Abilitations Hi-Write Wide Ruled
Notebook Paper, 10
1. Step
To get started, you must first create an account on site HelpWriting.net.
The registration process is quick and simple, taking just a few moments.
During this process, you will need to provide a password and a valid email
address.
2. Step
In order to create a "Write My Paper For Me" request, simply complete the
10-minute order form. Provide the necessary instructions, preferred
sources, and deadline. If you want the writer to imitate your writing style,
attach a sample of your previous work.
3. Step
When seeking assignment writing help from HelpWriting.net, our
platform utilizes a bidding system. Review bids from our writers for your
request, choose one of them based on qualifications, order history, and
feedback, then place a deposit to start the assignment writing.
4. Step
After receiving your paper, take a few moments to ensure it meets your
expectations. If you're pleased with the result, authorize payment for the
writer. Don't forget that we provide free revisions for our writing services.
5. Step
When you opt to write an assignment online with us, you can request
multiple revisions to ensure your satisfaction. We stand by our promise to
provide original, high-quality content - if plagiarized, we offer a full
refund. Choose us confidently, knowing that your needs will be fully met.
Abilitations Hi-Write Wide Ruled Notebook Paper, 10 Abilitations Hi-Write Wide Ruled Notebook Paper, 10
Muhammad Ali Biography
Amer Dzankovic Muhammad Ali: More than Just a Boxer
Float like a Butterfly, Sting Like a Bee. Muhammad Ali. Muhammad Ali was born on January 17.
1942, in Louisville Kentucky. Muhammad developed a talent for boxing at a very young age and
continued to strive to become better at it. Not only did he focus on himself and his career, but he
helped out people in need by donating to charities and contributing to poor communities/people and
the United Nations. He continued to battle with parkinson s disease throughout his life and he didn t
let it interfere with his passion towards boxing or living. Ali was a very famous african american
boxer who had who had a determined, talented, and passionate soul.
Muhammad Ali had a determined soul. When ... Show more content on Helpwriting.net ...
Ali never gave up on winning his bouts and championships even in some of the darkest moments of
his life and career. Ali was also very talented. His talent in boxing wasn t revealed until he was 12, and
shortly after he started training he started becoming a star. Lastly, Ali had a passionate soul for people
that needed help living their lives in a safe, healthy, and normal way. He used his fame and money to
contribute to those with health concerns and no roof over their heads. Ali died on June 3, 2016 from
Parkinson s disease. Muhammad Ali was the light at the end of the tunnel for many people around the
globe, and shouldn t only be remembered as a talented boxer but someone everyone should look up
... Get more on HelpWriting.net ...
Subliminal Messages Should Not Be Legal
Subliminal messages
By:
Edianis Seda
Advanced Placement Psychology
Mr. Cuetara
June, 4th 2015 Abstract
Subliminal messages are messages that are perceived in the unconscious mind that most of the time
we are not aware of. These messages are mainly designed to influence that way we think and feel.
They are used to get people to buy products from their company. Subliminal messages can be
perceived auditory or visually. Subliminal messages should not be legal and should be banned from
being used in advertisement for it can lead to negative results. There should be another way to
advertise that. Doesn t involve manipulating our minds into buying the products.
Subliminal messages are messages that are either auditory or visual which is presented below the
normal limits of perception. An example of a subliminal messages would be that a message might be
inaudible to the conscious mind but may be audible to the unconscious mind, in this case a deeper part
of your mind. Subliminal messages may also be in other cases an image that is unperceived but will be
perceived deeper in your mind. To put in simpler terms, subliminal messages are basically hypnotism
that many companies may use to encourage people to buy the product they re selling.
According to the article The Influence of Subliminal Messages , it states that subliminal messages can
influence our attitudes and behavior. Also, under certain circumstances of course, subliminal messages
may or may not have the
... Get more on HelpWriting.net ...
Political Socialization
Chapter 11 public opinion Political Socialization Essay Question Most people are exposed to the same
principals and agents of political socialization. Families spread values that support political authorities
and can heavily contribute to children s initial political ideological views, or party preferences.
Families influence political knowledge and identification depending on variables such as family
demographics, life cycle, parenting style, parental level of political skepticism and frequency of
political discussions. Demographics such as gender and age also attribute to political socialization.
School is another agent of political socialization. Spending numerous years in school, children in the
United States are taught and reinforced a view of the world that their text books tell them to trust.
Through primary, secondary and high schools, students are taught key principles such as individual
rights and property, personal responsibility and duty to their nation. Another is mass media. Mass
media is not only a source of political information; it is an influence on political values and beliefs.
Various media outlets, through news coverage and late night programs, provide different partisan
policy stances that are associated with political participation. Religions, beliefs, and practices play a
role in political opinion formation and political participation. The perspective offered by religious
institutions shape judgement regarding public policy, and political decision
... Get more on HelpWriting.net ...
The Itrust Database
When further analyzing the iTrust database, there was an issue of the lack of credit card information
not being encrypted. The lack of credit cart encryption does not only lead to a major concern for the
company, but also for the client. The risk of exposed PII invalidates any confidentiality for the
company due to the threat posed to client credit card information. Because health care provider is a
credit card merchant since they accept, transmit, or store credit card data, they must adhere to the
Payment Card Industry Security Standards Council (PCI SSC) to protect the customer s confidential
data. One of the requirements is that merchants must encrypt transmission of cardholder data and
sensitive information across public networks. (OWASP, ... Show more content on Helpwriting.net ...
These proposals and systems suggestions can minimize the vulnerabilities associated with any
compromises or intrusions within the network. Deploying an intrusion detection system is an essential
security strategy for monitoring a network information system for abnormal or authorized activity. An
intrusion detection system (IDS) is set of tools which monitor a network topology by providing a
system administrator with the overall picture of how the system is being utilized. Executing an IDS
will make a difference in creating a defense in depth architecture to be more compelling in
recognizing any form of malicious activities. The capacity of the IDS is to monitor and survey the
network traffic without affecting network activity. IDS tools gather information and analyzes it against
a pre characterized manage set, and against a set of known assault marks . The IDS can scan port
numbers and to determine if any breaches or attacks are occurring (Kuipers,
... Get more on HelpWriting.net ...
Realism And The Theory Of Realism
Introduction
The idea of Realism was unofficially was created in fifth century BC by Thucydides, and continued
through Niccolo Machiavelli. This lead to the first official IR theory of realism in Thomas Hobbes,
amd Hans Morgenthau, known as Classical Realist. From there Classical Realism evolved to the ideas
of Kenneth Waltz, which brought along the ideas of neo realism or structural realism theory. Then
came offensive, defensive, and neoclassical realism. Overall the main idea of realism is defined by
internationalrelations.org as when looking at the political system, or more specifically, the
international system, realists focus their ideas about how international relations work based upon the
concepts of power and security. ( Realism ... Show more content on Helpwriting.net ...
This ranges from military presence to business presence. These countries want a piece of Afghanistan
politics. This analysis of Realism will use this situation as an example of why these countries are
involving themselves in Afghanistan, to better understand the theory.
System and Power
A system, from a neorealist point of view is described by Waltz as A system is composed of a structure
and of interacting units. The structure is the system wide component that makes it possible to think of
the system as a whole. Waltz furthermore goes into how to define a structure A structure is defined by
the arrangement of its parts. (Waltz, 1979) Bringing the neorealism theory that looking at politics,
structure is the arrangement of the states, not the collection of them. This leads in to the neorealism
idea that there is no central authority, and the world depends on balance (Sterling Folker, 2013). That
the one thing structure or balance depends on is the states, not NGOs or other actors. From a classical
realism perspective according to Morgenthau s It is a characteristic aspect of all politics, domestic as
well as international, that frequently its basic manifestations do not appear as what they actually are
manifestations of a struggle for power . (Morgenthau, Thompson Clinton, 2010) Morgenthau is saying
that states are power seekers, and strive for dominance which is
... Get more on HelpWriting.net ...
An Epic Hero in Sir Gawain and the Green Knight, a Poem...
Sir Gawain and the Green Knight, a poem by the Pearl Poet, sends an epic hero on a journey to
discover his flaw. In his journey of figuring out his flaw, Sir Gawain encounters a Green Knight that
holds a holly and axe in his hands. On a Christmas dinner, the Green knight rides into King Arthur s
hall proposing a game. Any knight willing to cut off the his head is able to keep the axe, but only if he
agrees to let the Green Knight return the blow at a later time. The Green knight was described as one
who was plantlike and had a giant body structure, leading to the assumption that he was a certain type
of vegetation god. The knight also held a holly in one hand and an axe in another, possibly
representing the necessity of plants to die in the cooler climates in order for them to grow again when
it summer returns. The Green Knight, playing an important role for plant life and crops, is still a
mysterious character. His odd characteristics with his supernatural powers make it evident that the
Green Knight has some connection with crops and vegetation. The Green Knight s physical features
are clearly described in the story. He was described to have green skin and a huge build: greater than
any on earth; from neck to loin so strong and thickly made, and with limbs so long and so great that he
seemed even as a giant... For he was clad all in green This indicates that the knight s sturdy build and
green color is like that of a healthy plant. The knight s long limbs
... Get more on HelpWriting.net ...
AMC Strategic Advantages And Disadvantages
About AMC AMC Theatres is the United States largest movie theatre chain. They serve millions
throughout eight countries, with close to eight thousand screens worldwide. AMC makes efforts to
differentiate themselves from your average movie theatre experience. With the mission statement, We
make smiles happen , the company has continued to better the movie watching experience of its
consumers for decades. AMC s customer base ranges from families with children, to individuals who
are just eager to see a new film. To their customers, they offer a wide range of specials to get them in
the door. If you are first in the door for a brand new film, you could get movie themed collector s
items. Sometimes, AMC offers meal promotions as well. With the early purchase of a ticket, you
could receive concessions for almost half the price. They appeal to their older customers as well by
offering special cocktails based on the movie you have come to see. With the opening of the new It
film, AMC is selling The Pennywise cocktail , to sip on while watching the film. Loyal AMC
customers benefit from the membership system. The more points collected , the more discounts and
deals that customer experiences. AMC also hosts $5 ticket tuesdays for these exclusive members.
Putting the Customer First Over the years , AMC has worked diligently at increasing its customer
value proposition. From the beginning , the company has put its customers, those who enjoy
entertainment and film, first. Their overarching goal of having customers frequent one of their theatres
rather than the competition s has been clearly demonstrated in their efforts. The company has
interesting attributes that bolster their mission to create smiles . AMC was the first movie theatre chain
to include stadium seating, able to fit more customers comfortably. In addition to this, they were the
original theatre chain to incorporate options into their theatres. AMC s founder, Stanley Durwood, is
responsible for kickstarting the multiplex theatre industry. He felt AMC s customers were at a
disadvantage with just one theatre. He began renovating theatres to have several auditoriums, rather
than one major one. When the idea proved to be
... Get more on HelpWriting.net ...
Essay on The Early Renaissance
The Early Renaissance
Today, what is considered to be the modern times began with the Early Renaissance at the start of the
15th century. As time has progressed, things have modified within societies to mold with the new
ways of thinking for that time. Between the years of the 1400 s and the 1800 s this world has
undergone many changes. Focusing on Europe, the major forces of change were in politics,
economics, and religion. In modern European history political effort were supplied by the state. Early
in the 15th century political warfare was the theme of everyday life. It was not until the Peace of Lodi
in 1454 that a balance of power was established and ended the hundred years war. Early in the 16th
century there is a rise ... Show more content on Helpwriting.net ...
Banking was over run by the Germans. Trade in the East came to an end with the fall of
Constantinople. By the end of the 16th century, economics had shifted from the Mediterranean to the
Atlantic with the Spanish discovery of the New World. With this trade shift the worldwide economy
was in the makings. In the 17th century mercantilism is very prominent. Things such as state granted
monopolies, regulated exports and imports, tariffs, custom duties, quotas, slavery, colonial taxes, and
plantation system were in full effect. By the 18th century, a supply and demand economy had
produced. Through mercantilism, state regulations lowered the living standards of workers. The every
day lives that were led in modern Europe where primarily surrounded by religious ideas. In the times
of the 15th century, religion in Europe revolved around the religious beliefs of the Papal Court.
Though there were many religious battles over the Church, few doubted the Church, following its
every demand. By the 16th century, many began to challenge that of the Papal State. People felt that
the beliefs and efforts of the Church had traveled way off track, and was in need of some repair.
Martin Luther began the radical attempt to fix what had gone wrong within the Papal State by posting
his Ninety five Theses upon the door of the Wittenberg University. The outcome of Luther s efforts
supplied Europe with beginnings
... Get more on HelpWriting.net ...
Level One Trauma Nurse
What circumstances or events in your life have led you to choose nursing as a career?
Each blessed day of my journey toward nursing is not a job or an advancement toward a career, it is a
gift of care to be shared from my happy heart with those that need healing. From a very young age I
have been uniquely designed to be a nurse. My journey has been comprised of many nursing qualities
through vast disciplines and experiences. In this short essay, I will briefly share my unique
experiences of how God continues to teach me to be a Level One Trauma Nurse.
For over ten years of my life I dedicated everything I had to competitive cheer. Competition cheer in
Texas is a very serious business which can provide the absolute best scholarships for college. While
going to school full time, our competition team expected us to practice over thirty hours per week in
addition to the high school cheer requirements. This discipline paid off as many of our teams won the
NCA International Competitions. However, the long training hours ... Show more content on
Helpwriting.net ...
I believe God has prepared me to handle fast paced emergency scenarios. In my senior year, while
shadowing in the emergency room, doctors and nurses grabbed me and rush me into the trauma unit
where they had me observe surgery on a man who suffered a gunshot wound to the head. Many would
probably have been grossed out, but I felt a strange embracing moment where I knew God would one
day have me serve. I have also shadowed in other areas where I cared for elderly patients who later
passed away. In those times, I know that God used me to ease their suffering as they felt the genuine
love coming through me. A happy heart is good medicine and a joyful mind causes healing, But a
broken spirit dries up the bones. (Proverbs 17:22 AMP) My heart so desire to help others in medical
needs as well as in spiritual needs. When others allow me to serve them, this gives me great
... Get more on HelpWriting.net ...
Gesellschaft And Organic Solidarity
The social structure that bests fit my community would be organic solidarity, and Gesellschaft.
Organic solidarity is a theory that Emile Durkheim use to help illustrate social structure. He
hypothesized that a society s structure is determined by its division of labor and the task individuals
perform to ensure society will function properly (Lesson5, Video). To me organic solidarity is defined
as a big, diverse society with people of different personalities, cultural backgrounds, and values
coexist. Valdosta displays the elements of organic solidarity in many ways. Gesellschaft is very similar
to organic solidarity it is a theory that was composed by Ferdinand Tonnies. Tonnies theorized that
social structure is driven by a community s size and willingness to change (Lesson 5, Video). In my
own word Tonnies theory means that a society structure directly correlates with the size of the
community and the effort that those put into show. The social structure of Valdosta is displayed
through the theories of organic solidarity and Gesellschaft directly. The characteristics that serves as
example are ... Show more content on Helpwriting.net ...
Many of the people that reside in Valdosta are here for either the University or Moody Airforce Base.
People that commute here for school chose a major that interest themselves then obtain a four year
degree that promotes their self knowledge in the area of their choosing. Most students serve an
internship in the community of their schooling and this is putting that knowledge back into the
community and helping its social structure. Internships range from Doctors, Nurses, Lawyers, Future
educators, and more. Those residents that are here for Moody Airforce base are station here after being
job trained and promoting self interest in their field. These positions rage from Pharmacist, physician
assistant, airplane craftsman, chemical scientist, and
... Get more on HelpWriting.net ...
The Devil In The White City Critical Analysis
Two stories focusing on horrific murder share more than just that similarity. The Devil in the White
City is a novel by Erik Larson that focuses on America s first serial killer, Herman Webster Mudgett,
most commonly known as H. H. Holmes. It alternates telling of the construction of the Chicago World
Fair contrasting with the horrendous murders of the man that essentially invented the term psychopath.
