013
WATER SUPPLY
CN = 55 ??
3
DEVELOPMENT
 CN = 92 ??
11/2/2015 © Copyright Estes Design Inc. 2013 4
11/2/2015
© Copyright Estes Design Inc. 2013
RUNOFF
5© Copyright Estes Design Inc. 2013
11/2/2015
Precipitation
 1 yr – 2.79”
 2 yr - 3.36”
 10 yr – 4.89”
 100 yr – 7.28”
Charlotte
NOAA 24 hr ARI
© Copyright Estes Design Inc. 2013 6
Clay Soils
11/2/2015 © Copyright Estes Design Inc. 2013
 Clay soils are widely misunderstood
 Clay soils are not equal. There are
different types of clay
 Infiltration rates and shrink-swell vary
greatly. Piedmont soils are typically well
drained and low to moderate shrink swell
potential
 The majority of Piedmont soils are ideal for
infiltration
7
11/2/2015
Mecklenburg County Soils, NC
Approximately 64% of
Mecklenburg County is HSG B.
Dominant series Cecil 59%
95th percentile storm 1.8”
© Copyright Estes Design Inc. 2013 8
11/2/2015
Case Studies
Estes Design Inc.
 Davidson, NC - Built 2007 monitored
3.5 years
 Charlotte, NC - Built 2005 monitored
3 years
Both projects infiltrated 95% of their
annual rain events
© Copyright Estes Design Inc. 2013 9
11/2/2015
Jetton Street Condominiums
Site
© Copyright Estes Design Inc. 2013 10
11/2/2015
Technology
 Infiltration BMP’s - 2
 1 bio-Infiltration &1 infiltration wetland
 Detains & infiltrates designed volume.
 Bio-retention - 3
 Captures & treats first 1”
 Replaces standard planting beds
 Can be used in areas of high clay
© Copyright Estes Design Inc. 2013 11
11/2/2015
Soils
© Copyright Estes Design Inc. 2013 12
11/2/2015
Preliminary Soils Survey
© Copyright Estes Design Inc. 2013 13
11/2/2015
Site Specific Infiltration Testing
RG-1
RG-5
© Copyright Estes Design Inc. 2013
Field infiltration rate helps
determine probable outcome
and initial design parameters
14
11/2/2015
1.10 in/hr 1.50 in/hr
Test Results
1.125”/hr
1.5”/hr
© Copyright Estes Design Inc. 2013 15
11/2/2015
Jetton Street Condominiums
7.4
acres
Reduced
Detention
Infiltration
Wetland
Bio-retention
Gardens
Bio-
retention
Garden
Bio-
Infiltration
Garden
© Copyright Estes Design Inc. 2013 16
11/2/2015
Jetton Street Condominiums
Reduced
Detention
Basin
Bio-
Retention
Gardens
Bio-
Retention
Garden
Bio-
Infiltration
Garden
Infiltration
Wetland
© Copyright Estes Design Inc. 2013 17
11/2/2015
LID Modeling
Jetton Street, Town of Davidson
Reduction of 10 yr peak storage
volume by 45%
© Copyright Estes Design Inc. 2013
18
11/2/2015
Rain Garden 2
Redundant Treatment
Sub-drains to Bio-
infiltration Garden 1
© Copyright Estes Design Inc. 2013 19
11/2/2015
Bio-infiltration Garden 1
Filter Fabric
impedes
infiltration??
© Copyright Estes Design Inc. 2013 20
11/2/2015
Bio-infiltration Garden 1
Soil conveyor
reduces
compaction and
eases access.
© Copyright Estes Design Inc. 2013 21
11/2/2015
Bio-infiltration Garden 1
Rain
Garden 1 is
being
monitored
utilizing
water level
data
loggers
© Copyright Estes Design Inc. 2013 22
11/2/2015
Bio-Infiltration Garden 1
February
2008 –
April 2009
Avg.
0.26”/hr
(0.66 cm/hr)
6.35”/day
(16.13
cm/hr)
Rawls, Brakensiek and Saxton 1982 : Sandy Clay Loam = K of 0.43 cm/hr
© Copyright Estes Design Inc. 2013 23
