SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Centre for Modern Architecture Studies in Southeast Asia (MASSA)
Bachelor of Science (Honours) (Architecture)
BUILDING TECHNOLOGY 1 [BLD61403/ARC3514 / ARC3512]
ASSIGNMENT 2:
NAME: LIM JOE ONN
STUDENT ID: 0318679
TUTOR: MR KHAIROOL AIZAT
CONSTRUCTION
SOLUTIONS
INTRODUCTION
FAÇADE PRECEDENT STUDY 1 – COCOON HOUSE, VIETNAM
FAÇADE PRECEDENT STUDY 2 – LE NOUVEL, KL
FLOOR PRECEDENT STUDY – EPIC HOMES
ROOF PRECEDENT STUDY – VILLA SANUR, BALI
FAÇADE PROPOSAL 1 – VENTILATION BLOCKS
FAÇADE PROPOSAL 2 – INDIRECT SYSTEM WITH PLANTER BOXES
SECTIONAL PERSPECTIVE LOCATIONS
SECTIONAL PERSPECTIVE 1 – ROOF GARDEN
SECTIONAL PERSPECTIVE 2 – READING AREA
CONTENT
INTRODUCTION
In the module of Architectural
Studio 5, I designed a community
library in the heart of the humid
tropical metropolis of Kuala
Lumpur. The site is a narrow strip of
land right next to an old shopping
street.
The proposed library has an
estimated area of 1200 square
metres and is 5 stories tall excluding
its roof garden.
Its design aims to tackle two major
issues of the site, namely the
demand for an education centre
and lack of greenery. Thus, the
design focuses on softscape and
vernacular elements.
As for this module, we are to
propose a roof system and two
alternative façade designs.
PROJECT NAME:
VERTICAL PARK LIBRARY
SITE: JALAN TUANKU ABDUL
RAHMAN, KUALA LUMPUR
COCOON HOUSE, VIETNAM
Architects: Ta Tien Vinh and Truong Tuan Chung
ADVANTAGES & DISADVANTAGES REASON FOR SELECTION
Advantages:
 Simple to prefabricate and build,
promising rapid construction
 Great flexibility to customization and
design
 High thermal mass, providing cooling
effect to building interior
 Allows maximum ventilation
 Ease of maintenance
Disadvantages:
 Smaller and higher number of
components
 Repetitive work during construction
Application of vent blocks adapts the building to
its tropical context by maximizing cross
ventilation throughout its façade. It too gives a
sense of privacy as well as ample shading from
sun and rain.
Ventilation blocks are a trend in tropical regions
due to its aesthetics and functionality. It has a
long history as a traditional building module in
areas with hot climate as they provide climatic
comfort and protection.
FAÇADE PRECEDENT STUDY 1
This house is renovated from an older building that is narrow and clustered. The old balconies at both ends of
the house were skinned with precast concrete ventilation blocks. Two varieties of vent blocks alternate
randomly with the patterned one at higher frequency. The space inside the skin was left for rain, wind and
sunlight to pass through. Its design is inspired from a cocoon, where the expressive façade allows access to
nature but with security and privacy considerations.
MATERIALS USED
Precast concrete ventilation blocks, Cement mortar
METHOD OF
CONSTRUCTION
Concrete blocks are
precast and sent to site.
The blocks are then laid
onto one another with
cement mortar as
adhesive component.
Precast concrete vent
blocks
Similar method of applying
mortar to blocks
LE NOUVEL, KUALA LUMPUR
Architect: Jean Nouvel
ADVANTAGES & DISADVANTAGES REASON FOR SELECTION
Advantages:
 Reduces noise level within building
 Provides insulation, thus decreasing
air-conditioning requirement
 Improved air quality
 Visually pleasing and soothing
Disadvantages:
 Requires costly nutrient, pruning
and irrigation equipment
 High maintenance and construction
cost
The design of Vertical Park Library holds the
principle of resurrecting nature to the site,
which needs more shade and greenery. A
green wall forms a barrier between the
library’s interior and its chaotic surrounding,
hence improving its sound and air quality.
Covering a façade with flora gives a positive
psychological impact to pedestrians of the
dystopian, heavily-urbanized site which lacks
tranquil softscape.
Situated right next to KLCC, Le Nouvel is a dual-tower luxury residence with a façade integrating lush tropical
greenery into a heavily urbanized context. Its façade is a combination of vertical rectangular aluminum posts and
horizontal cable rods that allow vines to grow onto it. Planter boxes are placed irregularly between the posts.
The typology of this façade falls under ‘indirect system with planter boxes’. Climber plants are kept away from
the walls by cable supporters. The cable system suits faster growing plants with denser foliage. As time progresses,
the growing plants will cover the façade entirely.
FAÇADE PRECEDENT STUDY 2
MATERIALS USED
Cable rod, Rectangular hollow steel post, Aluminum planter boxes, Creeper and flowering plants, Fertile soil
(soil, peat and sand in the ratio 7:3:2 by volume)
METHOD OF CONSTRUCTION
The system is made up of the
following components: containers,
insulated containers, maintenance
remote automated irrigation and
fertilization systems, and wall
mounting system. Tensile cable rods
extend from permanent vertical
steel beams. Plants grow from
planter boxes, covering the façade.
Water
drainage
from poly
pipes
Reinforced
concrete
column
Zinc plated
handrail
Aluminum
planter box
Zinc-coated
aluminum
Aluminum
grid rail
Cable rod
Plants
EPIC HOMES (THROUGHOUT MALAYSIA)
Architect: Ben Phua
ADVANTAGES & DISADVANTAGES REASON FOR SELECTION
Advantages:
 Allowing passive design ventilation
as air flows freely through the gaps
between timber planks
 Simple and lightweight for
construction
 Rapid construction and lower costs
due to prefabrication
 Wooden floors do not retain much
heat nor conduct heat
Disadvantages:
 Susceptible to fire as they lose
strength at high temperatures
 Prone to corrosion at marine
environments
The houses’ design is suitable for tropical
climates similar to our current site. It drew
inspiration from traditional Malay attap
houses by standing on stilts, allowing cool air
