9/25/2011




Avery Dennison
Offset TPM Implementation : Bangladesh




                                                                  >     Iftekhar Aziz & Naynendu Bagchi
                                                                        RBIS
                                                                        AP / Bangladesh

                                                                            14 July 2011
1   | Presentation Name                Confidential—For Internal Use Only




Agenda
       What is TPM??
       History of TPM.
       16 Major losses.
       TPM 8 Pillars.
       SWOT Analysis.
       Limitations of our implementation.
       Initiate implementation : Department & Losses Selection #Pareto analysis.
       What are the KPIs??
       How we start the journey.
       Develop Project A3.
       Base Line & Target Condition.
       Yearly TPM calendar preparation.
       PM1: Autonomous Maintenance checklist & tracking system for PM1.
       Training and skill metrics development.
       Setup time reduction help from setup time team.
       Results.
       Further action plans.
2   | Presentation Name                Confidential—For Internal Use Only




                                                                                                                 1
9/25/2011




What is TPM??
      T: Total                                                           TPM
      P: Productive
      M: Maintenance & Management




                    Total Productive Maintenance & Management
                    combines the best features of productive &
                    preventive maintenance with innovative management
                    strategies and total employee involvement.




3   | Presentation Name             Confidential—For Internal Use Only




History of TPM.




4   | Presentation Name             Confidential—For Internal Use Only




                                                                                      2
9/25/2011




16 Major losses.




5   | Presentation Name   Confidential—For Internal Use Only




TPM 8 Pillars.




6   | Presentation Name   Confidential—For Internal Use Only




                                                                      3
9/25/2011




SWOT Analysis
Strengths                                         Weakness
    Management’s focus on TPM.                              Operators’ mind setup.
    Platform team’s support.                                Not having enough technical people.
    Skilled manpower.                                       Not having frequent audit system.
    Department’s willingness for TPM.                       Unwillingness for Tags fill up.




Opportunities                                        Threats
    Different m/c category.                                    Peak season higher order volume.
    Complex equipment parts.                                   Procurement policies.
    Discussion on MDI.                                         Root cause analysis of the Tags.
    Publishing success story.                                  Regular follow up of PM1.




7   | Presentation Name           Confidential—For Internal Use Only




Limitations of our implementation.

      Implement TPM initially in the Offset.

      Focusing on the Breakdown time loss only.

      Implement TPM for the major machines.




8   | Presentation Name           Confidential—For Internal Use Only




                                                                                                         4
9/25/2011




Initiate implementation : Department & Loss Selection #Pareto analysis

  Loss Selection

         Shut down loss: Power failure.
         Management loss: Training/Meeting, waiting for                   instruction, waiting
                               for proof reading, no work.
         Operating motion loss: Job changing.
         Schedule down time loss: Day end cleaning.
         Logistics loss: Waiting for material, ink preparation
         Break down loss: Machine break down.
         Measurement/Adjustment loss: Trouble shooting.




   9    | Presentation Name          Confidential—For Internal Use Only




Initiate implementation : Department & Loss Selection #Pareto analysis




   10   | Presentation Name          Confidential—For Internal Use Only




                                                                                                        5
9/25/2011




What are the KPIs??
                       Trained                                               Multi Skill
                      Operators #

                                                                               Uptime
                     Setup Time                                                 UEE
                                                                               Scrap



                                                                           Maintainability
                           MTTR


                                                                               Uptime
                      MTBF                                                   Performance


                                                                             Availability
                                                                                UEE
        Breakdown Time                                                        Uptime


11   | Presentation Name            Confidential—For Internal Use Only




How we start the journey
                                                                            Initiate
                                                                         Implementation




12   | Presentation Name            Confidential—For Internal Use Only




                                                                                                    6
9/25/2011




Develop Project A3




13   | Presentation Name   Confidential—For Internal Use Only




Base Line & Target Condition




14   | Presentation Name   Confidential—For Internal Use Only




                                                                       7
9/25/2011




Yearly TPM calendar preparation




15   | Presentation Name               Confidential—For Internal Use Only




TPM Completion
 laireS       oN C/M       emaN C/M   sutatS MPT
     1          10 L        C4 OTG
     2          20 L        C4 OTG
     3          30 L        C2 OTG

     4          40 L        C2OTG
     5          50 L       C1-64-MQ                                         Total No of m/c : 14
     6          32 L        C2 OTG
     7          42 L        DROK

     8          52 L        C1 OTG
                                                                            TPM initiates taken : 13
     9          92 L        47 DC

     01         13 L        C2 OTG                                          TPM initiates missing : 1
     11         84 L        C4 OTG

     21       47 DC DA     47 DC DA
     31        25 MS        25 MS
     41         ZOM          ZOM




16   | Presentation Name               Confidential—For Internal Use Only




                                                                                                               8
9/25/2011




PM1: Autonomous Maintenance checklist & tracking system for PM1.




