Hilario P. Martinez 1
PUBLIC PRIVATE
Accelerating
Public Service
or Funding Re-
Prioritization?
Hilario P. Martinez 2
ISSUES IN OBJECTIVE PRIORITY
ASSESSMENT OF PROGRAMS, PROJECTS
AND SERVICES
Difficulties and Intricacies in Finalizing the Succeeding Year’s
Work and Financial Plan in the Public Sector
Hilario P. Martinez 3
The Selection Dilemma of a
Government Agency
Hilario P. Martinez 4
Which agency or NGOs would be
complementing our programs and
projects for next year?
What criteria do we need to apply
to select the most appropriate
programs and projects for funding
and implementation?
Traditional Criteria in Prioritizing
Programs and Projects
Financing
Requirement
Schedule of
Implementation
Sponsoring
Institution/s
Hilario P. Martinez 5
What influences the prioritization of
programs, projects and other services?
Hilario P. Martinez 6
The survey says …
Cashflow and
Funding issues
Concept issues
Collaboration issues
What influences the prioritization of
programs, projects and other services?
Hilario P. Martinez 7
A political
promise?
A political
response?
A political
gimmick?
What influences the prioritization of
programs, projects and other services?
Hilario P. Martinez 8
Hmmm … Who?
What? How?
Why should I?
What influences the prioritization of
programs, projects and other services?
Hilario P. Martinez 9
Can we make
it in time?
Who takes what?
Who gives what?
How do we put
things together?
A DATA-BASED SYSTEM OF PRIORITY
RATING AND RANKING OF PROGRAMS/
PROJECTS FOR IMPLEMENTATION
Hilario P. Martinez 10
Criteria for Ranking
Programs/Projects
Do-ability
Importance
Magnitude
Urgency
Relevance
Hilario P. Martinez 11
The Criteria …
• relates to the capability and capacity of an organization to
accomplish its planned targets given the limitation of its resources
D o - a b i l i t y
• refers to the qualitative degree of significance attributed to certain
factors to contribute to mission critical
I m p o r t a n c e
• refers to the relative sizes and trends of a particular set of information
M a g n i t u d e
• refers to the degree of exigency of addressing a given situation
U r g e n c y
• refers to the degree of congruence to the vision, mission and
objectives of a service area
R e l e v a n c e
Hilario P. Martinez 12
Weight per Criterion
Do-ability 5 pts
Importance 5 pts
Magnitude 5 pts
Urgency 5 pts
Relevance 5 pts
Hilario P. Martinez 13
The Rating Scale …
5
points
Highest
4
points
2nd
Highest
3
points
Median
2
points
2nd
Lowest
1
point
Lowest
Hilario P. Martinez 14
The Rating per PPA*
Hilario P. Martinez 15
D
O
-
A
B
I
L
I
T
Y
I
M
P
O
R
T
A
N
C
E
M
A
G
N
I
T
U
D
E
U
R
G
E
N
C
Y
R
E
L
E
V
A
N
C
E
S
C
O
R
E
≤5 ≤5 ≤5 ≤5 ≤5 ≤25
* Program/Project/Activity
Agency Program/Project
Assessment Form
Hilario P. Martinez 16
Page 1 Page 2
Partner
Agency
Assessment
Form
Engaging the active
participation of partner
agencies in the development
and implementation of
public sector programs and
projects
Hilario P. Martinez 17
DETAILS OF THE PRIORITIZATION
CRITERIA
The 5 Cs . . .
DOABILITY,
IMPORTANCE,
MAGNITUDE,
URGENCY and
RELEVANCE . . .
Hilario P. Martinez 18
Do-ability
• PPAs that can be
implemented given the
limits of resources and
circumstances affecting
it
• Must be responded to
by proponent agency
• 90%+ of required
resources are available5 pts
• 80-89% of required
resources are available4 pts
• 70-79% of required
resources are available3 pts
• 60-69% of required
resources are available2 pts
• 50-59% of required
resources are available1 pt
Hilario P. Martinez 19
Rating Level:
Do-ability – Rating Reference
Hilario P. Martinez 20
Do-ability Sample Rating Worksheet
(Proponent Agency)
Hilario P. Martinez 21
Do-ability Sample Rating Worksheet
(Partner-Agency*)
Hilario P. Martinez 22
* - Assuming 1 Partner-Organization per PPA. If more than 1, apply
the same process and average rates obtained
Do-ability Sample Rating Worksheet
(Average of Proponent and Partner-Agency)
Hilario P. Martinez 23
Importance
The qualitative degree
of significance
attributed to certain
factors to contribute to
mission critical
programs
Each will determine,
according to its mandate
and perspective, the
degree of importance a
joint engagement entails
to them
•Highest imperative & value
to the agency’s mandate5 pts
•2nd highest degree of
significance4 pts
•3rd or moderate degree of
significance3 pts
•4th or minor degree of
significance2 pts
•least degree of significance1 pt
Hilario P. Martinez 24
Priority Ranking:
How
would you
rate the level of
importance of this
PPA to your agency?
Importance – Rating Reference
Hilario P. Martinez 25
81% - 100%
61% - 80%
41% - 60%
21% - 40%
01% - 20%
Degree of
Importance
How
does your
Partner-agency
rate the level of
importance of this
PPA to them?
C – Partner-Agency
P – Proponent Agency
Proponent Agency
P5
P4
P3
P2
P1
C5
C4
C3
C2
C1
Partner-Agency
Importance – Conversion Table
Hilario P. Martinez 26
Combination Points Combination Points Points Permutations
C5 & P5 = 5 C4 & P5 = 4.5 5 = C5 & P5
C5 & P4 = 4.5 C4 & P4 = 4 4.5 = C5 & P4, C4 & P5
C5 & P3 = 4 C4 & P3 = 3.5 4 = C5 & P3, C4 & P4, C3 & P5
C5 & P2 = 3.5 C4 & P2 = 3 3.5 = C5 & P2, C4 & P3, C3 & P4, C2 & P5
C5 & P1 = 3 C4 & P1 = 2.5 3 = C5 & P1, C4 & P2, C3 & P3, C2 & P4, C1 & P5
2.5 = C4 & P1, C3 & P2, C2 & P3, C1 & P4
C3 & P5 = 4 C2 & P5 = 3.5 2 = C3 & P1, C2 & P2, C1 & P2
C3 & P4 = 3.5 C2 & P4 = 3 1.5 = C2 & P1, C1 & P2
C3 & P3 = 3 C2 & P3 = 2.5 1 = C1 & P1
C3 & P2 = 2.5 C2 & P2 = 2
