A competent professional with 15 years of cross cultural experience in Project Construction &
Engineering in MEP and execution of Residential & commercial complexes.
Academia: Post Diploma In Refrigeration & Air Conditioning from C.M. Kothari Technological
Institute, Chennai, Tamil Nadu, India & Bachelor Degree in Mechanical Engineering from RVD
University, Rajasthan, India.
Presently associated with Bahwan Engineering Company as a Construction Manager.
Deft in tapping potential accounts, analyzing their requirements, rendering technical guidance
and liaising with consultants, clients and other administrative authorities.
Adept in Engineering, Planning, Executing and spearheading construction projects involving
contracts administration, material and resource planning with a flair for adopting modern
construction methodologies in compliance.
An effective communicator with good inter-personal, presentation & negotiation skills and
abilities in forging business partnerships and achieving quality product & service norms.
AREAS OF EXPERTISE
Project Planning, Execution & Cost Control
Developing project execution plans after thorough discussion with client, project evaluation in
terms of outlays and profits attached.
Reviewing and monitoring of overall project schedule.
Anchoring on-site construction activities to ensure completion of project within the time & cost
parameters and effective resource utilization to maximize the output.
Participating in project review meetings for evaluating project progress providing technical
inputs to construction design and methodology.
Managing the interface between the planning applications and the other cross functional
design engineering team.
Progress reporting (Externally to Clients & Internally to Management) including updating,
monitoring and project controls.
Interacting with clients/consultants on project management issues pertaining to time/cost
variations Carrying out critical path analysis periodically to avoid project cost and time
overruns.
Coordination of time extension claims by substantiating the effect in Critical Path. To prepare
construction schedule.
- 2 -
Close coordination with Project Management and design/ Construction team to enforce
accurate progress monitoring system.
Plan, organize, lead and control the function of the project through the activities of
subordinates and achieve a successful execution and completion of project.
Provide Technical support as required to obtain approval for drawings and Material Submittals.
Prepare Program of work in co-ordination with the Main Contractor’s approved Clause 14 Civil
Program.
Prepare Bill of materials, Material Schedule and the Material Request Voucher to ensure timely
delivery of equipment and materials.
Plan and Organize the manpower required for the project in co-ordination with the Site
Engineers and supervisors.
Negotiate with the subcontractors and assist Operations Manager to finalize sub-contract as
per the site requirements.
Prepare Progress Valuation and follow-up with Client/Consultant and Contractor for prompt
payments.
Ensure that the project Objectives is meets the terms of Cost Control, resources utilization and
meeting the target.
Evaluate and notify any deviations and/or changes with respect to Scope of Works, and co-
ordinate for the preparation of variations and organize to get approval from client/consultant.
Effectively communicate with the contractor, client and suppliers externally and between the
divisions internally.
Represent all the site progress meeting and all other project related meeting with consultant,
contractor and clients, and ensure that the project works are within the scope and lined up to
schedule.
Generate and distribute weekly project progress reports to relevant areas and the
management.
Develop and maintain good rapport with consultant, client, contractors, subcontractors,
engineers, supervisors and the site staff. Respond to all types of customer / consultant queries
and calls as soon as possible.
Provide feedback to the Operations Manager on the credit worthiness of each technician
involved on the project and conduct annual performance appraisal.
Arrange periodical coaching in problem solving areas, which will give root-cause analysis for
the problems arising and this creative solution, could be obtained by involving all the
technicians.
Support and encourage the project execution technical team “the correct way of doing the
technical jobs”, and improve the same to complete the project on fast tract system.
Inspect, approve and accept completed projects, ensure that the client receives quality
services in regards to job completion dates and that the client is satisfied.
Follow up with the testing and commissioning to ensure that the client receives quality service
in regards to job completion dates and that the client is satisfied.
Implement all the suggested and agreed corrective actions with the reference to the Internal
Quality Audits.
Ensure achievement of all quality objectives in terms of safe execution and timely completion.
Implement all the suggested and agreed corrective actions with reference to the Internal
Quality Audits meeting the standards of ISO 9001:2000
Maintain effective communication with Internal and External Customers.
