SlideShare a Scribd company logo
Arul Ranganathan – Project Sales & Estimation Engineer
Arul Ranganathan.
Ph:+971 562545279
Arul.dava@gmail.com /
Arul.Ranganathan@hotmail.com
➢ Mechanical Engineerwith ample experience of Estimation,ProjectManagement,andTender/
Bid Management.
➢ Responsible for Estimating projects from multiple stake holder & submission of proposal on
time.
➢ I possess in‐depth knowledge of Cost Estimation, Budget Preparation,Planning, Cost Control,
Project Management, Order Management, Change order Management, Expedite planning,
Economic Analysis and Risk Management.
➢ I have hands on experience and a comprehensive insight for preparation of Technical &
Commercial Proposals.
➢ Prepared multimillionworth Project Proposals (overseas) for most distinguished clients with
company ethics & guidelines.
➢ Proficient in handling customer complaints & accountable for quality service & timely
submission of bids & Clarifying of the quality problems through proper channel.
➢ Effective communicatorwithexcellentrelationshipmanagement&negotiationskills;possessa
flexible & result oriented attitude.
➢ WorkedasFunctioningProject-EstimationengineerinFisherValvesdivision,EmersonProcess
management,Singapore & Malaysia to support projects for 18 months & frequentlytraveled
for project requirements to multiple countries.
CAREER OBJECTIVE:
Highly competentEngineerwith about7+ yearsof extensiveexperiencewithinmultinational
companies.Possessessoundknowledge inMechanical Engineeringcombinedwithtechnical expertise
indeterminingspecificationsandauthoringall neededdocumentations.Alsocapable tomanage,lead
and Coordinate projectsaswell asdirectwide range of operationsrelatedtherewithsuchas
estimation,bill of quantities,procurement,resource projections,scheduling,andprogressmonitoring
and teamsupervision.Eagertoworkin a more challengingworkprofile toshare gainedexperience,
developedexpertise andleadershipskills.
Arul Ranganathan – Project Sales & Estimation Engineer
EMPLOYMENT CHRONICLE
 Project Sales & Estimation Engineer
Presently associatedwith Loops Automation,
Dubai UAE. From July 1st 2015 - Till
 Handle and prepare technical and commercial proposals and maintain business relationship
with vendors and suppliers for complete skid
 Responsible for handling assigned technical and commercial proposals.
 Responsible forcorrespondence withsuppliersandvendorstocollecttechnical informationand
quotations for materials/components/systems.
 Development of technical solution so as to meet project technical specifications.
 Liaise withTechnical Departments Headsforindepthtechnical informationand clarifications.
 Reporting back to the senior management
 Conduct site visits and pre-tender meetings whenever required.
 Liaise withcustomerswhichmayinclude actual visitsfortechnicaldiscussionand presentation.
 Maintain detailed knowledge of industry standards and practice.
 Acting as a contact between the company and Client during tendering stage.
 Might be involved in negotiating commercial terms with a Client to close the sale.
 Ensuringproperclose-outof the projectbygainingformal acceptance fromall project
Stakeholders.
 Conducting“LessonsLearnt”meetingaftercompletionof eachProposal handled
 Maintainaccurate records& updatingdata base for reference
 Continuousimprovements&implementingcostcontrol planning
 Project Estimation / Engineer
Bin Saud Technical Trading Est. (Bin Tec)
Abu Dhabi, UAE. From July 14th 2014- Jun 23rd 2015
➢ Preparationof tenderbothtechnicallyandcommerciallyforbothOnshore andOffshore