C3 & P1 = 2 C2 & P1 = 1.5
C1 & P5 = 3 Legend:
C1 & P4 = 2.5 C = Partner Agency
C1 & P3 = 2 P = Proponent Agency
C1 & P2 = 1.5
C1 & P1 = 1
Importance – Rating Matrix
5.0 - C5 & P5
4.5 - C5 & P4, C4 & P5
4.0 - C5 & P3, C4 & P4, C3 & P5
3.5 - C5 & P2, C4 & P3, C3 & P4, C2 & P5
3.0 - C5 & P1, C4 & P2, C3 & P3, C2 & P4, C1 & P5
2.5 - C4 & P1, C3 & P2, C2 & P3, C1 & P4
2.0 - C3 & P1, C2 & P2, C1 & P2
1.5 - C2 & P1, C1 & P2
1.0 - C1 & P1
Hilario P. Martinez 27
H
I
G
H
L
O
W
COMBINATION OF POSSIBLE RESPONSES PER RATE
C – Client-Partner or
Target Sector
P – Proponent Agency
Importance – Sample Rating
Worksheet
Hilario P. Martinez 28
Magnitude - the relative sizes and trends of
affected beneficiary sector
Hilario P. Martinez 29
Determining whether a
factor has an increasing or
decreasing trend is a
function of time series
Determining whether a
factor is increasing or
decreasing in size compared
to another is a function of
quantity
The combined ratings for
trend and size comprises
the rating for “Magnitude"
Priority Ranking:
5 points Very
Significant
4 points Significant
3 points Acceptable
2 points Slightly
Acceptable
1 point Not
Acceptable
What tendency does the
analysis of the data disclose?
Is it increasing, same as
before or decreasing?
Magnitude – Rating Reference
Hilario P. Martinez 30
How does the latest data set
compare with previous year,
bigger, the same or smaller?
• 51% to 100% greaterS5=5
• 11% to 50% greaterS4=4
• -10% to 10% deviationS3=3
• -11% to -50% lesserS2=2
• - 51% to -100% lesserS1=1
Decreasing
T1=1
Increasing
T2=2
Size (Quantity) Trend (Time Series)
(at least 3 years data set)
Magnitude – Size and
Trend Pairs
Hilario P. Martinez 31
T2 & S5
T2 & S4
T2 T2 & S3
S5 T2 & S2
S4 T2 & S1
S3
S2 T1 & S5
S1 T1 & S4
T1 T1 & S3
T1 & S2
T1 & S1
Magnitude – Rating Matrix
Hilario P. Martinez 32
S – Size
T – Trend
(S x T) / 2
H
I
G
H
L
O
W
COMBINATIONOFPOSSIBLE
RESPONSESPERPOINTSCORE
5 = T2 & S5
4 = T2 & S4
3 = T2 & S3
2.5 = T1 & S5
2 = T2 & S2, T1 & S2
1.5 = T1 & S3
1 = T2 & S1, T1
& S2
0.5 = T1
& S1
Magnitude – Sample Rating Worksheet
Hilario P. Martinez 33
Urgency - time consideration or response that must be
made to a given problem or issue over time
5
Most urgent
Within
the next
2 months
4
Urgent
Within
the next
3 to 4
months
3
Moderately
urgent
Within
the next
5 to 6
months
2
Least urgent
Within
the next
7 to 8
months
1
Not urgent
Within
the next
9 to 10
months
Hilario P. Martinez 34
This criterion should be responded to by the proponent organization, but
preferably in consultation with the client-organization or beneficiary sector
Urgency – Sample Rating Worksheet
Hilario P. Martinez 35
Relevance -how a project relates to the vision, mission
and objectives of the service area
5
Most
relevant
Beneficiary
impact
estimated at
81-100%
4
Relevant
Beneficiary
impact
estimated at
61-80%
3
Moderately
Relevant
Beneficiary
impact
estimated at
41-60%
2
Less
Relevant
Beneficiary
impact
estimated at
21-40%
1
Not
Relevant
Beneficiary
impact
estimated at
01-20%
Hilario P. Martinez 36
This criterion should be responded to by the proponent organization,
but in consultation with the client-organization or beneficiary sector
Relevance – Sample Rating Worksheet
Hilario P. Martinez 37
DETERMINING THE FINAL PRIORITY
RATING AND RANKING OF PROGRAMS
AND PROJECTS FOR NEXT YEAR’S WORK
AND FINANCIAL PLAN
Hilario P. Martinez 38
Putting the Scores together
Hilario P. Martinez 39
Priority
Rating
Doability
Importance
Magnitude
Urgency
Relevance
Ranking Summary Worksheet
Hilario P. Martinez 40
+ + + + +
S
O
R
T
D
E
S
C
E
N
D
I
N
G
Sample Summary Rating Worksheet
Hilario P. Martinez 41
Determining next year’s qualified PPAs
for prioritization
Hilario P. Martinez 42
Median = 15.5
Arranged by PPA # Arranged by Points Earned
QUALIFIEDPPAs
What if Magnitude (Size & Trend) could be
a factor for additional point/s?
Hilario P. Martinez 43
NOTE: The values for Mag(Size) per PPA are for illustrative purposes only, but the
ratings for Mag(size) and Mag(trend) are the same with previous data used.
‘
Total Additional Points due to Comparative
Implication of Magnitude (Size and Trend)
Hilario P. Martinez 44
Values of Magnitude(Size) are ranked,
only the top 5 are rated in descending
order (1, 0.8, 0.6, 0.4 & 0.2)
Only Magnitude (Trend)
with a score of 2 is rated
0.5 for bonus point
Final Total Points Earned per PPA
Hilario P. Martinez 45
PPAs’ Final Priority Ranking
Hilario P. Martinez 46
Set Median = 15.5
TopmosteligiblePPAs
forprioritization
Finalizing Partners’ Commitment to
Next Year’s Prioritized PPAs for
Funding and Programming
Hilario P. Martinez 47
WHAT ADVANTAGES DOES THIS CONCEPT
OFFER A PUBLIC SECTOR AGENCY? AND
MORESO, THE TAXPAYERS?
Hilario P. Martinez 48
Advantages of adopting this approach to
program/project ranking
Hilario P. Martinez 49
The other factor
It discourages,
minimizes, if not
totally prevent, the
adoption of
“?QUESTIONABLE?”
P.P.As from being
considered and
funded for
implementation
Themostimportant
advantageofusingthis
application–
Hilario P. Martinez 50
Ultimately, the Program/Project
Priority Rating System results in …
Higher % of
public sector
program/
project
implemen-
tation
Increased %
of public
sector fund
utilization
Improved
public sector
program/
project
planning
efficiency
Decreased
unwarranted
public sector
savings
accumu-
lation
Improved
public-
private
sector
collaboration
Hilario P. Martinez 51
S U S T A I N A B I L I T Y a n d S T A B I L I T Y