to enter below via gaps between timber
planks and hot air to be removed from the
top of the house.
The theme for Vertical Park Library
emphasizes on vernacular architecture and
living lightly on the site. Timber does not
retain heat, decreasing heat gain of the
building. Simple steel structures are
conventional and readily-available, thus cost
and time efficient.
FLOOR PRECEDENT STUDY 1
Specially designed for ease of assemble and rapid construction, EPIC homes are modular houses built throughout
Malaysia for the needy in remote areas. Its steel post and beam structural design with wooden floor finishing is
lightweight and portable, making it efficient to build.
METHOD OF CONSTRUCTION
The floor structure is made up of
beams that extend from columns
with brackets at intervals. The
secondary structure, which are
timber beams, are locked in these
brackets. Wooden planks are then
nailed onto the timber beams
beneath.
MATERIALS USED
Hollow steel beams, Chengal timber beams, Chengal timber planks, Nails
Hardwood timber
planks and beams
Steel beam with
brackets
VILLA SANUR, BALI, INDONESIA
Architect: Paul Koodravsev
ADVANTAGES & DISADVANTAGES REASON FOR SELECTION
Advantages:
 Utilizes local, renewable materials
 Inexpensive
 Waterproof and weather resistant
 Ideal for places with hot climates
due to good insulation
 Environment friendly as materials
needed are grown and harvested
with little machinery
Disadvantages:
 Combustible if fire occurs
 Labour intensive
 Thatch is not a standard product,
each roof will vary slightly
Thatched roofs have existed in our tropical
country since its early history, thus best
represents our indigenous heritage in
architecture, which fits the library’s theme of
reviving vernacular elements.
Craftsmen and materials needed for its
construction is easily available locally,
making it sustainable and efficient.
ROOF PRECEDENT STUDY 1
Villa Sanur is a complex of small villas and verandahs with traditional thatched roofs scattered on a 24000 m2
site. Its approach is highly localized and vernacular, an interpretation of a traditional Balinese compound. Design
emphasis was placed upon the openness of living areas to the garden. Water was an integral part of the
landscape design and rare palm species are used. To fit its theme, its construction fully utilized locally-available
materials and craftsmanship. Thus, explaining the villa’s abundant use of thatched roofs.
MATERIALS USED
Nipa palm leaves, Bamboo, Manila rope, Timber beams and columns
METHOD OF
CONSTRUCTION
Bamboo rafters are tied to the
ridge and purlin members of the
roof. The ladder lashing
technique is used to attach the
dried palm leaves to the
bamboo rafters. A series of
knots were tied from one end to
another, zigzagging through the
rafters that keep the leaves
intact.
Dried Nipa palm leaves
Bamboo 5 years of age
treated with boric acid
FAÇADE PROPOSAL 1
FRONT ELEVATION
scale 1:100
Façade entirely covered with prefabricated precast concrete
ventilation blocks, each attached to one another via cement
mortar. Metal plates extend from steel I-beams at each floor,
adding extra support to the repetitive blocks by countering
lateral forces.
Precast concrete ventilation blocks
Planter box
Horizontal metal plate
Steel I-column
FAÇADE PROPOSAL 1
REAR ELEVATION
scale 1:100
FAÇADE PROPOSAL 2
FRONT ELEVATION
scale 1:100
Façade composes of repeated vertical rectangular hollow steel
posts and horizontal cable rods that guide the growth of
creeper and flowering plants from planter boxes. Complex
irrigation and fertilization systems maintain the façade.
Planter box
Creeper plants
Cable rod
Rectangular hollow steel post
Steel I-column
FAÇADE PROPOSAL 2
REAR ELEVATION
scale 1:100
SECTIONAL PERSPECTIVE LOCATIONS
READING
AREA
ROOF GARDEN
SECTIONAL PERSPECTIVE 1ROOF GARDEN
scale 1:30
Nipa palm thatch
Manila rope
Dried bamboo purlin
Poly irrigation pipe
Horizontal
cable rod
Chengal wood
flooring
Rectangular
hollow steel rod
Waterproof sealant
Timber secondary beam
Each bamboo purlin is
drilled with holes and
clamped between two
hinges on a steel
rafter. Nuts and bolts
secure the purlins to
the permanent hinges.
Stainless steel
L-connector
brackets
Stainless steel
L-connector
brackets
Stainless steel hinge
Steel rafter
Aluminum
planter box
Steel I-beam
Vertical hollow steel rods
extend from horizontal
beams. Cable rods run
horizontally for creeper
plants to grow on.
Brackets secure planter
boxes.
Atrium
SECTIONAL PERSPECTIVE 2 READING AREA
scale 1:30
Steel I-columns
Stainless steel
L-connector
brackets
Rivet
Gusset plate
Precast concrete
ventilation
blocks
Aluminum
L-plate
Timber
beam
Timber beams are slotted
between brackets
Aluminum L-plates
run horizontally to
counter lateral forces
on the vent block wall
Chengal wood
flooring
Steel post and
beam system
with wooden
floor finishing
Gusset plate
I-columns
extend to
pad footings
below
Steel I-beam
Waterproof
sealant
http://inspirationist.net/cocoon-house-features-a-facade-of-ventilation-brick-blocks/
http://thisisbuildingmaterials.blogspot.my/2012/03/pros-and-cons-of-brick-and-block.html
https://www.slideshare.net/gertrudeleeys/building-technology-1-51752137?from_action=save
http://landmak.vn/cocoon-house/987987-8-670.html
https://www.slideshare.net/JoyeeLee0131/building-technology-project-2-report?qid=cdbfeec0-0abc-423f-a7c3-eda919a0eb85&v=&b=&from_search=4
https://epichome.org/building-system
https://www.verticalgardenpatrickblanc.com/realisations/kuala-lumpur/le-nouvel-kuala-lumpur
http://www.lnklcc.com/lenouvel.php
https://www.slideshare.net/mehdirakhshandehroo/an-introduction-to-green-walls-green-facades
http://www.architectsbali.com/projects-portfolio_villa-sanur.html
https://earthstonestation.com/2015/05/03/hawaiian-hale/
http://en.howtopedia.org/wiki/Biomass_Roofing_Materials-_Principles
REFERENCE & IMAGE SOURCES

