PENETRATION
TEST
Shweta Sagar & Juhita
M.Tech. CTM
1st sem
PENETRATION TEST OF BITUMEN
AIM
(i) To determine the consistency of the bituminous
material.
(ii)To assess the suitability of bitumen for use under
different climatic conditions and various types of
construction.
PENETRATION TEST OF BITUMEN
APPARATUS
(i) Container: A flat bottomed cylindrical metallic
dish 55mm in diameter and 35 mm in depth is
required. If the penetration is of the order of 225
or more, dish of 70mm diameter and 45mm depth
is required.
(ii)Transfer dish or tray: Should provide support to
the container & should not rock it. It should be of
such capacity as to completely immerse container
during test.
PENETRATION TEST OF BITUMEN
(iii) Water bath: Water bath maintained at 25 ± 0.1 °C,
containing not less than 10 litres of water, the
sample being immersed to a depth not less than
100 mm from top and supported on perforated
shelf not less than 50 mm from bottom of the bath.
(iv) Needle: A straight, highly polished, cylindrical
hard steel rod.
(v) Thermometer: Range 0°C - 44°C and in readable
up to 0.20°C.
PENETRATION TEST OF BITUMEN
(vi) Penetration apparatus: Should be such that it
allows needle to penetrate without much
friction & is accurately calibrated to give
results in one tenth of a millimeter.
(vii) Time measuring device: With an accuracy of
a second.
PENETRATION TEST OF BITUMEN
THEORY
Penetration value is a measure of hardness or
consistency of bituminous material. It is the vertical
distance traversed or penetrated by the point of a
standard needle in to the bituminous material under
specific conditions of load, time and temperature. This
distance is measured in one tenths of a millimeter.
This test is used for evaluating consistency of
bitumen. It is not regarded as suitable for use in
connection with the testing of road tar because of the
high surface tension exhibited by these materials.
PENETRATION TEST OF BITUMEN
PROCEDURE
(i) Preparation of test sample: Soften the material to a
pouring consistency at a temperature not more than
60°C for tars and 90°C for bitumen above the
approximate softening point and stir it thoroughly until
it is homogeneous and is free from air bubbles and
water. Pour the melt into the container to a depth at
least 10mm in excess of the expected penetration.
Protect the sample from dust and allow it to cool in an
atmosphere at a temperature between 15°C to 30°C for
one hour. Then place it along with the transfer dish in
the water bath at 25°C ± 0.1°C, unless otherwise
stated.
PENETRATION TEST OF BITUMEN
(ii) Fill the transfer dish with water from the water bath to
depth sufficient to cover the container completely,
place the sample in it and put it upon the stand of the
penetration apparatus.
(iii) Clean the needle with benzene, dry it and load with
the weight. The total moving load required is 100 ±
0.25 grams, including the weight of the needle, carrier
and super-imposed weights.
(iv) Adjust the needle to make contact with the surface of
the sample. This may be done by placing the
needlepoint in contact with its image reflected by the
surface of the bituminous material.
PENETRATION TEST OF BITUMEN
(v) Make the pointer of the dial to read zero or note the
initial dial reading.
(vi) Release the needle for exactly five seconds.
(vii) Adjust the penetration machine to measure the
distance penetrated.
PENETRATION TEST OF BITUMEN
(viii) Make at least 3 readings at points on the
surface of the sample not less than 10 mm apart
and not less than l0mm from the side of the dish.
After each test return the sample and transfer
dish to the water bath and wash the needle clean
with benzene and dry it. In case of material of
penetration greater than 225, three
determinations on each of the two identical test
specimens using a separate needle for each
determination should be made, leaving the
needle in the sample on completion of each
determination to avoid disturbance of the
specimen.
PENETRATION TEST OF BITUMEN
PENETRATION TEST OF BITUMEN
RECORD OF OBSERVATION
PENETRATION TEST OF BITUMEN
PENETROMETER DIAL READING TEST 1 TEST 2 TEST 3
(A) Initial 200 264 333
(B) Final 264 333 407
PENETRATION VALUE 64 69 74
Actual Test Temperature(°C) = 25°C
Mean Penetration Value = 69
RECOMMENDED VALUE AS
PER IS CODE 73:2006
PENETRATION TEST OF BITUMEN
BITUMEN GRADE PENETRATION VALUE
A-35 30-40
A-45 40-50
A-55 50-60
A-65 60-70
A-90 80-100
A-200 175-225
PENETRATION TEST OF BITUMEN
Download@notescvil.blogspot.in
PENETRATION TEST OF BITUMEN
PRECAUTION
(i) There should be no movement of the container
while needle penetrates into sample.
(ii) The sample should be free from any extraneous
matter.
(iii) The needle should be cleaned with benzene and
dried before penetration.
PENETRATION TEST OF BITUMEN
PENETRATION TEST OF BITUMEN
Thank You

