The document discusses the C programming language. It notes that C is commonly used for embedded systems as it produces efficient code and is portable across processors. The history of C is described, including its origins in the late 1960s/early 1970s at Bell Labs as a system programming language derived from B and BCPL. Examples of C code are provided, including a "Hello World" program and Euclid's algorithm, and how C code maps to assembly instructions on a PDP-11 computer. Key aspects of C like types, expressions, functions, and memory management are summarized.
Presentation on native interfaces for the R programming language given as part of a course in advanced R programming at FHCRC:
https://secure.bioconductor.org/SeattleMay10/
A minimal collection of most wanted and widely accepted idioms and coding conventions for C++ development presented with examples and explanations. The lecture targets performance oriented codes so emphasis is on performance-friendly techiques.
Topics covered:
1) Design issues: idioms and best practices
- Resource Aquisition Is Initialization (RAII)
- Ownership semantics and smart pointers
- Header files: dependencies and decoupling
2) Objects Construction/Destruction/Copying
- Designing constructors
- Rule Of Three
- Transactional programming
3) Namespaces
- ADL/Koenig Lookup
4) Static analyzers
This set of slides introduces the reader to the basics of memory management in C++ (with elements of C++11 and C++14). Specifically, after presenting the essential idea of memory segmentation, the presentation contrasts automatic and dynamic objects. To this extent the critical issue of memory leaks is introduced. It follows a discussion on the more advanced topics, such as owning and non-owning (i.e., observer) pointers, as well as dynamic arrays and structures.
Presentation on native interfaces for the R programming language given as part of a course in advanced R programming at FHCRC:
https://secure.bioconductor.org/SeattleMay10/
A minimal collection of most wanted and widely accepted idioms and coding conventions for C++ development presented with examples and explanations. The lecture targets performance oriented codes so emphasis is on performance-friendly techiques.
Topics covered:
1) Design issues: idioms and best practices
- Resource Aquisition Is Initialization (RAII)
- Ownership semantics and smart pointers
- Header files: dependencies and decoupling
2) Objects Construction/Destruction/Copying
- Designing constructors
- Rule Of Three
- Transactional programming
3) Namespaces
- ADL/Koenig Lookup
4) Static analyzers
This set of slides introduces the reader to the basics of memory management in C++ (with elements of C++11 and C++14). Specifically, after presenting the essential idea of memory segmentation, the presentation contrasts automatic and dynamic objects. To this extent the critical issue of memory leaks is introduced. It follows a discussion on the more advanced topics, such as owning and non-owning (i.e., observer) pointers, as well as dynamic arrays and structures.
Есть много причин заниматься конверсией управляемых языков в нативные: это прежде всего производительность, но также защита от реверс-инжиниринга, поддержка аппаратных технологий или каких-то специфичных платформ. В этом докладе мы посмотрим на пример построения конвертера из C# в C++ и те нюансы, которые встречаются при решении этой задачи
Fun with Lambdas: C++14 Style (part 1)Sumant Tambe
If virtual functions in C++ imply design patterns, then C++ lambdas imply what? What does it really mean to have lambdas in C++? Frankly, I don't know but I've a hunch: It's BIG.
Just like virtual functions open doors to the OO paradigm, lambdas open doors to a different paradigm--the functional paradigm. This talk is not a praise of functional programming or some elusive lambda-based library. (Although, I'll mention one briefly that tops my list these days.) Instead, the goal is to have fun while working our way through some mind-bending examples of C++14 lambdas. Beware, your brain will hurt! Bring your laptop and code the examples right along because that may be the fastest way to answer the quiz.
A look at a modern programming language and how it can enhance the productivity and workflow of developers while promising higher execution performance. We will be talking about metaprogramming, functional programming and type systems in a pragmatic way mixed with some examples from `vibe.d` web framework.
By Yazan Dabain - Senior System Engineer, Arabia Weather
2018 cosup-delete unused python code safely - englishJen Yee Hong
The talk is about doing cleanup and refactor for legacy Python code base in a safer way. I introduced several existing tools for this task and demonstrated how (surprisingly) Python ast module can also help in this case.