17   | Presentation Name   Confidential—For Internal Use Only




Training and skill metrics development.




18   | Presentation Name   Confidential—For Internal Use Only




                                                                          9
9/25/2011




Setup time reduction help from setup time team.
     ∏ Find out the base line
     ∏ Set the targeted time
     ∏ SOP from P & C
     ∏ SMED training for operators
     ∏ Explain SOP
     ∏ Implement SOP in local language
     ∏ Continuously monitor setup time
     ∏ Watch other site’s setup time



19   | Presentation Name   Confidential—For Internal Use Only




Action Figures
     TPM Kick Off




      Declaration
      from Top
      Management




                                                                TPM
                                                                Introduction




20   | Presentation Name   Confidential—For Internal Use Only




                                                                                     10
9/25/2011




Action Figures
                           Initial briefing




21   | Presentation Name        Confidential—For Internal Use Only




Action Figures




22   | Presentation Name        Confidential—For Internal Use Only




                                                                           11
9/25/2011




Action Figures




23   | Presentation Name                  Confidential—For Internal Use Only




Action Figures


Before




                     Dust, Grease & Ink are everywhere which stuck into the m / c parts




After




24   | Presentation Name                  Confidential—For Internal Use Only




                                                                                                12
9/25/2011




Action Figures


Before




After




25   | Presentation Name              Confidential—For Internal Use Only




Action Figures


Before




After



                           Cleaning is not easy as it sounds



26   | Presentation Name              Confidential—For Internal Use Only




                                                                                 13
9/25/2011




After Cleaning




27   | Presentation Name   Confidential—For Internal Use Only




Brain storming




28   | Presentation Name   Confidential—For Internal Use Only




                                                                      14
9/25/2011




  Training




  29   | Presentation Name          Confidential—For Internal Use Only




  Results
                               Breakdown Time

                               MTBF & MTTR                               Setup Time
Base Line:

Unplanned Downtime,                                                      Trained operator #
mins/week: 5396
                             Current Condition:
TPM trained operators: 0
                             Unplanned Downtime,
                                                                          Target Condition:
MTBF, hr/week: 36.6          mins/week: 2738
                                                                          Unplanned Downtime,
                             TPM trained operators: 50
MTTR, hr/week: 4.13                                                       mins/week: 4047
                             MTBF, hr/week: 29.35
Setup Time, mins: 58                                                      TPM trained operators: 100
                             MTTR, hr/week: 3.1
                                                                          MTBF, hr/week: 40
                             Setup Time, mins: 39
                                                                          MTTR, hr/week: 3.5

                                                                          Setup Time, mins: 30


  30   | Presentation Name          Confidential—For Internal Use Only




                                                                                                             15
9/25/2011




Schedule & Unscheduled Breakdown time contrast




31   | Presentation Name   Confidential—For Internal Use Only




Unscheduled Breakdown time contrast




32   | Presentation Name   Confidential—For Internal Use Only




                                                                      16
9/25/2011




MTBF (Mean Time between Failure) contrast




33   | Presentation Name   Confidential—For Internal Use Only




MTTR (Mean Time to Repair) contrast




34   | Presentation Name   Confidential—For Internal Use Only




                                                                      17
9/25/2011




Setup Time : Actual Vs Target




35   | Presentation Name   Confidential—For Internal Use Only




Fuguai Tags




36   | Presentation Name   Confidential—For Internal Use Only




                                                                      18
9/25/2011




Further action plans.