More Related Content

What's hot

Introduction to contract management
Introduction to contract managementIntroduction to contract management
Introduction to contract management
Berkman Solutions
 
Project procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaProject procuremenet contract in ethiopia
Project procuremenet contract in ethiopia
Guta Mengesha
 
Contract & Tender Management
Contract & Tender ManagementContract & Tender Management
Contract & Tender Management
Anand Subramaniam
 
Basic procurement principle lect.1
Basic procurement principle lect.1Basic procurement principle lect.1
Basic procurement principle lect.1
AMOS MIYUDA
 
Using Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyUsing Two-Stage Tendering Effectively
Using Two-Stage Tendering Effectively
Francis Ho
 
pRIMAVERA - Progress report checklist - Substation
pRIMAVERA - Progress report checklist - SubstationpRIMAVERA - Progress report checklist - Substation
pRIMAVERA - Progress report checklist - Substation
RAMESH PANIGRAHI PMP
 
Value management presentation
Value management presentationValue management presentation
Value management presentation
Koh Chiun Liang
 
Contract Management
Contract Management Contract Management
Contract Management
Gazi Sanaul Hasan
 
Tender Preparation & Bid Management
Tender Preparation & Bid ManagementTender Preparation & Bid Management
Tender Preparation & Bid Management
petroEDGE
 
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATIONCONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
Chester, Ryan Bourne MSc., MBA, PMP
 
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Optimus BT
 
Sample pa process flow by bev
Sample  pa process flow by bevSample  pa process flow by bev
Sample pa process flow by bev
Beverley Baker-Harris
 
Contract management general
Contract management generalContract management general
Contract management general
Vasudevan Deivasigamani
 
project management information system
project management information systemproject management information system
project management information system
Aswin prakash i , Xantus Technologies
 
Procurement
ProcurementProcurement
Procurement
asim78
 
RFP_Process Flow Chart
RFP_Process Flow ChartRFP_Process Flow Chart
PM process groups and processes
PM process groups and processesPM process groups and processes
PM process groups and processes
Hesham Abdalla هشام عبدالله
 
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoEpc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promo
ignitetribes
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013
Ong-Art Sanpinit
 
Contract Management
Contract ManagementContract Management

What's hot (20)

Introduction to contract management
Introduction to contract managementIntroduction to contract management
Introduction to contract management
 
Project procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaProject procuremenet contract in ethiopia
Project procuremenet contract in ethiopia
 
Contract & Tender Management
Contract & Tender ManagementContract & Tender Management
Contract & Tender Management
 
Basic procurement principle lect.1
Basic procurement principle lect.1Basic procurement principle lect.1
Basic procurement principle lect.1
 
Using Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyUsing Two-Stage Tendering Effectively
Using Two-Stage Tendering Effectively
 
pRIMAVERA - Progress report checklist - Substation
pRIMAVERA - Progress report checklist - SubstationpRIMAVERA - Progress report checklist - Substation
pRIMAVERA - Progress report checklist - Substation
 
Value management presentation
Value management presentationValue management presentation
Value management presentation
 
Contract Management
Contract Management Contract Management
Contract Management
 
Tender Preparation & Bid Management
Tender Preparation & Bid ManagementTender Preparation & Bid Management
Tender Preparation & Bid Management
 
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATIONCONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
 
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
 
Sample pa process flow by bev
Sample  pa process flow by bevSample  pa process flow by bev
Sample pa process flow by bev
 