works.
➢ Respondfullytothe Expressionof Interest(EOI) andpre‐qualificationrequirement.
➢ Developmentof the proposalsstrategyforthe tender
➢ Attendingpre‐tendermeetingsandkeyhighlightingpointtoaidsite surveys
➢ Evaluatingtenderdocuments,drawings,&schedules (Inspection&Delivery)
➢ PreparingRFQto suppliers,Vendormanagement&negotiations
➢ Preparingcostingreportof handledprojecttothe Manager
➢ Preparingcostcomparisonsheetsforall supply&sub‐contractoritems
➢ Estimationof projectcostin termsof manpower,resourcesandmaterials
➢ Preparationof ManpowerHistogram, EquipmentHistogramcalculationof Manhourson the
basisof the Time SheetsforbothOnShore and Off Shore
Arul Ranganathan – Project Sales & Estimation Engineer
➢ Providinginputstothe plannerforinitialstage of projectschedule
➢ GivingPresentationtothe Managementaswell asto the clientof the Technical Tender
➢ AnsweringPre‐bid&postbidclarification
➢ ArrangingInternal KOMwithProjectteamforpost award
➢ Arrange expeditingmeetingsvisitmade bycustomers.
➢ Administrationof ProjectDocumentationasperclientrequirements
Estimation Engineer –Projects
11th Aug 2008 to May 28th 2014 with Emerson Process Management
(Fisher valves Division) Chennai.
FisherChennai EngineeringCentre underEMERSON PROCESSMANAGEMENT inChennai,
IndiaissupportingEmersonofficesworldwideinengineeringactivitieslike Quotation,Estimation
ProjectManagement,EngineeringDesign,andProcurement.
EmersonProcessManagement – Fishervalves,Incare a worldleaderinProcessControl valves&
Automation&suppliedtoProcessIndustriesforSeveralyears.
➢ Tenderdocumentation(ITT) &BIDevaluation.
➢ To provide technical commercialsupportto LBPand directcustomers.
➢ Assistthe projectmanager(overseas)ontenders.
➢ Organizing&attendingProjectKick-OFFMeetings
➢ Preparesandcoordinatesthe projectschedule/costandmaintainsthroughoutthe projectby
coordinatingwithall internal stakeholders.Optimizesthe use of personnel toachieve the
schedule.Forecastsandaddressesdeviationstoschedule.
➢ Responsible forplanning&executionof assignedprojectsfromproposal toProject
completion.
➢ Reviewof ClientProjectspecificationsandensuringthatthe scope of the projectmeetsall
clientrequirements.
➢ Ensure the technical estimate takesintoaccountthe full calculationof costs.
➢ Ensure all tenderingdetailsrequiredforTechnical aswell ascommercial bidsare full filled.
➢ Ensure a follow‐uponclarificationsandnegotiationsthroughoutthe process
➢ Coordinate budgetaryassessments
➢ Estimationof Manufacturingworks(Includingcontrol valves,instruments,accessories etc.)
➢ Estimationof process equipment’s like Skids etc.
➢ Estimationof Testing&commissioninginsite
➢ Estimationof plantshutdown& modificationwork
➢ Providingtechnical clarificationsonqueries.
➢ Collectionof Payments,C-forms&Collectbackbankguarantees,securitydeposits etc.
➢ Coordinatingwithprojectdepartmentfortimelycompletionof projects
➢ IdentifyingandmanagingRiskswithalternatesolutions.
➢ Preparationof sourcingstrategiestomeetprojectschedule requirement&tomanage project
costs.
➢ Coordinateswiththe internalorderentryteamtoconvertthe customerrequirementsinto
“Supplierlanguage”whothenprocessforthe materialsplanning.
Arul Ranganathan – Project Sales & Estimation Engineer
➢ Beinga single pointcontacttothe client,handlesall projecttechno-commercial
communicationwiththe clients,attendsandminutesall projectmeetings.
➢ Coordinationof all projectactivities&assuringefficientdisseminationof datatoassure that