More Related Content

What's hot

Aggregate impact value test experiment
Aggregate impact value test experimentAggregate impact value test experiment
Aggregate impact value test experiment
charith98
 
Proktor compaction
Proktor compactionProktor compaction
Proktor compaction
Natalie Ulza
 
PENETRATION TEST ON BITUMINOUS MATERIALS.
PENETRATION TEST ON BITUMINOUS MATERIALS.PENETRATION TEST ON BITUMINOUS MATERIALS.
PENETRATION TEST ON BITUMINOUS MATERIALS.
Sayed Sajid H.Zidani
 
Unconfined compression test
Unconfined compression testUnconfined compression test
Unconfined compression test
Natalie Ulza
 
Presentation on Determination of Penetration & Specific Gravity Test of Bitumen
Presentation on Determination of Penetration & Specific Gravity Test of BitumenPresentation on Determination of Penetration & Specific Gravity Test of Bitumen
Presentation on Determination of Penetration & Specific Gravity Test of Bitumen
Abu Taher
 
Marshall Mix Design: Lab Report
Marshall Mix Design: Lab ReportMarshall Mix Design: Lab Report
Marshall Mix Design: Lab Report
Priyansh Singh
 
Field identification tests
Field identification  testsField identification  tests
Field identification tests
shabir rufai
 
Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1
GARRE RAVI KUMAR
 
lab report structure continuous beam
lab report structure continuous beamlab report structure continuous beam
lab report structure continuous beam
YASMINE HASLAN
 
SLUMP TEST REPORT DCC 2042
SLUMP TEST REPORT DCC 2042 SLUMP TEST REPORT DCC 2042
SLUMP TEST REPORT DCC 2042
YASMINE HASLAN
 
Softening point of bitumious
Softening point of bitumiousSoftening point of bitumious
Softening point of bitumious
Taha Samir
 
Test On Bitumen
Test On BitumenTest On Bitumen
Test On Bitumen
Ujas Patel
 
Permeability Test of soil Using Constant and Falling Head Method
Permeability Test of soil Using Constant and Falling Head MethodPermeability Test of soil Using Constant and Falling Head Method
Permeability Test of soil Using Constant and Falling Head Method
Jameel Academy
 
Ductility of bituminous material
Ductility of bituminous materialDuctility of bituminous material
Ductility of bituminous material
A O
 
Aggregate crushing strength test
Aggregate crushing strength testAggregate crushing strength test
Aggregate crushing strength test
MUST,Mirpur AJK,Pakistan
 
Design mix method of bitumenous materials by Marshall stability method
Design mix method of bitumenous materials by Marshall stability methodDesign mix method of bitumenous materials by Marshall stability method
Design mix method of bitumenous materials by Marshall stability method
Amardeep Singh
 
Laboratory soil compaction test
Laboratory soil compaction testLaboratory soil compaction test
Laboratory soil compaction test
Atul Hajong
 
