SlideShare a Scribd company logo
Project Presentation On wireless
communication
Department of Electronics & Communication
Lovely professional university.
Submitted By :
Name Arijit Roy
Reg No : 11710188
Wireless communications is a type of
data communication that is performed
and delivered wirelessly.
:
Definition:
Block diagram of wireless
communication:
Generations:
• 1st generation (1G)
• 2nd generation (2G)
• 3rd generation (3G)
• 4th generation (4G)
1G:
 1G is pure analog system
 FDMA
 AMPS(analog mobile phone system)
 Only voice
 Poor handoff
2G :
 GSM(global system for mobile communication)
 Voice and data
 Works on 900,1800,1900 bands
 FDMA and TDMA
 Speed up to 64kbps
3G:
 Speed increased to 2mbps.
 Video calling and TV streaming.
 WCDMA
 High security and performance.
4G:
 LTE (long time evolution).
 Speed 100Mbps to 1Gbps
 High speed and capacity
 More security
GSM architecture :
handover
According to area :
 Four types of handover
1. Intra BTS handover
2. Intra-BSC handover
3. Inter-BSC handover
4. Inter-MSC handover
According to frequency :
 Hard handover (break before make)
 Soft handover (make before break)
RF Survey & RF
Planning
RF Survey : It is a process of identifying
the cell site location or feasibility of cell site
location & to get the basic knowledge of the site.
It is of 2 types :
1. Anchor Survey
a)Nominal survey
b)Blind survey
2.Sharing Survey
Tools Used For Survey :
i) GPS ii) Magnetic Compass iii) Digital Camera
v) Site Data / Reference latitude/ longitude
vi) Stationary
vii) R.F. Form
iv) Measuring Tape:
RF Survey report
As Planned:
N :17.41366
E :78.53004
GPS :
SITE @0˚ SITE @30˚
SITE @ 60˚ SITE @ 90˚
SITE @ 120˚ SITE @ 150˚
SITE @ 180˚ SITE @ 210˚
SITE @ 240˚ SITE @ 270˚
SITE @ 300˚ SITE @ 330˚
ANTENNA 1 @0˚ ANTENNA 2@ 60˚
ANTENNA @240˚
RF Planning :
The three steps are as follows
STEP 1:- PREPLANNING OF NETWORK
STEP 2:-SURVEY
STEP 3:-POST PLANNING OF NETWORK
Preplanning of network :
• In Preplanning of a network, sites are established on
the map in the software without taking into
consideration the feasibility of the sites.
Open the ATOLL SOFTWARE and select the 3GPP MULTI-RAT.
Place the sites 0-5 of GSM UMTS and LTE.
Select an antenna and open the properties dialogue box
appears.
Now define the neighbours ( intra-technology , GSM and
UMTS ) of each antenna.
Now provide the coverage using signal level.
POST PLANNING :
In post planning of the network the site is moved to the actual feasible location, all the
parameters are adjusted to give coverage to the targeted location in this case telcocrats
technologies as shown in the pictures.
Change the angles of the antennas.
Now define the neighbours of all the antennas.
Now calculate the coverage of sites by signal level.
Thank You

More Related Content

What's hot

Bsnl project
Bsnl projectBsnl project
Bsnl projectnibedan
 
Pawan..bsnl
Pawan..bsnlPawan..bsnl
BSNL Industrial Training
BSNL Industrial Training BSNL Industrial Training
BSNL Industrial Training
Moulik .
 
BSNL training seminar ppt
BSNL training seminar pptBSNL training seminar ppt
BSNL training seminar ppt
Shubham Singh
 
BSNL training report
BSNL training reportBSNL training report
BSNL training report
ravi kant
 
BSNL training report
BSNL training reportBSNL training report
BSNL training report
Shubham Singh
 
presentation on TELECOM INDUSTRY BSNL
presentation on TELECOM INDUSTRY BSNLpresentation on TELECOM INDUSTRY BSNL
presentation on TELECOM INDUSTRY BSNL
Mohd Samiuddin
 