11/2/2015
Infiltration Wetland 5
Designed to
infiltrate the 2yr
storm
© Copyright Estes Design Inc. 2013 24
11/2/2015
Rain Garden
5 is being
monitored
utilizing water
level data
loggers
Infiltration Wetland 5
© Copyright Estes Design Inc. 2013 25
11/2/2015
Infiltration Wetland 5
© Copyright Estes Design Inc. 2013 26
11/2/2015
Infiltration Wetland 5
Monitoring
infiltration
rates with
water level
data loggers
© Copyright Estes Design Inc. 2013 27
11/2/2015
Infiltration Pond 5
February
2008 –
April 2009
Avg.
infiltration
rate
0.14 “/hr
(0.36 cm/hr)
3.2”/day
(8.13
cm/day)
July Aug Sept OctJuneMayAprMarFeb Nov Dec Jan Feb Mar Apr
Rawls, Brakensiek and Saxton 1982 : Sandy Clay Loam = K of 0.43 cm/hr
© Copyright Estes Design Inc. 2013
28
11/2/2015
Wilmore Walk LID
Site
© Copyright Estes Design Inc. 2013 29
11/2/2015
Wilmore Walk
 2.8 acre Multi-Family Urban
Redevelopment
 Over 90% of site runoff is treated
© Copyright Estes Design Inc. 2013 30
11/2/2015
Wilmore Walk
 BMPs were retrofitted into an existing site
design, including
6,355 sf of pervious concrete with
3,800 cf available storage in a gravel
base
 All water quality permit requirements were
satisfied using “Bio-Retention” BMPs
© Copyright Estes Design Inc. 2013 31
11/2/2015
Plan
Bio-
Retention
Porous
Concrete
Bio-
Retention
© Copyright Estes Design Inc. 2013 32
Bio-Retention
Drain
System
11/2/2015 © Copyright Estes Design Inc. 2013 33
Bio-Retention
Drain
System
11/2/2015 © Copyright Estes Design Inc. 2013 34
Finished
Bio-retention
as landscape
areas
Rapid infiltration rate to
start. Eventually
stabilized in 6 mos.
11/2/2015 © Copyright Estes Design Inc. 2013 35
Bio-retention as
landscape areas
Overflow weir
11/2/2015 © Copyright Estes Design Inc. 2013 36
11/2/2015 © Copyright Estes Design Inc. 2013 37
11/2/2015
Porous
Concrete
© Copyright Estes Design Inc. 2013 38
11/2/2015
Wilmore Walk
 Existing soils were investigated
 Green-Ampt equations for infiltration were
used for design of basin beneath the
pervious concrete area
 Bio-retention areas were located with
grading plans adjusted accordingly.
© Copyright Estes Design Inc. 2013 39
11/2/2015
Preliminary Soils Survey
© Copyright Estes Design Inc. 2013 40
Site-Specific
Infiltration Testing:
0.24 – 3.15 in/hr
Avg. 0.9 in/hr
Infiltration in Sandy Clay Loam
Field infiltration rate helps
determine probable outcome
and initial design parameters
11/2/2015 © Copyright Estes Design Inc. 2013 41
11/2/2015
Design
Stone Infiltration
Reservoir sized for
the 2yr storm for
respective watershed
Watershed includes
surrounding rooflines
and any off site
contributions.
Seasonal ground
water fluctuations
important
© Copyright Estes Design Inc. 2013 42
11/2/2015 © Copyright Estes Design Inc. 2013
Understanding soil
components and structure
required in predicting design
outcome
43
Sub-grade Prep
Clay soils are highly susceptible to inadvertent compaction
11/2/2015 © Copyright Estes Design Inc. 2013 44
Stone
Reservoir
11/2/2015 © Copyright Estes Design Inc. 2013 45
11/2/2015
Porous Concrete Installation
May 10, 2005
© Copyright Estes Design Inc. 2013 46