all of the ProjectTeamare familiarwiththe scope of the projectfororganizedproject
execution.
➢ Measuringthe projectperformance inline withthe projectplan&controllinganydeviations
by continuousimprovement.
➢ Submitsperiodicprojectstatusreporttocustomersindetail withthe assistance of
Procurement,supplychain,production&QA/QCdepartmentinfactory.
➢ Responsible forassuringthatall scope changesare maintainedandare promptlytransmitted
to the productiondepartment.
➢ CoordinatingCustomerWitnessInspections&assistingQA/QCinovercomingthe Non-
Conformance reports(NCR’s).
➢ Arrange expeditingmeetingsvisitmade bycustomers.
➢ Administrationof ProjectDocumentationasperclientrequirements.
➢ Coordinateswiththe invoicingteamtoissue progresspaymentinvoicesforprojectsbasedon
milestones.
.
Areas of proficiency:
➢ Estimationof Gas Jubail Phase VIIIprojectforSamsung(EPC),Koreawitha value of $3.4
million.
➢ Estimationof Saudikayan/LDPEprojectforDaelim(EPC),Koreawithavalue of $ 2.8 million
➢ Estimation of S-Oil Onsan Refinery project for Samsung(EPC), Korea with a value of $1.7
million
➢ Estimationof ChimSao FPSOprojectfor B.T Engineering(EPC),Singapore withavalue of $
1.1 million
➢ Estimation of Shah Gas project for SAIPEMItaly, Europe with a value of $ 34.6 million
➢ Estimation of Macedon project for Technip, Australia with a value of $ 5 million
➢ EPC estimation work for ADNOC group of companies
➢ EPC estimation work for Gulf region & Asia Pacific
➢ Estimation for Off shore works
➢ Estimation for On shore works
➢ Estimation for shut down & modification work
_________________________SCHOLASTICS____________________________
● SSLC from Sri Ramakrishna Mission Higher Secondary School, Chennai in 2005. Secured 85%.
● Diploma (Mechanical Engineering) from Murugappa Polytechnic College, Avadi, Chennai in
2008. Secured 88% (First class with Distinction).
● BE Mechanical Engineering (Pursuing) in Satyabama university, Chennai.
_______________________SCHOLASTICS Project____________________________
Solar power room:
Giving power to room using (Photovoltaic cells) solar energy system.
Arul Ranganathan – Project Sales & Estimation Engineer
Extracurricular:
● Served as a Student Placement coordinator for Mechanical Engineering department.
● Member of National Cadet Crops (NCC).
● Member of National Service Scheme and serviced several camps (NSS).
IT SKILLS - Well versed with the follows:
Application software : Microsoft office package. OPS, FFV.
Design Software : Pro-E 2000, AutoCAD & CO-create
____________________________ Personal Details____________________________
Date of Birth : 14th
Oct 1989
Languages Known : English, Tamil & Hindi
Present Address : 78/68, Periyar salai, Teynampet, Chennai-600018
Father’s Name : Ranganathan.S
Marital status : Single
Passport no : H4983922
UAE Driving License : Final RTA test
__________________________PersonalStrength__________________________
● Active Team Player.
● Flexible and Innovative.
● Consistency in performance
● Decision Maker
● Emotional Intelligence
● Professional Ethics
__________________________DECLARATION__________________________
I am here with to submit my RESUME for your kind perusal and solicit. To the best of my knowledge
the above given details are TRUE, I look forward to hearing from you. If you need more information,
please do not hesitate to contact me. I would also like to hear about other interesting positions you
might have.
Willing to learn continuously & Travel Extensively on Business requirements.
PLACE: Dubai, UAE
DATE: Regards,
-Arul Ranganathan