Contract management general
Contract management generalContract management general
Contract management general
 
project management information system
project management information systemproject management information system
project management information system
 
Procurement
ProcurementProcurement
Procurement
 
RFP_Process Flow Chart
RFP_Process Flow ChartRFP_Process Flow Chart
RFP_Process Flow Chart
 
PM process groups and processes
PM process groups and processesPM process groups and processes
PM process groups and processes
 
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoEpc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promo
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013
 
Contract Management
Contract ManagementContract Management
Contract Management
 

Similar to Program-Project Priority Rating and Ranking System

Integrated Performance Evaluation System
Integrated Performance Evaluation SystemIntegrated Performance Evaluation System
Integrated Performance Evaluation System
Hilario Martinez
 
Transfer Pricing Function Benchmarking Report
Transfer Pricing Function Benchmarking ReportTransfer Pricing Function Benchmarking Report
Transfer Pricing Function Benchmarking Report
Juan Carlos Ceballos
 
Training and Development Needs Assessment
Training and Development Needs AssessmentTraining and Development Needs Assessment
Training and Development Needs Assessment
Hilario Martinez
 
CAPE-GPS
CAPE-GPSCAPE-GPS
Employer Branding Presentation Coca Cola
Employer Branding Presentation Coca ColaEmployer Branding Presentation Coca Cola
Employer Branding Presentation Coca Cola
brandbliss
 
Board Reporting Framework - Engage your board members and keep them strategic!
Board Reporting Framework - Engage your board members and keep them strategic!Board Reporting Framework - Engage your board members and keep them strategic!
Board Reporting Framework - Engage your board members and keep them strategic!
Artique Consulting
 
The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014
PM Solutions
 
Civil Service Reforms
Civil Service ReformsCivil Service Reforms
Civil Service Reforms
Hilario Martinez
 
The 2018 JOTW Communications Survey
The 2018 JOTW Communications SurveyThe 2018 JOTW Communications Survey
The 2018 JOTW Communications Survey
Frank Strong
 
Measurement presentation 040110
Measurement presentation 040110Measurement presentation 040110
Measurement presentation 040110
Matt Kucharski
 
Differentiated Selection of Public Servants
Differentiated Selection of Public ServantsDifferentiated Selection of Public Servants
Differentiated Selection of Public Servants
Hilario Martinez
 
11 Tips From the Front Lines
11 Tips From the Front Lines11 Tips From the Front Lines
11 Tips From the Front Lines
Vivastream
 
orgvue connect people to profit infographic
orgvue connect people to profit infographicorgvue connect people to profit infographic
orgvue connect people to profit infographic
Orgvue
 
orgvue connect people to profit infographic
orgvue connect people to profit infographicorgvue connect people to profit infographic
orgvue connect people to profit infographic
Lee Stone
 
Our Integrated Future
Our Integrated FutureOur Integrated Future
Our Integrated Future
Paine Publishing
 
Strategic Event Alignment© Whitepaper
Strategic Event Alignment© WhitepaperStrategic Event Alignment© Whitepaper
Strategic Event Alignment© Whitepaper
Susan Radojevic
 
Growth Enablers - Fifth P Industry Viewpoint
Growth Enablers - Fifth P Industry ViewpointGrowth Enablers - Fifth P Industry Viewpoint
Growth Enablers - Fifth P Industry Viewpoint
FifthP
 
Process of managing successful programs stakeholder identification,
Process of managing successful programs stakeholder identification,Process of managing successful programs stakeholder identification,
Process of managing successful programs stakeholder identification,
Andrew Zogbi PRINCE2 and MSP Practitioner ?
 
MOVING THE NEEDLE ON STRATEGIC DIVERSITY
MOVING THE NEEDLE ON STRATEGIC DIVERSITYMOVING THE NEEDLE ON STRATEGIC DIVERSITY
MOVING THE NEEDLE ON STRATEGIC DIVERSITY
Human Capital Media
 
GreenBiz 20 Tutorial Slides: Aligning and Integrating Your Sustainability Str...
GreenBiz 20 Tutorial Slides: Aligning and Integrating Your Sustainability Str...GreenBiz 20 Tutorial Slides: Aligning and Integrating Your Sustainability Str...
GreenBiz 20 Tutorial Slides: Aligning and Integrating Your Sustainability Str...
GreenBiz Group
 

Similar to Program-Project Priority Rating and Ranking System (20)

Integrated Performance Evaluation System
Integrated Performance Evaluation SystemIntegrated Performance Evaluation System
Integrated Performance Evaluation System
 
Transfer Pricing Function Benchmarking Report
Transfer Pricing Function Benchmarking ReportTransfer Pricing Function Benchmarking Report
Transfer Pricing Function Benchmarking Report
 
Training and Development Needs Assessment
Training and Development Needs AssessmentTraining and Development Needs Assessment
Training and Development Needs Assessment
 
CAPE-GPS
CAPE-GPSCAPE-GPS
CAPE-GPS
 
Employer Branding Presentation Coca Cola
Employer Branding Presentation Coca ColaEmployer Branding Presentation Coca Cola
Employer Branding Presentation Coca Cola
 
Board Reporting Framework - Engage your board members and keep them strategic!
Board Reporting Framework - Engage your board members and keep them strategic!Board Reporting Framework - Engage your board members and keep them strategic!
Board Reporting Framework - Engage your board members and keep them strategic!
 