11/2/2015
Porous Concrete Installation
May 10, 2005
© Copyright Estes Design Inc. 2013 47
Porous
Concrete
Pavement
11/2/2015 © Copyright Estes Design Inc. 2013 48
Finished
Porous
Concrete
11/2/2015 © Copyright Estes Design Inc. 2013 49
11/2/2015
Monitoring
Infinities USA
Pressure Water
Level Data
Logger
© Copyright Estes Design Inc. 2013 50
11/2/2015
Monitoring Data
Aug-Sept 06
Average infiltration
rate of 0.09 in/hr
(0.23 cm/hr)
13” in 6 days
in semi-dry
conditions
Rawls, Brakensiek and Saxton 1982 : Sandy Clay Loam = K of 0.43 cm/hr
Rawls, Brakensiek and Saxton 1982 : Clay Loam = K of 0.23 cm/hr
© Copyright Estes Design Inc. 2013 51
11/2/2015
Testing
New Standard Test Method
for Infiltration Rate of In Place
Pervious Concrete being
developed
by ASTM committee C09/49
4 years later rates of 1040 –
1430 in/hr
© Copyright Estes Design Inc. 2013 52
11/2/2015
Preliminary Monitoring Data
Saturated Soils Feb. 06
Preliminary data
suggests average
infiltration rate of 0.06
in/hr (0.15 cm/hr)
(7.5” in 5.5 days) in
saturated soil
Extended research
completed by
UNCC 2010.
Rawls, Brakensiek and Saxton 1982 : Silty Clay Loam = K of 0.15 cm/hr
© Copyright Estes Design Inc. 2013
53
UNCC 2 Year Monitoring Study
Wilmore Walk
11/2/2015 © Copyright Estes Design Inc. 2013
• Monitored for 2 years
• Monitored water levels and precipitation
• Average infiltration rate 0.105”/hr, 2.52” /dy, 12.6” /5dy
• Concluded that rain events greater than the 10 year
24 hr events were retained and infiltrated.
•10 yr event is 4.8” = 12.6” gravel depth
•100 yr event is 6.96” = 18.3” gravel depth.
54
11/2/2015 © Copyright Estes Design Inc. 2013
Frankfort Kentucky
Building to be
demolished
A cooperative
effort
between the
City of
Frankfort and
KRMCA
55
11/2/2015 © Copyright Estes Design Inc. 2013 56
Frankfort Kentucky
11/2/2015 © Copyright Estes Design Inc. 2013 57
11/2/2015 © Copyright Estes Design Inc. 2013 58
Frankfort Kentucky
 City of Frankfort
Storm Water
11/2/2015
Working with UK and KRMCA on
the Monitoring
© Copyright Estes Design Inc. 2013 59
CRMCA, Charlotte NC
11/2/2015 © Copyright Estes Design Inc. 2013 60
CRMCA, Charlotte NC
11/2/2015 © Copyright Estes Design Inc. 2013
Sandy clay loam
61
CRMCA, Charlotte NC
11/2/2015 © Copyright Estes Design Inc. 2013
• Over 6
month period
72 rain
events.
• Rate of
infiltration
into sub-
grade 0.25”-
0.40 “ /hr
62
CRMCA, Charlotte NC
 CRMCA1 3720 in/hr First parking
space (Older pour)
 CRMCA2 5930 in/hr Second parking
space (Older pour)
 CRMCB1 way too slow for
accuracy (impervious strip)
 CRMCC1 2600 in/hr (First space new
pour)
 CRMCC2 3740 in/hr (second space
new pour)
MINIMUM OF 2600 IN/HR
11/2/2015 © Copyright Estes Design Inc. 2013
Pervious Concrete Pavement Testing
63
11/2/2015
END
 Thanks for listening!
© Copyright Estes Design Inc. 2013 64
Reversing History of Urban
Hydrology
What Could Happen On A watershed Scale?
 What if we modeled a watershed in the piedmont based
on where an infiltration project is already established,
monitored and validated over multiple years.
 How could a real urban watershed be retrofitted?