Concrete Mix Design Report
Concrete Mix Design ReportConcrete Mix Design Report
Concrete Mix Design Report
Zakaria Yahya
 
Atterberg Limit Test
Atterberg Limit Test  Atterberg Limit Test
Atterberg Limit Test
Sanduli Weerasekara
 

What's hot (20)

Aggregate impact value test experiment
Aggregate impact value test experimentAggregate impact value test experiment
Aggregate impact value test experiment
 
Proktor compaction
Proktor compactionProktor compaction
Proktor compaction
 
PENETRATION TEST ON BITUMINOUS MATERIALS.
PENETRATION TEST ON BITUMINOUS MATERIALS.PENETRATION TEST ON BITUMINOUS MATERIALS.
PENETRATION TEST ON BITUMINOUS MATERIALS.
 
Unconfined compression test
Unconfined compression testUnconfined compression test
Unconfined compression test
 
Presentation on Determination of Penetration & Specific Gravity Test of Bitumen
Presentation on Determination of Penetration & Specific Gravity Test of BitumenPresentation on Determination of Penetration & Specific Gravity Test of Bitumen
Presentation on Determination of Penetration & Specific Gravity Test of Bitumen
 
Marshall Mix Design: Lab Report
Marshall Mix Design: Lab ReportMarshall Mix Design: Lab Report
Marshall Mix Design: Lab Report
 
Field identification tests
Field identification  testsField identification  tests
Field identification tests
 
Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1
 
lab report structure continuous beam
lab report structure continuous beamlab report structure continuous beam
lab report structure continuous beam
 
Probe machintosh
Probe machintoshProbe machintosh
Probe machintosh
 
SLUMP TEST REPORT DCC 2042
SLUMP TEST REPORT DCC 2042 SLUMP TEST REPORT DCC 2042
SLUMP TEST REPORT DCC 2042
 
Softening point of bitumious
Softening point of bitumiousSoftening point of bitumious
Softening point of bitumious
 
Test On Bitumen
Test On BitumenTest On Bitumen
Test On Bitumen
 
Permeability Test of soil Using Constant and Falling Head Method
Permeability Test of soil Using Constant and Falling Head MethodPermeability Test of soil Using Constant and Falling Head Method
Permeability Test of soil Using Constant and Falling Head Method
 
Ductility of bituminous material
Ductility of bituminous materialDuctility of bituminous material
Ductility of bituminous material
 
Aggregate crushing strength test
Aggregate crushing strength testAggregate crushing strength test
Aggregate crushing strength test
 
Design mix method of bitumenous materials by Marshall stability method
Design mix method of bitumenous materials by Marshall stability methodDesign mix method of bitumenous materials by Marshall stability method
Design mix method of bitumenous materials by Marshall stability method
 
Laboratory soil compaction test
Laboratory soil compaction testLaboratory soil compaction test
Laboratory soil compaction test
 
Concrete Mix Design Report
Concrete Mix Design ReportConcrete Mix Design Report
Concrete Mix Design Report
 
Atterberg Limit Test
Atterberg Limit Test  Atterberg Limit Test
Atterberg Limit Test
 

Similar to Penetration Test for Bitumen

PENETRATION TEST OF BITUMEN Download@notescvil.blogspot.in
PENETRATION TEST OF BITUMEN  Download@notescvil.blogspot.in PENETRATION TEST OF BITUMEN  Download@notescvil.blogspot.in
PENETRATION TEST OF BITUMEN Download@notescvil.blogspot.in
SAURABH GUPTA
 
Ii cycle
Ii cycleIi cycle
Ii cycle
SHAMJITH KM
 
Quality control lab
Quality control labQuality control lab
Quality control labRaja Katoch
 
Job 3
Job 3Job 3
Cement test
Cement testCement test
Cement test
Drawings Point
 
Transportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdfTransportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdf
RESHMAFEGADE
 