On the other hand, The Hound of Baskervilles by Sir Arthur Conan Doyle focuses on the tale of
Sherlock Holmes and John Watson as they try to solve the mystery surrounding the death of Charles
Baskerville. These themes are linked through murder and the British surname Holmes, an alias taken
from Doyle s stories to claim to have land in England.
... Get more on HelpWriting.net ...
Htc
INTRODUCTION
HTC Corporation, formerly High Tech Computer Corporation, is a Taiwan based manufacturer of
smartphones founded in 1997. The company initially made smartphones based primarily on Microsoft
s Windows Mobile software, but in 2009 it began to shift its focus away from Windows Mobile
devices to devices based on the Android operating system.
HTC is also a member of the Open Handset Alliance, a group of handset manufacturers and mobile
network operators dedicated to the advancement of the Android mobile device platform.The HTC
Dream, marketed by T Mobile in many countries as the T Mobile G1, was the first phone to the
market that uses the Android mobile device platform.
HISTORY
Although initially the company made notebook ... Show more content on Helpwriting.net ...
They released the worlds first 4G phone,the Evo 4G.The phone is one of the most powerful phone in
the world today and its planning to capture the market by being ready for 4G out of the box.
Long term plans:
Women who want to surf while watching the telly in their living room are a prime market for tablets
according to HTC.
Market research conducted by the smartphone manufacturer found that likely users of the expensive
drink trays were women who wanted to communicate with friends with a tablet on their lap while
watching their favourite television programmes.
HTC views Microsoft as a strategic partner and Windows Phone 7 as a promising smart phone
operating system platform; and we plan to rollout our first Windows Phone 7 based smart phone
before the end of year, a statement by HTC reads.
We are talking about three form factors at this stage. There s going to be one available at launch,
which is big touch screen, gigahertz processor, dedicated graphics chip. And only touch, no keyboard
entry. Chassis two is going to be slide with a keyboard, so looking more like the Palm Treo, touch
screen plus a QWERTY keyboard. Chassis three, I don t think we ve released any data as about yet but
they re the three in total we re going to
... Get more on HelpWriting.net ...
Cathy Freeman Biography
Cathy Freeman has an Olympic s dream when she was young. During the 400 meters Olympic games
in Sydney, she won the gold medal. She became the first Aboriginal Australian athlete to win the
individual game. Cathy is an Aussie Indigenous hero. Cathy was born in 1973 in Slade Point in
Queensland. Cathy has start training as an athlete when she was 2 by her stepfather Bruce Barber. He
is the person that who took an interest in her athletics and became her first coach. And started
couching her for 100m, 200m, long jump and high jump games. In 1987, Cathy moved to the school
called Kooralbyn International School. At there she met her first professional coach called Mike
Danila. He is the first who bring Cathy in the Commonwealth Games Trials in Sydney. Because of the
chance that Mike Danila gave, Cathy has joined Australia commonwealth game in 1990 in Auckland,
and won the first place. That makes her became the first Aboriginal Australian and the youngest
athlete to win at the age of 16 years old. Cathy took her victory lap with the Aboriginal flag ... Show
more content on Helpwriting.net ...
She became the second Australian Aboriginal won the Olympic champion. She did the victory lap
again with both Aboriginal and Australian flags. She said, I just wanted to show I am proud of who I
am and where I come from. Cathy moved a Nation and the Nation moved her. She said, I didn t
become an Olympic champion and if anything except just because I knew I was good at it then I loved
and I hated losing but nobody prepares for what is the life like on the other side of once you get to that
pinnacle. She thought the people might do something that is meaningful. She wanted to do use that
what she had achieved, learned and suppose who she had become to do something worth doing.
Freeman s influence in the indigenous community especially to motivate the next generation of
... Get more on HelpWriting.net ...
Value Of Gold In Beowulf
In the Medieval Ages, wealth and jewels were not just a material one would use to buy lavish things or
to wear to show an importance in status. Armor, weapons, jewels, coins and wealthy treasures
possessed significant value within the warrior realms of duty, protection, heroism, loyalty and
accomplishment. Gold can also symbolize a King s royalty, relationships and fame. Modern day
archeological evidence proves this importance of metal and treasure through the uncovered Sutton
Hoo Anglo Saxon burial treasure hoard. The significance to Sutton Hoo shows clear evidence that at
this time, society thought of gold as a symbol for Pagan beliefs into the afterlife and as precious and
delicate. In Beowulf, the reader can clearly identify this value of wealth. The reader understands that
the power of wealth possessed by King Hrothgar is something that is given to only his best warriors.
In the beginning, Beowulf shows evidence that he fights for fame and reputation to receive gold and
boasts to improve his reputation. At the end of the poem, King Beowulf fights for the heroic code to
preserve peace and stability within the Geats society. However, King Beowulf s main duty is to be just
and protect his ... Show more content on Helpwriting.net ...
A lot of the pieces found within the ships such as swords and helmets match what is written in the
descriptions in Beowulf, from the ringed metal of the protective mail shirts to the boar imagery over
the brows and crests of mask like battle helmets (Walsh 102). Both Sutton Hoo and Beowulf show that
ship burials were a traditional way to bury, so that warriors... [Could] continue their journey into the
next world (Walsh 103). The discovered Sutton Hoo treasures authenticates my argument of the
significance of gold as a material object and abstract object that warriors performed for to improve
their reputation in the Medieval
... Get more on HelpWriting.net ...
Luis Valdez s Play, Los Vendidos Essay
In his play, Los Vendidos, Luis Valdez addresses, through humor and stereotypes, the issues faced by
Mexicans in America throughout history. Although a White Washed Mexican woman is supposedly
looking for a Mexican, what she is actually looking for is an American with darker skin. The key word
here is American, as she is looking for someone who has denied his or her Mexican roots and become
acculturated to the American way of life. This woman does not want a Mexican for any other reason
than the fact that he is Mexican, and she has no respect for his heritage.
The scene opens as a woman who works for the government walks into a shop that sells Mexicans.
She is looking for a Mexican for their administration. In the prologue of the ... Show more content on
Helpwriting.net ...
Vicki Ruiz explored the acculturation of young Mexican American women, which was similar to that
of young men, in the 1920s and 1930s and states that it ...reveals the blending of the old and the new,
fashioning new expectations, making choices, and learning to live with those choices (Vargas 271). It
is true that they were Mexican Americans, but many did not have strong ties to their native countries,
as a document by Raúl Morín states, The so called Spanish were in many instances accused of being
ashamed of the term Mexican. Being native born and raised Americans, they never felt any sentiment
for Mexico....they had never lived there....(Vargas 305). Although this quote refers to those who fought
in World War II, it was during the same time period that the Zoot Suit Riots were occurring. If they did
have strong ties to their native country, then they were often looked down upon, because there was
sentiment that if they were going to live in America, then they should act American. Merton Hill gives
a definition of what Americanization is when he states .... The securing through instruction such
reactions on the part of non Americans that they will accept and practice those ideals, customs,
methods of
... Get more on HelpWriting.net ...
Essay on the significance of the lemon law act
It happens many times. A person finds the car of their dreams. They drive it around for a few weeks
when it happens. The car will not start, it makes a funny noise, or the breaks just will not do anything
while stepping onto the pedal. Does the person have to pay for the repairs all by themselves? And if
so, what happens when the exact same problem happens more than 3 times? It is just not fair to pay all
this money on your brand new affordable car. But, one should not worry. There is a solution to all
these annoying questions one just does not know how to answer. This is how the Magnuson Moss
warranty act comes into this situation. The lemon law is a subdivision of this act. The Magnuson Moss
warranty act, when tied with the lemon ... Show more content on Helpwriting.net ...
It involves more serious things, which can not be repaired within 3 repairs. Autopedia explained that
for any serious safety defect, such as brakes or steering, the manufacturer has one attempt. If it is a
safety but not serious, they have 2 attempts. And for any other defect, they usually receive 3 or 4
chances to repair. The repairs may not be a result of abuse, neglect or unauthorized modifications or
alterations. The cases must be given to the manufacturer, and they must have responded to your
complaint and rendered a decision within 40 days. The terms apply within the express warranty or the
first year of ownership from date of delivery, which ever comes first. Another way also is within the
first 12 24 months or 24,000 miles. If miles have been put on, the manufacturer may decide to use
reduction. In order to do this, they use the following equation:
Miles at time of refund x the purchase price
100,000
This equation was found on both the Cartalk and the Autopedia sites. Another point that a consumer
may argue, is about the miles put on in between the repairs. However, the majority of times, it does
not work. In events of strike, war or natural disaster that prevent repairs, lemon laws will not help a
person with any car
... Get more on HelpWriting.net ...
The Transition From Drilling On Shore
Overview This project is dealing with the transition from drilling on shore to more difficult tasks that
companies are taking upon them with drilling off shore into shallow and deep water. Since drilling for
easy oil has depleted, companies are pursuing sources for the heavy oil by moving to offshore drilling.
The project was originally approved in 2014, but since the approval of the project oil prices have
plunged more than 50% percent in 2015. XYZ s Houston refinery is located on the Texas Gulf Coast
and has a capacity of 200,000 bpd. It is capable of processing mix of light and heavy crudes. The
company for years has been considering an expansion project for the Houston based refinery, which
can provide the company with an advantage due to the favorable heavy crude prices and light oil from
the Middle East. The expansion would be beneficial because bringing the heavy oil from Mexico and
Venezuela have both low shipping cost and lesser travel distance to the refinery. The expansion project
would also benefit from the Trans Canadian pipeline when it s completed which would bring heavy oil
from the Oil Sands in Canada. Objective The Houston Refinery s current configuration refines light
crudes with some capacity to refine heavy crude oil. With the proposed expansion the objective is to
increase the capacity for the heavier crude oil at the refinery, the heavy crude oil would be brought in
by tankers from Mexico and off loaded at the refinery docks and piped into the
... Get more on HelpWriting.net ...
Themes In The 5th Wave By Rick Yancey
The 5th Wave, a young adult, science fiction novel by Rick Yancey, can be used to teach many themes
to its readers. Some of these themes include, people are defined by the choices they make, family is
worth dying for, and survival depends on being dedicated to others, not yourself. The characters can
teach us a lot by their experiences and Rick Yancey most likely did this on purpose. There are many
examples in the text to support these recurring themes. To start with, we will examine the theme,
people are defined by the choices they make. One of the greatest examples for supporting this theme
in The 5th Wave, is the character, Evan Walker. He is half human and half alien. However, he
abandons the aliens and chooses to be human. In this case, being human just means siding with them,
especially since there are few left. Evan made choices to be human many times. In the first place, he
didn t kill Cassie on the highway. He describes it like he couldn t. Therefore, he showed feelings of
guilt, love, pity, and other human emotions. This was his initial act of starting to side with mankind.
He even saves her when she s dying in the snow bank, taking her in and nursing her back to health.
Later on in the book, he gives up his house to burn it as a distraction. Once they continue on their
journey, he protects her from soldiers that the aliens are training. Which means, he killed his own in
order to keep Cassie safe. Eventually, he even breaks into the alien s main base,
... Get more on HelpWriting.net ...
John Steinbeck s The Hollow Men
In The Hollow Men, the poem creates the story of individuals that are empty while residing in an
alternate world that portrays itself as dark and can represent the emptiness of the stuffed men. They
are indeed stuffed but it may not be in straw as customary, maybe in regrets and sins since this poem
alludes more than once to bible like stories or bits and pieces. The darker world they live in may be
the purgatory of unhappiness since they did nothing but bad and did not repent. Which brings up the
topic if they were just a poem fantasy or if The Hollow Men are a warning and bring out a hidden
meaning of repent and the need for this redemption by the celestial beings that have the authority to
forgive. Since they too have a tragic flaw of selfishness, ... Show more content on Helpwriting.net ...
Through literary works, writers allow for diverse endings or alternate endings to realistic events or just
any event shows through creations of their imaginations and subconscious thoughts that possibly end
up creating actual change in the world. The cycle between literature and society endlessly continues in
a way since the outcome of a decision to go into a bigger picture that can not decide by one but many
minor decisions and one being the decision to take on something greater than themselves, although
most of the time the first thought avoids what seems calculates impossibly for just one person and
deny the opportunity of a
... Get more on HelpWriting.net ...
UK s Main Electoral System and Should It Be Reformed Essay...
UK s Main Electoral System and Should It Be Reformed
Over the years Britain s pluralist electoral system has been scrutinised by many political and pressure
groups, such as the Liberal Democrats and the Electoral Reform Society. In their 1997 Manifesto, the
Labour Party did state that they would look into the matter, by holding a referendum on the issue,
however there was no change as Labour had a large majority in 1997 and Labour has preformed
disappointingly in elections where Proportional Representation had been used. The main electoral
system in the UK should be reformed because the first past the post system does not represent the
electorate in a democratic manner. It also under represents ... Show more content on Helpwriting.net ...
The system is also disproportionate, an example of this is can be shown in a study of the 2001 General
Election.
From the 2001 General Election results, we can deliberately see that through our pluralist electoral
system, the system is disproportionate. We can see many examples of this]. The percentage of votes to
the percentage of seats is unequal, showing how its seats not votes that count, and judging by labour s
landslide victory. In fact, we can see that Labour did not even gain a majority from voters but only
from seats. Another example is the Liberal Democrats; they received 18.3% of the electorate s votes,
but only received less than half the percentage of seats at 7.9%. Labour also received a mere 9% more
votes than the Conservatives, but yet still managed to acquire around 247 more seats. This also shows
that some parties, especially Labour in the 2001 elections, are over represented and this can lead
eventually lead to a dangerous one party system , which certainly undermines our ideology of a
Democracy. On average 70% of votes are also wasted during a single election. We find that 100.0% of
votes are accounted for, only 40.7% actually counted, therefore, votes a drastically wasted.
Other arguments to demonstrate how the
... Get more on HelpWriting.net ...
Inherited Genetic Variations
Inherited genetic variations may result from new genetic combinations through meiosis,
nondisjunction errors occurring during cell division and through mutations in the DNA of egg and
sperm cells.
Meiosis is a cell division that results in four daughter cells. The daughter cells have half the number of
chromosomes of the parent cells.In meiosis the Law of Independent Assortment states that the alleles
of one gene sort in gametes independently of the alleles of another gene. Meiosis increases inherited
genetic variation because during meiosis, homologous chromosomes each from one pair of parents.
The parents chromosomes cross over and and trade some genes when they break apart. This
recombination of forming together then breaking apart and
... Get more on HelpWriting.net ...
Car Roll Over Collision Report
Friday, August 19, 2016 at 20:40 I was dispatched to a call of a one car roll over collision. The
collision was near Cook Ave on Elmira St. JeffCom said that the three occupants had self extracted
and were not injured. I arrived on scene and found the road blocked by a rolled over vehicle blue in
color. The vehicle had the roof crushed on the driver s side all the way to the bottom of the window,
and the roadway was littered with things from the car s interior. I contacted the two males first and the
shorter of the two had visible injuries to his face and left arm. He was identified as Kale A.
GONZALEZ. The male next to him was identified MARTIN, Travis B. of Port Townsend. He said the
car belonged to him. The female was identified as Kiera ... Show more content on Helpwriting.net ...
There was also a plastic five gallon gas can in the vehicle. I mention this because the driver put
himself and the passenger s lives in extreme danger of being seriously injured or killed by the glass,
and gasoline. The danger of an explosion from the gasoline in a confined space I requested a AAA tow
at the owners request, and gave the AAA number as requested by JeffCom. Officer Dumond took
pictures of the scene, and notified the father (Matthew J. Sholty 1 22 1980) of Sholty that she had been
in an accident and was going home with an adult friend. The Port Townsend City Street Department
had to send the on call operator to the scene and then required a front loader to remove the car and roll
it over as well as to cut the tree up and remove it from the road way. The driver of the vehicle was not
able to show me proof of insurance, and the passenger Travis (who owned the car) said he did not
have proof of insurance for the car. In fact he said he had not even registered or transferred the title of
the car yet (he said he has owned it for two
... Get more on HelpWriting.net ...