More Related Content

What's hot

Daniel Lee
Daniel LeeDaniel Lee
Daniel Lee
Daniel Lee
 
GP_RESUME
GP_RESUMEGP_RESUME
Iad Zalaf C.V
Iad Zalaf C.VIad Zalaf C.V
Iad Zalaf C.V
iad zalaf
 
ABC
ABCABC
NPS_L
NPS_LNPS_L
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
Khalid Alismail
 
CV ABHI 06-09 - Copy
CV ABHI 06-09 - CopyCV ABHI 06-09 - Copy
CV ABHI 06-09 - Copy
ABHIJIT DASGUPTA
 
B TECH MECHANICAL_4 YEARS 10 MONTHS EXPERIENCE IN PROJECTS AND PROCUREMENT E...
B TECH MECHANICAL_4 YEARS 10 MONTHS  EXPERIENCE IN PROJECTS AND PROCUREMENT E...B TECH MECHANICAL_4 YEARS 10 MONTHS  EXPERIENCE IN PROJECTS AND PROCUREMENT E...
B TECH MECHANICAL_4 YEARS 10 MONTHS EXPERIENCE IN PROJECTS AND PROCUREMENT E...
Merupula Vinay
 
mohamed elshazli-CV oil & gas with personal info
mohamed elshazli-CV oil & gas with personal infomohamed elshazli-CV oil & gas with personal info
mohamed elshazli-CV oil & gas with personal info
Mohamed Elshazli
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
ramiz reyad
 
RAB resume 09 01 2016
RAB resume    09 01 2016RAB resume    09 01 2016
RAB resume 09 01 2016
Rich Bellino
 
resume_Celeste_May2015
resume_Celeste_May2015resume_Celeste_May2015
resume_Celeste_May2015
Celeste Lim
 
Sathish Palani Resume(7-2-17).
Sathish Palani Resume(7-2-17).Sathish Palani Resume(7-2-17).
Sathish Palani Resume(7-2-17).
SATHISH PALANI
 
My Updated C.V as of 25-6-2016
My Updated C.V as of 25-6-2016My Updated C.V as of 25-6-2016
My Updated C.V as of 25-6-2016
Khalid Ghazi Hassan
 
Todd's Resume
Todd's ResumeTodd's Resume
Todd's Resume
Todd Kelly
 
2018 01-11 raq infra profile v3.0.1
2018 01-11 raq infra profile v3.0.12018 01-11 raq infra profile v3.0.1
2018 01-11 raq infra profile v3.0.1
RAQ Infra Pvt. Ltd.
 
Craig Sheehan Resume 2016_JUNE
Craig Sheehan Resume 2016_JUNECraig Sheehan Resume 2016_JUNE
Craig Sheehan Resume 2016_JUNE
Craig Sheehan
 
DPINKERTON-LinkedIn Resume1
DPINKERTON-LinkedIn Resume1DPINKERTON-LinkedIn Resume1
DPINKERTON-LinkedIn Resume1
D'Ann Pinkerton
 
Jeremy CV 2.
Jeremy CV 2.Jeremy CV 2.
Jeremy CV 2.
Jeremy Hodgin
 

What's hot (19)

Daniel Lee
Daniel LeeDaniel Lee
Daniel Lee
 
GP_RESUME
GP_RESUMEGP_RESUME
GP_RESUME
 
Iad Zalaf C.V
Iad Zalaf C.VIad Zalaf C.V
Iad Zalaf C.V
 
ABC
ABCABC
ABC
 
NPS_L
NPS_LNPS_L
NPS_L
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
 
CV ABHI 06-09 - Copy
CV ABHI 06-09 - CopyCV ABHI 06-09 - Copy
CV ABHI 06-09 - Copy
 
B TECH MECHANICAL_4 YEARS 10 MONTHS EXPERIENCE IN PROJECTS AND PROCUREMENT E...
B TECH MECHANICAL_4 YEARS 10 MONTHS  EXPERIENCE IN PROJECTS AND PROCUREMENT E...B TECH MECHANICAL_4 YEARS 10 MONTHS  EXPERIENCE IN PROJECTS AND PROCUREMENT E...
B TECH MECHANICAL_4 YEARS 10 MONTHS EXPERIENCE IN PROJECTS AND PROCUREMENT E...
 
mohamed elshazli-CV oil & gas with personal info
mohamed elshazli-CV oil & gas with personal infomohamed elshazli-CV oil & gas with personal info
mohamed elshazli-CV oil & gas with personal info
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
 
RAB resume 09 01 2016
RAB resume    09 01 2016RAB resume    09 01 2016
RAB resume 09 01 2016
 
resume_Celeste_May2015
resume_Celeste_May2015resume_Celeste_May2015
resume_Celeste_May2015
 
Sathish Palani Resume(7-2-17).
Sathish Palani Resume(7-2-17).Sathish Palani Resume(7-2-17).
Sathish Palani Resume(7-2-17).
 