 How would this scenario effect watershed hydrology?
11/2/2015 © Copyright Estes Design Inc. 2013 65
THE WATERSHED EFFECT
GIS modeling study of watershed retrofit
11/2/2015 © Copyright Estes Design Inc. 2013
Capstone research project by Megan Gray
Department of Geography & Earth Science
University of North Carolina Charlotte
66
PROJECT OBJECTIVES
 Expanded Wilmore Walk research to explore
watershed implication of PP on runoff using GIS
and HydroCAD
 How would PP affect runoff within a
watershed?
 Applied SCS CN TR-55 runoff model to predict
effect of PP on watershed by using;
1. ArcGIS©
2. HydroCAD©
11/2/2015 67© Copyright Estes Design Inc. 2013
METHODS - STORMWATER MODELING
SCS CN RUNOFF MODEL
 Four CN Maps represent four scenarios:
 1 – Present, real-time data. Impervious surfaces are
impervious
 2 - Parking lots, driveways, and sidewalks are
pervious
 3 - Secondary roads are pervious
 4 – Parking lots, driveways, sidewalks, and secondary
roads are pervious
 CN Values
 Impervious = 98
 Pervious = 61 (Used Equivalent CN of grass for B
Hydrogroup. Conservative)
Q = (P – 0.2S)2/(P + 0.8S)
11/2/2015 68© Copyright Estes Design Inc. 2013
Watershed Scale
 Digital Elevation
Model for seven
precipitation maps (P
maps) ranging from
1.25 to 100-year
storm events
11/2/2015 © Copyright Estes Design Inc. 2013 69
Watershed Scale
 Hyperspatial
image of
Irwin
Watershed
was used to
create land
use maps
11/2/2015 © Copyright Estes Design Inc. 2013
Existing Conditions
Land-use Cover
70
“S” Maps
11/2/2015 71© Copyright Estes Design Inc. 2013
Watershed Scale
 Hyperspatial
image &
SSURGO soil
survey map
was used in
combination to
create the CN
maps
 Impervious =
CN 98
 Pervious = CN
61
11/2/2015 © Copyright Estes Design Inc. 2013
Existing Conditions
72
“CN” Maps
11/2/2015 73© Copyright Estes Design Inc. 2013
Watershed Scale
 CN Map for
Scenario 2,
Driveways
Sidewalks &
Parking lots
are pervious
 75% of
impervious
area
11/2/2015 © Copyright Estes Design Inc. 2013 74
Watershed Scale
11/2/2015 © Copyright Estes Design Inc. 2013
Scenario 2 – Parking Lots, Driveways and Sidewalks account for
75% of area where permeable pavement might be installed and are
typically privately owned.
IECA Environmental
Connection 2014
Runoff “Q” Maps
11/2/2015 76© Copyright Estes Design Inc. 2013
Watershed Scale
Results Scenario 2 -
HydroCAD
 approximately 55%
reduction in peak flow for
the 1.25 year 24 hr rain
event
 approximately 37%
reduction in peak flow for
the 100 year 24 hr event
 approximately 30 minute
delay in peak compared to
scenario 1 & 3
 infrastructure not modeled
11/2/2015 © Copyright Estes Design Inc. 2013 77
WATERSHED EFFECT
 CN = [1000/[10 + 5P + 10Qa– 10(Qa2+ 1.25QaP)1/2]
 where:
 P = rainfall (in)
 Qa = Runoff Volume
 Pervious Concrete with 6” stone base
 Stone base retains 2.4” = CN 45.5
 Include real time Ir 0.10” /hr (2.4”) = CN 29.4
 Pervious concrete pavement 6” retains 1.2” = CN 25
 A watershed that is 75% CN 30 and 25% 98 =
CN 47
11/2/2015 © Copyright Estes Design Inc. 2013 78
11/2/2015
END
 Thanks for listening!
© Copyright Estes Design Inc. 2013 79