The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014
 
Civil Service Reforms
Civil Service ReformsCivil Service Reforms
Civil Service Reforms
 
The 2018 JOTW Communications Survey
The 2018 JOTW Communications SurveyThe 2018 JOTW Communications Survey
The 2018 JOTW Communications Survey
 
Measurement presentation 040110
Measurement presentation 040110Measurement presentation 040110
Measurement presentation 040110
 
Differentiated Selection of Public Servants
Differentiated Selection of Public ServantsDifferentiated Selection of Public Servants
Differentiated Selection of Public Servants
 
11 Tips From the Front Lines
11 Tips From the Front Lines11 Tips From the Front Lines
11 Tips From the Front Lines
 
orgvue connect people to profit infographic
orgvue connect people to profit infographicorgvue connect people to profit infographic
orgvue connect people to profit infographic
 
orgvue connect people to profit infographic
orgvue connect people to profit infographicorgvue connect people to profit infographic
orgvue connect people to profit infographic
 
Our Integrated Future
Our Integrated FutureOur Integrated Future
Our Integrated Future
 
Strategic Event Alignment© Whitepaper
Strategic Event Alignment© WhitepaperStrategic Event Alignment© Whitepaper
Strategic Event Alignment© Whitepaper
 
Growth Enablers - Fifth P Industry Viewpoint
Growth Enablers - Fifth P Industry ViewpointGrowth Enablers - Fifth P Industry Viewpoint
Growth Enablers - Fifth P Industry Viewpoint
 
Process of managing successful programs stakeholder identification,
Process of managing successful programs stakeholder identification,Process of managing successful programs stakeholder identification,
Process of managing successful programs stakeholder identification,
 
MOVING THE NEEDLE ON STRATEGIC DIVERSITY
MOVING THE NEEDLE ON STRATEGIC DIVERSITYMOVING THE NEEDLE ON STRATEGIC DIVERSITY
MOVING THE NEEDLE ON STRATEGIC DIVERSITY
 
GreenBiz 20 Tutorial Slides: Aligning and Integrating Your Sustainability Str...
GreenBiz 20 Tutorial Slides: Aligning and Integrating Your Sustainability Str...GreenBiz 20 Tutorial Slides: Aligning and Integrating Your Sustainability Str...
GreenBiz 20 Tutorial Slides: Aligning and Integrating Your Sustainability Str...
 

More from Hilario Martinez

House of L.A.R.A.
House of L.A.R.A.House of L.A.R.A.
House of L.A.R.A.
Hilario Martinez
 
Anatomy of Traditional Politicians
Anatomy of Traditional PoliticiansAnatomy of Traditional Politicians
Anatomy of Traditional Politicians
Hilario Martinez
 
Making better use of SWOT
Making better use of SWOTMaking better use of SWOT
Making better use of SWOT
Hilario Martinez
 
Simple Excel in Fund Monitoring
Simple Excel in Fund MonitoringSimple Excel in Fund Monitoring
Simple Excel in Fund Monitoring
Hilario Martinez
 
Issues of Critical Changes in Maharlika
Issues of Critical Changes in MaharlikaIssues of Critical Changes in Maharlika
Issues of Critical Changes in Maharlika
Hilario Martinez
 
Competency Standard - Anti-Graft Tool
Competency Standard - Anti-Graft ToolCompetency Standard - Anti-Graft Tool
Competency Standard - Anti-Graft Tool
Hilario Martinez
 
SPEAR
SPEARSPEAR
Solution Providers or TraPos - an Election Reform
Solution Providers or TraPos - an Election ReformSolution Providers or TraPos - an Election Reform
Solution Providers or TraPos - an Election Reform
Hilario Martinez
 
Citizens' Commission on Appointments
Citizens' Commission on AppointmentsCitizens' Commission on Appointments
Citizens' Commission on Appointments
Hilario Martinez
 
Public bidding
Public biddingPublic bidding
Public bidding
Hilario Martinez
 
Towards Direct Citizen Participation in Governance
Towards Direct Citizen Participation in GovernanceTowards Direct Citizen Participation in Governance
Towards Direct Citizen Participation in Governance
Hilario Martinez
 
Color coded Multi-Project Monitoring (CPM)
Color coded Multi-Project Monitoring (CPM)Color coded Multi-Project Monitoring (CPM)
Color coded Multi-Project Monitoring (CPM)
Hilario Martinez
 
Public Service - A Career Choice
Public Service - A Career ChoicePublic Service - A Career Choice
Public Service - A Career Choice
Hilario Martinez
 
The State or the Citizens
The State or the CitizensThe State or the Citizens
The State or the Citizens
Hilario Martinez
 
Solution Providers or Traditional Politicians
Solution Providers or Traditional PoliticiansSolution Providers or Traditional Politicians
Solution Providers or Traditional Politicians
Hilario Martinez
 
Standardizing Appointive Positions in Government
Standardizing Appointive Positions in GovernmentStandardizing Appointive Positions in Government
Standardizing Appointive Positions in Government
Hilario Martinez
 
TVET in Maharlika
TVET in MaharlikaTVET in Maharlika
TVET in Maharlika
Hilario Martinez
 
Profiling 3rd Level Personnel in the Philippine Civil Service
Profiling 3rd Level Personnel in the Philippine Civil ServiceProfiling 3rd Level Personnel in the Philippine Civil Service
Profiling 3rd Level Personnel in the Philippine Civil Service
Hilario Martinez
 
Eligibility or Competency
Eligibility or CompetencyEligibility or Competency
Eligibility or Competency
Hilario Martinez
 
Competency Assessment System for the Philippine Civil Service
Competency Assessment System for the Philippine Civil ServiceCompetency Assessment System for the Philippine Civil Service
Competency Assessment System for the Philippine Civil Service
Hilario Martinez
 

More from Hilario Martinez (20)

House of L.A.R.A.
House of L.A.R.A.House of L.A.R.A.
House of L.A.R.A.
 
