4. TECTONIC SHIFT IN OFF GRID ECONOMICS
< $1 per Watt
Utility Scale
Typical Off Grid Projects
27kWp Off Grid School, Lagos
($50M for 5MWp across 183 sites)
http://bit.ly/2eLFvDo
SolarEnabler
w/ 3kWp Solar,
5kWh Battery,
Installation
$0.21 per kWh
LCOE
< $1.60 per Watt $10 per Watt
22. 100 Deliveries per Month,
Mostly at Night
“Candles are not appropriate
to suture an episiotomy.”
Hurungwe Rural Hospital ,
Zimbabwe
ZIMBABWE: CLINIC ELECTRIFICATION