- 3 -
Ensure that Occupational Health & Safety procedures are adhered to, thus preventing illness
and accidents.
Perform miscellaneous duties as directed.
Project Co-ordination
Close coordination with Project Management and design/ Construction team to enforce
accurate progress monitoring system.
Coordinating with Project Team Members & Main Contractor for Timely completion of activities.
Identifying & developing vendor source for achieving cost effective purchase & timely delivery
so as to minimize project cost.
Provide Technical inputs to design so as to facilitate effective execution of the work.
Coordination for Material Submittals & Preparation of Method Statements in compliance with
requirements to match the best practice.
Networking with architects/ consultants to ascertain technical specifications, construction
related essentials, based on the prevalent rules.
Relationship Management with Statutory Authorities for availing mandatory sanctions.
CAREER SCAN
Since February’2010: Bahwan Engineering Company as a Construction Manager,
Sultanate of Oman
Project Title: Multiple – Commercial, Residential, Hotels, PDO & Industrial
Building projects
April 2009- January’ 10: Metro Aircon, Chennai, Tamil Nadu, India
Project Title: Project Manager
Roles held:
Leading Planning Design & Construction for AC Division.
Planning and monitoring the progress of work.
Initiate the project plan and review of progress against set targets.
Monitor progress of all aspects of the work to ensure completion on time. Notify the client of any
delays to the works.
December 2004- March ‘ 09:Jamheer Constructions LLC, Dubai, United Arab Emirates
Project Title: Project In-charge
Roles held:
Leading Planning Design & Construction for MEP Division.
Planning and monitoring the progress of work.
Involved in all Purchase Negotiation for finalizing Materials & Sub Contracts
Co-ordination with QS for Monthly Billing & Variation submissions
Initiate the project plan and review of progress against set targets.
- 4 -
Monitor progress of all aspects of the work to ensure completion on time. Notify the client of any
delays to the works.
December 2002- November’ 04: Voltas Limited, Cochin, Kerala, India
Project Title: Project Engineer
Roles held:
Leading of Estimate & Sales for AC Division
Designing of Low Temperature Application System
Leading of Construction for AC Division.
Planning and monitoring the progress of work.
Initiate the project plan and review of progress against set targets.
Monitor progress of all aspects of the work to ensure completion on time. Notify the client of any
delays to the works.
PROJECTS HANDLED AS OF DATE
MEP Works for JW Marriot Hotel at Oman Convention & Exhibition Centre, Sultanate of
Oman
MEP Works for Oman Trading & Establishment Showroom, Sultanate of Oman
MEP Works for Majlis Oman, Al Bustan, Sultanate of Oman
MEP Works for Oman Arab Bank, Sultanate of Oman
MEP Works for City Season Hotel & Apartment ( Commercial & Residential), Sultanate of
Oman
MEP Works for New Digital TV Studio (OMAN TV) , Sultanate of Oman
SQUH Radiology & Operation Theatre, Sultanate of Oman
Air Conditioning Works for Commercial & Residential Building for Al Naba Holding LLC,
Sultanate of Oman
Commercial Building for Badr Shipping Agencies, Sultanate of Oman
Residential Building at Al Qurum, Sultanate of Oman
Refurbishment of Al Nahdha Hospital, Sultanate of Oman
Air Conditioning Works for Al Noor MGI PH3A in Nimr, Sultanate of Oman
Air Conditioning Works for Nesto Hypermarket, Sultanate of Oman
Process Cooling System at Dibba, Sultanate of Oman
Air Conditioning Works for Various Grid Substations (132KV & 33/11KV) (Azaiba, Rusayl,
Ibra, Al Khuwair, Ruwi in Sultanate of Oman
Air Conditioning Works for Oman LNG, Sur, Sultanate of Oman
Air Conditioning Works for Oman Fiber Optic Cables, Sultanate of Oman
Air Conditioning Works for Various Mosque (Ibra, Sur, Mussanah) , Sultanate of Oman
Air Conditioning Works for Renal Dialysis at Al Seeb, Sultanate of Oman
Nokia Factory, Sriperumabadur, India
Samsung Showroom, Chennai.