My Updated C.V as of 25-6-2016
My Updated C.V as of 25-6-2016My Updated C.V as of 25-6-2016
My Updated C.V as of 25-6-2016
 
Todd's Resume
Todd's ResumeTodd's Resume
Todd's Resume
 
2018 01-11 raq infra profile v3.0.1
2018 01-11 raq infra profile v3.0.12018 01-11 raq infra profile v3.0.1
2018 01-11 raq infra profile v3.0.1
 
Craig Sheehan Resume 2016_JUNE
Craig Sheehan Resume 2016_JUNECraig Sheehan Resume 2016_JUNE
Craig Sheehan Resume 2016_JUNE
 
DPINKERTON-LinkedIn Resume1
DPINKERTON-LinkedIn Resume1DPINKERTON-LinkedIn Resume1
DPINKERTON-LinkedIn Resume1
 
Jeremy CV 2.
Jeremy CV 2.Jeremy CV 2.
Jeremy CV 2.
 

Similar to Arul.s.r project sales & estimation engineer

Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad Samir
 
Henry CV
Henry CVHenry CV
Henry CV
Henry Jayahar
 
CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016
Rajkumar Narayanan
 
Abhishek Kumar CV with cover letter
Abhishek Kumar CV  with cover letterAbhishek Kumar CV  with cover letter
Abhishek Kumar CV with cover letter
Abhishek Kumar
 
Kannan PEM
Kannan PEMKannan PEM
Kannan PEM
Kannan Kamala
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
Balakrishna Dampur
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CV
Tarek Fergani
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
Ramiz Siddiq
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
Rodel Merida
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CV
Sanad Samir
 
Bhuiya, Alex Pm With Achievements
Bhuiya, Alex Pm With AchievementsBhuiya, Alex Pm With Achievements
Bhuiya, Alex Pm With Achievements
abhuiya
 
IJAZ MOHAMMED - Facilities Manager.
IJAZ MOHAMMED - Facilities Manager.IJAZ MOHAMMED - Facilities Manager.
IJAZ MOHAMMED - Facilities Manager.
Ijaz Mohammed
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers
 
Resume_Sales_BD- 9years experience control valve industry
Resume_Sales_BD- 9years experience control valve industryResume_Sales_BD- 9years experience control valve industry
Resume_Sales_BD- 9years experience control valve industry
Dinil Mohanan
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
Vikram Prabhakar
 
Ketan's resume
Ketan's resumeKetan's resume
Ketan's resume
Ketan Joshi
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
Ismail Shaikh
 
Manohar Resume
Manohar ResumeManohar Resume
Manohar Resume
Anivilla Manohar
 
Resume-Estimation
Resume-EstimationResume-Estimation
Resume-Estimation
singaravelan rajaguru
 
Gopi 221116
Gopi 221116 Gopi 221116
Gopi 221116
kakumanu Gopi
 

Similar to Arul.s.r project sales & estimation engineer (20)

Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
 
Henry CV
Henry CVHenry CV
Henry CV
 
CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016
 
Abhishek Kumar CV with cover letter
Abhishek Kumar CV  with cover letterAbhishek Kumar CV  with cover letter
Abhishek Kumar CV with cover letter
 
Kannan PEM
Kannan PEMKannan PEM
Kannan PEM
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CV
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CV
 
Bhuiya, Alex Pm With Achievements
Bhuiya, Alex Pm With AchievementsBhuiya, Alex Pm With Achievements
Bhuiya, Alex Pm With Achievements
 
IJAZ MOHAMMED - Facilities Manager.
IJAZ MOHAMMED - Facilities Manager.IJAZ MOHAMMED - Facilities Manager.
IJAZ MOHAMMED - Facilities Manager.
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
 