      Initial cleaning schedule for Varimatrics, Die-             cut,
      Guillotine
      PM 1 for SM 52, MOZ
      PM 2 for GTO, CD 74
      Maintenance checklist training for SM 52, MOZ
      Spare parts management system




37   | Presentation Name     Confidential—For Internal Use Only




38   | Presentation Name     Confidential—For Internal Use Only




                                                                               19
9/25/2011




© 2011 Avery Dennison Corporation. All rights reserved. Avery Dennison and all other Aver y brands, product names and codes are trademarks of Avery Dennison Corporation. All
other brands and product names are trademarks of their respective owners. Fortune 500 is a trademark of Time, Inc. Personal and company names and other information on
samples depicted are fictitious. Any resemblance to actual names and addresses is purely coincidental.


39    | Presentation Name                                              Confidential—For Internal Use Only




                                                                                                                                                                                      20

Adbd Offset Tpm Implementation Program [Compatibility Mode]

  • 1.
    9/25/2011 Avery Dennison Offset TPMImplementation : Bangladesh > Iftekhar Aziz & Naynendu Bagchi RBIS AP / Bangladesh 14 July 2011 1 | Presentation Name Confidential—For Internal Use Only Agenda What is TPM?? History of TPM. 16 Major losses. TPM 8 Pillars. SWOT Analysis. Limitations of our implementation. Initiate implementation : Department & Losses Selection #Pareto analysis. What are the KPIs?? How we start the journey. Develop Project A3. Base Line & Target Condition. Yearly TPM calendar preparation. PM1: Autonomous Maintenance checklist & tracking system for PM1. Training and skill metrics development. Setup time reduction help from setup time team. Results. Further action plans. 2 | Presentation Name Confidential—For Internal Use Only 1
  • 2.
    9/25/2011 What is TPM?? T: Total TPM P: Productive M: Maintenance & Management Total Productive Maintenance & Management combines the best features of productive & preventive maintenance with innovative management strategies and total employee involvement. 3 | Presentation Name Confidential—For Internal Use Only History of TPM. 4 | Presentation Name Confidential—For Internal Use Only 2
  • 3.
    9/25/2011 16 Major losses. 5 | Presentation Name Confidential—For Internal Use Only TPM 8 Pillars. 6 | Presentation Name Confidential—For Internal Use Only 3
  • 4.
    9/25/2011 SWOT Analysis Strengths Weakness Management’s focus on TPM. Operators’ mind setup. Platform team’s support. Not having enough technical people. Skilled manpower. Not having frequent audit system. Department’s willingness for TPM. Unwillingness for Tags fill up. Opportunities Threats Different m/c category. Peak season higher order volume. Complex equipment parts. Procurement policies. Discussion on MDI. Root cause analysis of the Tags. Publishing success story. Regular follow up of PM1. 7 | Presentation Name Confidential—For Internal Use Only Limitations of our implementation. Implement TPM initially in the Offset. Focusing on the Breakdown time loss only. Implement TPM for the major machines. 8 | Presentation Name Confidential—For Internal Use Only 4
  • 5.
    9/25/2011 Initiate implementation :Department & Loss Selection #Pareto analysis Loss Selection Shut down loss: Power failure. Management loss: Training/Meeting, waiting for instruction, waiting for proof reading, no work. Operating motion loss: Job changing. Schedule down time loss: Day end cleaning. Logistics loss: Waiting for material, ink preparation Break down loss: Machine break down. Measurement/Adjustment loss: Trouble shooting. 9 | Presentation Name Confidential—For Internal Use Only Initiate implementation : Department & Loss Selection #Pareto analysis 10 | Presentation Name Confidential—For Internal Use Only 5
  • 6.
    9/25/2011 What are theKPIs?? Trained Multi Skill Operators # Uptime Setup Time UEE Scrap Maintainability MTTR Uptime MTBF Performance Availability UEE Breakdown Time Uptime 11 | Presentation Name Confidential—For Internal Use Only How we start the journey Initiate Implementation 12 | Presentation Name Confidential—For Internal Use Only 6