- 5 -
Exomos operational facility building-Jebal Ali
Palm Marine operational facility building-Jebal Ali
Proposed Warehouse and Office Building for DANZAZ at Jebel Ali
Proposed Warehouse and Office Building for DANZAS (South) at Jebel Ali
Substations for DEWA at Burj Dubai & Meadows
3B+G+6 Commercial Building at Al Mina, MEP Works, Dubai
G+2 Labour accommodation or Gulf & World, MEP Works, Dubai
B+G+8 Residential Building at Dubai Silicon Qasis, MEP Works, Dubai
Proposed Warehouse for CWT Logistics, Jebel Ali, Fire Fighting Works, Dubai
Renovation works at Jumeirah beach hotel-Dubai
Substations for DEWA at Horse & Barsha
EMS Memorial Hospital, Calicut, Kerala
Hindustan Newsprint Limited, Kottayam, Kerala
Carthias Hospital, Kottayam, Kerala
Alukkas Jewellary, Kochi, Kerala
Kinfra, Kochi, Kerala
Vikram Sarabhai Space Center, ISRO, Trivandrum, Kerala
Airport Authority of India, Trivandrum, Kerala
Airport Authority of India, Kochi, Kerala
Alappat Jewellary, Kochi, Kerala
Indian telephone Industries Limited, Palghat, Kerala
Interseas, Chandiroor, Kerala
Freeze Engineering Limited, Kochi, Kerala
International Freeze Fish Limited, Kochi, Kerala
ACADEMIA
2016 B. Tech. (Mechanical Engineering) from RVD University, Rajasthan (Certificate Awaited –
Distance Learning Program)
2003 Post Diploma in Refrigeration & Air Conditioning from C.M. Kothari Technological Institute,
Chennai, Tamil Nadu, India (Honors).
IT FORTE
Operating Systems : Windows (98, 2000, XP)
Design & Planning Tool & Others : MS Project, Auto Cad
BEYOND CURRICULUM
Playing both Indoor and outdoor games.
Personal Interests: Listening songs, Playing Cricket
Holding Valid Oman Driving License
- 6 -
PERSONAL DOSSIER
Date of Birth : 04TH
OCTOBER 1978
Language Skills : English, Hindi, Malayalam

CV-Rajkumar 23.11.2016

  • 1.
    - 1 - RAJKUMARNARAYANAN 66, E B Colony, Varatharajapuram, Mudichur, Chennai 600048, Tamil Nadu, India Contact No.: 968 97679681 (Muscat, Sultanate of OMAN) E-Mail: mers2k@gmail.com Seeking assignments in Project Management with a high growth oriented organization A competent professional with 15 years of cross cultural experience in Project Construction & Engineering in MEP and execution of Residential & commercial complexes. Academia: Post Diploma In Refrigeration & Air Conditioning from C.M. Kothari Technological Institute, Chennai, Tamil Nadu, India & Bachelor Degree in Mechanical Engineering from RVD University, Rajasthan, India. Presently associated with Bahwan Engineering Company as a Construction Manager. Deft in tapping potential accounts, analyzing their requirements, rendering technical guidance and liaising with consultants, clients and other administrative authorities. Adept in Engineering, Planning, Executing and spearheading construction projects involving contracts administration, material and resource planning with a flair for adopting modern construction methodologies in compliance. An effective communicator with good inter-personal, presentation & negotiation skills and abilities in forging business partnerships and achieving quality product & service norms. AREAS OF EXPERTISE Project Planning, Execution & Cost Control Developing project execution plans after thorough discussion with client, project evaluation in terms of outlays and profits attached. Reviewing and monitoring of overall project schedule. Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output. Participating in project review meetings for evaluating project progress providing technical inputs to construction design and methodology. Managing the interface between the planning applications and the other cross functional design engineering team. Progress reporting (Externally to Clients & Internally to Management) including updating, monitoring and project controls. Interacting with clients/consultants on project management issues pertaining to time/cost variations Carrying out critical path analysis periodically to avoid project cost and time overruns. Coordination of time extension claims by substantiating the effect in Critical Path. To prepare construction schedule.
  • 2.