More Related Content

What's hot

sustainable building case study
sustainable building case studysustainable building case study
sustainable building case study
Aahuti Prajapati
 
Intelligent Building Management Systems
Intelligent Building Management SystemsIntelligent Building Management Systems
Intelligent Building Management Systems
Khaled Ali
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
Gertrude Lee
 
Modular coordination
Modular coordinationModular coordination
Modular coordination
Shubham Jain
 
Geodesic Dome - History and Construction
Geodesic Dome - History and ConstructionGeodesic Dome - History and Construction
Geodesic Dome - History and Construction
Azra Maliha
 
Green buildings case study
Green buildings case studyGreen buildings case study
Acp and glazing
Acp and glazingAcp and glazing
Acp and glazing
aduiti
 
curtain wall -skin of building
 curtain wall -skin of building curtain wall -skin of building
curtain wall -skin of building
abidha karthu
 
Residential villa
Residential villaResidential villa
Residential villa
Satrudhan11240
 
Modified clay material
Modified clay material Modified clay material
Modified clay material
Denis Patel
 
SITE ANALYSIS .pdf
SITE ANALYSIS .pdfSITE ANALYSIS .pdf
SITE ANALYSIS .pdf
SuhanaSb
 
Building Technology Project 1
Building Technology Project 1Building Technology Project 1
Building Technology Project 1
zerospaces_
 
Building Technology I : Project 1 : IBS
Building Technology I : Project 1 : IBSBuilding Technology I : Project 1 : IBS
Building Technology I : Project 1 : IBS
Jing Fan Koh
 
Glazing
GlazingGlazing
Intelligent building project report
Intelligent building project reportIntelligent building project report
Intelligent building project report
Being Deepak
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]
JerotichMaswan
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
Abhishek Gupta
 

What's hot (20)

sustainable building case study
sustainable building case studysustainable building case study
sustainable building case study
 
Intelligent Building Management Systems
Intelligent Building Management SystemsIntelligent Building Management Systems
Intelligent Building Management Systems
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
Lecture 1 site analysis
Lecture 1 site analysisLecture 1 site analysis
Lecture 1 site analysis
 
Modular coordination
Modular coordinationModular coordination
Modular coordination
 
Geodesic Dome - History and Construction
Geodesic Dome - History and ConstructionGeodesic Dome - History and Construction
Geodesic Dome - History and Construction
 
Green buildings case study
Green buildings case studyGreen buildings case study
Green buildings case study
 
Acp and glazing
Acp and glazingAcp and glazing
Acp and glazing
 
curtain wall -skin of building
 curtain wall -skin of building curtain wall -skin of building
curtain wall -skin of building
 
Residential villa
Residential villaResidential villa
Residential villa
 
Site Analysis
Site AnalysisSite Analysis
Site Analysis
 
Modified clay material
Modified clay material Modified clay material
Modified clay material
 
SITE ANALYSIS .pdf
SITE ANALYSIS .pdfSITE ANALYSIS .pdf
SITE ANALYSIS .pdf
 
Smart buildings
Smart buildingsSmart buildings
Smart buildings
 
Building Technology Project 1
Building Technology Project 1Building Technology Project 1
Building Technology Project 1
 
Building Technology I : Project 1 : IBS
Building Technology I : Project 1 : IBSBuilding Technology I : Project 1 : IBS
Building Technology I : Project 1 : IBS
 
Glazing
GlazingGlazing
Glazing
 
Intelligent building project report
Intelligent building project reportIntelligent building project report
Intelligent building project report
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 

Viewers also liked

Btech project 01 report
Btech project 01 reportBtech project 01 report
Btech project 01 report
WC Yan
 
AN INTRODUCTION TO GREEN WALLS: GREEN FACADES
AN INTRODUCTION TO GREEN WALLS: GREEN FACADESAN INTRODUCTION TO GREEN WALLS: GREEN FACADES
AN INTRODUCTION TO GREEN WALLS: GREEN FACADES
Mehdi Rakhshandehroo
 
BUILDING CONSTRUCTION
BUILDING CONSTRUCTIONBUILDING CONSTRUCTION
BUILDING CONSTRUCTION
Yen Min Khor
 
Synopsis 3 - Towards Critical Regionalism
Synopsis 3 - Towards Critical RegionalismSynopsis 3 - Towards Critical Regionalism
Synopsis 3 - Towards Critical Regionalism
Joe Onn Lim
 
Building science 2 project 2
Building science 2 project 2Building science 2 project 2
Building science 2 project 2
Joe Onn Lim
 
Synopsis 2 - The Geometry of Feeling
Synopsis 2 - The Geometry of FeelingSynopsis 2 - The Geometry of Feeling
Synopsis 2 - The Geometry of Feeling
Joe Onn Lim
 
INTEGRATION
INTEGRATIONINTEGRATION
INTEGRATION
Pengeneee Peng
 
Building Science 2 - Auditorium
Building Science 2 - AuditoriumBuilding Science 2 - Auditorium
Building Science 2 - Auditorium
Joe Onn Lim
 
Btechfinal
BtechfinalBtechfinal
Btechfinal
Garnette Robert
 
Synopsis 1 - Learning From Las Vegas
Synopsis 1 - Learning From Las VegasSynopsis 1 - Learning From Las Vegas
Synopsis 1 - Learning From Las Vegas
Joe Onn Lim
 
Building Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions ReportBuilding Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions Report
douglasloon
 
Bentley music auditorium
Bentley music auditoriumBentley music auditorium
Bentley music auditorium
Uploader Share
 