More Related Content

What's hot

Pervious concrete
Pervious concretePervious concrete
Pervious concrete
Aglaia Connect
 
Project report on pervious concrete
Project report on pervious concreteProject report on pervious concrete
Project report on pervious concrete
MDZAFARHASIB
 
PERMEABLE PAVEMENT SYSTEMS AND TOP MIX PERMEABLE PAVEMENT
PERMEABLE PAVEMENT SYSTEMS AND TOP MIX PERMEABLE PAVEMENTPERMEABLE PAVEMENT SYSTEMS AND TOP MIX PERMEABLE PAVEMENT
PERMEABLE PAVEMENT SYSTEMS AND TOP MIX PERMEABLE PAVEMENT
G.Ajith Kumar
 
senior seminar presentation
senior seminar presentationsenior seminar presentation
senior seminar presentationAaron Slevin
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
Aglaia Connect
 
report on pervious concrete by atendra
report on pervious concrete by atendrareport on pervious concrete by atendra
report on pervious concrete by atendra
pratap Thakur
 
Design of eco friendlypervious concrete
Design of eco friendlypervious concreteDesign of eco friendlypervious concrete
Design of eco friendlypervious concrete
IAEME Publication
 
PERVIOUS CONCRETE by DEEPAK TIWARI
PERVIOUS CONCRETE by DEEPAK TIWARI PERVIOUS CONCRETE by DEEPAK TIWARI
PERVIOUS CONCRETE by DEEPAK TIWARI
Deepak_Tiwari19
 
Porous concrete
 Porous concrete Porous concrete
Porous concrete
Kunal Lakhani
 
porous and previous roads
porous and previous roadsporous and previous roads
porous and previous roads
Shubham Singh [NITK]
 
Permeable concrete pavement
Permeable concrete pavementPermeable concrete pavement
Permeable concrete pavement
pratik vanam
 
Pervious or Porous Concrete
Pervious or Porous ConcretePervious or Porous Concrete
Pervious or Porous Concrete
MANUJ sinh
 
Porous concrete
Porous concretePorous concrete
Porous concrete
Pallavi Patil
 
Thirsty concrete (2)
Thirsty concrete (2)Thirsty concrete (2)
Thirsty concrete (2)
Karthi Kavya
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
anwar albassrih
 
An Experimental Paper on Compressive Strength of Pervious Concrete
An Experimental Paper on Compressive Strength of Pervious ConcreteAn Experimental Paper on Compressive Strength of Pervious Concrete
An Experimental Paper on Compressive Strength of Pervious Concrete
ijtsrd
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
Latha Reddy
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
Arpit Sethia
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
nithianju
 
Porous asphalt pavement
Porous asphalt pavementPorous asphalt pavement
Porous asphalt pavement
Ashif AR
 

What's hot (20)

Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
Project report on pervious concrete
Project report on pervious concreteProject report on pervious concrete
Project report on pervious concrete
 
PERMEABLE PAVEMENT SYSTEMS AND TOP MIX PERMEABLE PAVEMENT
PERMEABLE PAVEMENT SYSTEMS AND TOP MIX PERMEABLE PAVEMENTPERMEABLE PAVEMENT SYSTEMS AND TOP MIX PERMEABLE PAVEMENT
PERMEABLE PAVEMENT SYSTEMS AND TOP MIX PERMEABLE PAVEMENT
 
senior seminar presentation
senior seminar presentationsenior seminar presentation
senior seminar presentation
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
report on pervious concrete by atendra
report on pervious concrete by atendrareport on pervious concrete by atendra
report on pervious concrete by atendra
 
Design of eco friendlypervious concrete
Design of eco friendlypervious concreteDesign of eco friendlypervious concrete
Design of eco friendlypervious concrete
 
PERVIOUS CONCRETE by DEEPAK TIWARI
PERVIOUS CONCRETE by DEEPAK TIWARI PERVIOUS CONCRETE by DEEPAK TIWARI
PERVIOUS CONCRETE by DEEPAK TIWARI
 
Porous concrete
 Porous concrete Porous concrete
Porous concrete
 
porous and previous roads
porous and previous roadsporous and previous roads
porous and previous roads
 
Permeable concrete pavement
Permeable concrete pavementPermeable concrete pavement
Permeable concrete pavement
 
Pervious or Porous Concrete
Pervious or Porous ConcretePervious or Porous Concrete
Pervious or Porous Concrete
 
Porous concrete
Porous concretePorous concrete
Porous concrete
 
Thirsty concrete (2)
Thirsty concrete (2)Thirsty concrete (2)
Thirsty concrete (2)
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
An Experimental Paper on Compressive Strength of Pervious Concrete
An Experimental Paper on Compressive Strength of Pervious ConcreteAn Experimental Paper on Compressive Strength of Pervious Concrete
An Experimental Paper on Compressive Strength of Pervious Concrete
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
Porous asphalt pavement
Porous asphalt pavementPorous asphalt pavement
Porous asphalt pavement
 