    - 2 - Closecoordination with Project Management and design/ Construction team to enforce accurate progress monitoring system. Plan, organize, lead and control the function of the project through the activities of subordinates and achieve a successful execution and completion of project. Provide Technical support as required to obtain approval for drawings and Material Submittals. Prepare Program of work in co-ordination with the Main Contractor’s approved Clause 14 Civil Program. Prepare Bill of materials, Material Schedule and the Material Request Voucher to ensure timely delivery of equipment and materials. Plan and Organize the manpower required for the project in co-ordination with the Site Engineers and supervisors. Negotiate with the subcontractors and assist Operations Manager to finalize sub-contract as per the site requirements. Prepare Progress Valuation and follow-up with Client/Consultant and Contractor for prompt payments. Ensure that the project Objectives is meets the terms of Cost Control, resources utilization and meeting the target. Evaluate and notify any deviations and/or changes with respect to Scope of Works, and co- ordinate for the preparation of variations and organize to get approval from client/consultant. Effectively communicate with the contractor, client and suppliers externally and between the divisions internally. Represent all the site progress meeting and all other project related meeting with consultant, contractor and clients, and ensure that the project works are within the scope and lined up to schedule. Generate and distribute weekly project progress reports to relevant areas and the management. Develop and maintain good rapport with consultant, client, contractors, subcontractors, engineers, supervisors and the site staff. Respond to all types of customer / consultant queries and calls as soon as possible. Provide feedback to the Operations Manager on the credit worthiness of each technician involved on the project and conduct annual performance appraisal. Arrange periodical coaching in problem solving areas, which will give root-cause analysis for the problems arising and this creative solution, could be obtained by involving all the technicians. Support and encourage the project execution technical team “the correct way of doing the technical jobs”, and improve the same to complete the project on fast tract system. Inspect, approve and accept completed projects, ensure that the client receives quality services in regards to job completion dates and that the client is satisfied. Follow up with the testing and commissioning to ensure that the client receives quality service in regards to job completion dates and that the client is satisfied. Implement all the suggested and agreed corrective actions with the reference to the Internal Quality Audits. Ensure achievement of all quality objectives in terms of safe execution and timely completion. Implement all the suggested and agreed corrective actions with reference to the Internal Quality Audits meeting the standards of ISO 9001:2000 Maintain effective communication with Internal and External Customers.
  • 3.
    - 3 - Ensurethat Occupational Health & Safety procedures are adhered to, thus preventing illness and accidents. Perform miscellaneous duties as directed. Project Co-ordination Close coordination with Project Management and design/ Construction team to enforce accurate progress monitoring system. Coordinating with Project Team Members & Main Contractor for Timely completion of activities. Identifying & developing vendor source for achieving cost effective purchase & timely delivery so as to minimize project cost. Provide Technical inputs to design so as to facilitate effective execution of the work. Coordination for Material Submittals & Preparation of Method Statements in compliance with requirements to match the best practice. Networking with architects/ consultants to ascertain technical specifications, construction related essentials, based on the prevalent rules. Relationship Management with Statutory Authorities for availing mandatory sanctions. CAREER SCAN Since February’2010: Bahwan Engineering Company as a Construction Manager, Sultanate of Oman Project Title: Multiple – Commercial, Residential, Hotels, PDO & Industrial Building projects April 2009- January’ 10: Metro Aircon, Chennai, Tamil Nadu, India Project Title: Project Manager Roles held: Leading Planning Design & Construction for AC Division. Planning and monitoring the progress of work. Initiate the project plan and review of progress against set targets. Monitor progress of all aspects of the work to ensure completion on time. Notify the client of any delays to the works. December 2004- March ‘ 09:Jamheer Constructions LLC, Dubai, United Arab Emirates Project Title: Project In-charge Roles held: Leading Planning Design & Construction for MEP Division. Planning and monitoring the progress of work. Involved in all Purchase Negotiation for finalizing Materials & Sub Contracts Co-ordination with QS for Monthly Billing & Variation submissions Initiate the project plan and review of progress against set targets.
  • 4.