The Long Walk Home By Forrest Gump
Compare and Contrast Now a days for some people to learn and completely understand history they
can watch movies and documentaries on whichever subject they need help with or on. Over the past
few weeks I have watched the following movies: Forrest Gump, The Long Walk Home, The Help, and
A League of Their Own. Forrest Gump is about a disabled boy who grows up and goes into the
Vietnam War and eventually owns a shrimp company. The Long Walk Home and The Help are movies
based off of equality of race by exemplifying for the viewers what life was like for colored people.
The Help specifically is about a lady who became interested in sharing the stories of maids. The Long
Walk Home is specifically about colored people fighting for their rights and to be treated equally and
fairly. A League of their Own is about women across the United States playing baseball while still
being treated like a lady. All the movies have similarities and differences. While taking notes I
compared and contrasted the movies by focusing on the government and lifestyle during the movies.
Government: The government and government issues in the movies is rather similar. To start off, In
Forrest Gump a quote that Forrest s mom states and in my opinion is like the government itself, Life is
like a box of chocolates, you never know what you re going to get. The war the United States is in is
the Vietnam War where platoons were taken out in the blink of an eye. Vietnam would have Jets
would fly over the
... Get more on HelpWriting.net ...
St. Basil s Cathedral Essay
Knudsen 1 St. Basil s Cathedral As legend has it, the builders of St. Basil s Cathedral were blinded by
the command of Ivan the Terrible, so they could never create a building greater. There is still the
question if St. Basil s is actually the most beautiful cathedral made in its time. Comparing it to the
beautiful Pisa Cathedral and Assumption Cathedral, which were made around the same time, one
could find it hard to decide which is the most artistic. Looking at the materials, art, and icons of
cathedrals are ways to gauge how beautiful the building is. St. Basil s Cathedral was the most
beautiful cathedral made in its time. Some words that would be helpful to know as these churches are
being described, which will be quoted ... Show more content on Helpwriting.net ...
The outside is made of white stone blocks. Inside the cathedral the masonry is filled with pieces of
rough stone used in the walls to fill the cavities. The pillars, drums, and the alter wall are made out of
brick. There are large paintings on the pillars stretching from the ground to the bottom of the domes.
Assumption Cathedral is famous for its murals. The walls are painted in extremely fine detail, and on
the top of the walls there are images of God. On the middle of the Knudsen 4 walls, there are paintings
of the Life of the Virgin. On the bottom of the walls there are images of the seven ecumenical
councils. The song The Last Judgement is painted on the west wall. Numerous figures of martyrs are
painted on the pillars, and there are also many icons. There used to be an icon of Our Lady of
Vladimir, but later on the icon was moved to St. Basil s Cathedral so it wouldn t be stolen because it
was so expensive. There are icons of the Virgin Hodegetria, Saint George, Trinity. There is a large
iconostasis, which is a screen bearing icon that separates the sanctuary from the nave, that occupies
the whole wide wall of the cathedral. One of Russia s most famous monuments is St. Basil s Cathedral
located in Red Square. It is said that the cathedral is located where another church with a cemetery
stood. That cemetery is said to be the cemetery in which the
... Get more on HelpWriting.net ...
The Case Of Arizona Vs. United States
Brief for Respondent: In the case, Arizona versus United States, I am representing the respondent,
United States, where we are seeking to stop the enforcement of S.B. 1070 in the federal district court
before the law can be taken into effect. S.B. 1070, also known as Support Our Law Enforcement and
Safe Neighborhoods Act, was passed in the state of Arizona in 2010 as an effort to address the large
numbers of unlawful immigrants entering the state. The United States seeks to declare S.B. 1070 as
preempted by the federal immigration law, where the four provisions of S.B. 1070, Section 3, Section
5, Section 6 and Section 2(B) violated the Supremacy Clause of the United States Constitution.
Relevant Constitutional Provision: In our defense, we will be utilizing Article 1, Section 8, clause 4 of
the United States Constitution which establishes a uniform rule of Naturalization. It states that only
Congress has the exclusive authority control over immigration and establishing new regulations that
would allow individuals to become naturalized citizens of the United States of America and not the
states. Section 9, clause 2 will also come into play in relation to Section 6 of S.B. 1070, in which the
privilege of the Writ of Habeas Corpus cannot not be suspended. It solidifies the notion that an
individual cannot be incarcerated without facing legitimate charges indefinite imprisonment is not
allowed without legal due process.
The Equal Protection Clause, which is part of the
... Get more on HelpWriting.net ...
Richard Rainsford In The Most Dangerous Game By Richard...
In the short story, The Most Dangerous Game by Richard Connell Rainsford has to prove he still has a
sense of humanity when he encounters The evil general Zaroff. Dwight Lyman once said, Character is
what you are in the dark. which is excellent quote to compare this story too. In the beginning of the
story Rainsford has his eye set out on the mysterious and ominous island which all sailors were afraid
to go too. The sailors claimed there was a beast on the island which was not afraid of any man, but
Rainsford without flinching left to this notorious island. Rainsfords actions show his bravery while all
other men are afraid. Upon arrival he walks through the forest with the noises of many animals
echoing throughout. Suddenly, he
... Get more on HelpWriting.net ...
How Does Jay Gatsby Change
It all started as a young son of farmers felt in love with a beautiful rich woman by the name of daisy.
The young man left to follow his dream of becoming wealthy and hopefully come back and win daisy
s love. The great gatsby explores a big theme on change. The character originated the name James
gatz later on to changed to jay gatsby. James gatz young life was not really the best, his parents were
farmers. He was not happy with them, as a young man gatz stranged away from his parents now
having even less than before. As the time passed he wanted to be away from all his early years.
Changing his name from james gatz to become jay gatsby as his life became much more different
from the past years. Jay gatsby was dreaming big but the money was
... Get more on HelpWriting.net ...
Role of Nature and Nurture in Language Development
How do both nature and nurture interact in the promotion of language development in young children?
The debate between many researchers is the argument of whether nature or nurture play a more
important role in development. In this essay I will be looking into both aspects of nature and nurture
focusing specifically on their influence towards language development in children. A main
controversial question I will be looking into is the question of whether are we born already equipped
with mechanisms which help us to learn language, or is language learned throughout a child s
environment by, for example, imitation and repetition? Studies done by some opposing researchers
claim to show that nature and nurture promote language development ... Show more content on
Helpwriting.net ...
Although Jim did learn speech it became noticeably odd to others around him as he had developed his
own, unique grammatical characteristics and his poor articulation meant he didn t acquire normal
language skills (Sachs et al 1981). Bruner suggests that this was due to lack of social interaction in his
learning of speech, which again highlights the importance of nurture in promoting a child s language
development.
However, it can be argued with (Bruner 1964) that social interaction doesn t explain all the
complexities of language acquisition. Almost every day the language we hear is often incorrect, poorly
defined, incomplete and full of hesitations, mispronunciations and other errors, and yet despite this we
still learn to talk following the correct grammatical rules. Again this indicates the idea of Chomsky s
(1968) LAD model that children are born hard wired with the innate knowledge of linguistic rules and
so these rules help the baby make estimations and presumptions about the language it is hearing. From
these estimations and presumption the child can work out grammatical sets of rules and when more
language is exposed to them, the more their language develops. Even within Chomsky s (1968) LAD
theory, undoubtedly he believed the role and promotion of the nature aspect is the core foundation on
which language can develop. But his theory also requires the role of nurture
... Get more on HelpWriting.net ...
Looking at Skyy s Vodka Advetisement
When looking at Skyy s vodka advertisement, they had encoded many types of meanings in their
advertisement to appeal customers into buying their products. You first see a woman dressed up all in
black holding a martini shaker while a man is sitting in a round chair holding a martini glass. You can
only see the man s hand and legs which creates a mysterious look with the combination of the setting
being night time. The second thing you would see is the actual product in the corner of the ad because
of the contrast of the dark bottle and the white table and chair. The white man sitting in the big round
chair without his face reduces the attention of him which brings more attention towards the woman.
The man without the face could represent that you could be the person who is sitting there and be
treated like a king by the women serving you vodka in a seductive way. This would bring attention to
male customers who are looking at the ad and they can decode the message of buying this vodka
would get you a sexy woman serving you in a luxurious suite alone. The attractive woman is the core
concept to appeal to customers by the placement and size being almost the whole print ad. The
lighting towards the women enhances the woman s curves, breasts and a smooth silky skin. The
position of the woman shows a seductive approach to the man by how she is very close holding a
margarita shaker even though his martini glass is full. The position of the woman with the woman s
gesture towards
... Get more on HelpWriting.net ...
Essay on Gender in The Crime Drama Fiction Genre
According to John Fiske, Television as a culture is a crucial part of the social dynamics. Indeed any
television genre is based on apparent similarities, differences and on expectations as well as
assumptions shared by the viewers. It is also a cross cultural translatability as it is understood in a
diversity of contexts and markets. According to Graeme Burton (2000), the genre study leads to
understanding of audience pleasures and revelation of cultural myths. Also an understanding of
finance and marketing within television and finally an understanding of intertextuality and
postmodernist forms of television. However audiences are aware of the codes and conventions that
distinguish one genre product from the next. Genre has to be what ... Show more content on
Helpwriting.net ...
Charlieʼs Angels was according to Anna Gough Yates (2001) a representation of femininity to the
cultural dialogue surrounding feminism in the US during the 1970s . The three main protagonists in
the series were private detectives called Jill Munroe, Sabrina Duncan and Kelly Garrett. They all
worked for their mysterious boss Charlie that we never see and were helped by Charlieʼs sidekick
Bosley. Each of the characters brought something different to the series. For example, Jill Munroe
played by Farrah Fawcett was the glamorous and sexy one; however her easy going charm and her
lively personality helped the angels on several investigations. Then there was Sabrina Duncan who
was the smartest of the angels. She was always thinking about solutions and her strategic and
calculated mind was a key ingredient to the success of their missions. Finally the last angel was Kelly
Garrett who was had a mix of both good looks and intelligence. The three angels showed us how they
can be confident and sexy by using many clothes and makeup to disguise themselves and fool the
male criminals. According to Anna Cough Yates (2001) Within the world of Charlieʼs Angels [...]
women could be empowered through immersing themselves in the world of consumerism commodity
consumption allowing for a performance of femininity that could deceive and evade the exercise of
dominant pattern of gender relations. This also
... Get more on HelpWriting.net ...
Advantages And Disadvantages Of Electronic Survey
In this part I will go through the questionnaire layout and construction. Then I will define the
electronic survey and its advantages and disadvantages.
In fact, there is no strong theoretical base for questionnaire design. All researchers have their own way
born out from their experience and other previous researchers experience. Moreover, Questionnaire
design is more of an art than science (Oberski, 2015, p. 1).
The questionnaire is defined as a document containing serious of questions and other types of items
designed to solicit information appropriate to analysis (Babbie, 1990, p. 377). In our daily work we
used the questionnaire as a tool for collecting information to justify and explain cases, knowledge, and
behaviors on target group. Questionnaire design is very crucial and important part of the research
because inappropriate questionnaire will misleads the research result. Indeed, we used questionnaire in
our daily life to satisfy our queries in in another format. For example, we ask questions in different
events like when we want to pay something. The use of questionnaire in research is somehow similar
to that in our daily life. It constructed to collect information or answers related to the research issue for
... Show more content on Helpwriting.net ...
The online survey is the cheapest survey method. No need to pay for printing questionnaire, no cost
for developing the questionnaire and telephone interviews. Also, no cost of additional workers to
collect and analyze data. The time needed for completing the online survey is on average two thirds
shorter than that of traditional research methods as the information gathered automatically (smith et al.
1986). Also. It is quicky and easy to analyse like google Drive. You can develop your survey and the
data will analyzed automatocly. Electronic survey easy to use for researchers, participants and also to
style as you
... Get more on HelpWriting.net ...
The Defining Decade
The Defining Decade was one of the most unique and informative books I have ever read. Using this
book in relation to my life, I have gained a lot of acumen on how there are a lot of advantages in your
twenties and if you do not take advantage of them now, there will be consequences in the future. One
point that made a lasting impression on me was the topic on weak ties. Meg Jay says, Weak ties feel
too different or in some cases, literally too far away to be close friends. But thats the point. Because
they re not just figures in an already ingrown cluster, weak ties gives us access to something fresh.
They know things and people that we don t know. (21) This is a very accurate statement because
networking leads to opportunities that cannot be seen unless you act and take advantage of it. Perhaps
the single best thing we can do to make our own luck in our twenties is to say yes to our weak ties or
give them a reason to say yes to us. (31) Most people stay in their ... Show more content on
Helpwriting.net ...
However, I will not use this book to help me with my love life because there are cultural differences
when it comes to love and marriage in my religion. This book has also taught me that many people
will have an opinion on how I should live my life. However finding myself and making my own
decisions is how I choose to grow as a man. Jay has stated helpful career tips and intelligent points
regarding time. The choices we make in our twenties affect us for the rest of our lives. You have to
start somewhere and experience is what will count in the long run. One new aspect I have learned is to
never procrastinate or hold back. Meg Jays continues to remind us that it is always beneficiary to take
the first step. Never let fear or doubt hold you back. I agree with what Meg Jay has to say because I
was always doubtful and anxious about my future. After reading The Defining Decade, I feel I have
effectively learned how to cope with
... Get more on HelpWriting.net ...
The Impact Of Contemporary Uk On New Zealand Essay
The increase in globalization has enabled a plethora of means in which organizations can access more
talent and new technology that have become available. Due to this phenomenon, businesses have
required to become more creative and embrace change as an essential method of staying competitive
in their marketplace. The increase in ethnic group migration to New Zealand and the concept of
managing this diverse range of culture and interacting with individuals with different cultures, belief
systems is a current issue that impacts contemporary organisations in New Zealand. According to
Sayers (2012), countries throughout history have different yet related ways to deal with inequality and
discrimination issues that occur through diverse people existing in close proximity. From social
movements focusing on womens rights, civil rights, anti slavery and indigenous rights, to modern
diversity such as disability activism and managing diversity in the workplace, it is apparent that this
issue of managing diversity is an ongoing encounter. Looking at the 2013 Census published by
Statistics New Zealand (2013), we can see a substantial increase in ethnic groups in New Zealand
since the 2006 Census. There is a 14% increase in European ethnicities, 6% increase in Maori, 11%
increase in Pacific peoples, 33% increase in Asians, and 35% increase in Middle Eastern, Latin
American, and African ethnicities since 2006. Sayers (2012) states that demographic change is the
main reason organizations
... Get more on HelpWriting.net ...
The Rosetta Mission
Billions of years ago, a comet roughly 15 kilometers in size collided with the Earth. The collision
resulted in the extinction of ninety percent of the species on earth, including the dinosaurs. For many
years scientist have been working to solve the age old question, how did life originate on Earth? Many
have come up with hypotheses ranging from evolution to extraterrestrial beings. However new
evidence has come into light that the same comet that destroyed the dinosaurs could have been the
starting point for our creation. In September, Dr. Haruna Sugahara and Dr. Koichi Mimura presented
their findings at the Goldschmidt Geochemistry Conference, held in Prague. They had performed a
number of experiments, where they tried to recreate the conditions of the Earth after impact with the
comet. To do this they used a mixture of chemicals containing water, silicate, and amino acids. They
then shot the frozen mixture out of a gun and observed the fall out. When they were observing the
aftermath, they noticed that some of the amino acids has bonded and formed peptides. Peptides are
known to be some of the basic building blocks of life. They are used in our bodies every day when
creating ... Show more content on Helpwriting.net ...
Some of which are the NASA Stardust Mission and the Rosetta Mission. The Rosetta mission, along
with its probe Philae, was launched in 2004, and after 10 years it landed on the comet 67P/Churyumov
Gerasimenko. During touchdown, Philae survived a double bounce landing. It then proceeded to
collect and analyzed dozens of samples from the comet s surface. But this data was almost lost when
Philae s primary battery died, and it was unable to recharge, due to its position on the shaded side of
the comet. However, when the comet got closer to the Sun, it was able to recharge and it sent a signal
on June 13th, along with the data it had contained, before losing signal once
... Get more on HelpWriting.net ...
