Daniel Lee
E: danox74@gmail.com / M: 96194641
Linkedin.com/in/lee-daniel
Brief Profile
Fabrication Manager with 4 years of experience who leads and oversees all production
(Fabrication & Machining). Undertakes complex project, meet tight deadlines and delivers with
standard quality. Possess practical knowledge for product inspection, recommending
improvement, motivating and supervising of staff while working to address fabrication or
production issues in a fast-paced setting
Throughout my employment, I was given the opportunities to serve all the main client in Oil & Gas
industry like GE Vetco, Cameron, One Subsea, FMC, Aker Solution, MHWirth, Bumi Armada.
Core Competencies
Project Management * Leadership & Performance Enhancement * Cost Control * Process
Development / Implementation * Vendor/Supplier Negotiation * Client Relation * Team Building,
Coaching & Mentoring * Piping / Metal Fabrication & Machining * Re-manufacturing & Re-
certification.
Work Experiences
Westmont Pte Ltd 1/9/2016 till Present
Project Lead (Contract)
Job Task:
 Assist in tendering projects
 Manpower staffing and allocation
 Allocation of tools & equipment
 Procurement of all required raw material, consumables & fixture
 Engage secondary services as required
 Cost control & Quality Control
 Monitor, Update & feedback on Project Status
 Provide Technical assistance if required to client
Achievement:
 On-time-delivery of all re-manufacturing (Re-furbish / Rework & Recertification) as desired by
client was made possible even with uncertainty factor at repair stages
Ausgroup Singapore Pte Ltd 1/8/2012 to 25/8/2016
Fabrication Manager
Job Task:
 To lead and supervise project and operation staff
 Plan, schedule & execute of project
 Process development & implementation
 Assessing of project & resources requirement
 Liaise with Welding Engineer on WPS utilization and development
 Oversee all production process and schedule. Re-negotiating timescales or schedule if
necessary with Project Managers.
 Facilities & Maintenance control
 Machine & Equipment control
 Tools / Fixture & consumables control
 Ensure that health and safety regulation are met with the assistant of Safety Manager
 Reviewing of Risk Assessment (RA), Safe Work Instruction (SWI) & Work Procedure (WP)
 Provide technical assistant to both internal & external client as required
 Ensure quality standard are met as per client requirement with the assistant of QC Inspector
 Resolve any non-conformances by investigation to identify the root cause and to propose
possible corrective and preventive action with no recurrence.
 Continuously exploring new or improved process / method.
 Co-ordination with internal client to achieve on-time-delivery within budgetary cost
 Provide assistant to estimating, marketing and sales staff on new tendering projects
 Provide assistant to purchasing team on any technical issue during the selecting, ordering
and purchasing of material, components, consumables and fixture
 Provide Training plan for all staff related to Health & Safety and Operation requirement
Achievement:
 In year 2012 last quarter to year 2013 first quarter. Introducing new changes on shop layout
plan, re-allocate of certain process ownership and new methodology of certain process. The
result is increase in efficiency of 40% and cost reduction of 25%.
Ausgroup Singapore Pte Ltd 18/7/2006 to 31/7/2012
Project Planner
Job Task:
 Study Specification and Drawing and raise material requisition.
 Raise material waiver with any deviation from customer bill of material and specification..
 To ensure that the material & man-hours (Fabrication and Machine hours) cost are planned
within the budgeted cost draft out by Sales & Estimation group
 Clarify on any technical issue or doubts with customer engineer before proceeding for any
fabrication & machining.
 Monitoring work progress through co-ordination with procurement team and shop team.
 Attend weekly meeting with customer on project progress if required.
 Co-ordination with client on re-conditioning & repair job.
 Co-ordination with client with regards to on-site jobs example like load test & modification
works.
 Arrange with internal / external logistic to deliver finished product on time.
Achievement:
 Negotiating and propose raw material alternative and changes of certain component
manufacturing process which in turn reduce 10-15% on material cost and 20-25% reduced
manufacturing lead time
Republic of Singapore AirForce (RSAF) 18/7/1996 to 17/7/2006
Senior Technician
Certification
1. Speak with Confidence Course
2. Internal Auditing Course (OHSAS 18001: 2007)
3. Performance Appraisal / Management Skills
4. Certificate in How to be a good Project Manager
5. Certificate in Risk Management Course
Qualification
Year School Result Attained
1993-1996 Ngee-Ann Polytechnic Diploma in Mechanical
Engineering

Daniel Lee

  • 1.