ALTTC(BSNL) PPT BY AMBRISH KUMAR SHUKLA
ALTTC(BSNL)   PPT BY AMBRISH KUMAR SHUKLAALTTC(BSNL)   PPT BY AMBRISH KUMAR SHUKLA
ALTTC(BSNL) PPT BY AMBRISH KUMAR SHUKLAEMAM RAZA KHAN
 
a seminar on summer vocational training in BSNL
a seminar on summer vocational training in BSNLa seminar on summer vocational training in BSNL
a seminar on summer vocational training in BSNL
kirbadh
 
Training ppt bsnl
Training ppt  bsnlTraining ppt  bsnl
Training ppt bsnl
manish katara
 
Seminar on BSNL
Seminar on BSNLSeminar on BSNL
Seminar on BSNL
Pankaj Tiwari
 
Internship ppt on bsnl
Internship ppt on bsnlInternship ppt on bsnl
Internship ppt on bsnl
RanjitUpadhyay4
 
Presentation on training in bsnl by sss
Presentation on training in bsnl by sssPresentation on training in bsnl by sss
Presentation on training in bsnl by sss
Suraj Singh Solanki
 
Bsnl
BsnlBsnl
Bsnl training 4th year
Bsnl training 4th year Bsnl training 4th year
Bsnl training 4th year
Anuj Varshney
 
DESHBANDHU BSNL SUMMER TRAINING REPORT
DESHBANDHU BSNL SUMMER TRAINING REPORTDESHBANDHU BSNL SUMMER TRAINING REPORT
DESHBANDHU BSNL SUMMER TRAINING REPORT
Deshbandhu Kumar
 
Summer training at bsnl
Summer training at bsnlSummer training at bsnl
Summer training at bsnl
Ayush Anand
 
Industrial presentation(Summer Training) On GSM at BSNL
Industrial presentation(Summer Training) On GSM at BSNLIndustrial presentation(Summer Training) On GSM at BSNL
Industrial presentation(Summer Training) On GSM at BSNL
Anshul Joshi
 
Bsnl electronics training report
Bsnl electronics training reportBsnl electronics training report
Bsnl electronics training reportDeepak Bhati
 

What's hot (20)

Alttc report
Alttc report Alttc report
Alttc report
 
Bsnl project
Bsnl projectBsnl project
Bsnl project
 
Pawan..bsnl
Pawan..bsnlPawan..bsnl
Pawan..bsnl
 
BSNL Industrial Training
BSNL Industrial Training BSNL Industrial Training
BSNL Industrial Training
 
BSNL training seminar ppt
BSNL training seminar pptBSNL training seminar ppt
BSNL training seminar ppt
 
BSNL training report
BSNL training reportBSNL training report
BSNL training report
 
BSNL training report
BSNL training reportBSNL training report
BSNL training report
 
presentation on TELECOM INDUSTRY BSNL
presentation on TELECOM INDUSTRY BSNLpresentation on TELECOM INDUSTRY BSNL
presentation on TELECOM INDUSTRY BSNL
 
ALTTC(BSNL) PPT BY AMBRISH KUMAR SHUKLA
ALTTC(BSNL)   PPT BY AMBRISH KUMAR SHUKLAALTTC(BSNL)   PPT BY AMBRISH KUMAR SHUKLA
ALTTC(BSNL) PPT BY AMBRISH KUMAR SHUKLA
 
a seminar on summer vocational training in BSNL
a seminar on summer vocational training in BSNLa seminar on summer vocational training in BSNL
a seminar on summer vocational training in BSNL
 
Training ppt bsnl
Training ppt  bsnlTraining ppt  bsnl
Training ppt bsnl
 
Seminar on BSNL
Seminar on BSNLSeminar on BSNL
Seminar on BSNL
 
Internship ppt on bsnl
Internship ppt on bsnlInternship ppt on bsnl
Internship ppt on bsnl
 
Presentation on training in bsnl by sss
Presentation on training in bsnl by sssPresentation on training in bsnl by sss
Presentation on training in bsnl by sss
 
Bsnl
BsnlBsnl
Bsnl
 
Bsnl training 4th year
Bsnl training 4th year Bsnl training 4th year
Bsnl training 4th year
 
DESHBANDHU BSNL SUMMER TRAINING REPORT
DESHBANDHU BSNL SUMMER TRAINING REPORTDESHBANDHU BSNL SUMMER TRAINING REPORT
DESHBANDHU BSNL SUMMER TRAINING REPORT
 