Anatomy of Traditional Politicians
Anatomy of Traditional PoliticiansAnatomy of Traditional Politicians
Anatomy of Traditional Politicians
 
Making better use of SWOT
Making better use of SWOTMaking better use of SWOT
Making better use of SWOT
 
Simple Excel in Fund Monitoring
Simple Excel in Fund MonitoringSimple Excel in Fund Monitoring
Simple Excel in Fund Monitoring
 
Issues of Critical Changes in Maharlika
Issues of Critical Changes in MaharlikaIssues of Critical Changes in Maharlika
Issues of Critical Changes in Maharlika
 
Competency Standard - Anti-Graft Tool
Competency Standard - Anti-Graft ToolCompetency Standard - Anti-Graft Tool
Competency Standard - Anti-Graft Tool
 
SPEAR
SPEARSPEAR
SPEAR
 
Solution Providers or TraPos - an Election Reform
Solution Providers or TraPos - an Election ReformSolution Providers or TraPos - an Election Reform
Solution Providers or TraPos - an Election Reform
 
Citizens' Commission on Appointments
Citizens' Commission on AppointmentsCitizens' Commission on Appointments
Citizens' Commission on Appointments
 
Public bidding
Public biddingPublic bidding
Public bidding
 
Towards Direct Citizen Participation in Governance
Towards Direct Citizen Participation in GovernanceTowards Direct Citizen Participation in Governance
Towards Direct Citizen Participation in Governance
 
Color coded Multi-Project Monitoring (CPM)
Color coded Multi-Project Monitoring (CPM)Color coded Multi-Project Monitoring (CPM)
Color coded Multi-Project Monitoring (CPM)
 
Public Service - A Career Choice
Public Service - A Career ChoicePublic Service - A Career Choice
Public Service - A Career Choice
 
The State or the Citizens
The State or the CitizensThe State or the Citizens
The State or the Citizens
 
Solution Providers or Traditional Politicians
Solution Providers or Traditional PoliticiansSolution Providers or Traditional Politicians
Solution Providers or Traditional Politicians
 
Standardizing Appointive Positions in Government
Standardizing Appointive Positions in GovernmentStandardizing Appointive Positions in Government
Standardizing Appointive Positions in Government
 
TVET in Maharlika
TVET in MaharlikaTVET in Maharlika
TVET in Maharlika
 
Profiling 3rd Level Personnel in the Philippine Civil Service
Profiling 3rd Level Personnel in the Philippine Civil ServiceProfiling 3rd Level Personnel in the Philippine Civil Service
Profiling 3rd Level Personnel in the Philippine Civil Service
 
Eligibility or Competency
Eligibility or CompetencyEligibility or Competency
Eligibility or Competency
 
Competency Assessment System for the Philippine Civil Service
Competency Assessment System for the Philippine Civil ServiceCompetency Assessment System for the Philippine Civil Service
Competency Assessment System for the Philippine Civil Service
 

Recently uploaded

2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
JSchaus & Associates
 
PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
ahcitycouncil
 
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
yemqpj
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
DanielOliver74
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
dj1cx4ex
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
narinav14
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
odmqk
 
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
yemqpj
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
Christina Parmionova
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
3woawyyl
 
Practical guide for the celebration of World Environment Day on june 5th.
Practical guide for the  celebration of World Environment Day on  june 5th.Practical guide for the  celebration of World Environment Day on  june 5th.
Practical guide for the celebration of World Environment Day on june 5th.
Christina Parmionova
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
Marked12
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
ahcitycouncil
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
narinav14
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
fundraising4
 
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
yemqpj
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
ahcitycouncil
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
Cheong Man Keong
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
ahcitycouncil
 

Recently uploaded (20)

2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
 
PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
 
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
 
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
 
Practical guide for the celebration of World Environment Day on june 5th.
Practical guide for the  celebration of World Environment Day on  june 5th.Practical guide for the  celebration of World Environment Day on  june 5th.
Practical guide for the celebration of World Environment Day on june 5th.
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
 