    Daniel Lee E: danox74@gmail.com/ M: 96194641 Linkedin.com/in/lee-daniel Brief Profile Fabrication Manager with 4 years of experience who leads and oversees all production (Fabrication & Machining). Undertakes complex project, meet tight deadlines and delivers with standard quality. Possess practical knowledge for product inspection, recommending improvement, motivating and supervising of staff while working to address fabrication or production issues in a fast-paced setting Throughout my employment, I was given the opportunities to serve all the main client in Oil & Gas industry like GE Vetco, Cameron, One Subsea, FMC, Aker Solution, MHWirth, Bumi Armada. Core Competencies Project Management * Leadership & Performance Enhancement * Cost Control * Process Development / Implementation * Vendor/Supplier Negotiation * Client Relation * Team Building, Coaching & Mentoring * Piping / Metal Fabrication & Machining * Re-manufacturing & Re- certification. Work Experiences Westmont Pte Ltd 1/9/2016 till Present Project Lead (Contract) Job Task:  Assist in tendering projects  Manpower staffing and allocation  Allocation of tools & equipment  Procurement of all required raw material, consumables & fixture  Engage secondary services as required  Cost control & Quality Control  Monitor, Update & feedback on Project Status  Provide Technical assistance if required to client Achievement:  On-time-delivery of all re-manufacturing (Re-furbish / Rework & Recertification) as desired by client was made possible even with uncertainty factor at repair stages Ausgroup Singapore Pte Ltd 1/8/2012 to 25/8/2016 Fabrication Manager Job Task:  To lead and supervise project and operation staff  Plan, schedule & execute of project  Process development & implementation  Assessing of project & resources requirement  Liaise with Welding Engineer on WPS utilization and development  Oversee all production process and schedule. Re-negotiating timescales or schedule if necessary with Project Managers.
  • 2.
     Facilities &Maintenance control  Machine & Equipment control  Tools / Fixture & consumables control  Ensure that health and safety regulation are met with the assistant of Safety Manager  Reviewing of Risk Assessment (RA), Safe Work Instruction (SWI) & Work Procedure (WP)  Provide technical assistant to both internal & external client as required  Ensure quality standard are met as per client requirement with the assistant of QC Inspector  Resolve any non-conformances by investigation to identify the root cause and to propose possible corrective and preventive action with no recurrence.  Continuously exploring new or improved process / method.  Co-ordination with internal client to achieve on-time-delivery within budgetary cost  Provide assistant to estimating, marketing and sales staff on new tendering projects  Provide assistant to purchasing team on any technical issue during the selecting, ordering and purchasing of material, components, consumables and fixture  Provide Training plan for all staff related to Health & Safety and Operation requirement Achievement:  In year 2012 last quarter to year 2013 first quarter. Introducing new changes on shop layout plan, re-allocate of certain process ownership and new methodology of certain process. The result is increase in efficiency of 40% and cost reduction of 25%. Ausgroup Singapore Pte Ltd 18/7/2006 to 31/7/2012 Project Planner Job Task:  Study Specification and Drawing and raise material requisition.  Raise material waiver with any deviation from customer bill of material and specification..  To ensure that the material & man-hours (Fabrication and Machine hours) cost are planned within the budgeted cost draft out by Sales & Estimation group  Clarify on any technical issue or doubts with customer engineer before proceeding for any fabrication & machining.  Monitoring work progress through co-ordination with procurement team and shop team.  Attend weekly meeting with customer on project progress if required.  Co-ordination with client on re-conditioning & repair job.  Co-ordination with client with regards to on-site jobs example like load test & modification works.  Arrange with internal / external logistic to deliver finished product on time. Achievement:  Negotiating and propose raw material alternative and changes of certain component manufacturing process which in turn reduce 10-15% on material cost and 20-25% reduced manufacturing lead time Republic of Singapore AirForce (RSAF) 18/7/1996 to 17/7/2006 Senior Technician
  • 3.
    Certification 1. Speak withConfidence Course 2. Internal Auditing Course (OHSAS 18001: 2007) 3. Performance Appraisal / Management Skills 4. Certificate in How to be a good Project Manager 5. Certificate in Risk Management Course Qualification Year School Result Attained 1993-1996 Ngee-Ann Polytechnic Diploma in Mechanical Engineering