Viewers also liked

AU 2012-2013 Pavement Thermal Study
AU 2012-2013 Pavement Thermal StudyAU 2012-2013 Pavement Thermal Study
AU 2012-2013 Pavement Thermal Study
Dale Fisher
 
Critical Importance of Site Design
Critical Importance of Site DesignCritical Importance of Site Design
Critical Importance of Site Design
Dale Fisher
 
Innovative Applications of Pervious Concrete
Innovative Applications of Pervious ConcreteInnovative Applications of Pervious Concrete
Innovative Applications of Pervious Concrete
Dale Fisher
 
Fiber Reinforced Pervious
Fiber Reinforced PerviousFiber Reinforced Pervious
Fiber Reinforced Pervious
Dale Fisher
 
Measurement of Infiltration Rates and the Rejuvenation of Pervious Concrete P...
Measurement of Infiltration Rates and the Rejuvenation of Pervious Concrete P...Measurement of Infiltration Rates and the Rejuvenation of Pervious Concrete P...
Measurement of Infiltration Rates and the Rejuvenation of Pervious Concrete P...
Dale Fisher
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
shiva prakash
 
Effect and Optimization of Silica Fume in Pervious Concrete
Effect and Optimization of Silica Fume in Pervious ConcreteEffect and Optimization of Silica Fume in Pervious Concrete
Effect and Optimization of Silica Fume in Pervious Concrete
Dale Fisher
 
Pervious Concrete Projects in Beaverton
Pervious Concrete Projects in BeavertonPervious Concrete Projects in Beaverton
Pervious Concrete Projects in Beaverton
Maria Cahill
 
Pervious Concrete - Density is our Destiny
Pervious Concrete - Density is our DestinyPervious Concrete - Density is our Destiny
Pervious Concrete - Density is our Destiny
Dale Fisher
 
Troubleshooting Pervious Concrete
Troubleshooting Pervious ConcreteTroubleshooting Pervious Concrete
Troubleshooting Pervious Concrete
Dale Fisher
 
How to repair wet or leaking concrete cracks
How to repair wet or leaking concrete cracksHow to repair wet or leaking concrete cracks
How to repair wet or leaking concrete cracks
Foundation Armor
 
Pervious Concrete: Getting Down to the Details
Pervious Concrete: Getting Down to the DetailsPervious Concrete: Getting Down to the Details
Pervious Concrete: Getting Down to the Details
Sean Van Delist
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
Abhishek Gupta
 
Pervious Concrete Pilot Project COT 042413
Pervious Concrete Pilot Project COT 042413Pervious Concrete Pilot Project COT 042413
Pervious Concrete Pilot Project COT 042413Mary Kell
 

Viewers also liked (14)

AU 2012-2013 Pavement Thermal Study
AU 2012-2013 Pavement Thermal StudyAU 2012-2013 Pavement Thermal Study
AU 2012-2013 Pavement Thermal Study
 
Critical Importance of Site Design
Critical Importance of Site DesignCritical Importance of Site Design
Critical Importance of Site Design
 
Innovative Applications of Pervious Concrete
Innovative Applications of Pervious ConcreteInnovative Applications of Pervious Concrete
Innovative Applications of Pervious Concrete
 
Fiber Reinforced Pervious
Fiber Reinforced PerviousFiber Reinforced Pervious
Fiber Reinforced Pervious
 
Measurement of Infiltration Rates and the Rejuvenation of Pervious Concrete P...
Measurement of Infiltration Rates and the Rejuvenation of Pervious Concrete P...Measurement of Infiltration Rates and the Rejuvenation of Pervious Concrete P...
Measurement of Infiltration Rates and the Rejuvenation of Pervious Concrete P...
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
Effect and Optimization of Silica Fume in Pervious Concrete
Effect and Optimization of Silica Fume in Pervious ConcreteEffect and Optimization of Silica Fume in Pervious Concrete
Effect and Optimization of Silica Fume in Pervious Concrete
 
Pervious Concrete Projects in Beaverton
Pervious Concrete Projects in BeavertonPervious Concrete Projects in Beaverton
Pervious Concrete Projects in Beaverton
 