Summer training ppt
Summer training pptSummer training ppt
Summer training ppt
SomayaGangotiya
 
production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen
Abhijeet Bhosale
 
Penetration of bitumious
Penetration of bitumiousPenetration of bitumious
Penetration of bitumious
Taha Samir
 
Tests of cement in concrete technology
Tests of cement in concrete technologyTests of cement in concrete technology
Tests of cement in concrete technology
Sunny Saha
 
Practical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptxPractical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptx
LaxmiNarayanGurung
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012
Vijay Patidar
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)
Vijay Patidar
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01
Engr. Umair Razzaq
 
Sampling of cement & its tests
Sampling of cement & its testsSampling of cement & its tests
Sampling of cement & its tests
Kundan Sanap
 
Fineness air permeability final (1)
Fineness air permeability final (1)Fineness air permeability final (1)
Fineness air permeability final (1)
Dave Madhav
 
Water Absorption of Bricks
Water Absorption of BricksWater Absorption of Bricks
Water Absorption of Bricks
Mayur Rahangdale
 
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Mayur Rahangdale
 
Cement and admixtures
Cement and admixturesCement and admixtures
Cement and admixtures
Tarun kumar
 
Determining the ductility of bitumen
Determining the ductility of bitumenDetermining the ductility of bitumen
Determining the ductility of bitumen
pradeep tiwari
 

Similar to Penetration Test for Bitumen (20)

PENETRATION TEST OF BITUMEN Download@notescvil.blogspot.in
PENETRATION TEST OF BITUMEN  Download@notescvil.blogspot.in PENETRATION TEST OF BITUMEN  Download@notescvil.blogspot.in
PENETRATION TEST OF BITUMEN Download@notescvil.blogspot.in
 
Ii cycle
Ii cycleIi cycle
Ii cycle
 
Quality control lab
Quality control labQuality control lab
Quality control lab
 
Job 3
Job 3Job 3
Job 3
 
Cement test
Cement testCement test
Cement test
 
Transportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdfTransportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdf
 
Summer training ppt
Summer training pptSummer training ppt
Summer training ppt
 
production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen
 
Penetration of bitumious
Penetration of bitumiousPenetration of bitumious
Penetration of bitumious
 
Tests of cement in concrete technology
Tests of cement in concrete technologyTests of cement in concrete technology
Tests of cement in concrete technology
 
Practical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptxPractical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptx
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01
 
Sampling of cement & its tests
Sampling of cement & its testsSampling of cement & its tests
Sampling of cement & its tests
 
Fineness air permeability final (1)
Fineness air permeability final (1)Fineness air permeability final (1)
Fineness air permeability final (1)
 
Water Absorption of Bricks
Water Absorption of BricksWater Absorption of Bricks
Water Absorption of Bricks
 
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
 
Cement and admixtures
Cement and admixturesCement and admixtures
Cement and admixtures
 
Determining the ductility of bitumen
Determining the ductility of bitumenDetermining the ductility of bitumen
Determining the ductility of bitumen
 

Recently uploaded

Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 

Recently uploaded (20)

Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 

Penetration Test for Bitumen

  • 1. PENETRATION TEST Shweta Sagar & Juhita M.Tech. CTM 1st sem PENETRATION TEST OF BITUMEN
  • 2. AIM (i) To determine the consistency of the bituminous material. (ii)To assess the suitability of bitumen for use under different climatic conditions and various types of construction. PENETRATION TEST OF BITUMEN
  • 3. APPARATUS (i) Container: A flat bottomed cylindrical metallic dish 55mm in diameter and 35 mm in depth is required. If the penetration is of the order of 225 or more, dish of 70mm diameter and 45mm depth is required. (ii)Transfer dish or tray: Should provide support to the container & should not rock it. It should be of such capacity as to completely immerse container during test. PENETRATION TEST OF BITUMEN
  • 4. (iii) Water bath: Water bath maintained at 25 ± 0.1 °C, containing not less than 10 litres of water, the sample being immersed to a depth not less than 100 mm from top and supported on perforated shelf not less than 50 mm from bottom of the bath. (iv) Needle: A straight, highly polished, cylindrical hard steel rod. (v) Thermometer: Range 0°C - 44°C and in readable up to 0.20°C. PENETRATION TEST OF BITUMEN
  • 5. (vi) Penetration apparatus: Should be such that it allows needle to penetrate without much friction & is accurately calibrated to give results in one tenth of a millimeter. (vii) Time measuring device: With an accuracy of a second. PENETRATION TEST OF BITUMEN
  • 6. THEORY Penetration value is a measure of hardness or consistency of bituminous material. It is the vertical distance traversed or penetrated by the point of a standard needle in to the bituminous material under specific conditions of load, time and temperature. This distance is measured in one tenths of a millimeter. This test is used for evaluating consistency of bitumen. It is not regarded as suitable for use in connection with the testing of road tar because of the high surface tension exhibited by these materials. PENETRATION TEST OF BITUMEN
  • 7. PROCEDURE (i) Preparation of test sample: Soften the material to a pouring consistency at a temperature not more than 60°C for tars and 90°C for bitumen above the approximate softening point and stir it thoroughly until it is homogeneous and is free from air bubbles and water. Pour the melt into the container to a depth at least 10mm in excess of the expected penetration. Protect the sample from dust and allow it to cool in an atmosphere at a temperature between 15°C to 30°C for one hour. Then place it along with the transfer dish in the water bath at 25°C ± 0.1°C, unless otherwise stated. PENETRATION TEST OF BITUMEN
  • 8. (ii) Fill the transfer dish with water from the water bath to depth sufficient to cover the container completely, place the sample in it and put it upon the stand of the penetration apparatus. (iii) Clean the needle with benzene, dry it and load with the weight. The total moving load required is 100 ± 0.25 grams, including the weight of the needle, carrier and super-imposed weights. (iv) Adjust the needle to make contact with the surface of the sample. This may be done by placing the needlepoint in contact with its image reflected by the surface of the bituminous material. PENETRATION TEST OF BITUMEN
  • 9. (v) Make the pointer of the dial to read zero or note the initial dial reading. (vi) Release the needle for exactly five seconds. (vii) Adjust the penetration machine to measure the distance penetrated. PENETRATION TEST OF BITUMEN
  • 10. (viii) Make at least 3 readings at points on the surface of the sample not less than 10 mm apart and not less than l0mm from the side of the dish. After each test return the sample and transfer dish to the water bath and wash the needle clean with benzene and dry it. In case of material of penetration greater than 225, three determinations on each of the two identical test specimens using a separate needle for each determination should be made, leaving the needle in the sample on completion of each determination to avoid disturbance of the specimen. PENETRATION TEST OF BITUMEN
  • 12. RECORD OF OBSERVATION PENETRATION TEST OF BITUMEN PENETROMETER DIAL READING TEST 1 TEST 2 TEST 3 (A) Initial 200 264 333 (B) Final 264 333 407 PENETRATION VALUE 64 69 74 Actual Test Temperature(°C) = 25°C Mean Penetration Value = 69
  • 13. RECOMMENDED VALUE AS PER IS CODE 73:2006 PENETRATION TEST OF BITUMEN BITUMEN GRADE PENETRATION VALUE A-35 30-40 A-45 40-50 A-55 50-60 A-65 60-70 A-90 80-100 A-200 175-225
  • 14. PENETRATION TEST OF BITUMEN Download@notescvil.blogspot.in PENETRATION TEST OF BITUMEN
  • 15. PRECAUTION (i) There should be no movement of the container while needle penetrates into sample. (ii) The sample should be free from any extraneous matter. (iii) The needle should be cleaned with benzene and dried before penetration. PENETRATION TEST OF BITUMEN
  • 16. PENETRATION TEST OF BITUMEN Thank You