Resume_Sales_BD- 9years experience control valve industry
Resume_Sales_BD- 9years experience control valve industryResume_Sales_BD- 9years experience control valve industry
Resume_Sales_BD- 9years experience control valve industry
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Ketan's resume
Ketan's resumeKetan's resume
Ketan's resume
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
Manohar Resume
Manohar ResumeManohar Resume
Manohar Resume
 
Resume-Estimation
Resume-EstimationResume-Estimation
Resume-Estimation
 
Gopi 221116
Gopi 221116 Gopi 221116
Gopi 221116
 

Recently uploaded

Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
iemerc2024
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
bhadouriyakaku
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
zwunae
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
introduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdfintroduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdf
ravindarpurohit26
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
obonagu
 
This is my Environmental physics presentation
This is my Environmental physics presentationThis is my Environmental physics presentation
This is my Environmental physics presentation
ZainabHashmi17
 

Recently uploaded (20)

Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
introduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdfintroduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdf
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
 
This is my Environmental physics presentation
This is my Environmental physics presentationThis is my Environmental physics presentation
This is my Environmental physics presentation
 

Arul.s.r project sales & estimation engineer

  • 1. Arul Ranganathan – Project Sales & Estimation Engineer Arul Ranganathan. Ph:+971 562545279 Arul.dava@gmail.com / Arul.Ranganathan@hotmail.com ➢ Mechanical Engineerwith ample experience of Estimation,ProjectManagement,andTender/ Bid Management. ➢ Responsible for Estimating projects from multiple stake holder & submission of proposal on time. ➢ I possess in‐depth knowledge of Cost Estimation, Budget Preparation,Planning, Cost Control, Project Management, Order Management, Change order Management, Expedite planning, Economic Analysis and Risk Management. ➢ I have hands on experience and a comprehensive insight for preparation of Technical & Commercial Proposals. ➢ Prepared multimillionworth Project Proposals (overseas) for most distinguished clients with company ethics & guidelines. ➢ Proficient in handling customer complaints & accountable for quality service & timely submission of bids & Clarifying of the quality problems through proper channel. ➢ Effective communicatorwithexcellentrelationshipmanagement&negotiationskills;possessa flexible & result oriented attitude. ➢ WorkedasFunctioningProject-EstimationengineerinFisherValvesdivision,EmersonProcess management,Singapore & Malaysia to support projects for 18 months & frequentlytraveled for project requirements to multiple countries. CAREER OBJECTIVE: Highly competentEngineerwith about7+ yearsof extensiveexperiencewithinmultinational companies.Possessessoundknowledge inMechanical Engineeringcombinedwithtechnical expertise indeterminingspecificationsandauthoringall neededdocumentations.Alsocapable tomanage,lead and Coordinate projectsaswell asdirectwide range of operationsrelatedtherewithsuchas estimation,bill of quantities,procurement,resource projections,scheduling,andprogressmonitoring and teamsupervision.Eagertoworkin a more challengingworkprofile toshare gainedexperience, developedexpertise andleadershipskills.