Realism In Umberto D
The Italian Neo realist film Umberto D directed by Vittorio De Sica follows the life of elderly
Umberto Domenico Ferrari, a pensioner struggling to get by after pensions have been reduced post
World War II. In the aftermath of major tragedy and suffering, such as the war that Umberto lived
through, hope can be hard to find. Society is a web of dependence. Individuals rely on the government
to provide a support structure of benefits and protection. Individuals count on each other for love and
validation. When one strand of the web collapses, disaster can result. In this case, the government let
Umberto down by not providing his pension. His life tilts on the edge, but the dependence of his dog
brings it back into balance. Umberto D shows how ... Show more content on Helpwriting.net ...
At certain points throughout the movie, he tries to step in as a father figure for her. He asks her if she
has done her grammar assignment. When she responds no he replies, Everyone takes advantage of the
ignorant. Umberto also promises to talk to the two soldiers who one of which she suspects may be the
father to get them to them to take responsibility. Maria does return the relationship, she trusts him
enough that he is the only one she tells that she is pregnant and does not know who the father is and
she agrees to watch Flike while he is in the hospital, however; when one of the nuns at the hospital
asks Umberto is Maria is his daughter he jokingly responds yes but she is quick to say no. She leaves
soon after. Isolation brings these two together but their relationship doesn t go much deeper than that
and Maria has too many of her own issues to fully be there for Umberto. The only constant presence
in Umberto s life is his dog
... Get more on HelpWriting.net ...
The Tories Research Paper
The Tories were compiled disgruntled young Irishmen whose ancient hatred for the English coupled
with the spectacle of defeat, despair and degradation was sufficient reason to continue resistance .
They were led by dispossessed noblemen and Irish officers. They mostly attacked livestock but were
not against killing an Englishman once in a while. The English s punishment for Tories was strict and
after a band of Tories killed two Protestants in Lackagh, 4 Irishmen were hanged for not preventing
the murder and others, including 2 priests and an 80 year old woman were sent to Barbados. Since the
Irish usually just took livestock though, the English would just tax the town closest to where the
livestock was taken. Frequently, the town could not pay this and this would cause the government to
tax the surrounding areas. This in turn would cause many more men to become Tories due the
economic strife being inflicted on them by the English. It got so bad in some areas that Catholic
swordsmen were allowed to stay in some ... Show more content on Helpwriting.net ...
When the Adventurers arrived on their lands, they often found the former Irish owners still living on
it. Little sympathy was found amongst the English military officers due to their newfound economic
rivalry and the affection that some of the officers had gained through their exposure to the Irish for
almost a decade . The Adventures, who were made up of mostly London merchant, had all the Anti
Catholic prejudices that were all too common at the time of their arrival . But little to nothing was
actually done to rid the area of the Irish who were doing labor. The Adventures also made up only a
small group that had little influence over policies in Ireland at the time. Shortly after the Adventurers
arrival though, the Cromwellian Settlement would begin its unraveling that would lead to the
Restoration of King Charles II in
... Get more on HelpWriting.net ...
Nt1330 Lab 3.1
Fig. 3.1 Fingerprint scanning
Minutia points represent positions where friction ridges end abruptly or where a ridge branches into
two or many more ridges. A typical good quality fingerprint template contains 20 70 minutiae points;
the actual number depends on the size of the finger sensor surface and how the user places his or her
finger on the sensor. The system stores the minutiae information position and direction along with the
user s demographic information as a template in the enrollment database. During the identification
phase, the user puts the finger on the same sensor, generating a new fingerprint image or template
called query print. Minutiae points are carried out from the query print, and the matcher module
compares the set of query minutia with the stored minutia templates or image in the enrollment
database to find the number of similar minutia points. Because of variations present in finger
placement and pressure applied to the sensor, the minutia points take out from the template and query
fingerprints must be lined up, or submitted before matching. After line up the fingerprints, the matcher
decides the number of pairs of matching minutiae two minutiae points that have similar location and
directions. The system decides the user s identity by comparing the match score to a ... Show more
content on Helpwriting.net ...
It is an excellent fingerprint input device can be applied extensively in social security, public security,
attendance, fingerprint encryption, embedded, and many other applications. R305 miniature
fingerprint scanner to automatically read the fingerprint image, and through a USB interface to
transfer digital images of the fingerprint to the computer controlled technology to support the Bio key
SDK build out tools. Require authentication for laptop computers, desktop computer or other personal
computing devices, it is the ideal
... Get more on HelpWriting.net ...
Tim Good Leadership
Strategic Analysis
Lonnie Ivery American Public University
Introduction
When the leadership of Apple changed from the visionary leader and founder Steve Jobs to Tim Cook
many people viewed the transition with skepticism because of the big shoes that Tim was expected to
fit in. The competition was high especially in the smart phones and watches market where the rate of
innovation from the other competing companies is also high. The creativity of firms like Sam Sung
had threatened to wipe out the legacy of Apple as the leading producer of smart devices.
The Apple stocks had begun declining, and the sales volume for the Apple products had gone down in
the global market. It was the innovative and creative nature of the company that Tim ... Show more
content on Helpwriting.net ...
A good management body learns from the mistakes of the past, the competition and uses the feedback
to bounce back and take the lead. This is the tactic that Tim Cook when he released the iPhone 6
series, the Apple watch and the Apple pay to stay ahead of the competition.
Organizational Structure of Apple
Organizational structure is the most crucial element for the success of any business. This is because of
the way it facilitates and supports the management system of the organization. It is through the
structure that specialization and differentiation are attained. For effective management of the
employees, different firms employ different structures for the organization that is unique to its
operation and the organization culture.
The CEO is at the center of the structure, and he coordinates the activities of all the other functions to
ensure that the goals of the firm are reached. Its organizational structure majorly contributes the
successful innovation culture of Apple. It has also created the business and market growth
opportunities for the
... Get more on HelpWriting.net ...
Strategic Plan Analysis
strategic Plan Analysis This paper will evaluate and make recommendations regarding City of El
Centro s strategic plan, its mission, vision, goals, and objectives. A brief history of the City of El
Centro will be included. A SWOTt analysis (strengths, weaknesses, opportunities, threats, and trends)
on the City of El Centro will be performed. Included in this paper will be City of El Centro s mission
statement labeled Attachment A , City of El Centro s vision statement labeled Attachment B , City of
El Centro s goals labeled Attachment C , City of El Centro s objectives labeled Attachment D , City of
El Centro s history labeled Attachment E , and City of El Centro s SWOTt Analysis Grid labeled
Attachment F . Peter ... Show more content on Helpwriting.net ...
Will mature into a modern, technologically advanced, socially cohesive community, which celebrates
its diversity and openness to change while remaining a wholesome place to raise a family. ...will thrive
as regional focus for the advancement and enjoyment of the arts, culture, leisure, and recreational
activities. We foresee that together we will have made 21st century El Centro a model city; safe,
environmentally healthy, culturally vibrant, clean and beautiful with an admirable quality of life.
(para. 1 2).
Please see the attached City of El Centro s vision statement labeled Attachment B.
City of El Centro s Goals Planware.org (n.d.) defines goals as, Goals are specific interim or ultimate
time based measurements to be achieved by implementing strategies in pursuit of the company s
objectives (p. 5). The City of El Centro s city goals are: 1. Transportation Mobility, 2. Transportation
Infrastructure, 3. Implement, 4. Safe Neighborhoods, 5. Recreation and Lifelong Learning, 6. Health
and Wellness, 7. City Beautification, 8. Arts Culture, and 9. Economic Development (p.1). Please see
the attached City of El Centro s city goals labeled Attachment C for detailed goals.
City of El Centro s Objectives Planware.org (n.d.) defines objectives as, The third key element is to
explicitly state the business s objective in terms of the
... Get more on HelpWriting.net ...
Examples Of Pride In The Iliad
In his telling of The Iliad, Homer introduces us to one of the demigods, Akhilleus. Akhilleus was born
by the goddess, Thetis, daughter to Poseidon and to the human, Peleus. His position is as commander
of the entire Greek army. At the start of this war, between the Akhaians and the Trojians, there was a
falling out between him and the Greek king, Agamemnon. In short, he ended up packing his bags and
leaving the army without a commander. Pride was the cause of this whole quarrel. This pride of his
was the center of many improprieties during the war. A feeling that you respect yourself and deserve
to be respected by other people (definition of pride) This first example may have occurred near the
end of the book, but it is going to be used first. Akhilleus pride was the direct cause for the need to
withhold and torture Hektor s body after he killed him. (The Iliad, 22.410 421, 24.14 27) This event
caused him to act inhumanely, no matter the reason. This action also prevented Hektor s family from
having a proper funeral. Said Akhilleus: Let it be so. Let someone bring the ransom and the dead
away, if the Olympian commands this in his wisdom. (24.63 66) Later he allowed Hektor s body to be
taken away. ... Show more content on Helpwriting.net ...
Sheen) Another time when Akhilleus pride kicked in was when his prizes from a previous battle we
taken from him, and he decided to just walk away. ...Well, this time I [Akhilleus] make sail for home...
(1.174 199) Akhilleus left all because he felt that he was too important to be cheated of his prizes.
Frankly, he should have just sucked it up and kept going, besides he was technically AWOL. (absent
without leave) However, in his defense, Agamemnon should have just done what the priest requested.
Unfortunately, Akhilleus misses an opportunity to fix his mistake, when Agamemnon sent an offer of
... Get more on HelpWriting.net ...
Rfid at the Metro Group Essay
t the M9 606 053
REV: APRIL 1, 2009
ZEYNEP TON VINCENT DESSAIN MONIKA STACHOWIAK JOULAIN
RFID at the METRO Group
In early 2004, the METRO Group (Metro), Germany s biggest retailer, announced its upcoming radio
frequency identification (RFID) technology rollout at 250 stores and 10 warehouses, in collaboration
with 100 suppliers. The news echoed throughout the retailing community. Previous similar
announcements by Wal Mart and Tesco had made it clear that some in the industry believed that the
new technology had the potential to improve the performance of retail supply chains significantly.
Among the many potential benefits of this technology were reduced shrink,1 increased product
availability, better data quality, and higher labor ... Show more content on Helpwriting.net ...
In 1939, the British Royal Air Force developed an identify friend or foe transponder that could
interpret received radar signals to distinguish friendly aircraft. This was the first example of a device
that could automatically and remotely identify itself to another device. RFID worked on the same
basic principle: A signal was sent to a transponder which either reflected back a signal (passive
system) or broadcast a signal (active system). Research and development in radar and radio frequency
communication systems continued through the 1950s and 1960s. In 1973, an American entrepreneur
was awarded a patent for a passive transponder used to unlock a door without a key. When a card with
an embedded transponder communicated a signal to a reader near the door, the reader detected a valid
identity number stored within the RFID tag and unlocked the door. A similar idea, an automated toll
payment system, was commercialized in the mid 1980s. By 2005, the use of RFID had expanded.
Many companies used RFID tags in employee badges. Several prisons in the United States used RFID
tags to track prisoners. In 2004, Boston Marathon participants shoe laces contained RFID tags to track
and accurately time the runners and to share their progress with spectators. The American Express
Blue credit card started including a feature called ExpressPay that
... Get more on HelpWriting.net ...
How To Write An Essay On The Sorcerers Of The Nightwing
Recently I read this book called Sorcerers of the Nightwing by Geoffrey Huntington, it is a great book
by the way. In the beginning, you will meet a young boy named Devon, who is attacked by a demon as
a young boy. Fast forwarding a few years later Devon s father gets very sick, he dies, but tells Devon
that he is adopted. Soon after he is sent to a place called Misery Point, where he meets Amanda and
Cecily Crandall, and Alexander Muir. He lives with them at Ravenscliff, a very creepy house on top a
hill in Misery Point. Later Devon faces a demon that appeared out of his closet, he remembers his
father s words from when he was young, that he is stronger than any of them. He defeats the demon in
without fear, and questions why it was there. ... Show more content on Helpwriting.net ...
Unfortunately for Devon, it s not that simple.Around a quarter way through the book, with D.J.,
Marcus, Cecily, and Natalie; Devon went to Gio s, a local pizza place. Being as the chapter is called
The Boy With the Talons for Hands, you could guess it s probably not a human boy. After conversing
with the group about how they all came to be friends, and then they suddenly heard a noise and
commotion coming from outside of the parlor. D.J. attempts to break up the fight when Devon realizes
that it is no kid that is in that fight. Though the kid had brandish hair, a small frame, jeans, and Nike
sneakers; something was off about him... Maybe it was the talons that he was pummeling the other kid
with. Then after telling the demon to go back to hell, punched the demon straight in the face, sending
the demon flying out of the door. Devon was praised for his bravery and stares of awe from the crowd
around them, even D.J. asking How d you get to be so strong? in an awestruck way. Despite not being
able to avoid the demon, he did save someone from being seriously hurt; thus avoiding more pain than
needed, which probably was more of a demon for him. Surprisingly enough, all he had to do was
punch the thing in the face and BAM! The demon s out the
... Get more on HelpWriting.net ...
Amt Case Analysis Essay
1. What has created the need for additional finance by AMT since 1983? The need for additional
financing is a result of multiple factors that placed intense pressure on available cash. The first factor
is the extraordinary growth AMT has experienced the last few years with an annual sales growth rate
of 52.88%. The extreme growth rate in sales was accompanied with heavy spending on research and
development along with rapid expansion in the company s sales force and other marketing
expenditures. What made matters worse is the company has incurred operating losses, which meant
that generating cash from operations was at best limited or insufficient. The second major factor is the
inefficient use or mismanagement of some of the ... Show more content on Helpwriting.net ...
Accounts Payable Days and Accrued Expenses also play a critical role. Days Payable is set at 50 while
Accrued Expenses is assumed to be 5% of Sales. Cash as a percent of sales is set at 7.5%. Going
forward, and assuming 7.5% ratio, which is very similar to the industry upper quartile in 1985, cash
balances at AMT will remains solid going forward. Note that the industry s cash to sales ratio is not
given directly but can be deducted by taking the Cash to Assets ratio of 16.3% (1985) and Assets to
Sales ratio of 45.3% (Upper Quartile in 1985). Reshuffling these figures yields the industry s Cash to
Sales of 7.4%. All these assumptions about net working capital result in tremendous need for external
financing over the next several years as mentioned earlier. Annual Sales growth is expected to be at
high rate 30% over the next 5 years, which puts tremendous pressure on cash. Poor management of
working capital will unnecessarily tie up cash, thus requiring external financing from banks such as
Western National Bank. Looking at cash to sales ratio, the historical trend for AMT is very much
disturbing with the last two years having negative cash balances. With the 7.5% ratio of cash to net
sales, cash balances, when managed efficiently, will remain at healthy levels over the next 5 years.
The above discussion shows that high growth in sales, which is typically accompanied with high
growth in working capital exerts tremendous
... Get more on HelpWriting.net ...
The Subway Story
The subway story Introduction of Subway restaurant The Subway story started when Fred DeLuca, its
cofounder and his family friend Dr. Peter Buck, worked on a business plan for a submarine sandwich
shop. Dr. Buck gave a loan of $1000 for implementation of this plan. The first restaurant was opened
in Bridgeport, Connecticut, in 1965. It did well in its first summer with the help of advertising slogans
like put a foot in your mouth. Emphasizing the foot long sandwich, and when you re hungry, make
tracks for Subway. Buck suggested opening a second restaurant. That way people will see us
expanding and think that we re successful. DeLuca has changed the company s system of franchise
development several times over the years and has kept ... Show more content on Helpwriting.net ...
According to Alon, L. (2006, p.47 48), due to religious prohibition to eat pork in case of Muslims and
to eat beef in Hindus in India, no pork or beef products are used in any of the sandwiches. Instead
these were substituted with lamb, chicken and turkey. Counter area and preparation areas in India are
separated because vegetarians do not like to be served from the same place that non vegetarian food
are prepared. Technological: new innovations and development, technological transfer, obsolescence.
Subway is using Partech POS (point of sale) System. Competitive analysis According to McCarty, M.