Building Services Project 2 Diary
Building Services Project 2 DiaryBuilding Services Project 2 Diary
Building Services Project 2 Diary
Nekumi Kida
 
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Nekumi Kida
 
「S」by Kida-kun(鬼駄くん), AncientSun, Cyberbread
「S」by Kida-kun(鬼駄くん), AncientSun, Cyberbread「S」by Kida-kun(鬼駄くん), AncientSun, Cyberbread
「S」by Kida-kun(鬼駄くん), AncientSun, Cyberbread
Nekumi Kida
 
Small house - Unemori Architects (2010) Contextual Case Study
Small house - Unemori Architects (2010) Contextual Case StudySmall house - Unemori Architects (2010) Contextual Case Study
Small house - Unemori Architects (2010) Contextual Case Study
Nekumi Kida
 
ランニュウRANNYU by Kida-kun
ランニュウRANNYU by Kida-kunランニュウRANNYU by Kida-kun
ランニュウRANNYU by Kida-kun
Nekumi Kida
 
Community Service Initiative - E-Poster
Community Service Initiative - E-PosterCommunity Service Initiative - E-Poster
Community Service Initiative - E-Poster
Nekumi Kida
 
BUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTBUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORT
JoyeeLee0131
 
FOLDED PLATES TYPES
FOLDED PLATES TYPES FOLDED PLATES TYPES
FOLDED PLATES TYPES
Ar Naveen Naveen
 

Viewers also liked (20)

Btech project 01 report
Btech project 01 reportBtech project 01 report
Btech project 01 report
 
AN INTRODUCTION TO GREEN WALLS: GREEN FACADES
AN INTRODUCTION TO GREEN WALLS: GREEN FACADESAN INTRODUCTION TO GREEN WALLS: GREEN FACADES
AN INTRODUCTION TO GREEN WALLS: GREEN FACADES
 
BUILDING CONSTRUCTION
BUILDING CONSTRUCTIONBUILDING CONSTRUCTION
BUILDING CONSTRUCTION
 
Synopsis 3 - Towards Critical Regionalism
Synopsis 3 - Towards Critical RegionalismSynopsis 3 - Towards Critical Regionalism
Synopsis 3 - Towards Critical Regionalism
 
Building science 2 project 2
Building science 2 project 2Building science 2 project 2
Building science 2 project 2
 
Synopsis 2 - The Geometry of Feeling
Synopsis 2 - The Geometry of FeelingSynopsis 2 - The Geometry of Feeling
Synopsis 2 - The Geometry of Feeling
 
INTEGRATION
INTEGRATIONINTEGRATION
INTEGRATION
 
Building Science 2 - Auditorium
Building Science 2 - AuditoriumBuilding Science 2 - Auditorium
Building Science 2 - Auditorium
 
Btechfinal
BtechfinalBtechfinal
Btechfinal
 
Synopsis 1 - Learning From Las Vegas
Synopsis 1 - Learning From Las VegasSynopsis 1 - Learning From Las Vegas
Synopsis 1 - Learning From Las Vegas
 
Building Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions ReportBuilding Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions Report
 
Bentley music auditorium
Bentley music auditoriumBentley music auditorium
Bentley music auditorium
 
Building Services Project 2 Diary
Building Services Project 2 DiaryBuilding Services Project 2 Diary
Building Services Project 2 Diary
 
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
 
「S」by Kida-kun(鬼駄くん), AncientSun, Cyberbread
「S」by Kida-kun(鬼駄くん), AncientSun, Cyberbread「S」by Kida-kun(鬼駄くん), AncientSun, Cyberbread
「S」by Kida-kun(鬼駄くん), AncientSun, Cyberbread
 
Small house - Unemori Architects (2010) Contextual Case Study
Small house - Unemori Architects (2010) Contextual Case StudySmall house - Unemori Architects (2010) Contextual Case Study
Small house - Unemori Architects (2010) Contextual Case Study
 
ランニュウRANNYU by Kida-kun
ランニュウRANNYU by Kida-kunランニュウRANNYU by Kida-kun
ランニュウRANNYU by Kida-kun
 
Community Service Initiative - E-Poster
Community Service Initiative - E-PosterCommunity Service Initiative - E-Poster
Community Service Initiative - E-Poster
 
BUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTBUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORT
 
FOLDED PLATES TYPES
FOLDED PLATES TYPES FOLDED PLATES TYPES
FOLDED PLATES TYPES
 

Similar to Building Technology 1 Assignment 2 - Construction Solutions

Btech 1, 2
Btech 1, 2Btech 1, 2
Btech 1, 2
Harwinder Girn
 
A3 report
A3 reportA3 report
A3 report
Sarah Esa
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
Nik Ahmad Munawwar Nik Din
 
BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT
Darshiini Vig
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design Solution
Jia Xin Chee
 
Facades and envelopes
Facades and envelopesFacades and envelopes
Facades and envelopes
DanishPathan7
 
Sustainability in interior design, Architecture
Sustainability in interior design, ArchitectureSustainability in interior design, Architecture
Sustainability in interior design, Architecture
mahmood Albrifkany
 
Building tech Project 2
Building tech Project 2Building tech Project 2
Building tech Project 2
zerospaces_
 
BUILDING TECHNOLOGY MODULE ONE TO 5 WALL PANEL SYSTEM
BUILDING TECHNOLOGY MODULE ONE TO 5 WALL PANEL SYSTEMBUILDING TECHNOLOGY MODULE ONE TO 5 WALL PANEL SYSTEM
BUILDING TECHNOLOGY MODULE ONE TO 5 WALL PANEL SYSTEM
RicaJetBDemavivas
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction Solutions
Jing Fan Koh
 
Building Technology I - Project 2
Building Technology I - Project 2Building Technology I - Project 2
Building Technology I - Project 2
jernjack
 
Asian Architecture Presentation on 15 nov 2016
Asian Architecture Presentation on 15 nov 2016Asian Architecture Presentation on 15 nov 2016
Asian Architecture Presentation on 15 nov 2016
Joe Onn Lim
 