  • 2. Arul Ranganathan – Project Sales & Estimation Engineer EMPLOYMENT CHRONICLE  Project Sales & Estimation Engineer Presently associatedwith Loops Automation, Dubai UAE. From July 1st 2015 - Till  Handle and prepare technical and commercial proposals and maintain business relationship with vendors and suppliers for complete skid  Responsible for handling assigned technical and commercial proposals.  Responsible forcorrespondence withsuppliersandvendorstocollecttechnical informationand quotations for materials/components/systems.  Development of technical solution so as to meet project technical specifications.  Liaise withTechnical Departments Headsforindepthtechnical informationand clarifications.  Reporting back to the senior management  Conduct site visits and pre-tender meetings whenever required.  Liaise withcustomerswhichmayinclude actual visitsfortechnicaldiscussionand presentation.  Maintain detailed knowledge of industry standards and practice.  Acting as a contact between the company and Client during tendering stage.  Might be involved in negotiating commercial terms with a Client to close the sale.  Ensuringproperclose-outof the projectbygainingformal acceptance fromall project Stakeholders.  Conducting“LessonsLearnt”meetingaftercompletionof eachProposal handled  Maintainaccurate records& updatingdata base for reference  Continuousimprovements&implementingcostcontrol planning  Project Estimation / Engineer Bin Saud Technical Trading Est. (Bin Tec) Abu Dhabi, UAE. From July 14th 2014- Jun 23rd 2015 ➢ Preparationof tenderbothtechnicallyandcommerciallyforbothOnshore andOffshore works. ➢ Respondfullytothe Expressionof Interest(EOI) andpre‐qualificationrequirement. ➢ Developmentof the proposalsstrategyforthe tender ➢ Attendingpre‐tendermeetingsandkeyhighlightingpointtoaidsite surveys ➢ Evaluatingtenderdocuments,drawings,&schedules (Inspection&Delivery) ➢ PreparingRFQto suppliers,Vendormanagement&negotiations ➢ Preparingcostingreportof handledprojecttothe Manager ➢ Preparingcostcomparisonsheetsforall supply&sub‐contractoritems ➢ Estimationof projectcostin termsof manpower,resourcesandmaterials ➢ Preparationof ManpowerHistogram, EquipmentHistogramcalculationof Manhourson the basisof the Time SheetsforbothOnShore and Off Shore
  • 3. Arul Ranganathan – Project Sales & Estimation Engineer ➢ Providinginputstothe plannerforinitialstage of projectschedule ➢ GivingPresentationtothe Managementaswell asto the clientof the Technical Tender ➢ AnsweringPre‐bid&postbidclarification ➢ ArrangingInternal KOMwithProjectteamforpost award ➢ Arrange expeditingmeetingsvisitmade bycustomers. ➢ Administrationof ProjectDocumentationasperclientrequirements Estimation Engineer –Projects 11th Aug 2008 to May 28th 2014 with Emerson Process Management (Fisher valves Division) Chennai. FisherChennai EngineeringCentre underEMERSON PROCESSMANAGEMENT inChennai, IndiaissupportingEmersonofficesworldwideinengineeringactivitieslike Quotation,Estimation ProjectManagement,EngineeringDesign,andProcurement. EmersonProcessManagement – Fishervalves,Incare a worldleaderinProcessControl valves& Automation&suppliedtoProcessIndustriesforSeveralyears. ➢ Tenderdocumentation(ITT) &BIDevaluation. ➢ To provide technical commercialsupportto LBPand directcustomers. ➢ Assistthe projectmanager(overseas)ontenders. ➢ Organizing&attendingProjectKick-OFFMeetings ➢ Preparesandcoordinatesthe projectschedule/costandmaintainsthroughoutthe projectby coordinatingwithall internal stakeholders.Optimizesthe use of personnel toachieve the schedule.Forecastsandaddressesdeviationstoschedule. ➢ Responsible forplanning&executionof assignedprojectsfromproposal toProject completion. ➢ Reviewof ClientProjectspecificationsandensuringthatthe scope of the projectmeetsall clientrequirements. ➢ Ensure the technical estimate takesintoaccountthe full calculationof costs. ➢ Ensure all tenderingdetailsrequiredforTechnical aswell ascommercial bidsare full filled. ➢ Ensure a follow‐uponclarificationsandnegotiationsthroughoutthe process ➢ Coordinate budgetaryassessments ➢ Estimationof Manufacturingworks(Includingcontrol valves,instruments,accessories etc.) ➢ Estimationof process equipment’s like Skids etc. ➢ Estimationof Testing&commissioninginsite ➢ Estimationof plantshutdown& modificationwork ➢ Providingtechnical clarificationsonqueries. ➢ Collectionof Payments,C-forms&Collectbackbankguarantees,securitydeposits etc. ➢ Coordinatingwithprojectdepartmentfortimelycompletionof projects ➢ IdentifyingandmanagingRiskswithalternatesolutions. ➢ Preparationof sourcingstrategiestomeetprojectschedule requirement&tomanage project costs. ➢ Coordinateswiththe internalorderentryteamtoconvertthe customerrequirementsinto “Supplierlanguage”whothenprocessforthe materialsplanning.