    - 4 - Monitorprogress of all aspects of the work to ensure completion on time. Notify the client of any delays to the works. December 2002- November’ 04: Voltas Limited, Cochin, Kerala, India Project Title: Project Engineer Roles held: Leading of Estimate & Sales for AC Division Designing of Low Temperature Application System Leading of Construction for AC Division. Planning and monitoring the progress of work. Initiate the project plan and review of progress against set targets. Monitor progress of all aspects of the work to ensure completion on time. Notify the client of any delays to the works. PROJECTS HANDLED AS OF DATE MEP Works for JW Marriot Hotel at Oman Convention & Exhibition Centre, Sultanate of Oman MEP Works for Oman Trading & Establishment Showroom, Sultanate of Oman MEP Works for Majlis Oman, Al Bustan, Sultanate of Oman MEP Works for Oman Arab Bank, Sultanate of Oman MEP Works for City Season Hotel & Apartment ( Commercial & Residential), Sultanate of Oman MEP Works for New Digital TV Studio (OMAN TV) , Sultanate of Oman SQUH Radiology & Operation Theatre, Sultanate of Oman Air Conditioning Works for Commercial & Residential Building for Al Naba Holding LLC, Sultanate of Oman Commercial Building for Badr Shipping Agencies, Sultanate of Oman Residential Building at Al Qurum, Sultanate of Oman Refurbishment of Al Nahdha Hospital, Sultanate of Oman Air Conditioning Works for Al Noor MGI PH3A in Nimr, Sultanate of Oman Air Conditioning Works for Nesto Hypermarket, Sultanate of Oman Process Cooling System at Dibba, Sultanate of Oman Air Conditioning Works for Various Grid Substations (132KV & 33/11KV) (Azaiba, Rusayl, Ibra, Al Khuwair, Ruwi in Sultanate of Oman Air Conditioning Works for Oman LNG, Sur, Sultanate of Oman Air Conditioning Works for Oman Fiber Optic Cables, Sultanate of Oman Air Conditioning Works for Various Mosque (Ibra, Sur, Mussanah) , Sultanate of Oman Air Conditioning Works for Renal Dialysis at Al Seeb, Sultanate of Oman Nokia Factory, Sriperumabadur, India Samsung Showroom, Chennai.
  • 5.
    - 5 - Exomosoperational facility building-Jebal Ali Palm Marine operational facility building-Jebal Ali Proposed Warehouse and Office Building for DANZAZ at Jebel Ali Proposed Warehouse and Office Building for DANZAS (South) at Jebel Ali Substations for DEWA at Burj Dubai & Meadows 3B+G+6 Commercial Building at Al Mina, MEP Works, Dubai G+2 Labour accommodation or Gulf & World, MEP Works, Dubai B+G+8 Residential Building at Dubai Silicon Qasis, MEP Works, Dubai Proposed Warehouse for CWT Logistics, Jebel Ali, Fire Fighting Works, Dubai Renovation works at Jumeirah beach hotel-Dubai Substations for DEWA at Horse & Barsha EMS Memorial Hospital, Calicut, Kerala Hindustan Newsprint Limited, Kottayam, Kerala Carthias Hospital, Kottayam, Kerala Alukkas Jewellary, Kochi, Kerala Kinfra, Kochi, Kerala Vikram Sarabhai Space Center, ISRO, Trivandrum, Kerala Airport Authority of India, Trivandrum, Kerala Airport Authority of India, Kochi, Kerala Alappat Jewellary, Kochi, Kerala Indian telephone Industries Limited, Palghat, Kerala Interseas, Chandiroor, Kerala Freeze Engineering Limited, Kochi, Kerala International Freeze Fish Limited, Kochi, Kerala ACADEMIA 2016 B. Tech. (Mechanical Engineering) from RVD University, Rajasthan (Certificate Awaited – Distance Learning Program) 2003 Post Diploma in Refrigeration & Air Conditioning from C.M. Kothari Technological Institute, Chennai, Tamil Nadu, India (Honors). IT FORTE Operating Systems : Windows (98, 2000, XP) Design & Planning Tool & Others : MS Project, Auto Cad BEYOND CURRICULUM Playing both Indoor and outdoor games. Personal Interests: Listening songs, Playing Cricket Holding Valid Oman Driving License