(2006), Subway is also facing competitive pressures. Main competitors are McDonalds, KFC, and
Pizza Hut. McDonald s is the world s largest retailing chain with 31,000 fast food restaurants in 119
countries.(FAQ, 13), All fast food chains, including McDonald s®, Burger King®, Wendy s®, Taco
Bell®, KFC®, Quiznos Sub®, Blimpie® and Arby s® are the SUBWAY® chain s competitors. This
chart has been made with the help of data available on http://www.subway.com/StudentGuide/ (How
we compare to our competitors, 2006) Franchisee fee of Subway is less in comparison to other
restaurants. Start up cost of Subway is also less comparison to other restaurants. But the basic royalty
of Wandy s is less as compare to Subway. Advertising royalty of Taco bell, Pizza hut, and Scholtzky s
deli is
... Get more on HelpWriting.net ...

Abilitations Hi-Write Wide Ruled Notebook Paper, 10

  • 1.
    Abilitations Hi-Write WideRuled Notebook Paper, 10 1. Step To get started, you must first create an account on site HelpWriting.net. The registration process is quick and simple, taking just a few moments. During this process, you will need to provide a password and a valid email address. 2. Step In order to create a "Write My Paper For Me" request, simply complete the 10-minute order form. Provide the necessary instructions, preferred sources, and deadline. If you want the writer to imitate your writing style, attach a sample of your previous work. 3. Step When seeking assignment writing help from HelpWriting.net, our platform utilizes a bidding system. Review bids from our writers for your request, choose one of them based on qualifications, order history, and feedback, then place a deposit to start the assignment writing. 4. Step After receiving your paper, take a few moments to ensure it meets your expectations. If you're pleased with the result, authorize payment for the writer. Don't forget that we provide free revisions for our writing services. 5. Step When you opt to write an assignment online with us, you can request multiple revisions to ensure your satisfaction. We stand by our promise to provide original, high-quality content - if plagiarized, we offer a full refund. Choose us confidently, knowing that your needs will be fully met. Abilitations Hi-Write Wide Ruled Notebook Paper, 10 Abilitations Hi-Write Wide Ruled Notebook Paper, 10
  • 2.
    Muhammad Ali Biography AmerDzankovic Muhammad Ali: More than Just a Boxer Float like a Butterfly, Sting Like a Bee. Muhammad Ali. Muhammad Ali was born on January 17. 1942, in Louisville Kentucky. Muhammad developed a talent for boxing at a very young age and continued to strive to become better at it. Not only did he focus on himself and his career, but he helped out people in need by donating to charities and contributing to poor communities/people and the United Nations. He continued to battle with parkinson s disease throughout his life and he didn t let it interfere with his passion towards boxing or living. Ali was a very famous african american boxer who had who had a determined, talented, and passionate soul. Muhammad Ali had a determined soul. When ... Show more content on Helpwriting.net ... Ali never gave up on winning his bouts and championships even in some of the darkest moments of his life and career. Ali was also very talented. His talent in boxing wasn t revealed until he was 12, and shortly after he started training he started becoming a star. Lastly, Ali had a passionate soul for people that needed help living their lives in a safe, healthy, and normal way. He used his fame and money to contribute to those with health concerns and no roof over their heads. Ali died on June 3, 2016 from Parkinson s disease. Muhammad Ali was the light at the end of the tunnel for many people around the globe, and shouldn t only be remembered as a talented boxer but someone everyone should look up ... Get more on HelpWriting.net ...
  • 3.
    Subliminal Messages ShouldNot Be Legal Subliminal messages By: Edianis Seda Advanced Placement Psychology Mr. Cuetara June, 4th 2015 Abstract Subliminal messages are messages that are perceived in the unconscious mind that most of the time we are not aware of. These messages are mainly designed to influence that way we think and feel. They are used to get people to buy products from their company. Subliminal messages can be perceived auditory or visually. Subliminal messages should not be legal and should be banned from being used in advertisement for it can lead to negative results. There should be another way to advertise that. Doesn t involve manipulating our minds into buying the products. Subliminal messages are messages that are either auditory or visual which is presented below the normal limits of perception. An example of a subliminal messages would be that a message might be inaudible to the conscious mind but may be audible to the unconscious mind, in this case a deeper part of your mind. Subliminal messages may also be in other cases an image that is unperceived but will be perceived deeper in your mind. To put in simpler terms, subliminal messages are basically hypnotism that many companies may use to encourage people to buy the product they re selling. According to the article The Influence of Subliminal Messages , it states that subliminal messages can influence our attitudes and behavior. Also, under certain circumstances of course, subliminal messages may or may not have the ... Get more on HelpWriting.net ...
  • 4.
    Political Socialization Chapter 11public opinion Political Socialization Essay Question Most people are exposed to the same principals and agents of political socialization. Families spread values that support political authorities and can heavily contribute to children s initial political ideological views, or party preferences. Families influence political knowledge and identification depending on variables such as family demographics, life cycle, parenting style, parental level of political skepticism and frequency of political discussions. Demographics such as gender and age also attribute to political socialization. School is another agent of political socialization. Spending numerous years in school, children in the United States are taught and reinforced a view of the world that their text books tell them to trust. Through primary, secondary and high schools, students are taught key principles such as individual rights and property, personal responsibility and duty to their nation. Another is mass media. Mass media is not only a source of political information; it is an influence on political values and beliefs. Various media outlets, through news coverage and late night programs, provide different partisan policy stances that are associated with political participation. Religions, beliefs, and practices play a role in political opinion formation and political participation. The perspective offered by religious institutions shape judgement regarding public policy, and political decision ... Get more on HelpWriting.net ...
  • 5.
    The Itrust Database Whenfurther analyzing the iTrust database, there was an issue of the lack of credit card information not being encrypted. The lack of credit cart encryption does not only lead to a major concern for the company, but also for the client. The risk of exposed PII invalidates any confidentiality for the company due to the threat posed to client credit card information. Because health care provider is a credit card merchant since they accept, transmit, or store credit card data, they must adhere to the Payment Card Industry Security Standards Council (PCI SSC) to protect the customer s confidential data. One of the requirements is that merchants must encrypt transmission of cardholder data and sensitive information across public networks. (OWASP, ... Show more content on Helpwriting.net ... These proposals and systems suggestions can minimize the vulnerabilities associated with any compromises or intrusions within the network. Deploying an intrusion detection system is an essential security strategy for monitoring a network information system for abnormal or authorized activity. An intrusion detection system (IDS) is set of tools which monitor a network topology by providing a system administrator with the overall picture of how the system is being utilized. Executing an IDS will make a difference in creating a defense in depth architecture to be more compelling in recognizing any form of malicious activities. The capacity of the IDS is to monitor and survey the network traffic without affecting network activity. IDS tools gather information and analyzes it against a pre characterized manage set, and against a set of known assault marks . The IDS can scan port numbers and to determine if any breaches or attacks are occurring (Kuipers, ... Get more on HelpWriting.net ...
  • 6.
    Realism And TheTheory Of Realism Introduction The idea of Realism was unofficially was created in fifth century BC by Thucydides, and continued through Niccolo Machiavelli. This lead to the first official IR theory of realism in Thomas Hobbes, amd Hans Morgenthau, known as Classical Realist. From there Classical Realism evolved to the ideas of Kenneth Waltz, which brought along the ideas of neo realism or structural realism theory. Then came offensive, defensive, and neoclassical realism. Overall the main idea of realism is defined by internationalrelations.org as when looking at the political system, or more specifically, the international system, realists focus their ideas about how international relations work based upon the concepts of power and security. ( Realism ... Show more content on Helpwriting.net ... This ranges from military presence to business presence. These countries want a piece of Afghanistan politics. This analysis of Realism will use this situation as an example of why these countries are involving themselves in Afghanistan, to better understand the theory. System and Power A system, from a neorealist point of view is described by Waltz as A system is composed of a structure and of interacting units. The structure is the system wide component that makes it possible to think of the system as a whole. Waltz furthermore goes into how to define a structure A structure is defined by the arrangement of its parts. (Waltz, 1979) Bringing the neorealism theory that looking at politics, structure is the arrangement of the states, not the collection of them. This leads in to the neorealism idea that there is no central authority, and the world depends on balance (Sterling Folker, 2013). That the one thing structure or balance depends on is the states, not NGOs or other actors. From a classical realism perspective according to Morgenthau s It is a characteristic aspect of all politics, domestic as well as international, that frequently its basic manifestations do not appear as what they actually are manifestations of a struggle for power . (Morgenthau, Thompson Clinton, 2010) Morgenthau is saying that states are power seekers, and strive for dominance which is ... Get more on HelpWriting.net ...
  • 7.
    An Epic Heroin Sir Gawain and the Green Knight, a Poem... Sir Gawain and the Green Knight, a poem by the Pearl Poet, sends an epic hero on a journey to discover his flaw. In his journey of figuring out his flaw, Sir Gawain encounters a Green Knight that holds a holly and axe in his hands. On a Christmas dinner, the Green knight rides into King Arthur s hall proposing a game. Any knight willing to cut off the his head is able to keep the axe, but only if he agrees to let the Green Knight return the blow at a later time. The Green knight was described as one who was plantlike and had a giant body structure, leading to the assumption that he was a certain type of vegetation god. The knight also held a holly in one hand and an axe in another, possibly representing the necessity of plants to die in the cooler climates in order for them to grow again when it summer returns. The Green Knight, playing an important role for plant life and crops, is still a mysterious character. His odd characteristics with his supernatural powers make it evident that the Green Knight has some connection with crops and vegetation. The Green Knight s physical features are clearly described in the story. He was described to have green skin and a huge build: greater than any on earth; from neck to loin so strong and thickly made, and with limbs so long and so great that he seemed even as a giant... For he was clad all in green This indicates that the knight s sturdy build and green color is like that of a healthy plant. The knight s long limbs ... Get more on HelpWriting.net ...
  • 8.
    AMC Strategic AdvantagesAnd Disadvantages About AMC AMC Theatres is the United States largest movie theatre chain. They serve millions throughout eight countries, with close to eight thousand screens worldwide. AMC makes efforts to differentiate themselves from your average movie theatre experience. With the mission statement, We make smiles happen , the company has continued to better the movie watching experience of its consumers for decades. AMC s customer base ranges from families with children, to individuals who are just eager to see a new film. To their customers, they offer a wide range of specials to get them in the door. If you are first in the door for a brand new film, you could get movie themed collector s items. Sometimes, AMC offers meal promotions as well. With the early purchase of a ticket, you could receive concessions for almost half the price. They appeal to their older customers as well by offering special cocktails based on the movie you have come to see. With the opening of the new It film, AMC is selling The Pennywise cocktail , to sip on while watching the film. Loyal AMC customers benefit from the membership system. The more points collected , the more discounts and deals that customer experiences. AMC also hosts $5 ticket tuesdays for these exclusive members. Putting the Customer First Over the years , AMC has worked diligently at increasing its customer value proposition. From the beginning , the company has put its customers, those who enjoy entertainment and film, first. Their overarching goal of having customers frequent one of their theatres rather than the competition s has been clearly demonstrated in their efforts. The company has interesting attributes that bolster their mission to create smiles . AMC was the first movie theatre chain to include stadium seating, able to fit more customers comfortably. In addition to this, they were the original theatre chain to incorporate options into their theatres. AMC s founder, Stanley Durwood, is responsible for kickstarting the multiplex theatre industry. He felt AMC s customers were at a disadvantage with just one theatre. He began renovating theatres to have several auditoriums, rather than one major one. When the idea proved to be ... Get more on HelpWriting.net ...
  • 9.
    Essay on TheEarly Renaissance The Early Renaissance Today, what is considered to be the modern times began with the Early Renaissance at the start of the 15th century. As time has progressed, things have modified within societies to mold with the new ways of thinking for that time. Between the years of the 1400 s and the 1800 s this world has undergone many changes. Focusing on Europe, the major forces of change were in politics, economics, and religion. In modern European history political effort were supplied by the state. Early in the 15th century political warfare was the theme of everyday life. It was not until the Peace of Lodi in 1454 that a balance of power was established and ended the hundred years war. Early in the 16th century there is a rise ... Show more content on Helpwriting.net ... Banking was over run by the Germans. Trade in the East came to an end with the fall of Constantinople. By the end of the 16th century, economics had shifted from the Mediterranean to the Atlantic with the Spanish discovery of the New World. With this trade shift the worldwide economy was in the makings. In the 17th century mercantilism is very prominent. Things such as state granted monopolies, regulated exports and imports, tariffs, custom duties, quotas, slavery, colonial taxes, and plantation system were in full effect. By the 18th century, a supply and demand economy had produced. Through mercantilism, state regulations lowered the living standards of workers. The every day lives that were led in modern Europe where primarily surrounded by religious ideas. In the times of the 15th century, religion in Europe revolved around the religious beliefs of the Papal Court. Though there were many religious battles over the Church, few doubted the Church, following its every demand. By the 16th century, many began to challenge that of the Papal State. People felt that the beliefs and efforts of the Church had traveled way off track, and was in need of some repair. Martin Luther began the radical attempt to fix what had gone wrong within the Papal State by posting his Ninety five Theses upon the door of the Wittenberg University. The outcome of Luther s efforts supplied Europe with beginnings ... Get more on HelpWriting.net ...
  • 10.
    Level One TraumaNurse What circumstances or events in your life have led you to choose nursing as a career? Each blessed day of my journey toward nursing is not a job or an advancement toward a career, it is a gift of care to be shared from my happy heart with those that need healing. From a very young age I have been uniquely designed to be a nurse. My journey has been comprised of many nursing qualities through vast disciplines and experiences. In this short essay, I will briefly share my unique experiences of how God continues to teach me to be a Level One Trauma Nurse. For over ten years of my life I dedicated everything I had to competitive cheer. Competition cheer in Texas is a very serious business which can provide the absolute best scholarships for college. While going to school full time, our competition team expected us to practice over thirty hours per week in addition to the high school cheer requirements. This discipline paid off as many of our teams won the NCA International Competitions. However, the long training hours ... Show more content on Helpwriting.net ... I believe God has prepared me to handle fast paced emergency scenarios. In my senior year, while shadowing in the emergency room, doctors and nurses grabbed me and rush me into the trauma unit where they had me observe surgery on a man who suffered a gunshot wound to the head. Many would probably have been grossed out, but I felt a strange embracing moment where I knew God would one day have me serve. I have also shadowed in other areas where I cared for elderly patients who later passed away. In those times, I know that God used me to ease their suffering as they felt the genuine love coming through me. A happy heart is good medicine and a joyful mind causes healing, But a broken spirit dries up the bones. (Proverbs 17:22 AMP) My heart so desire to help others in medical needs as well as in spiritual needs. When others allow me to serve them, this gives me great ... Get more on HelpWriting.net ...
  • 11.
    Gesellschaft And OrganicSolidarity The social structure that bests fit my community would be organic solidarity, and Gesellschaft. Organic solidarity is a theory that Emile Durkheim use to help illustrate social structure. He hypothesized that a society s structure is determined by its division of labor and the task individuals perform to ensure society will function properly (Lesson5, Video). To me organic solidarity is defined as a big, diverse society with people of different personalities, cultural backgrounds, and values coexist. Valdosta displays the elements of organic solidarity in many ways. Gesellschaft is very similar to organic solidarity it is a theory that was composed by Ferdinand Tonnies. Tonnies theorized that social structure is driven by a community s size and willingness to change (Lesson 5, Video). In my own word Tonnies theory means that a society structure directly correlates with the size of the community and the effort that those put into show. The social structure of Valdosta is displayed through the theories of organic solidarity and Gesellschaft directly. The characteristics that serves as example are ... Show more content on Helpwriting.net ... Many of the people that reside in Valdosta are here for either the University or Moody Airforce Base. People that commute here for school chose a major that interest themselves then obtain a four year degree that promotes their self knowledge in the area of their choosing. Most students serve an internship in the community of their schooling and this is putting that knowledge back into the community and helping its social structure. Internships range from Doctors, Nurses, Lawyers, Future educators, and more. Those residents that are here for Moody Airforce base are station here after being job trained and promoting self interest in their field. These positions rage from Pharmacist, physician assistant, airplane craftsman, chemical scientist, and ... Get more on HelpWriting.net ...
  • 12.