Pervious Concrete - Density is our Destiny
Pervious Concrete - Density is our DestinyPervious Concrete - Density is our Destiny
Pervious Concrete - Density is our Destiny
 
Troubleshooting Pervious Concrete
Troubleshooting Pervious ConcreteTroubleshooting Pervious Concrete
Troubleshooting Pervious Concrete
 
How to repair wet or leaking concrete cracks
How to repair wet or leaking concrete cracksHow to repair wet or leaking concrete cracks
How to repair wet or leaking concrete cracks
 
Pervious Concrete: Getting Down to the Details
Pervious Concrete: Getting Down to the DetailsPervious Concrete: Getting Down to the Details
Pervious Concrete: Getting Down to the Details
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
Pervious Concrete Pilot Project COT 042413
Pervious Concrete Pilot Project COT 042413Pervious Concrete Pilot Project COT 042413
Pervious Concrete Pilot Project COT 042413
 

Similar to Can Pervious Concrete Work in Clay Soils?

Himkaar Singh Diepsloot SW Report
Himkaar Singh Diepsloot SW ReportHimkaar Singh Diepsloot SW Report
Himkaar Singh Diepsloot SW ReportHimkaar Singh
 
Use of Pervious Concrete in Pavements
Use of Pervious Concrete in PavementsUse of Pervious Concrete in Pavements
Use of Pervious Concrete in Pavements
IRJET Journal
 
Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14
MCDEP
 
Environmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources ProjectsEnvironmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources Projects
National Institute of Technology Hamirpur
 
What Practices are Reducing Environmental and Economic Risks on Wisconsin Farms?
What Practices are Reducing Environmental and Economic Risks on Wisconsin Farms?What Practices are Reducing Environmental and Economic Risks on Wisconsin Farms?
What Practices are Reducing Environmental and Economic Risks on Wisconsin Farms?
LPE Learning Center
 
IRJET- Predicting Piping Erosion Susceptibility by Statistical and Artificial...
IRJET- Predicting Piping Erosion Susceptibility by Statistical and Artificial...IRJET- Predicting Piping Erosion Susceptibility by Statistical and Artificial...
IRJET- Predicting Piping Erosion Susceptibility by Statistical and Artificial...
IRJET Journal
 
Castle Debates - Managing the environmental impacts of new housing developments
Castle Debates - Managing the environmental impacts of new housing developmentsCastle Debates - Managing the environmental impacts of new housing developments
Castle Debates - Managing the environmental impacts of new housing developments
GeoSmart Information
 
The Soque Watershed - Considerations for Habersham County (7.20.15)
The Soque Watershed - Considerations for Habersham County (7.20.15)The Soque Watershed - Considerations for Habersham County (7.20.15)
The Soque Watershed - Considerations for Habersham County (7.20.15)
Justin Ellis
 
The impact of providing surface cover on the soil loss and water discharge un...
The impact of providing surface cover on the soil loss and water discharge un...The impact of providing surface cover on the soil loss and water discharge un...
The impact of providing surface cover on the soil loss and water discharge un...
Alexander Decker
 
IRJET- Analysis, Modelling and Simulation of Subsurface Dams and their Role i...
IRJET- Analysis, Modelling and Simulation of Subsurface Dams and their Role i...IRJET- Analysis, Modelling and Simulation of Subsurface Dams and their Role i...
IRJET- Analysis, Modelling and Simulation of Subsurface Dams and their Role i...
IRJET Journal
 
Impacts of hydel dam projects in world
Impacts of hydel dam projects in worldImpacts of hydel dam projects in world
Impacts of hydel dam projects in world
Soubhagya Tripathy
 
Attachment a
Attachment aAttachment a
Attachment a
louisette lanteigne
 
White paper permeablepavement
White paper permeablepavementWhite paper permeablepavement
White paper permeablepavementcathexis123
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Fairfax County
 
OC harbor brook wetlands stakeholder 6 15-11 final-1
OC harbor brook wetlands stakeholder 6 15-11 final-1OC harbor brook wetlands stakeholder 6 15-11 final-1
OC harbor brook wetlands stakeholder 6 15-11 final-1
Onondaga County Save the Rain
 
Modeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on FloodingModeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on Flooding
Adam Nayak
 