Summer training at bsnl
Summer training at bsnlSummer training at bsnl
Summer training at bsnl
 
Industrial presentation(Summer Training) On GSM at BSNL
Industrial presentation(Summer Training) On GSM at BSNLIndustrial presentation(Summer Training) On GSM at BSNL
Industrial presentation(Summer Training) On GSM at BSNL
 
Bsnl electronics training report
Bsnl electronics training reportBsnl electronics training report
Bsnl electronics training report
 

Similar to 6 Weeks Summer Training In TelcoCrats

Introduction To Cellular And Wireless Networks
Introduction To Cellular And Wireless NetworksIntroduction To Cellular And Wireless Networks
Introduction To Cellular And Wireless Networks
Yoram Orzach
 
Himanshu kamboj4 g
Himanshu kamboj4 gHimanshu kamboj4 g
Himanshu kamboj4 g
kambojhimanshu
 
Himanshu kamboj4 g
Himanshu kamboj4 gHimanshu kamboj4 g
Himanshu kamboj4 g
kambojhimanshu
 
Cellular
CellularCellular
Cellular
GokulRaghu1
 
5G antenna-Technology
5G antenna-Technology5G antenna-Technology
5G antenna-Technology
DrJayprakashThakur
 
5g New Revolution
5g New Revolution 5g New Revolution
5g New Revolution
Samir Mohanty
 
02 M Walker Vodafone
02 M Walker Vodafone02 M Walker Vodafone
02 M Walker Vodafonedarshanai
 
Neha 4g wireless network
Neha 4g wireless networkNeha 4g wireless network
Neha 4g wireless network
pankaj143neha
 
Neha 4g
Neha 4gNeha 4g
Neha 4g
pankaj143neha
 
4gtechnology
4gtechnology 4gtechnology
4gtechnology
Neeraj Dixit
 
4 g and 5g Communication
4 g and 5g Communication4 g and 5g Communication
4 g and 5g Communication
Manash Kumar Mondal
 
eee264cxxxxxxxxxxxxxxxxxxccccccccccccccc
eee264cxxxxxxxxxxxxxxxxxxccccccccccccccceee264cxxxxxxxxxxxxxxxxxxccccccccccccccc
eee264cxxxxxxxxxxxxxxxxxxccccccccccccccc
TDERAISEN
 
3 g & 4g radio propagation
3 g & 4g radio propagation3 g & 4g radio propagation
3 g & 4g radio propagationSamibwn
 
ppt on 4g in detail from og to 4g
ppt on 4g in detail from og to 4gppt on 4g in detail from og to 4g
ppt on 4g in detail from og to 4g
Neeraj Dixit
 
5G technical_overview_training_sec_1
5G technical_overview_training_sec_15G technical_overview_training_sec_1
5G technical_overview_training_sec_1
Sajal Kumar Das
 
Opy
OpyOpy

Similar to 6 Weeks Summer Training In TelcoCrats (20)

Introduction To Cellular And Wireless Networks
Introduction To Cellular And Wireless NetworksIntroduction To Cellular And Wireless Networks
Introduction To Cellular And Wireless Networks
 
Himanshu kamboj4 g
Himanshu kamboj4 gHimanshu kamboj4 g
Himanshu kamboj4 g
 
Himanshu kamboj4 g
Himanshu kamboj4 gHimanshu kamboj4 g
Himanshu kamboj4 g
 
Cellular
CellularCellular
Cellular
 
5G antenna-Technology
5G antenna-Technology5G antenna-Technology
5G antenna-Technology
 
5g New Revolution
5g New Revolution 5g New Revolution
5g New Revolution
 
5 gppt
5 gppt5 gppt
5 gppt
 
02 M Walker Vodafone
02 M Walker Vodafone02 M Walker Vodafone
02 M Walker Vodafone
 
Neha 4g wireless network
Neha 4g wireless networkNeha 4g wireless network
Neha 4g wireless network
 
Neha 4g
Neha 4gNeha 4g
Neha 4g
 
4gtechnology
4gtechnology 4gtechnology
4gtechnology
 
2g 3g
2g 3g2g 3g
2g 3g
 
4 g and 5g Communication
4 g and 5g Communication4 g and 5g Communication
4 g and 5g Communication
 
eee264cxxxxxxxxxxxxxxxxxxccccccccccccccc
eee264cxxxxxxxxxxxxxxxxxxccccccccccccccceee264cxxxxxxxxxxxxxxxxxxccccccccccccccc
eee264cxxxxxxxxxxxxxxxxxxccccccccccccccc
 