中文摘要:
不管是 open source 專案還是工作上,經過長時間開發累積,source code 內可能會殘留許多不再需要的 code,造成維護以及 refactor 的困難,也造成新手 trace code 時的障礙。
對 C/C++ 這類編譯式語言來說,開啟編譯器最佳化能自動清除 dead code,但對於 Python 這類動態語言,則沒有公認完美的方法。
本議程分享一些相關經驗,佐以利用 Python AST 的簡易自製工具,討論如何從較複雜的 python source tree 中,安全的清除不再需要的 code。
Code: https://github.com/PCMan/python-find-unused-func
Есть много причин заниматься конверсией управляемых языков в нативные: это прежде всего производительность, но также защита от реверс-инжиниринга, поддержка аппаратных технологий или каких-то специфичных платформ. В этом докладе мы посмотрим на пример построения конвертера из C# в C++ и те нюансы, которые встречаются при решении этой задачи
Fun with Lambdas: C++14 Style (part 1)Sumant Tambe
If virtual functions in C++ imply design patterns, then C++ lambdas imply what? What does it really mean to have lambdas in C++? Frankly, I don't know but I've a hunch: It's BIG.
Just like virtual functions open doors to the OO paradigm, lambdas open doors to a different paradigm--the functional paradigm. This talk is not a praise of functional programming or some elusive lambda-based library. (Although, I'll mention one briefly that tops my list these days.) Instead, the goal is to have fun while working our way through some mind-bending examples of C++14 lambdas. Beware, your brain will hurt! Bring your laptop and code the examples right along because that may be the fastest way to answer the quiz.
A look at a modern programming language and how it can enhance the productivity and workflow of developers while promising higher execution performance. We will be talking about metaprogramming, functional programming and type systems in a pragmatic way mixed with some examples from `vibe.d` web framework.
By Yazan Dabain - Senior System Engineer, Arabia Weather
2018 cosup-delete unused python code safely - englishJen Yee Hong
The talk is about doing cleanup and refactor for legacy Python code base in a safer way. I introduced several existing tools for this task and demonstrated how (surprisingly) Python ast module can also help in this case.
中文摘要:
不管是 open source 專案還是工作上,經過長時間開發累積,source code 內可能會殘留許多不再需要的 code,造成維護以及 refactor 的困難,也造成新手 trace code 時的障礙。
對 C/C++ 這類編譯式語言來說,開啟編譯器最佳化能自動清除 dead code,但對於 Python 這類動態語言,則沒有公認完美的方法。
本議程分享一些相關經驗,佐以利用 Python AST 的簡易自製工具,討論如何從較複雜的 python source tree 中,安全的清除不再需要的 code。
Code: https://github.com/PCMan/python-find-unused-func
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
How to Make a Field invisible in Odoo 17Celine George
It is possible to hide or invisible some fields in odoo. Commonly using “invisible” attribute in the field definition to invisible the fields. This slide will show how to make a field invisible in odoo 17.
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...Levi Shapiro
Letter from the Congress of the United States regarding Anti-Semitism sent June 3rd to MIT President Sally Kornbluth, MIT Corp Chair, Mark Gorenberg
Dear Dr. Kornbluth and Mr. Gorenberg,
The US House of Representatives is deeply concerned by ongoing and pervasive acts of antisemitic
harassment and intimidation at the Massachusetts Institute of Technology (MIT). Failing to act decisively to ensure a safe learning environment for all students would be a grave dereliction of your responsibilities as President of MIT and Chair of the MIT Corporation.
This Congress will not stand idly by and allow an environment hostile to Jewish students to persist. The House believes that your institution is in violation of Title VI of the Civil Rights Act, and the inability or
unwillingness to rectify this violation through action requires accountability.
Postsecondary education is a unique opportunity for students to learn and have their ideas and beliefs challenged. However, universities receiving hundreds of millions of federal funds annually have denied
students that opportunity and have been hijacked to become venues for the promotion of terrorism, antisemitic harassment and intimidation, unlawful encampments, and in some cases, assaults and riots.
The House of Representatives will not countenance the use of federal funds to indoctrinate students into hateful, antisemitic, anti-American supporters of terrorism. Investigations into campus antisemitism by the Committee on Education and the Workforce and the Committee on Ways and Means have been expanded into a Congress-wide probe across all relevant jurisdictions to address this national crisis. The undersigned Committees will conduct oversight into the use of federal funds at MIT and its learning environment under authorities granted to each Committee.
• The Committee on Education and the Workforce has been investigating your institution since December 7, 2023. The Committee has broad jurisdiction over postsecondary education, including its compliance with Title VI of the Civil Rights Act, campus safety concerns over disruptions to the learning environment, and the awarding of federal student aid under the Higher Education Act.