  • 7.
    9/25/2011 Develop Project A3 13 | Presentation Name Confidential—For Internal Use Only Base Line & Target Condition 14 | Presentation Name Confidential—For Internal Use Only 7
  • 8.
    9/25/2011 Yearly TPM calendarpreparation 15 | Presentation Name Confidential—For Internal Use Only TPM Completion laireS oN C/M emaN C/M sutatS MPT 1 10 L C4 OTG 2 20 L C4 OTG 3 30 L C2 OTG 4 40 L C2OTG 5 50 L C1-64-MQ Total No of m/c : 14 6 32 L C2 OTG 7 42 L DROK 8 52 L C1 OTG TPM initiates taken : 13 9 92 L 47 DC 01 13 L C2 OTG TPM initiates missing : 1 11 84 L C4 OTG 21 47 DC DA 47 DC DA 31 25 MS 25 MS 41 ZOM ZOM 16 | Presentation Name Confidential—For Internal Use Only 8
  • 9.
    9/25/2011 PM1: Autonomous Maintenancechecklist & tracking system for PM1. 17 | Presentation Name Confidential—For Internal Use Only Training and skill metrics development. 18 | Presentation Name Confidential—For Internal Use Only 9
  • 10.
    9/25/2011 Setup time reductionhelp from setup time team. ∏ Find out the base line ∏ Set the targeted time ∏ SOP from P & C ∏ SMED training for operators ∏ Explain SOP ∏ Implement SOP in local language ∏ Continuously monitor setup time ∏ Watch other site’s setup time 19 | Presentation Name Confidential—For Internal Use Only Action Figures TPM Kick Off Declaration from Top Management TPM Introduction 20 | Presentation Name Confidential—For Internal Use Only 10
  • 11.
    9/25/2011 Action Figures Initial briefing 21 | Presentation Name Confidential—For Internal Use Only Action Figures 22 | Presentation Name Confidential—For Internal Use Only 11
  • 12.
    9/25/2011 Action Figures 23 | Presentation Name Confidential—For Internal Use Only Action Figures Before Dust, Grease & Ink are everywhere which stuck into the m / c parts After 24 | Presentation Name Confidential—For Internal Use Only 12
  • 13.
    9/25/2011 Action Figures Before After 25 | Presentation Name Confidential—For Internal Use Only Action Figures Before After Cleaning is not easy as it sounds 26 | Presentation Name Confidential—For Internal Use Only 13
  • 14.
    9/25/2011 After Cleaning 27 | Presentation Name Confidential—For Internal Use Only Brain storming 28 | Presentation Name Confidential—For Internal Use Only 14
  • 15.
    9/25/2011 Training 29 | Presentation Name Confidential—For Internal Use Only Results Breakdown Time MTBF & MTTR Setup Time Base Line: Unplanned Downtime, Trained operator # mins/week: 5396 Current Condition: TPM trained operators: 0 Unplanned Downtime, Target Condition: MTBF, hr/week: 36.6 mins/week: 2738 Unplanned Downtime, TPM trained operators: 50 MTTR, hr/week: 4.13 mins/week: 4047 MTBF, hr/week: 29.35 Setup Time, mins: 58 TPM trained operators: 100 MTTR, hr/week: 3.1 MTBF, hr/week: 40 Setup Time, mins: 39 MTTR, hr/week: 3.5 Setup Time, mins: 30 30 | Presentation Name Confidential—For Internal Use Only 15
  • 16.
    9/25/2011 Schedule & UnscheduledBreakdown time contrast 31 | Presentation Name Confidential—For Internal Use Only Unscheduled Breakdown time contrast 32 | Presentation Name Confidential—For Internal Use Only 16
  • 17.
    9/25/2011 MTBF (Mean Timebetween Failure) contrast 33 | Presentation Name Confidential—For Internal Use Only MTTR (Mean Time to Repair) contrast 34 | Presentation Name Confidential—For Internal Use Only 17
  • 18.
    9/25/2011 Setup Time :Actual Vs Target 35 | Presentation Name Confidential—For Internal Use Only Fuguai Tags 36 | Presentation Name Confidential—For Internal Use Only 18
  • 19.
    9/25/2011 Further action plans. Initial cleaning schedule for Varimatrics, Die- cut, Guillotine PM 1 for SM 52, MOZ PM 2 for GTO, CD 74 Maintenance checklist training for SM 52, MOZ Spare parts management system 37 | Presentation Name Confidential—For Internal Use Only 38 | Presentation Name Confidential—For Internal Use Only 19
  • 20.
    9/25/2011 © 2011 AveryDennison Corporation. All rights reserved. Avery Dennison and all other Aver y brands, product names and codes are trademarks of Avery Dennison Corporation. All other brands and product names are trademarks of their respective owners. Fortune 500 is a trademark of Time, Inc. Personal and company names and other information on samples depicted are fictitious. Any resemblance to actual names and addresses is purely coincidental. 39 | Presentation Name Confidential—For Internal Use Only 20