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
 

Program-Project Priority Rating and Ranking System

  • 1. Hilario P. Martinez 1 PUBLIC PRIVATE
  • 2. Accelerating Public Service or Funding Re- Prioritization? Hilario P. Martinez 2
  • 3. ISSUES IN OBJECTIVE PRIORITY ASSESSMENT OF PROGRAMS, PROJECTS AND SERVICES Difficulties and Intricacies in Finalizing the Succeeding Year’s Work and Financial Plan in the Public Sector Hilario P. Martinez 3
  • 4. The Selection Dilemma of a Government Agency Hilario P. Martinez 4 Which agency or NGOs would be complementing our programs and projects for next year? What criteria do we need to apply to select the most appropriate programs and projects for funding and implementation?
  • 5. Traditional Criteria in Prioritizing Programs and Projects Financing Requirement Schedule of Implementation Sponsoring Institution/s Hilario P. Martinez 5
  • 6. What influences the prioritization of programs, projects and other services? Hilario P. Martinez 6 The survey says … Cashflow and Funding issues Concept issues Collaboration issues
  • 7. What influences the prioritization of programs, projects and other services? Hilario P. Martinez 7 A political promise? A political response? A political gimmick?
  • 8. What influences the prioritization of programs, projects and other services? Hilario P. Martinez 8 Hmmm … Who? What? How? Why should I?
  • 9. What influences the prioritization of programs, projects and other services? Hilario P. Martinez 9 Can we make it in time? Who takes what? Who gives what? How do we put things together?
  • 10. A DATA-BASED SYSTEM OF PRIORITY RATING AND RANKING OF PROGRAMS/ PROJECTS FOR IMPLEMENTATION Hilario P. Martinez 10
  • 12. The Criteria … • relates to the capability and capacity of an organization to accomplish its planned targets given the limitation of its resources D o - a b i l i t y • refers to the qualitative degree of significance attributed to certain factors to contribute to mission critical I m p o r t a n c e • refers to the relative sizes and trends of a particular set of information M a g n i t u d e • refers to the degree of exigency of addressing a given situation U r g e n c y • refers to the degree of congruence to the vision, mission and objectives of a service area R e l e v a n c e Hilario P. Martinez 12
  • 13. Weight per Criterion Do-ability 5 pts Importance 5 pts Magnitude 5 pts Urgency 5 pts Relevance 5 pts Hilario P. Martinez 13
  • 14. The Rating Scale … 5 points Highest 4 points 2nd Highest 3 points Median 2 points 2nd Lowest 1 point Lowest Hilario P. Martinez 14
  • 15. The Rating per PPA* Hilario P. Martinez 15 D O - A B I L I T Y I M P O R T A N C E M A G N I T U D E U R G E N C Y R E L E V A N C E S C O R E ≤5 ≤5 ≤5 ≤5 ≤5 ≤25 * Program/Project/Activity
  • 16. Agency Program/Project Assessment Form Hilario P. Martinez 16 Page 1 Page 2
  • 17. Partner Agency Assessment Form Engaging the active participation of partner agencies in the development and implementation of public sector programs and projects Hilario P. Martinez 17
  • 18. DETAILS OF THE PRIORITIZATION CRITERIA The 5 Cs . . . DOABILITY, IMPORTANCE, MAGNITUDE, URGENCY and RELEVANCE . . . Hilario P. Martinez 18
  • 19. Do-ability • PPAs that can be implemented given the limits of resources and circumstances affecting it • Must be responded to by proponent agency • 90%+ of required resources are available5 pts • 80-89% of required resources are available4 pts • 70-79% of required resources are available3 pts • 60-69% of required resources are available2 pts • 50-59% of required resources are available1 pt Hilario P. Martinez 19 Rating Level:
  • 20. Do-ability – Rating Reference Hilario P. Martinez 20
  • 21. Do-ability Sample Rating Worksheet (Proponent Agency) Hilario P. Martinez 21
  • 22. Do-ability Sample Rating Worksheet (Partner-Agency*) Hilario P. Martinez 22 * - Assuming 1 Partner-Organization per PPA. If more than 1, apply the same process and average rates obtained
  • 23. Do-ability Sample Rating Worksheet (Average of Proponent and Partner-Agency) Hilario P. Martinez 23
  • 24. Importance The qualitative degree of significance attributed to certain factors to contribute to mission critical programs Each will determine, according to its mandate and perspective, the degree of importance a joint engagement entails to them •Highest imperative & value to the agency’s mandate5 pts •2nd highest degree of significance4 pts •3rd or moderate degree of significance3 pts •4th or minor degree of significance2 pts •least degree of significance1 pt Hilario P. Martinez 24 Priority Ranking:
  • 25. How would you rate the level of importance of this PPA to your agency? Importance – Rating Reference Hilario P. Martinez 25 81% - 100% 61% - 80% 41% - 60% 21% - 40% 01% - 20% Degree of Importance How does your Partner-agency rate the level of importance of this PPA to them? C – Partner-Agency P – Proponent Agency Proponent Agency P5 P4 P3 P2 P1 C5 C4 C3 C2 C1 Partner-Agency
  • 26. Importance – Conversion Table Hilario P. Martinez 26 Combination Points Combination Points Points Permutations C5 & P5 = 5 C4 & P5 = 4.5 5 = C5 & P5 C5 & P4 = 4.5 C4 & P4 = 4 4.5 = C5 & P4, C4 & P5 C5 & P3 = 4 C4 & P3 = 3.5 4 = C5 & P3, C4 & P4, C3 & P5 C5 & P2 = 3.5 C4 & P2 = 3 3.5 = C5 & P2, C4 & P3, C3 & P4, C2 & P5 C5 & P1 = 3 C4 & P1 = 2.5 3 = C5 & P1, C4 & P2, C3 & P3, C2 & P4, C1 & P5 2.5 = C4 & P1, C3 & P2, C2 & P3, C1 & P4 C3 & P5 = 4 C2 & P5 = 3.5 2 = C3 & P1, C2 & P2, C1 & P2 C3 & P4 = 3.5 C2 & P4 = 3 1.5 = C2 & P1, C1 & P2 C3 & P3 = 3 C2 & P3 = 2.5 1 = C1 & P1 C3 & P2 = 2.5 C2 & P2 = 2 C3 & P1 = 2 C2 & P1 = 1.5 C1 & P5 = 3 Legend: C1 & P4 = 2.5 C = Partner Agency C1 & P3 = 2 P = Proponent Agency C1 & P2 = 1.5 C1 & P1 = 1