    The Devil InThe White City Critical Analysis Two stories focusing on horrific murder share more than just that similarity. The Devil in the White City is a novel by Erik Larson that focuses on America s first serial killer, Herman Webster Mudgett, most commonly known as H. H. Holmes. It alternates telling of the construction of the Chicago World Fair contrasting with the horrendous murders of the man that essentially invented the term psychopath. On the other hand, The Hound of Baskervilles by Sir Arthur Conan Doyle focuses on the tale of Sherlock Holmes and John Watson as they try to solve the mystery surrounding the death of Charles Baskerville. These themes are linked through murder and the British surname Holmes, an alias taken from Doyle s stories to claim to have land in England. ... Get more on HelpWriting.net ...
  • 13.
    Htc INTRODUCTION HTC Corporation, formerlyHigh Tech Computer Corporation, is a Taiwan based manufacturer of smartphones founded in 1997. The company initially made smartphones based primarily on Microsoft s Windows Mobile software, but in 2009 it began to shift its focus away from Windows Mobile devices to devices based on the Android operating system. HTC is also a member of the Open Handset Alliance, a group of handset manufacturers and mobile network operators dedicated to the advancement of the Android mobile device platform.The HTC Dream, marketed by T Mobile in many countries as the T Mobile G1, was the first phone to the market that uses the Android mobile device platform. HISTORY Although initially the company made notebook ... Show more content on Helpwriting.net ... They released the worlds first 4G phone,the Evo 4G.The phone is one of the most powerful phone in the world today and its planning to capture the market by being ready for 4G out of the box. Long term plans: Women who want to surf while watching the telly in their living room are a prime market for tablets according to HTC. Market research conducted by the smartphone manufacturer found that likely users of the expensive drink trays were women who wanted to communicate with friends with a tablet on their lap while watching their favourite television programmes. HTC views Microsoft as a strategic partner and Windows Phone 7 as a promising smart phone operating system platform; and we plan to rollout our first Windows Phone 7 based smart phone before the end of year, a statement by HTC reads. We are talking about three form factors at this stage. There s going to be one available at launch, which is big touch screen, gigahertz processor, dedicated graphics chip. And only touch, no keyboard entry. Chassis two is going to be slide with a keyboard, so looking more like the Palm Treo, touch screen plus a QWERTY keyboard. Chassis three, I don t think we ve released any data as about yet but they re the three in total we re going to ... Get more on HelpWriting.net ...
  • 14.
    Cathy Freeman Biography CathyFreeman has an Olympic s dream when she was young. During the 400 meters Olympic games in Sydney, she won the gold medal. She became the first Aboriginal Australian athlete to win the individual game. Cathy is an Aussie Indigenous hero. Cathy was born in 1973 in Slade Point in Queensland. Cathy has start training as an athlete when she was 2 by her stepfather Bruce Barber. He is the person that who took an interest in her athletics and became her first coach. And started couching her for 100m, 200m, long jump and high jump games. In 1987, Cathy moved to the school called Kooralbyn International School. At there she met her first professional coach called Mike Danila. He is the first who bring Cathy in the Commonwealth Games Trials in Sydney. Because of the chance that Mike Danila gave, Cathy has joined Australia commonwealth game in 1990 in Auckland, and won the first place. That makes her became the first Aboriginal Australian and the youngest athlete to win at the age of 16 years old. Cathy took her victory lap with the Aboriginal flag ... Show more content on Helpwriting.net ... She became the second Australian Aboriginal won the Olympic champion. She did the victory lap again with both Aboriginal and Australian flags. She said, I just wanted to show I am proud of who I am and where I come from. Cathy moved a Nation and the Nation moved her. She said, I didn t become an Olympic champion and if anything except just because I knew I was good at it then I loved and I hated losing but nobody prepares for what is the life like on the other side of once you get to that pinnacle. She thought the people might do something that is meaningful. She wanted to do use that what she had achieved, learned and suppose who she had become to do something worth doing. Freeman s influence in the indigenous community especially to motivate the next generation of ... Get more on HelpWriting.net ...
  • 15.
    Value Of GoldIn Beowulf In the Medieval Ages, wealth and jewels were not just a material one would use to buy lavish things or to wear to show an importance in status. Armor, weapons, jewels, coins and wealthy treasures possessed significant value within the warrior realms of duty, protection, heroism, loyalty and accomplishment. Gold can also symbolize a King s royalty, relationships and fame. Modern day archeological evidence proves this importance of metal and treasure through the uncovered Sutton Hoo Anglo Saxon burial treasure hoard. The significance to Sutton Hoo shows clear evidence that at this time, society thought of gold as a symbol for Pagan beliefs into the afterlife and as precious and delicate. In Beowulf, the reader can clearly identify this value of wealth. The reader understands that the power of wealth possessed by King Hrothgar is something that is given to only his best warriors. In the beginning, Beowulf shows evidence that he fights for fame and reputation to receive gold and boasts to improve his reputation. At the end of the poem, King Beowulf fights for the heroic code to preserve peace and stability within the Geats society. However, King Beowulf s main duty is to be just and protect his ... Show more content on Helpwriting.net ... A lot of the pieces found within the ships such as swords and helmets match what is written in the descriptions in Beowulf, from the ringed metal of the protective mail shirts to the boar imagery over the brows and crests of mask like battle helmets (Walsh 102). Both Sutton Hoo and Beowulf show that ship burials were a traditional way to bury, so that warriors... [Could] continue their journey into the next world (Walsh 103). The discovered Sutton Hoo treasures authenticates my argument of the significance of gold as a material object and abstract object that warriors performed for to improve their reputation in the Medieval ... Get more on HelpWriting.net ...
  • 16.
    Luis Valdez sPlay, Los Vendidos Essay In his play, Los Vendidos, Luis Valdez addresses, through humor and stereotypes, the issues faced by Mexicans in America throughout history. Although a White Washed Mexican woman is supposedly looking for a Mexican, what she is actually looking for is an American with darker skin. The key word here is American, as she is looking for someone who has denied his or her Mexican roots and become acculturated to the American way of life. This woman does not want a Mexican for any other reason than the fact that he is Mexican, and she has no respect for his heritage. The scene opens as a woman who works for the government walks into a shop that sells Mexicans. She is looking for a Mexican for their administration. In the prologue of the ... Show more content on Helpwriting.net ... Vicki Ruiz explored the acculturation of young Mexican American women, which was similar to that of young men, in the 1920s and 1930s and states that it ...reveals the blending of the old and the new, fashioning new expectations, making choices, and learning to live with those choices (Vargas 271). It is true that they were Mexican Americans, but many did not have strong ties to their native countries, as a document by Raúl Morín states, The so called Spanish were in many instances accused of being ashamed of the term Mexican. Being native born and raised Americans, they never felt any sentiment for Mexico....they had never lived there....(Vargas 305). Although this quote refers to those who fought in World War II, it was during the same time period that the Zoot Suit Riots were occurring. If they did have strong ties to their native country, then they were often looked down upon, because there was sentiment that if they were going to live in America, then they should act American. Merton Hill gives a definition of what Americanization is when he states .... The securing through instruction such reactions on the part of non Americans that they will accept and practice those ideals, customs, methods of ... Get more on HelpWriting.net ...
  • 17.
    Essay on thesignificance of the lemon law act It happens many times. A person finds the car of their dreams. They drive it around for a few weeks when it happens. The car will not start, it makes a funny noise, or the breaks just will not do anything while stepping onto the pedal. Does the person have to pay for the repairs all by themselves? And if so, what happens when the exact same problem happens more than 3 times? It is just not fair to pay all this money on your brand new affordable car. But, one should not worry. There is a solution to all these annoying questions one just does not know how to answer. This is how the Magnuson Moss warranty act comes into this situation. The lemon law is a subdivision of this act. The Magnuson Moss warranty act, when tied with the lemon ... Show more content on Helpwriting.net ... It involves more serious things, which can not be repaired within 3 repairs. Autopedia explained that for any serious safety defect, such as brakes or steering, the manufacturer has one attempt. If it is a safety but not serious, they have 2 attempts. And for any other defect, they usually receive 3 or 4 chances to repair. The repairs may not be a result of abuse, neglect or unauthorized modifications or alterations. The cases must be given to the manufacturer, and they must have responded to your complaint and rendered a decision within 40 days. The terms apply within the express warranty or the first year of ownership from date of delivery, which ever comes first. Another way also is within the first 12 24 months or 24,000 miles. If miles have been put on, the manufacturer may decide to use reduction. In order to do this, they use the following equation: Miles at time of refund x the purchase price 100,000 This equation was found on both the Cartalk and the Autopedia sites. Another point that a consumer may argue, is about the miles put on in between the repairs. However, the majority of times, it does not work. In events of strike, war or natural disaster that prevent repairs, lemon laws will not help a person with any car ... Get more on HelpWriting.net ...
  • 18.
    The Transition FromDrilling On Shore Overview This project is dealing with the transition from drilling on shore to more difficult tasks that companies are taking upon them with drilling off shore into shallow and deep water. Since drilling for easy oil has depleted, companies are pursuing sources for the heavy oil by moving to offshore drilling. The project was originally approved in 2014, but since the approval of the project oil prices have plunged more than 50% percent in 2015. XYZ s Houston refinery is located on the Texas Gulf Coast and has a capacity of 200,000 bpd. It is capable of processing mix of light and heavy crudes. The company for years has been considering an expansion project for the Houston based refinery, which can provide the company with an advantage due to the favorable heavy crude prices and light oil from the Middle East. The expansion would be beneficial because bringing the heavy oil from Mexico and Venezuela have both low shipping cost and lesser travel distance to the refinery. The expansion project would also benefit from the Trans Canadian pipeline when it s completed which would bring heavy oil from the Oil Sands in Canada. Objective The Houston Refinery s current configuration refines light crudes with some capacity to refine heavy crude oil. With the proposed expansion the objective is to increase the capacity for the heavier crude oil at the refinery, the heavy crude oil would be brought in by tankers from Mexico and off loaded at the refinery docks and piped into the ... Get more on HelpWriting.net ...
  • 19.
    Themes In The5th Wave By Rick Yancey The 5th Wave, a young adult, science fiction novel by Rick Yancey, can be used to teach many themes to its readers. Some of these themes include, people are defined by the choices they make, family is worth dying for, and survival depends on being dedicated to others, not yourself. The characters can teach us a lot by their experiences and Rick Yancey most likely did this on purpose. There are many examples in the text to support these recurring themes. To start with, we will examine the theme, people are defined by the choices they make. One of the greatest examples for supporting this theme in The 5th Wave, is the character, Evan Walker. He is half human and half alien. However, he abandons the aliens and chooses to be human. In this case, being human just means siding with them, especially since there are few left. Evan made choices to be human many times. In the first place, he didn t kill Cassie on the highway. He describes it like he couldn t. Therefore, he showed feelings of guilt, love, pity, and other human emotions. This was his initial act of starting to side with mankind. He even saves her when she s dying in the snow bank, taking her in and nursing her back to health. Later on in the book, he gives up his house to burn it as a distraction. Once they continue on their journey, he protects her from soldiers that the aliens are training. Which means, he killed his own in order to keep Cassie safe. Eventually, he even breaks into the alien s main base, ... Get more on HelpWriting.net ...
  • 20.
    John Steinbeck sThe Hollow Men In The Hollow Men, the poem creates the story of individuals that are empty while residing in an alternate world that portrays itself as dark and can represent the emptiness of the stuffed men. They are indeed stuffed but it may not be in straw as customary, maybe in regrets and sins since this poem alludes more than once to bible like stories or bits and pieces. The darker world they live in may be the purgatory of unhappiness since they did nothing but bad and did not repent. Which brings up the topic if they were just a poem fantasy or if The Hollow Men are a warning and bring out a hidden meaning of repent and the need for this redemption by the celestial beings that have the authority to forgive. Since they too have a tragic flaw of selfishness, ... Show more content on Helpwriting.net ... Through literary works, writers allow for diverse endings or alternate endings to realistic events or just any event shows through creations of their imaginations and subconscious thoughts that possibly end up creating actual change in the world. The cycle between literature and society endlessly continues in a way since the outcome of a decision to go into a bigger picture that can not decide by one but many minor decisions and one being the decision to take on something greater than themselves, although most of the time the first thought avoids what seems calculates impossibly for just one person and deny the opportunity of a ... Get more on HelpWriting.net ...
  • 21.
    UK s MainElectoral System and Should It Be Reformed Essay... UK s Main Electoral System and Should It Be Reformed Over the years Britain s pluralist electoral system has been scrutinised by many political and pressure groups, such as the Liberal Democrats and the Electoral Reform Society. In their 1997 Manifesto, the Labour Party did state that they would look into the matter, by holding a referendum on the issue, however there was no change as Labour had a large majority in 1997 and Labour has preformed disappointingly in elections where Proportional Representation had been used. The main electoral system in the UK should be reformed because the first past the post system does not represent the electorate in a democratic manner. It also under represents ... Show more content on Helpwriting.net ... The system is also disproportionate, an example of this is can be shown in a study of the 2001 General Election. From the 2001 General Election results, we can deliberately see that through our pluralist electoral system, the system is disproportionate. We can see many examples of this]. The percentage of votes to the percentage of seats is unequal, showing how its seats not votes that count, and judging by labour s landslide victory. In fact, we can see that Labour did not even gain a majority from voters but only from seats. Another example is the Liberal Democrats; they received 18.3% of the electorate s votes, but only received less than half the percentage of seats at 7.9%. Labour also received a mere 9% more votes than the Conservatives, but yet still managed to acquire around 247 more seats. This also shows that some parties, especially Labour in the 2001 elections, are over represented and this can lead eventually lead to a dangerous one party system , which certainly undermines our ideology of a Democracy. On average 70% of votes are also wasted during a single election. We find that 100.0% of votes are accounted for, only 40.7% actually counted, therefore, votes a drastically wasted. Other arguments to demonstrate how the ... Get more on HelpWriting.net ...
  • 22.
    Inherited Genetic Variations Inheritedgenetic variations may result from new genetic combinations through meiosis, nondisjunction errors occurring during cell division and through mutations in the DNA of egg and sperm cells. Meiosis is a cell division that results in four daughter cells. The daughter cells have half the number of chromosomes of the parent cells.In meiosis the Law of Independent Assortment states that the alleles of one gene sort in gametes independently of the alleles of another gene. Meiosis increases inherited genetic variation because during meiosis, homologous chromosomes each from one pair of parents. The parents chromosomes cross over and and trade some genes when they break apart. This recombination of forming together then breaking apart and ... Get more on HelpWriting.net ...
  • 23.
    Car Roll OverCollision Report Friday, August 19, 2016 at 20:40 I was dispatched to a call of a one car roll over collision. The collision was near Cook Ave on Elmira St. JeffCom said that the three occupants had self extracted and were not injured. I arrived on scene and found the road blocked by a rolled over vehicle blue in color. The vehicle had the roof crushed on the driver s side all the way to the bottom of the window, and the roadway was littered with things from the car s interior. I contacted the two males first and the shorter of the two had visible injuries to his face and left arm. He was identified as Kale A. GONZALEZ. The male next to him was identified MARTIN, Travis B. of Port Townsend. He said the car belonged to him. The female was identified as Kiera ... Show more content on Helpwriting.net ... There was also a plastic five gallon gas can in the vehicle. I mention this because the driver put himself and the passenger s lives in extreme danger of being seriously injured or killed by the glass, and gasoline. The danger of an explosion from the gasoline in a confined space I requested a AAA tow at the owners request, and gave the AAA number as requested by JeffCom. Officer Dumond took pictures of the scene, and notified the father (Matthew J. Sholty 1 22 1980) of Sholty that she had been in an accident and was going home with an adult friend. The Port Townsend City Street Department had to send the on call operator to the scene and then required a front loader to remove the car and roll it over as well as to cut the tree up and remove it from the road way. The driver of the vehicle was not able to show me proof of insurance, and the passenger Travis (who owned the car) said he did not have proof of insurance for the car. In fact he said he had not even registered or transferred the title of the car yet (he said he has owned it for two ... Get more on HelpWriting.net ...
  • 24.