Vernacular architecture and factors
Vernacular architecture and factorsVernacular architecture and factors
Vernacular architecture and factors
ayushi04j
 
University of exeter, forum building
University of exeter, forum  buildingUniversity of exeter, forum  building
University of exeter, forum building
Mehari Melaku
 
Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"
Digital Space Consultancy Ltd
 
F.i. presentation
F.i. presentationF.i. presentation
F.i. presentationschrocklr
 
Construction solutions
Construction solutionsConstruction solutions
Construction solutions
kennett2203
 
Presentation on Concrete Thermal Mass Wall System
Presentation on Concrete Thermal Mass Wall SystemPresentation on Concrete Thermal Mass Wall System
Presentation on Concrete Thermal Mass Wall System
IGBC Green Building Congress
 

Similar to Building Technology 1 Assignment 2 - Construction Solutions (20)

Btech 1, 2
Btech 1, 2Btech 1, 2
Btech 1, 2
 
A3 report
A3 reportA3 report
A3 report
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
 
BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design Solution
 
Facades and envelopes
Facades and envelopesFacades and envelopes
Facades and envelopes
 
Sustainability in interior design, Architecture
Sustainability in interior design, ArchitectureSustainability in interior design, Architecture
Sustainability in interior design, Architecture
 
Building tech Project 2
Building tech Project 2Building tech Project 2
Building tech Project 2
 
BUILDING TECHNOLOGY MODULE ONE TO 5 WALL PANEL SYSTEM
BUILDING TECHNOLOGY MODULE ONE TO 5 WALL PANEL SYSTEMBUILDING TECHNOLOGY MODULE ONE TO 5 WALL PANEL SYSTEM
BUILDING TECHNOLOGY MODULE ONE TO 5 WALL PANEL SYSTEM
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction Solutions
 
Building Technology I - Project 2
Building Technology I - Project 2Building Technology I - Project 2
Building Technology I - Project 2
 
Asian Architecture Presentation on 15 nov 2016
Asian Architecture Presentation on 15 nov 2016Asian Architecture Presentation on 15 nov 2016
Asian Architecture Presentation on 15 nov 2016
 
Vernacular architecture and factors
Vernacular architecture and factorsVernacular architecture and factors
Vernacular architecture and factors
 
Assignment 02
Assignment 02Assignment 02
Assignment 02
 
University of exeter, forum building
University of exeter, forum  buildingUniversity of exeter, forum  building
University of exeter, forum building
 
Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"
 
F.i. presentation
F.i. presentationF.i. presentation
F.i. presentation
 
Construction solutions
Construction solutionsConstruction solutions
Construction solutions
 
Full PORTFOLIO 5
Full PORTFOLIO 5Full PORTFOLIO 5
Full PORTFOLIO 5
 
Presentation on Concrete Thermal Mass Wall System
Presentation on Concrete Thermal Mass Wall SystemPresentation on Concrete Thermal Mass Wall System
Presentation on Concrete Thermal Mass Wall System
 

More from Joe Onn Lim

Enbe fp online tutorial (lim joe onn)
Enbe fp online tutorial (lim joe onn)Enbe fp online tutorial (lim joe onn)
Enbe fp online tutorial (lim joe onn)
Joe Onn Lim
 
Building Technology 2 - BOMBA plans
Building Technology 2 - BOMBA plansBuilding Technology 2 - BOMBA plans
Building Technology 2 - BOMBA plans
Joe Onn Lim
 
AYDA Final Presentation - Architecture Category
AYDA Final Presentation - Architecture CategoryAYDA Final Presentation - Architecture Category
AYDA Final Presentation - Architecture Category
Joe Onn Lim
 
Studio Semester 6 Final Report
Studio Semester 6 Final ReportStudio Semester 6 Final Report
Studio Semester 6 Final Report
Joe Onn Lim
 
Project Management Documentation: Medium-Sized Project
Project Management Documentation: Medium-Sized ProjectProject Management Documentation: Medium-Sized Project
Project Management Documentation: Medium-Sized Project
Joe Onn Lim
 
Project Management: Recreation District - A3 Orthographic Drawings
Project Management: Recreation District - A3 Orthographic DrawingsProject Management: Recreation District - A3 Orthographic Drawings
Project Management: Recreation District - A3 Orthographic Drawings
Joe Onn Lim
 
Project Management - Recreation District in Taylor's University Subang Jaya
Project Management - Recreation District in Taylor's University Subang JayaProject Management - Recreation District in Taylor's University Subang Jaya
Project Management - Recreation District in Taylor's University Subang Jaya
Joe Onn Lim
 
Ar Mun Inn's Group - Taman Tasik Titiwangsa Site Analysis
Ar Mun Inn's Group - Taman Tasik Titiwangsa Site AnalysisAr Mun Inn's Group - Taman Tasik Titiwangsa Site Analysis
Ar Mun Inn's Group - Taman Tasik Titiwangsa Site Analysis
Joe Onn Lim
 
Community Service Initiative Journal
Community Service Initiative JournalCommunity Service Initiative Journal
Community Service Initiative Journal
Joe Onn Lim
 
ARC61303 Theories of Architecture and Urbanism Project Part II: Comparative A...
ARC61303 Theories of Architecture and Urbanism Project Part II: Comparative A...ARC61303 Theories of Architecture and Urbanism Project Part II: Comparative A...
ARC61303 Theories of Architecture and Urbanism Project Part II: Comparative A...
Joe Onn Lim
 
In Adaptation - Italo Calvino's Invisible Cities: Bukit Bintang
In Adaptation - Italo Calvino's Invisible Cities: Bukit BintangIn Adaptation - Italo Calvino's Invisible Cities: Bukit Bintang
In Adaptation - Italo Calvino's Invisible Cities: Bukit Bintang
Joe Onn Lim
 
Architecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe OnnArchitecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe Onn
Joe Onn Lim
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures Report
Joe Onn Lim
 