  • 4. Arul Ranganathan – Project Sales & Estimation Engineer ➢ Beinga single pointcontacttothe client,handlesall projecttechno-commercial communicationwiththe clients,attendsandminutesall projectmeetings. ➢ Coordinationof all projectactivities&assuringefficientdisseminationof datatoassure that all of the ProjectTeamare familiarwiththe scope of the projectfororganizedproject execution. ➢ Measuringthe projectperformance inline withthe projectplan&controllinganydeviations by continuousimprovement. ➢ Submitsperiodicprojectstatusreporttocustomersindetail withthe assistance of Procurement,supplychain,production&QA/QCdepartmentinfactory. ➢ Responsible forassuringthatall scope changesare maintainedandare promptlytransmitted to the productiondepartment. ➢ CoordinatingCustomerWitnessInspections&assistingQA/QCinovercomingthe Non- Conformance reports(NCR’s). ➢ Arrange expeditingmeetingsvisitmade bycustomers. ➢ Administrationof ProjectDocumentationasperclientrequirements. ➢ Coordinateswiththe invoicingteamtoissue progresspaymentinvoicesforprojectsbasedon milestones. . Areas of proficiency: ➢ Estimationof Gas Jubail Phase VIIIprojectforSamsung(EPC),Koreawitha value of $3.4 million. ➢ Estimationof Saudikayan/LDPEprojectforDaelim(EPC),Koreawithavalue of $ 2.8 million ➢ Estimation of S-Oil Onsan Refinery project for Samsung(EPC), Korea with a value of $1.7 million ➢ Estimationof ChimSao FPSOprojectfor B.T Engineering(EPC),Singapore withavalue of $ 1.1 million ➢ Estimation of Shah Gas project for SAIPEMItaly, Europe with a value of $ 34.6 million ➢ Estimation of Macedon project for Technip, Australia with a value of $ 5 million ➢ EPC estimation work for ADNOC group of companies ➢ EPC estimation work for Gulf region & Asia Pacific ➢ Estimation for Off shore works ➢ Estimation for On shore works ➢ Estimation for shut down & modification work _________________________SCHOLASTICS____________________________ ● SSLC from Sri Ramakrishna Mission Higher Secondary School, Chennai in 2005. Secured 85%. ● Diploma (Mechanical Engineering) from Murugappa Polytechnic College, Avadi, Chennai in 2008. Secured 88% (First class with Distinction). ● BE Mechanical Engineering (Pursuing) in Satyabama university, Chennai. _______________________SCHOLASTICS Project____________________________ Solar power room: Giving power to room using (Photovoltaic cells) solar energy system.
  • 5. Arul Ranganathan – Project Sales & Estimation Engineer Extracurricular: ● Served as a Student Placement coordinator for Mechanical Engineering department. ● Member of National Cadet Crops (NCC). ● Member of National Service Scheme and serviced several camps (NSS). IT SKILLS - Well versed with the follows: Application software : Microsoft office package. OPS, FFV. Design Software : Pro-E 2000, AutoCAD & CO-create ____________________________ Personal Details____________________________ Date of Birth : 14th Oct 1989 Languages Known : English, Tamil & Hindi Present Address : 78/68, Periyar salai, Teynampet, Chennai-600018 Father’s Name : Ranganathan.S Marital status : Single Passport no : H4983922 UAE Driving License : Final RTA test __________________________PersonalStrength__________________________ ● Active Team Player. ● Flexible and Innovative. ● Consistency in performance ● Decision Maker ● Emotional Intelligence ● Professional Ethics __________________________DECLARATION__________________________ I am here with to submit my RESUME for your kind perusal and solicit. To the best of my knowledge the above given details are TRUE, I look forward to hearing from you. If you need more information, please do not hesitate to contact me. I would also like to hear about other interesting positions you might have. Willing to learn continuously & Travel Extensively on Business requirements. PLACE: Dubai, UAE DATE: Regards, -Arul Ranganathan