    The Long WalkHome By Forrest Gump Compare and Contrast Now a days for some people to learn and completely understand history they can watch movies and documentaries on whichever subject they need help with or on. Over the past few weeks I have watched the following movies: Forrest Gump, The Long Walk Home, The Help, and A League of Their Own. Forrest Gump is about a disabled boy who grows up and goes into the Vietnam War and eventually owns a shrimp company. The Long Walk Home and The Help are movies based off of equality of race by exemplifying for the viewers what life was like for colored people. The Help specifically is about a lady who became interested in sharing the stories of maids. The Long Walk Home is specifically about colored people fighting for their rights and to be treated equally and fairly. A League of their Own is about women across the United States playing baseball while still being treated like a lady. All the movies have similarities and differences. While taking notes I compared and contrasted the movies by focusing on the government and lifestyle during the movies. Government: The government and government issues in the movies is rather similar. To start off, In Forrest Gump a quote that Forrest s mom states and in my opinion is like the government itself, Life is like a box of chocolates, you never know what you re going to get. The war the United States is in is the Vietnam War where platoons were taken out in the blink of an eye. Vietnam would have Jets would fly over the ... Get more on HelpWriting.net ...
  • 25.
    St. Basil sCathedral Essay Knudsen 1 St. Basil s Cathedral As legend has it, the builders of St. Basil s Cathedral were blinded by the command of Ivan the Terrible, so they could never create a building greater. There is still the question if St. Basil s is actually the most beautiful cathedral made in its time. Comparing it to the beautiful Pisa Cathedral and Assumption Cathedral, which were made around the same time, one could find it hard to decide which is the most artistic. Looking at the materials, art, and icons of cathedrals are ways to gauge how beautiful the building is. St. Basil s Cathedral was the most beautiful cathedral made in its time. Some words that would be helpful to know as these churches are being described, which will be quoted ... Show more content on Helpwriting.net ... The outside is made of white stone blocks. Inside the cathedral the masonry is filled with pieces of rough stone used in the walls to fill the cavities. The pillars, drums, and the alter wall are made out of brick. There are large paintings on the pillars stretching from the ground to the bottom of the domes. Assumption Cathedral is famous for its murals. The walls are painted in extremely fine detail, and on the top of the walls there are images of God. On the middle of the Knudsen 4 walls, there are paintings of the Life of the Virgin. On the bottom of the walls there are images of the seven ecumenical councils. The song The Last Judgement is painted on the west wall. Numerous figures of martyrs are painted on the pillars, and there are also many icons. There used to be an icon of Our Lady of Vladimir, but later on the icon was moved to St. Basil s Cathedral so it wouldn t be stolen because it was so expensive. There are icons of the Virgin Hodegetria, Saint George, Trinity. There is a large iconostasis, which is a screen bearing icon that separates the sanctuary from the nave, that occupies the whole wide wall of the cathedral. One of Russia s most famous monuments is St. Basil s Cathedral located in Red Square. It is said that the cathedral is located where another church with a cemetery stood. That cemetery is said to be the cemetery in which the ... Get more on HelpWriting.net ...
  • 26.
    The Case OfArizona Vs. United States Brief for Respondent: In the case, Arizona versus United States, I am representing the respondent, United States, where we are seeking to stop the enforcement of S.B. 1070 in the federal district court before the law can be taken into effect. S.B. 1070, also known as Support Our Law Enforcement and Safe Neighborhoods Act, was passed in the state of Arizona in 2010 as an effort to address the large numbers of unlawful immigrants entering the state. The United States seeks to declare S.B. 1070 as preempted by the federal immigration law, where the four provisions of S.B. 1070, Section 3, Section 5, Section 6 and Section 2(B) violated the Supremacy Clause of the United States Constitution. Relevant Constitutional Provision: In our defense, we will be utilizing Article 1, Section 8, clause 4 of the United States Constitution which establishes a uniform rule of Naturalization. It states that only Congress has the exclusive authority control over immigration and establishing new regulations that would allow individuals to become naturalized citizens of the United States of America and not the states. Section 9, clause 2 will also come into play in relation to Section 6 of S.B. 1070, in which the privilege of the Writ of Habeas Corpus cannot not be suspended. It solidifies the notion that an individual cannot be incarcerated without facing legitimate charges indefinite imprisonment is not allowed without legal due process. The Equal Protection Clause, which is part of the ... Get more on HelpWriting.net ...
  • 27.
    Richard Rainsford InThe Most Dangerous Game By Richard... In the short story, The Most Dangerous Game by Richard Connell Rainsford has to prove he still has a sense of humanity when he encounters The evil general Zaroff. Dwight Lyman once said, Character is what you are in the dark. which is excellent quote to compare this story too. In the beginning of the story Rainsford has his eye set out on the mysterious and ominous island which all sailors were afraid to go too. The sailors claimed there was a beast on the island which was not afraid of any man, but Rainsford without flinching left to this notorious island. Rainsfords actions show his bravery while all other men are afraid. Upon arrival he walks through the forest with the noises of many animals echoing throughout. Suddenly, he ... Get more on HelpWriting.net ...
  • 28.
    How Does JayGatsby Change It all started as a young son of farmers felt in love with a beautiful rich woman by the name of daisy. The young man left to follow his dream of becoming wealthy and hopefully come back and win daisy s love. The great gatsby explores a big theme on change. The character originated the name James gatz later on to changed to jay gatsby. James gatz young life was not really the best, his parents were farmers. He was not happy with them, as a young man gatz stranged away from his parents now having even less than before. As the time passed he wanted to be away from all his early years. Changing his name from james gatz to become jay gatsby as his life became much more different from the past years. Jay gatsby was dreaming big but the money was ... Get more on HelpWriting.net ...
  • 29.
    Role of Natureand Nurture in Language Development How do both nature and nurture interact in the promotion of language development in young children? The debate between many researchers is the argument of whether nature or nurture play a more important role in development. In this essay I will be looking into both aspects of nature and nurture focusing specifically on their influence towards language development in children. A main controversial question I will be looking into is the question of whether are we born already equipped with mechanisms which help us to learn language, or is language learned throughout a child s environment by, for example, imitation and repetition? Studies done by some opposing researchers claim to show that nature and nurture promote language development ... Show more content on Helpwriting.net ... Although Jim did learn speech it became noticeably odd to others around him as he had developed his own, unique grammatical characteristics and his poor articulation meant he didn t acquire normal language skills (Sachs et al 1981). Bruner suggests that this was due to lack of social interaction in his learning of speech, which again highlights the importance of nurture in promoting a child s language development. However, it can be argued with (Bruner 1964) that social interaction doesn t explain all the complexities of language acquisition. Almost every day the language we hear is often incorrect, poorly defined, incomplete and full of hesitations, mispronunciations and other errors, and yet despite this we still learn to talk following the correct grammatical rules. Again this indicates the idea of Chomsky s (1968) LAD model that children are born hard wired with the innate knowledge of linguistic rules and so these rules help the baby make estimations and presumptions about the language it is hearing. From these estimations and presumption the child can work out grammatical sets of rules and when more language is exposed to them, the more their language develops. Even within Chomsky s (1968) LAD theory, undoubtedly he believed the role and promotion of the nature aspect is the core foundation on which language can develop. But his theory also requires the role of nurture ... Get more on HelpWriting.net ...
  • 30.
    Looking at Skyys Vodka Advetisement When looking at Skyy s vodka advertisement, they had encoded many types of meanings in their advertisement to appeal customers into buying their products. You first see a woman dressed up all in black holding a martini shaker while a man is sitting in a round chair holding a martini glass. You can only see the man s hand and legs which creates a mysterious look with the combination of the setting being night time. The second thing you would see is the actual product in the corner of the ad because of the contrast of the dark bottle and the white table and chair. The white man sitting in the big round chair without his face reduces the attention of him which brings more attention towards the woman. The man without the face could represent that you could be the person who is sitting there and be treated like a king by the women serving you vodka in a seductive way. This would bring attention to male customers who are looking at the ad and they can decode the message of buying this vodka would get you a sexy woman serving you in a luxurious suite alone. The attractive woman is the core concept to appeal to customers by the placement and size being almost the whole print ad. The lighting towards the women enhances the woman s curves, breasts and a smooth silky skin. The position of the woman shows a seductive approach to the man by how she is very close holding a margarita shaker even though his martini glass is full. The position of the woman with the woman s gesture towards ... Get more on HelpWriting.net ...
  • 31.
    Essay on Genderin The Crime Drama Fiction Genre According to John Fiske, Television as a culture is a crucial part of the social dynamics. Indeed any television genre is based on apparent similarities, differences and on expectations as well as assumptions shared by the viewers. It is also a cross cultural translatability as it is understood in a diversity of contexts and markets. According to Graeme Burton (2000), the genre study leads to understanding of audience pleasures and revelation of cultural myths. Also an understanding of finance and marketing within television and finally an understanding of intertextuality and postmodernist forms of television. However audiences are aware of the codes and conventions that distinguish one genre product from the next. Genre has to be what ... Show more content on Helpwriting.net ... Charlieʼs Angels was according to Anna Gough Yates (2001) a representation of femininity to the cultural dialogue surrounding feminism in the US during the 1970s . The three main protagonists in the series were private detectives called Jill Munroe, Sabrina Duncan and Kelly Garrett. They all worked for their mysterious boss Charlie that we never see and were helped by Charlieʼs sidekick Bosley. Each of the characters brought something different to the series. For example, Jill Munroe played by Farrah Fawcett was the glamorous and sexy one; however her easy going charm and her lively personality helped the angels on several investigations. Then there was Sabrina Duncan who was the smartest of the angels. She was always thinking about solutions and her strategic and calculated mind was a key ingredient to the success of their missions. Finally the last angel was Kelly Garrett who was had a mix of both good looks and intelligence. The three angels showed us how they can be confident and sexy by using many clothes and makeup to disguise themselves and fool the male criminals. According to Anna Cough Yates (2001) Within the world of Charlieʼs Angels [...] women could be empowered through immersing themselves in the world of consumerism commodity consumption allowing for a performance of femininity that could deceive and evade the exercise of dominant pattern of gender relations. This also ... Get more on HelpWriting.net ...
  • 32.
    Advantages And DisadvantagesOf Electronic Survey In this part I will go through the questionnaire layout and construction. Then I will define the electronic survey and its advantages and disadvantages. In fact, there is no strong theoretical base for questionnaire design. All researchers have their own way born out from their experience and other previous researchers experience. Moreover, Questionnaire design is more of an art than science (Oberski, 2015, p. 1). The questionnaire is defined as a document containing serious of questions and other types of items designed to solicit information appropriate to analysis (Babbie, 1990, p. 377). In our daily work we used the questionnaire as a tool for collecting information to justify and explain cases, knowledge, and behaviors on target group. Questionnaire design is very crucial and important part of the research because inappropriate questionnaire will misleads the research result. Indeed, we used questionnaire in our daily life to satisfy our queries in in another format. For example, we ask questions in different events like when we want to pay something. The use of questionnaire in research is somehow similar to that in our daily life. It constructed to collect information or answers related to the research issue for ... Show more content on Helpwriting.net ... The online survey is the cheapest survey method. No need to pay for printing questionnaire, no cost for developing the questionnaire and telephone interviews. Also, no cost of additional workers to collect and analyze data. The time needed for completing the online survey is on average two thirds shorter than that of traditional research methods as the information gathered automatically (smith et al. 1986). Also. It is quicky and easy to analyse like google Drive. You can develop your survey and the data will analyzed automatocly. Electronic survey easy to use for researchers, participants and also to style as you ... Get more on HelpWriting.net ...
  • 33.
    The Defining Decade TheDefining Decade was one of the most unique and informative books I have ever read. Using this book in relation to my life, I have gained a lot of acumen on how there are a lot of advantages in your twenties and if you do not take advantage of them now, there will be consequences in the future. One point that made a lasting impression on me was the topic on weak ties. Meg Jay says, Weak ties feel too different or in some cases, literally too far away to be close friends. But thats the point. Because they re not just figures in an already ingrown cluster, weak ties gives us access to something fresh. They know things and people that we don t know. (21) This is a very accurate statement because networking leads to opportunities that cannot be seen unless you act and take advantage of it. Perhaps the single best thing we can do to make our own luck in our twenties is to say yes to our weak ties or give them a reason to say yes to us. (31) Most people stay in their ... Show more content on Helpwriting.net ... However, I will not use this book to help me with my love life because there are cultural differences when it comes to love and marriage in my religion. This book has also taught me that many people will have an opinion on how I should live my life. However finding myself and making my own decisions is how I choose to grow as a man. Jay has stated helpful career tips and intelligent points regarding time. The choices we make in our twenties affect us for the rest of our lives. You have to start somewhere and experience is what will count in the long run. One new aspect I have learned is to never procrastinate or hold back. Meg Jays continues to remind us that it is always beneficiary to take the first step. Never let fear or doubt hold you back. I agree with what Meg Jay has to say because I was always doubtful and anxious about my future. After reading The Defining Decade, I feel I have effectively learned how to cope with ... Get more on HelpWriting.net ...
  • 34.
    The Impact OfContemporary Uk On New Zealand Essay The increase in globalization has enabled a plethora of means in which organizations can access more talent and new technology that have become available. Due to this phenomenon, businesses have required to become more creative and embrace change as an essential method of staying competitive in their marketplace. The increase in ethnic group migration to New Zealand and the concept of managing this diverse range of culture and interacting with individuals with different cultures, belief systems is a current issue that impacts contemporary organisations in New Zealand. According to Sayers (2012), countries throughout history have different yet related ways to deal with inequality and discrimination issues that occur through diverse people existing in close proximity. From social movements focusing on womens rights, civil rights, anti slavery and indigenous rights, to modern diversity such as disability activism and managing diversity in the workplace, it is apparent that this issue of managing diversity is an ongoing encounter. Looking at the 2013 Census published by Statistics New Zealand (2013), we can see a substantial increase in ethnic groups in New Zealand since the 2006 Census. There is a 14% increase in European ethnicities, 6% increase in Maori, 11% increase in Pacific peoples, 33% increase in Asians, and 35% increase in Middle Eastern, Latin American, and African ethnicities since 2006. Sayers (2012) states that demographic change is the main reason organizations ... Get more on HelpWriting.net ...
  • 35.
    The Rosetta Mission Billionsof years ago, a comet roughly 15 kilometers in size collided with the Earth. The collision resulted in the extinction of ninety percent of the species on earth, including the dinosaurs. For many years scientist have been working to solve the age old question, how did life originate on Earth? Many have come up with hypotheses ranging from evolution to extraterrestrial beings. However new evidence has come into light that the same comet that destroyed the dinosaurs could have been the starting point for our creation. In September, Dr. Haruna Sugahara and Dr. Koichi Mimura presented their findings at the Goldschmidt Geochemistry Conference, held in Prague. They had performed a number of experiments, where they tried to recreate the conditions of the Earth after impact with the comet. To do this they used a mixture of chemicals containing water, silicate, and amino acids. They then shot the frozen mixture out of a gun and observed the fall out. When they were observing the aftermath, they noticed that some of the amino acids has bonded and formed peptides. Peptides are known to be some of the basic building blocks of life. They are used in our bodies every day when creating ... Show more content on Helpwriting.net ... Some of which are the NASA Stardust Mission and the Rosetta Mission. The Rosetta mission, along with its probe Philae, was launched in 2004, and after 10 years it landed on the comet 67P/Churyumov Gerasimenko. During touchdown, Philae survived a double bounce landing. It then proceeded to collect and analyzed dozens of samples from the comet s surface. But this data was almost lost when Philae s primary battery died, and it was unable to recharge, due to its position on the shaded side of the comet. However, when the comet got closer to the Sun, it was able to recharge and it sent a signal on June 13th, along with the data it had contained, before losing signal once ... Get more on HelpWriting.net ...
  • 36.