Asian Architecture topic proposal
Asian Architecture topic proposalAsian Architecture topic proposal
Asian Architecture topic proposal
Joe Onn Lim
 
Asian Architecture- Redefining Malaysian Terrace Residential Architecture by...
Asian Architecture-  Redefining Malaysian Terrace Residential Architecture by...Asian Architecture-  Redefining Malaysian Terrace Residential Architecture by...
Asian Architecture- Redefining Malaysian Terrace Residential Architecture by...
Joe Onn Lim
 
Asian Architecture - Redefining Malaysian Terrace Residential Architecture by...
Asian Architecture - Redefining Malaysian Terrace Residential Architecture by...Asian Architecture - Redefining Malaysian Terrace Residential Architecture by...
Asian Architecture - Redefining Malaysian Terrace Residential Architecture by...
Joe Onn Lim
 
Mapping the Townscape - Central Market Petaling Street KL
Mapping the Townscape - Central Market Petaling Street KLMapping the Townscape - Central Market Petaling Street KL
Mapping the Townscape - Central Market Petaling Street KL
Joe Onn Lim
 
Tales of Three Cities - Georgetown, Penang, Malaysia
Tales of Three Cities - Georgetown, Penang, MalaysiaTales of Three Cities - Georgetown, Penang, Malaysia
Tales of Three Cities - Georgetown, Penang, Malaysia
Joe Onn Lim
 
Biodiversity in Malaysia - Zoo Negara report with 6 animals
Biodiversity in Malaysia - Zoo Negara report with 6 animalsBiodiversity in Malaysia - Zoo Negara report with 6 animals
Biodiversity in Malaysia - Zoo Negara report with 6 animals
Joe Onn Lim
 
Bcon report - Tropical bus shelter
Bcon report - Tropical bus shelterBcon report - Tropical bus shelter
Bcon report - Tropical bus shelter
Joe Onn Lim
 

More from Joe Onn Lim (20)

Enbe fp online tutorial (lim joe onn)
Enbe fp online tutorial (lim joe onn)Enbe fp online tutorial (lim joe onn)
Enbe fp online tutorial (lim joe onn)
 
Building Technology 2 - BOMBA plans
Building Technology 2 - BOMBA plansBuilding Technology 2 - BOMBA plans
Building Technology 2 - BOMBA plans
 
AYDA Final Presentation - Architecture Category
AYDA Final Presentation - Architecture CategoryAYDA Final Presentation - Architecture Category
AYDA Final Presentation - Architecture Category
 
Studio Semester 6 Final Report
Studio Semester 6 Final ReportStudio Semester 6 Final Report
Studio Semester 6 Final Report
 
Project Management Documentation: Medium-Sized Project
Project Management Documentation: Medium-Sized ProjectProject Management Documentation: Medium-Sized Project
Project Management Documentation: Medium-Sized Project
 
Project Management: Recreation District - A3 Orthographic Drawings
Project Management: Recreation District - A3 Orthographic DrawingsProject Management: Recreation District - A3 Orthographic Drawings
Project Management: Recreation District - A3 Orthographic Drawings
 
Project Management - Recreation District in Taylor's University Subang Jaya
Project Management - Recreation District in Taylor's University Subang JayaProject Management - Recreation District in Taylor's University Subang Jaya
Project Management - Recreation District in Taylor's University Subang Jaya
 
Ar Mun Inn's Group - Taman Tasik Titiwangsa Site Analysis
Ar Mun Inn's Group - Taman Tasik Titiwangsa Site AnalysisAr Mun Inn's Group - Taman Tasik Titiwangsa Site Analysis
Ar Mun Inn's Group - Taman Tasik Titiwangsa Site Analysis
 
Community Service Initiative Journal
Community Service Initiative JournalCommunity Service Initiative Journal
Community Service Initiative Journal
 
ARC61303 Theories of Architecture and Urbanism Project Part II: Comparative A...
ARC61303 Theories of Architecture and Urbanism Project Part II: Comparative A...ARC61303 Theories of Architecture and Urbanism Project Part II: Comparative A...
ARC61303 Theories of Architecture and Urbanism Project Part II: Comparative A...
 
In Adaptation - Italo Calvino's Invisible Cities: Bukit Bintang
In Adaptation - Italo Calvino's Invisible Cities: Bukit BintangIn Adaptation - Italo Calvino's Invisible Cities: Bukit Bintang
In Adaptation - Italo Calvino's Invisible Cities: Bukit Bintang
 
Architecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe OnnArchitecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe Onn
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures Report
 
Asian Architecture topic proposal
Asian Architecture topic proposalAsian Architecture topic proposal
Asian Architecture topic proposal
 
Asian Architecture- Redefining Malaysian Terrace Residential Architecture by...
Asian Architecture-  Redefining Malaysian Terrace Residential Architecture by...Asian Architecture-  Redefining Malaysian Terrace Residential Architecture by...
Asian Architecture- Redefining Malaysian Terrace Residential Architecture by...
 
Asian Architecture - Redefining Malaysian Terrace Residential Architecture by...
Asian Architecture - Redefining Malaysian Terrace Residential Architecture by...Asian Architecture - Redefining Malaysian Terrace Residential Architecture by...
Asian Architecture - Redefining Malaysian Terrace Residential Architecture by...
 