Projects(Nov 17 2010)
Projects(Nov 17 2010)Projects(Nov 17 2010)
Projects(Nov 17 2010)Ora Berman
 
A Review Paper on Pervious Concrete
A Review Paper on Pervious ConcreteA Review Paper on Pervious Concrete
A Review Paper on Pervious Concrete
IRJET Journal
 
Oyster castle addition at bennett's point
Oyster castle addition at bennett's pointOyster castle addition at bennett's point
Oyster castle addition at bennett's point
MadisonSocha
 

Similar to Can Pervious Concrete Work in Clay Soils? (20)

Himkaar Singh Diepsloot SW Report
Himkaar Singh Diepsloot SW ReportHimkaar Singh Diepsloot SW Report
Himkaar Singh Diepsloot SW Report
 
Use of Pervious Concrete in Pavements
Use of Pervious Concrete in PavementsUse of Pervious Concrete in Pavements
Use of Pervious Concrete in Pavements
 
LIUDD by Maria Ignatieva
LIUDD by Maria IgnatievaLIUDD by Maria Ignatieva
LIUDD by Maria Ignatieva
 
Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14
 
Environmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources ProjectsEnvironmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources Projects
 
What Practices are Reducing Environmental and Economic Risks on Wisconsin Farms?
What Practices are Reducing Environmental and Economic Risks on Wisconsin Farms?What Practices are Reducing Environmental and Economic Risks on Wisconsin Farms?
What Practices are Reducing Environmental and Economic Risks on Wisconsin Farms?
 
IRJET- Predicting Piping Erosion Susceptibility by Statistical and Artificial...
IRJET- Predicting Piping Erosion Susceptibility by Statistical and Artificial...IRJET- Predicting Piping Erosion Susceptibility by Statistical and Artificial...
IRJET- Predicting Piping Erosion Susceptibility by Statistical and Artificial...
 
Castle Debates - Managing the environmental impacts of new housing developments
Castle Debates - Managing the environmental impacts of new housing developmentsCastle Debates - Managing the environmental impacts of new housing developments
Castle Debates - Managing the environmental impacts of new housing developments
 
The Soque Watershed - Considerations for Habersham County (7.20.15)
The Soque Watershed - Considerations for Habersham County (7.20.15)The Soque Watershed - Considerations for Habersham County (7.20.15)
The Soque Watershed - Considerations for Habersham County (7.20.15)
 
The impact of providing surface cover on the soil loss and water discharge un...
The impact of providing surface cover on the soil loss and water discharge un...The impact of providing surface cover on the soil loss and water discharge un...
The impact of providing surface cover on the soil loss and water discharge un...
 
IRJET- Analysis, Modelling and Simulation of Subsurface Dams and their Role i...
IRJET- Analysis, Modelling and Simulation of Subsurface Dams and their Role i...IRJET- Analysis, Modelling and Simulation of Subsurface Dams and their Role i...
IRJET- Analysis, Modelling and Simulation of Subsurface Dams and their Role i...
 
Impacts of hydel dam projects in world
Impacts of hydel dam projects in worldImpacts of hydel dam projects in world
Impacts of hydel dam projects in world
 
Attachment a
Attachment aAttachment a
Attachment a
 
White paper permeablepavement
White paper permeablepavementWhite paper permeablepavement
White paper permeablepavement
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
 
OC harbor brook wetlands stakeholder 6 15-11 final-1
OC harbor brook wetlands stakeholder 6 15-11 final-1OC harbor brook wetlands stakeholder 6 15-11 final-1
OC harbor brook wetlands stakeholder 6 15-11 final-1
 
Modeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on FloodingModeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on Flooding
 
Projects(Nov 17 2010)
Projects(Nov 17 2010)Projects(Nov 17 2010)
Projects(Nov 17 2010)
 
A Review Paper on Pervious Concrete
A Review Paper on Pervious ConcreteA Review Paper on Pervious Concrete
A Review Paper on Pervious Concrete
 
Oyster castle addition at bennett's point
Oyster castle addition at bennett's pointOyster castle addition at bennett's point
Oyster castle addition at bennett's point
 

Recently uploaded

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 

Recently uploaded (20)

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 

Can Pervious Concrete Work in Clay Soils?