  • 27. Importance – Rating Matrix 5.0 - C5 & P5 4.5 - C5 & P4, C4 & P5 4.0 - C5 & P3, C4 & P4, C3 & P5 3.5 - C5 & P2, C4 & P3, C3 & P4, C2 & P5 3.0 - C5 & P1, C4 & P2, C3 & P3, C2 & P4, C1 & P5 2.5 - C4 & P1, C3 & P2, C2 & P3, C1 & P4 2.0 - C3 & P1, C2 & P2, C1 & P2 1.5 - C2 & P1, C1 & P2 1.0 - C1 & P1 Hilario P. Martinez 27 H I G H L O W COMBINATION OF POSSIBLE RESPONSES PER RATE C – Client-Partner or Target Sector P – Proponent Agency
  • 28. Importance – Sample Rating Worksheet Hilario P. Martinez 28
  • 29. Magnitude - the relative sizes and trends of affected beneficiary sector Hilario P. Martinez 29 Determining whether a factor has an increasing or decreasing trend is a function of time series Determining whether a factor is increasing or decreasing in size compared to another is a function of quantity The combined ratings for trend and size comprises the rating for “Magnitude" Priority Ranking: 5 points Very Significant 4 points Significant 3 points Acceptable 2 points Slightly Acceptable 1 point Not Acceptable
  • 30. What tendency does the analysis of the data disclose? Is it increasing, same as before or decreasing? Magnitude – Rating Reference Hilario P. Martinez 30 How does the latest data set compare with previous year, bigger, the same or smaller? • 51% to 100% greaterS5=5 • 11% to 50% greaterS4=4 • -10% to 10% deviationS3=3 • -11% to -50% lesserS2=2 • - 51% to -100% lesserS1=1 Decreasing T1=1 Increasing T2=2 Size (Quantity) Trend (Time Series) (at least 3 years data set)
  • 31. Magnitude – Size and Trend Pairs Hilario P. Martinez 31 T2 & S5 T2 & S4 T2 T2 & S3 S5 T2 & S2 S4 T2 & S1 S3 S2 T1 & S5 S1 T1 & S4 T1 T1 & S3 T1 & S2 T1 & S1
  • 32. Magnitude – Rating Matrix Hilario P. Martinez 32 S – Size T – Trend (S x T) / 2 H I G H L O W COMBINATIONOFPOSSIBLE RESPONSESPERPOINTSCORE 5 = T2 & S5 4 = T2 & S4 3 = T2 & S3 2.5 = T1 & S5 2 = T2 & S2, T1 & S2 1.5 = T1 & S3 1 = T2 & S1, T1 & S2 0.5 = T1 & S1
  • 33. Magnitude – Sample Rating Worksheet Hilario P. Martinez 33
  • 34. Urgency - time consideration or response that must be made to a given problem or issue over time 5 Most urgent Within the next 2 months 4 Urgent Within the next 3 to 4 months 3 Moderately urgent Within the next 5 to 6 months 2 Least urgent Within the next 7 to 8 months 1 Not urgent Within the next 9 to 10 months Hilario P. Martinez 34 This criterion should be responded to by the proponent organization, but preferably in consultation with the client-organization or beneficiary sector
  • 35. Urgency – Sample Rating Worksheet Hilario P. Martinez 35
  • 36. Relevance -how a project relates to the vision, mission and objectives of the service area 5 Most relevant Beneficiary impact estimated at 81-100% 4 Relevant Beneficiary impact estimated at 61-80% 3 Moderately Relevant Beneficiary impact estimated at 41-60% 2 Less Relevant Beneficiary impact estimated at 21-40% 1 Not Relevant Beneficiary impact estimated at 01-20% Hilario P. Martinez 36 This criterion should be responded to by the proponent organization, but in consultation with the client-organization or beneficiary sector
  • 37. Relevance – Sample Rating Worksheet Hilario P. Martinez 37
  • 38. DETERMINING THE FINAL PRIORITY RATING AND RANKING OF PROGRAMS AND PROJECTS FOR NEXT YEAR’S WORK AND FINANCIAL PLAN Hilario P. Martinez 38
  • 39. Putting the Scores together Hilario P. Martinez 39 Priority Rating Doability Importance Magnitude Urgency Relevance
  • 40. Ranking Summary Worksheet Hilario P. Martinez 40 + + + + + S O R T D E S C E N D I N G
  • 41. Sample Summary Rating Worksheet Hilario P. Martinez 41
  • 42. Determining next year’s qualified PPAs for prioritization Hilario P. Martinez 42 Median = 15.5 Arranged by PPA # Arranged by Points Earned QUALIFIEDPPAs
  • 43. What if Magnitude (Size & Trend) could be a factor for additional point/s? Hilario P. Martinez 43 NOTE: The values for Mag(Size) per PPA are for illustrative purposes only, but the ratings for Mag(size) and Mag(trend) are the same with previous data used. ‘
  • 44. Total Additional Points due to Comparative Implication of Magnitude (Size and Trend) Hilario P. Martinez 44 Values of Magnitude(Size) are ranked, only the top 5 are rated in descending order (1, 0.8, 0.6, 0.4 & 0.2) Only Magnitude (Trend) with a score of 2 is rated 0.5 for bonus point
  • 45. Final Total Points Earned per PPA Hilario P. Martinez 45
  • 46. PPAs’ Final Priority Ranking Hilario P. Martinez 46 Set Median = 15.5 TopmosteligiblePPAs forprioritization
  • 47. Finalizing Partners’ Commitment to Next Year’s Prioritized PPAs for Funding and Programming Hilario P. Martinez 47
  • 48. WHAT ADVANTAGES DOES THIS CONCEPT OFFER A PUBLIC SECTOR AGENCY? AND MORESO, THE TAXPAYERS? Hilario P. Martinez 48
  • 49. Advantages of adopting this approach to program/project ranking Hilario P. Martinez 49
  • 50. The other factor It discourages, minimizes, if not totally prevent, the adoption of “?QUESTIONABLE?” P.P.As from being considered and funded for implementation Themostimportant advantageofusingthis application– Hilario P. Martinez 50
  • 51. Ultimately, the Program/Project Priority Rating System results in … Higher % of public sector program/ project implemen- tation Increased % of public sector fund utilization Improved public sector program/ project planning efficiency Decreased unwarranted public sector savings accumu- lation Improved public- private sector collaboration Hilario P. Martinez 51 S U S T A I N A B I L I T Y a n d S T A B I L I T Y