    Realism In UmbertoD The Italian Neo realist film Umberto D directed by Vittorio De Sica follows the life of elderly Umberto Domenico Ferrari, a pensioner struggling to get by after pensions have been reduced post World War II. In the aftermath of major tragedy and suffering, such as the war that Umberto lived through, hope can be hard to find. Society is a web of dependence. Individuals rely on the government to provide a support structure of benefits and protection. Individuals count on each other for love and validation. When one strand of the web collapses, disaster can result. In this case, the government let Umberto down by not providing his pension. His life tilts on the edge, but the dependence of his dog brings it back into balance. Umberto D shows how ... Show more content on Helpwriting.net ... At certain points throughout the movie, he tries to step in as a father figure for her. He asks her if she has done her grammar assignment. When she responds no he replies, Everyone takes advantage of the ignorant. Umberto also promises to talk to the two soldiers who one of which she suspects may be the father to get them to them to take responsibility. Maria does return the relationship, she trusts him enough that he is the only one she tells that she is pregnant and does not know who the father is and she agrees to watch Flike while he is in the hospital, however; when one of the nuns at the hospital asks Umberto is Maria is his daughter he jokingly responds yes but she is quick to say no. She leaves soon after. Isolation brings these two together but their relationship doesn t go much deeper than that and Maria has too many of her own issues to fully be there for Umberto. The only constant presence in Umberto s life is his dog ... Get more on HelpWriting.net ...
  • 37.
    The Tories ResearchPaper The Tories were compiled disgruntled young Irishmen whose ancient hatred for the English coupled with the spectacle of defeat, despair and degradation was sufficient reason to continue resistance . They were led by dispossessed noblemen and Irish officers. They mostly attacked livestock but were not against killing an Englishman once in a while. The English s punishment for Tories was strict and after a band of Tories killed two Protestants in Lackagh, 4 Irishmen were hanged for not preventing the murder and others, including 2 priests and an 80 year old woman were sent to Barbados. Since the Irish usually just took livestock though, the English would just tax the town closest to where the livestock was taken. Frequently, the town could not pay this and this would cause the government to tax the surrounding areas. This in turn would cause many more men to become Tories due the economic strife being inflicted on them by the English. It got so bad in some areas that Catholic swordsmen were allowed to stay in some ... Show more content on Helpwriting.net ... When the Adventurers arrived on their lands, they often found the former Irish owners still living on it. Little sympathy was found amongst the English military officers due to their newfound economic rivalry and the affection that some of the officers had gained through their exposure to the Irish for almost a decade . The Adventures, who were made up of mostly London merchant, had all the Anti Catholic prejudices that were all too common at the time of their arrival . But little to nothing was actually done to rid the area of the Irish who were doing labor. The Adventures also made up only a small group that had little influence over policies in Ireland at the time. Shortly after the Adventurers arrival though, the Cromwellian Settlement would begin its unraveling that would lead to the Restoration of King Charles II in ... Get more on HelpWriting.net ...
  • 38.
    Nt1330 Lab 3.1 Fig.3.1 Fingerprint scanning Minutia points represent positions where friction ridges end abruptly or where a ridge branches into two or many more ridges. A typical good quality fingerprint template contains 20 70 minutiae points; the actual number depends on the size of the finger sensor surface and how the user places his or her finger on the sensor. The system stores the minutiae information position and direction along with the user s demographic information as a template in the enrollment database. During the identification phase, the user puts the finger on the same sensor, generating a new fingerprint image or template called query print. Minutiae points are carried out from the query print, and the matcher module compares the set of query minutia with the stored minutia templates or image in the enrollment database to find the number of similar minutia points. Because of variations present in finger placement and pressure applied to the sensor, the minutia points take out from the template and query fingerprints must be lined up, or submitted before matching. After line up the fingerprints, the matcher decides the number of pairs of matching minutiae two minutiae points that have similar location and directions. The system decides the user s identity by comparing the match score to a ... Show more content on Helpwriting.net ... It is an excellent fingerprint input device can be applied extensively in social security, public security, attendance, fingerprint encryption, embedded, and many other applications. R305 miniature fingerprint scanner to automatically read the fingerprint image, and through a USB interface to transfer digital images of the fingerprint to the computer controlled technology to support the Bio key SDK build out tools. Require authentication for laptop computers, desktop computer or other personal computing devices, it is the ideal ... Get more on HelpWriting.net ...
  • 39.
    Tim Good Leadership StrategicAnalysis Lonnie Ivery American Public University Introduction When the leadership of Apple changed from the visionary leader and founder Steve Jobs to Tim Cook many people viewed the transition with skepticism because of the big shoes that Tim was expected to fit in. The competition was high especially in the smart phones and watches market where the rate of innovation from the other competing companies is also high. The creativity of firms like Sam Sung had threatened to wipe out the legacy of Apple as the leading producer of smart devices. The Apple stocks had begun declining, and the sales volume for the Apple products had gone down in the global market. It was the innovative and creative nature of the company that Tim ... Show more content on Helpwriting.net ... A good management body learns from the mistakes of the past, the competition and uses the feedback to bounce back and take the lead. This is the tactic that Tim Cook when he released the iPhone 6 series, the Apple watch and the Apple pay to stay ahead of the competition. Organizational Structure of Apple Organizational structure is the most crucial element for the success of any business. This is because of the way it facilitates and supports the management system of the organization. It is through the structure that specialization and differentiation are attained. For effective management of the employees, different firms employ different structures for the organization that is unique to its operation and the organization culture. The CEO is at the center of the structure, and he coordinates the activities of all the other functions to ensure that the goals of the firm are reached. Its organizational structure majorly contributes the successful innovation culture of Apple. It has also created the business and market growth opportunities for the ... Get more on HelpWriting.net ...
  • 40.
    Strategic Plan Analysis strategicPlan Analysis This paper will evaluate and make recommendations regarding City of El Centro s strategic plan, its mission, vision, goals, and objectives. A brief history of the City of El Centro will be included. A SWOTt analysis (strengths, weaknesses, opportunities, threats, and trends) on the City of El Centro will be performed. Included in this paper will be City of El Centro s mission statement labeled Attachment A , City of El Centro s vision statement labeled Attachment B , City of El Centro s goals labeled Attachment C , City of El Centro s objectives labeled Attachment D , City of El Centro s history labeled Attachment E , and City of El Centro s SWOTt Analysis Grid labeled Attachment F . Peter ... Show more content on Helpwriting.net ... Will mature into a modern, technologically advanced, socially cohesive community, which celebrates its diversity and openness to change while remaining a wholesome place to raise a family. ...will thrive as regional focus for the advancement and enjoyment of the arts, culture, leisure, and recreational activities. We foresee that together we will have made 21st century El Centro a model city; safe, environmentally healthy, culturally vibrant, clean and beautiful with an admirable quality of life. (para. 1 2). Please see the attached City of El Centro s vision statement labeled Attachment B. City of El Centro s Goals Planware.org (n.d.) defines goals as, Goals are specific interim or ultimate time based measurements to be achieved by implementing strategies in pursuit of the company s objectives (p. 5). The City of El Centro s city goals are: 1. Transportation Mobility, 2. Transportation Infrastructure, 3. Implement, 4. Safe Neighborhoods, 5. Recreation and Lifelong Learning, 6. Health and Wellness, 7. City Beautification, 8. Arts Culture, and 9. Economic Development (p.1). Please see the attached City of El Centro s city goals labeled Attachment C for detailed goals. City of El Centro s Objectives Planware.org (n.d.) defines objectives as, The third key element is to explicitly state the business s objective in terms of the ... Get more on HelpWriting.net ...
  • 41.
    Examples Of PrideIn The Iliad In his telling of The Iliad, Homer introduces us to one of the demigods, Akhilleus. Akhilleus was born by the goddess, Thetis, daughter to Poseidon and to the human, Peleus. His position is as commander of the entire Greek army. At the start of this war, between the Akhaians and the Trojians, there was a falling out between him and the Greek king, Agamemnon. In short, he ended up packing his bags and leaving the army without a commander. Pride was the cause of this whole quarrel. This pride of his was the center of many improprieties during the war. A feeling that you respect yourself and deserve to be respected by other people (definition of pride) This first example may have occurred near the end of the book, but it is going to be used first. Akhilleus pride was the direct cause for the need to withhold and torture Hektor s body after he killed him. (The Iliad, 22.410 421, 24.14 27) This event caused him to act inhumanely, no matter the reason. This action also prevented Hektor s family from having a proper funeral. Said Akhilleus: Let it be so. Let someone bring the ransom and the dead away, if the Olympian commands this in his wisdom. (24.63 66) Later he allowed Hektor s body to be taken away. ... Show more content on Helpwriting.net ... Sheen) Another time when Akhilleus pride kicked in was when his prizes from a previous battle we taken from him, and he decided to just walk away. ...Well, this time I [Akhilleus] make sail for home... (1.174 199) Akhilleus left all because he felt that he was too important to be cheated of his prizes. Frankly, he should have just sucked it up and kept going, besides he was technically AWOL. (absent without leave) However, in his defense, Agamemnon should have just done what the priest requested. Unfortunately, Akhilleus misses an opportunity to fix his mistake, when Agamemnon sent an offer of ... Get more on HelpWriting.net ...
  • 42.
    Rfid at theMetro Group Essay t the M9 606 053 REV: APRIL 1, 2009 ZEYNEP TON VINCENT DESSAIN MONIKA STACHOWIAK JOULAIN RFID at the METRO Group In early 2004, the METRO Group (Metro), Germany s biggest retailer, announced its upcoming radio frequency identification (RFID) technology rollout at 250 stores and 10 warehouses, in collaboration with 100 suppliers. The news echoed throughout the retailing community. Previous similar announcements by Wal Mart and Tesco had made it clear that some in the industry believed that the new technology had the potential to improve the performance of retail supply chains significantly. Among the many potential benefits of this technology were reduced shrink,1 increased product availability, better data quality, and higher labor ... Show more content on Helpwriting.net ... In 1939, the British Royal Air Force developed an identify friend or foe transponder that could interpret received radar signals to distinguish friendly aircraft. This was the first example of a device that could automatically and remotely identify itself to another device. RFID worked on the same basic principle: A signal was sent to a transponder which either reflected back a signal (passive system) or broadcast a signal (active system). Research and development in radar and radio frequency communication systems continued through the 1950s and 1960s. In 1973, an American entrepreneur was awarded a patent for a passive transponder used to unlock a door without a key. When a card with an embedded transponder communicated a signal to a reader near the door, the reader detected a valid identity number stored within the RFID tag and unlocked the door. A similar idea, an automated toll payment system, was commercialized in the mid 1980s. By 2005, the use of RFID had expanded. Many companies used RFID tags in employee badges. Several prisons in the United States used RFID tags to track prisoners. In 2004, Boston Marathon participants shoe laces contained RFID tags to track and accurately time the runners and to share their progress with spectators. The American Express Blue credit card started including a feature called ExpressPay that ... Get more on HelpWriting.net ...
  • 43.
    How To WriteAn Essay On The Sorcerers Of The Nightwing Recently I read this book called Sorcerers of the Nightwing by Geoffrey Huntington, it is a great book by the way. In the beginning, you will meet a young boy named Devon, who is attacked by a demon as a young boy. Fast forwarding a few years later Devon s father gets very sick, he dies, but tells Devon that he is adopted. Soon after he is sent to a place called Misery Point, where he meets Amanda and Cecily Crandall, and Alexander Muir. He lives with them at Ravenscliff, a very creepy house on top a hill in Misery Point. Later Devon faces a demon that appeared out of his closet, he remembers his father s words from when he was young, that he is stronger than any of them. He defeats the demon in without fear, and questions why it was there. ... Show more content on Helpwriting.net ... Unfortunately for Devon, it s not that simple.Around a quarter way through the book, with D.J., Marcus, Cecily, and Natalie; Devon went to Gio s, a local pizza place. Being as the chapter is called The Boy With the Talons for Hands, you could guess it s probably not a human boy. After conversing with the group about how they all came to be friends, and then they suddenly heard a noise and commotion coming from outside of the parlor. D.J. attempts to break up the fight when Devon realizes that it is no kid that is in that fight. Though the kid had brandish hair, a small frame, jeans, and Nike sneakers; something was off about him... Maybe it was the talons that he was pummeling the other kid with. Then after telling the demon to go back to hell, punched the demon straight in the face, sending the demon flying out of the door. Devon was praised for his bravery and stares of awe from the crowd around them, even D.J. asking How d you get to be so strong? in an awestruck way. Despite not being able to avoid the demon, he did save someone from being seriously hurt; thus avoiding more pain than needed, which probably was more of a demon for him. Surprisingly enough, all he had to do was punch the thing in the face and BAM! The demon s out the ... Get more on HelpWriting.net ...
  • 44.
    Amt Case AnalysisEssay 1. What has created the need for additional finance by AMT since 1983? The need for additional financing is a result of multiple factors that placed intense pressure on available cash. The first factor is the extraordinary growth AMT has experienced the last few years with an annual sales growth rate of 52.88%. The extreme growth rate in sales was accompanied with heavy spending on research and development along with rapid expansion in the company s sales force and other marketing expenditures. What made matters worse is the company has incurred operating losses, which meant that generating cash from operations was at best limited or insufficient. The second major factor is the inefficient use or mismanagement of some of the ... Show more content on Helpwriting.net ... Accounts Payable Days and Accrued Expenses also play a critical role. Days Payable is set at 50 while Accrued Expenses is assumed to be 5% of Sales. Cash as a percent of sales is set at 7.5%. Going forward, and assuming 7.5% ratio, which is very similar to the industry upper quartile in 1985, cash balances at AMT will remains solid going forward. Note that the industry s cash to sales ratio is not given directly but can be deducted by taking the Cash to Assets ratio of 16.3% (1985) and Assets to Sales ratio of 45.3% (Upper Quartile in 1985). Reshuffling these figures yields the industry s Cash to Sales of 7.4%. All these assumptions about net working capital result in tremendous need for external financing over the next several years as mentioned earlier. Annual Sales growth is expected to be at high rate 30% over the next 5 years, which puts tremendous pressure on cash. Poor management of working capital will unnecessarily tie up cash, thus requiring external financing from banks such as Western National Bank. Looking at cash to sales ratio, the historical trend for AMT is very much disturbing with the last two years having negative cash balances. With the 7.5% ratio of cash to net sales, cash balances, when managed efficiently, will remain at healthy levels over the next 5 years. The above discussion shows that high growth in sales, which is typically accompanied with high growth in working capital exerts tremendous ... Get more on HelpWriting.net ...
  • 45.
    The Subway Story Thesubway story Introduction of Subway restaurant The Subway story started when Fred DeLuca, its cofounder and his family friend Dr. Peter Buck, worked on a business plan for a submarine sandwich shop. Dr. Buck gave a loan of $1000 for implementation of this plan. The first restaurant was opened in Bridgeport, Connecticut, in 1965. It did well in its first summer with the help of advertising slogans like put a foot in your mouth. Emphasizing the foot long sandwich, and when you re hungry, make tracks for Subway. Buck suggested opening a second restaurant. That way people will see us expanding and think that we re successful. DeLuca has changed the company s system of franchise development several times over the years and has kept ... Show more content on Helpwriting.net ... According to Alon, L. (2006, p.47 48), due to religious prohibition to eat pork in case of Muslims and to eat beef in Hindus in India, no pork or beef products are used in any of the sandwiches. Instead these were substituted with lamb, chicken and turkey. Counter area and preparation areas in India are separated because vegetarians do not like to be served from the same place that non vegetarian food are prepared. Technological: new innovations and development, technological transfer, obsolescence. Subway is using Partech POS (point of sale) System. Competitive analysis According to McCarty, M. (2006), Subway is also facing competitive pressures. Main competitors are McDonalds, KFC, and Pizza Hut. McDonald s is the world s largest retailing chain with 31,000 fast food restaurants in 119 countries.(FAQ, 13), All fast food chains, including McDonald s®, Burger King®, Wendy s®, Taco Bell®, KFC®, Quiznos Sub®, Blimpie® and Arby s® are the SUBWAY® chain s competitors. This chart has been made with the help of data available on http://www.subway.com/StudentGuide/ (How we compare to our competitors, 2006) Franchisee fee of Subway is less in comparison to other restaurants. Start up cost of Subway is also less comparison to other restaurants. But the basic royalty of Wandy s is less as compare to Subway. Advertising royalty of Taco bell, Pizza hut, and Scholtzky s deli is ... Get more on HelpWriting.net ...