Mapping the Townscape - Central Market Petaling Street KL
Mapping the Townscape - Central Market Petaling Street KLMapping the Townscape - Central Market Petaling Street KL
Mapping the Townscape - Central Market Petaling Street KL
 
Tales of Three Cities - Georgetown, Penang, Malaysia
Tales of Three Cities - Georgetown, Penang, MalaysiaTales of Three Cities - Georgetown, Penang, Malaysia
Tales of Three Cities - Georgetown, Penang, Malaysia
 
Biodiversity in Malaysia - Zoo Negara report with 6 animals
Biodiversity in Malaysia - Zoo Negara report with 6 animalsBiodiversity in Malaysia - Zoo Negara report with 6 animals
Biodiversity in Malaysia - Zoo Negara report with 6 animals
 
Bcon report - Tropical bus shelter
Bcon report - Tropical bus shelterBcon report - Tropical bus shelter
Bcon report - Tropical bus shelter
 

Recently uploaded

LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 

Recently uploaded (20)

LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 

Building Technology 1 Assignment 2 - Construction Solutions

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Centre for Modern Architecture Studies in Southeast Asia (MASSA) Bachelor of Science (Honours) (Architecture) BUILDING TECHNOLOGY 1 [BLD61403/ARC3514 / ARC3512] ASSIGNMENT 2: NAME: LIM JOE ONN STUDENT ID: 0318679 TUTOR: MR KHAIROOL AIZAT CONSTRUCTION SOLUTIONS
  • 2. INTRODUCTION FAÇADE PRECEDENT STUDY 1 – COCOON HOUSE, VIETNAM FAÇADE PRECEDENT STUDY 2 – LE NOUVEL, KL FLOOR PRECEDENT STUDY – EPIC HOMES ROOF PRECEDENT STUDY – VILLA SANUR, BALI FAÇADE PROPOSAL 1 – VENTILATION BLOCKS FAÇADE PROPOSAL 2 – INDIRECT SYSTEM WITH PLANTER BOXES SECTIONAL PERSPECTIVE LOCATIONS SECTIONAL PERSPECTIVE 1 – ROOF GARDEN SECTIONAL PERSPECTIVE 2 – READING AREA CONTENT
  • 3. INTRODUCTION In the module of Architectural Studio 5, I designed a community library in the heart of the humid tropical metropolis of Kuala Lumpur. The site is a narrow strip of land right next to an old shopping street. The proposed library has an estimated area of 1200 square metres and is 5 stories tall excluding its roof garden. Its design aims to tackle two major issues of the site, namely the demand for an education centre and lack of greenery. Thus, the design focuses on softscape and vernacular elements. As for this module, we are to propose a roof system and two alternative façade designs. PROJECT NAME: VERTICAL PARK LIBRARY SITE: JALAN TUANKU ABDUL RAHMAN, KUALA LUMPUR
  • 4. COCOON HOUSE, VIETNAM Architects: Ta Tien Vinh and Truong Tuan Chung ADVANTAGES & DISADVANTAGES REASON FOR SELECTION Advantages:  Simple to prefabricate and build, promising rapid construction  Great flexibility to customization and design  High thermal mass, providing cooling effect to building interior  Allows maximum ventilation  Ease of maintenance Disadvantages:  Smaller and higher number of components  Repetitive work during construction Application of vent blocks adapts the building to its tropical context by maximizing cross ventilation throughout its façade. It too gives a sense of privacy as well as ample shading from sun and rain. Ventilation blocks are a trend in tropical regions due to its aesthetics and functionality. It has a long history as a traditional building module in areas with hot climate as they provide climatic comfort and protection. FAÇADE PRECEDENT STUDY 1 This house is renovated from an older building that is narrow and clustered. The old balconies at both ends of the house were skinned with precast concrete ventilation blocks. Two varieties of vent blocks alternate randomly with the patterned one at higher frequency. The space inside the skin was left for rain, wind and sunlight to pass through. Its design is inspired from a cocoon, where the expressive façade allows access to nature but with security and privacy considerations. MATERIALS USED Precast concrete ventilation blocks, Cement mortar METHOD OF CONSTRUCTION Concrete blocks are precast and sent to site. The blocks are then laid onto one another with cement mortar as adhesive component. Precast concrete vent blocks Similar method of applying mortar to blocks
  • 5. LE NOUVEL, KUALA LUMPUR Architect: Jean Nouvel ADVANTAGES & DISADVANTAGES REASON FOR SELECTION Advantages:  Reduces noise level within building  Provides insulation, thus decreasing air-conditioning requirement  Improved air quality  Visually pleasing and soothing Disadvantages:  Requires costly nutrient, pruning and irrigation equipment  High maintenance and construction cost The design of Vertical Park Library holds the principle of resurrecting nature to the site, which needs more shade and greenery. A green wall forms a barrier between the library’s interior and its chaotic surrounding, hence improving its sound and air quality. Covering a façade with flora gives a positive psychological impact to pedestrians of the dystopian, heavily-urbanized site which lacks tranquil softscape. Situated right next to KLCC, Le Nouvel is a dual-tower luxury residence with a façade integrating lush tropical greenery into a heavily urbanized context. Its façade is a combination of vertical rectangular aluminum posts and horizontal cable rods that allow vines to grow onto it. Planter boxes are placed irregularly between the posts. The typology of this façade falls under ‘indirect system with planter boxes’. Climber plants are kept away from the walls by cable supporters. The cable system suits faster growing plants with denser foliage. As time progresses, the growing plants will cover the façade entirely. FAÇADE PRECEDENT STUDY 2 MATERIALS USED Cable rod, Rectangular hollow steel post, Aluminum planter boxes, Creeper and flowering plants, Fertile soil (soil, peat and sand in the ratio 7:3:2 by volume) METHOD OF CONSTRUCTION The system is made up of the following components: containers, insulated containers, maintenance remote automated irrigation and fertilization systems, and wall mounting system. Tensile cable rods extend from permanent vertical steel beams. Plants grow from planter boxes, covering the façade. Water drainage from poly pipes Reinforced concrete column Zinc plated handrail Aluminum planter box Zinc-coated aluminum Aluminum grid rail Cable rod Plants