• The Committee on Oversight and Accountability is investigating the sources of funding and other support flowing to groups espousing pro-Hamas propaganda and engaged in antisemitic harassment and intimidation of students. The Committee on Oversight and Accountability is the principal oversight committee of the US House of Representatives and has broad authority to investigate “any matter” at “any time” under House Rule X.
• The Committee on Ways and Means has been investigating several universities since November 15, 2023, when the Committee held a hearing entitled From Ivory Towers to Dark Corners: Investigating the Nexus Between Antisemitism, Tax-Exempt Universities, and Terror Financing. The Committee followed the hearing with letters to those institutions on January 10, 202
The French Revolution, which began in 1789, was a period of radical social and political upheaval in France. It marked the decline of absolute monarchies, the rise of secular and democratic republics, and the eventual rise of Napoleon Bonaparte. This revolutionary period is crucial in understanding the transition from feudalism to modernity in Europe.
For more information, visit-www.vavaclasses.com
The Roman Empire A Historical Colossus.pdfkaushalkr1407
The Roman Empire, a vast and enduring power, stands as one of history's most remarkable civilizations, leaving an indelible imprint on the world. It emerged from the Roman Republic, transitioning into an imperial powerhouse under the leadership of Augustus Caesar in 27 BCE. This transformation marked the beginning of an era defined by unprecedented territorial expansion, architectural marvels, and profound cultural influence.
The empire's roots lie in the city of Rome, founded, according to legend, by Romulus in 753 BCE. Over centuries, Rome evolved from a small settlement to a formidable republic, characterized by a complex political system with elected officials and checks on power. However, internal strife, class conflicts, and military ambitions paved the way for the end of the Republic. Julius Caesar’s dictatorship and subsequent assassination in 44 BCE created a power vacuum, leading to a civil war. Octavian, later Augustus, emerged victorious, heralding the Roman Empire’s birth.
Under Augustus, the empire experienced the Pax Romana, a 200-year period of relative peace and stability. Augustus reformed the military, established efficient administrative systems, and initiated grand construction projects. The empire's borders expanded, encompassing territories from Britain to Egypt and from Spain to the Euphrates. Roman legions, renowned for their discipline and engineering prowess, secured and maintained these vast territories, building roads, fortifications, and cities that facilitated control and integration.
The Roman Empire’s society was hierarchical, with a rigid class system. At the top were the patricians, wealthy elites who held significant political power. Below them were the plebeians, free citizens with limited political influence, and the vast numbers of slaves who formed the backbone of the economy. The family unit was central, governed by the paterfamilias, the male head who held absolute authority.
Culturally, the Romans were eclectic, absorbing and adapting elements from the civilizations they encountered, particularly the Greeks. Roman art, literature, and philosophy reflected this synthesis, creating a rich cultural tapestry. Latin, the Roman language, became the lingua franca of the Western world, influencing numerous modern languages.
Roman architecture and engineering achievements were monumental. They perfected the arch, vault, and dome, constructing enduring structures like the Colosseum, Pantheon, and aqueducts. These engineering marvels not only showcased Roman ingenuity but also served practical purposes, from public entertainment to water supply.
Embracing GenAI - A Strategic ImperativePeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Biological screening of herbal drugs: Introduction and Need for
Phyto-Pharmacological Screening, New Strategies for evaluating
Natural Products, In vitro evaluation techniques for Antioxidants, Antimicrobial and Anticancer drugs. In vivo evaluation techniques
for Anti-inflammatory, Antiulcer, Anticancer, Wound healing, Antidiabetic, Hepatoprotective, Cardio protective, Diuretics and
Antifertility, Toxicity studies as per OECD guidelines
Macroeconomics- Movie Location
This will be used as part of your Personal Professional Portfolio once graded.
Objective:
Prepare a presentation or a paper using research, basic comparative analysis, data organization and application of economic information. You will make an informed assessment of an economic climate outside of the United States to accomplish an entertainment industry objective.
Acetabularia Information For Class 9 .docxvaibhavrinwa19
Acetabularia acetabulum is a single-celled green alga that in its vegetative state is morphologically differentiated into a basal rhizoid and an axially elongated stalk, which bears whorls of branching hairs. The single diploid nucleus resides in the rhizoid.