This document discusses using crumb rubber from waste tires in asphalt pavement. It begins with an introduction that notes the large volume of waste tires produced globally each year and the environmental issues with current disposal methods. The objectives are then stated as utilizing waste rubber in flexible pavement construction to reduce costs and natural resource usage. Various materials used are described, including aggregates, asphalt, and crumb rubber. Testing conducted on the materials is summarized. A literature review covers several papers on using crumb rubber in asphalt mixes. The methodology section outlines the test specimens prepared with different percentages of crumb rubber added. Marshall stability tests are then used to evaluate the mixtures and determine the optimal crumb rubber content.