  • 6. EPIC HOMES (THROUGHOUT MALAYSIA) Architect: Ben Phua ADVANTAGES & DISADVANTAGES REASON FOR SELECTION Advantages:  Allowing passive design ventilation as air flows freely through the gaps between timber planks  Simple and lightweight for construction  Rapid construction and lower costs due to prefabrication  Wooden floors do not retain much heat nor conduct heat Disadvantages:  Susceptible to fire as they lose strength at high temperatures  Prone to corrosion at marine environments The houses’ design is suitable for tropical climates similar to our current site. It drew inspiration from traditional Malay attap houses by standing on stilts, allowing cool air to enter below via gaps between timber planks and hot air to be removed from the top of the house. The theme for Vertical Park Library emphasizes on vernacular architecture and living lightly on the site. Timber does not retain heat, decreasing heat gain of the building. Simple steel structures are conventional and readily-available, thus cost and time efficient. FLOOR PRECEDENT STUDY 1 Specially designed for ease of assemble and rapid construction, EPIC homes are modular houses built throughout Malaysia for the needy in remote areas. Its steel post and beam structural design with wooden floor finishing is lightweight and portable, making it efficient to build. METHOD OF CONSTRUCTION The floor structure is made up of beams that extend from columns with brackets at intervals. The secondary structure, which are timber beams, are locked in these brackets. Wooden planks are then nailed onto the timber beams beneath. MATERIALS USED Hollow steel beams, Chengal timber beams, Chengal timber planks, Nails Hardwood timber planks and beams Steel beam with brackets
  • 7. VILLA SANUR, BALI, INDONESIA Architect: Paul Koodravsev ADVANTAGES & DISADVANTAGES REASON FOR SELECTION Advantages:  Utilizes local, renewable materials  Inexpensive  Waterproof and weather resistant  Ideal for places with hot climates due to good insulation  Environment friendly as materials needed are grown and harvested with little machinery Disadvantages:  Combustible if fire occurs  Labour intensive  Thatch is not a standard product, each roof will vary slightly Thatched roofs have existed in our tropical country since its early history, thus best represents our indigenous heritage in architecture, which fits the library’s theme of reviving vernacular elements. Craftsmen and materials needed for its construction is easily available locally, making it sustainable and efficient. ROOF PRECEDENT STUDY 1 Villa Sanur is a complex of small villas and verandahs with traditional thatched roofs scattered on a 24000 m2 site. Its approach is highly localized and vernacular, an interpretation of a traditional Balinese compound. Design emphasis was placed upon the openness of living areas to the garden. Water was an integral part of the landscape design and rare palm species are used. To fit its theme, its construction fully utilized locally-available materials and craftsmanship. Thus, explaining the villa’s abundant use of thatched roofs. MATERIALS USED Nipa palm leaves, Bamboo, Manila rope, Timber beams and columns METHOD OF CONSTRUCTION Bamboo rafters are tied to the ridge and purlin members of the roof. The ladder lashing technique is used to attach the dried palm leaves to the bamboo rafters. A series of knots were tied from one end to another, zigzagging through the rafters that keep the leaves intact. Dried Nipa palm leaves Bamboo 5 years of age treated with boric acid
  • 8. FAÇADE PROPOSAL 1 FRONT ELEVATION scale 1:100 Façade entirely covered with prefabricated precast concrete ventilation blocks, each attached to one another via cement mortar. Metal plates extend from steel I-beams at each floor, adding extra support to the repetitive blocks by countering lateral forces. Precast concrete ventilation blocks Planter box Horizontal metal plate Steel I-column
  • 9. FAÇADE PROPOSAL 1 REAR ELEVATION scale 1:100
  • 10. FAÇADE PROPOSAL 2 FRONT ELEVATION scale 1:100 Façade composes of repeated vertical rectangular hollow steel posts and horizontal cable rods that guide the growth of creeper and flowering plants from planter boxes. Complex irrigation and fertilization systems maintain the façade. Planter box Creeper plants Cable rod Rectangular hollow steel post Steel I-column
  • 11. FAÇADE PROPOSAL 2 REAR ELEVATION scale 1:100
  • 13. SECTIONAL PERSPECTIVE 1ROOF GARDEN scale 1:30 Nipa palm thatch Manila rope Dried bamboo purlin Poly irrigation pipe Horizontal cable rod Chengal wood flooring Rectangular hollow steel rod Waterproof sealant Timber secondary beam Each bamboo purlin is drilled with holes and clamped between two hinges on a steel rafter. Nuts and bolts secure the purlins to the permanent hinges. Stainless steel L-connector brackets Stainless steel L-connector brackets Stainless steel hinge Steel rafter Aluminum planter box Steel I-beam Vertical hollow steel rods extend from horizontal beams. Cable rods run horizontally for creeper plants to grow on. Brackets secure planter boxes. Atrium
  • 14. SECTIONAL PERSPECTIVE 2 READING AREA scale 1:30 Steel I-columns Stainless steel L-connector brackets Rivet Gusset plate Precast concrete ventilation blocks Aluminum L-plate Timber beam Timber beams are slotted between brackets Aluminum L-plates run horizontally to counter lateral forces on the vent block wall Chengal wood flooring Steel post and beam system with wooden floor finishing Gusset plate I-columns extend to pad footings below Steel I-beam Waterproof sealant
  • 15. http://inspirationist.net/cocoon-house-features-a-facade-of-ventilation-brick-blocks/ http://thisisbuildingmaterials.blogspot.my/2012/03/pros-and-cons-of-brick-and-block.html https://www.slideshare.net/gertrudeleeys/building-technology-1-51752137?from_action=save http://landmak.vn/cocoon-house/987987-8-670.html https://www.slideshare.net/JoyeeLee0131/building-technology-project-2-report?qid=cdbfeec0-0abc-423f-a7c3-eda919a0eb85&v=&b=&from_search=4 https://epichome.org/building-system https://www.verticalgardenpatrickblanc.com/realisations/kuala-lumpur/le-nouvel-kuala-lumpur http://www.lnklcc.com/lenouvel.php https://www.slideshare.net/mehdirakhshandehroo/an-introduction-to-green-walls-green-facades http://www.architectsbali.com/projects-portfolio_villa-sanur.html https://earthstonestation.com/2015/05/03/hawaiian-hale/ http://en.howtopedia.org/wiki/Biomass_Roofing_Materials-_Principles REFERENCE & IMAGE SOURCES