1 tmo18023 umts overview
1 tmo18023 umts overview1 tmo18023 umts overview
1 tmo18023 umts overview
 
Aa
AaAa
Aa
 
3 g & 4g radio propagation
3 g & 4g radio propagation3 g & 4g radio propagation
3 g & 4g radio propagation
 
ppt on 4g in detail from og to 4g
ppt on 4g in detail from og to 4gppt on 4g in detail from og to 4g
ppt on 4g in detail from og to 4g
 
5G technical_overview_training_sec_1
5G technical_overview_training_sec_15G technical_overview_training_sec_1
5G technical_overview_training_sec_1
 
Opy
OpyOpy
Opy
 

More from Arijit Roy

4 Weeks Summer Training In BSNL, Agartala
4 Weeks Summer Training In BSNL, Agartala4 Weeks Summer Training In BSNL, Agartala
4 Weeks Summer Training In BSNL, Agartala
Arijit Roy
 
project report
project reportproject report
project reportArijit Roy
 
Project report
Project reportProject report
Project report
Arijit Roy
 
Summer Training Report Of OTPC
Summer Training Report Of OTPCSummer Training Report Of OTPC
Summer Training Report Of OTPC
Arijit Roy
 
Arijit summer training
Arijit summer trainingArijit summer training
Arijit summer training
Arijit Roy
 
arijit summer training
arijit summer trainingarijit summer training
arijit summer trainingArijit Roy
 

More from Arijit Roy (7)

4 Weeks Summer Training In BSNL, Agartala
4 Weeks Summer Training In BSNL, Agartala4 Weeks Summer Training In BSNL, Agartala
4 Weeks Summer Training In BSNL, Agartala
 
project report
project reportproject report
project report
 
Project report
Project reportProject report
Project report
 
Summer Training Report Of OTPC
Summer Training Report Of OTPCSummer Training Report Of OTPC
Summer Training Report Of OTPC
 
Arijit summer training
Arijit summer trainingArijit summer training
Arijit summer training
 
hard bind arj
hard bind arjhard bind arj
hard bind arj
 
arijit summer training
arijit summer trainingarijit summer training
arijit summer training
 

Recently uploaded

Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 

Recently uploaded (20)

Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 

6 Weeks Summer Training In TelcoCrats

  • 1. Project Presentation On wireless communication Department of Electronics & Communication Lovely professional university. Submitted By : Name Arijit Roy Reg No : 11710188
  • 2. Wireless communications is a type of data communication that is performed and delivered wirelessly. : Definition:
  • 3. Block diagram of wireless communication:
  • 4. Generations: • 1st generation (1G) • 2nd generation (2G) • 3rd generation (3G) • 4th generation (4G)
  • 5. 1G:  1G is pure analog system  FDMA  AMPS(analog mobile phone system)  Only voice  Poor handoff
  • 6. 2G :  GSM(global system for mobile communication)  Voice and data  Works on 900,1800,1900 bands  FDMA and TDMA  Speed up to 64kbps
  • 7. 3G:  Speed increased to 2mbps.  Video calling and TV streaming.  WCDMA  High security and performance.
  • 8. 4G:  LTE (long time evolution).  Speed 100Mbps to 1Gbps  High speed and capacity  More security
  • 11. According to area :  Four types of handover 1. Intra BTS handover 2. Intra-BSC handover 3. Inter-BSC handover 4. Inter-MSC handover
  • 12. According to frequency :  Hard handover (break before make)  Soft handover (make before break)
  • 13. RF Survey & RF Planning
  • 14. RF Survey : It is a process of identifying the cell site location or feasibility of cell site location & to get the basic knowledge of the site. It is of 2 types : 1. Anchor Survey a)Nominal survey b)Blind survey 2.Sharing Survey
  • 15. Tools Used For Survey : i) GPS ii) Magnetic Compass iii) Digital Camera v) Site Data / Reference latitude/ longitude vi) Stationary vii) R.F. Form iv) Measuring Tape:
  • 17. As Planned: N :17.41366 E :78.53004 GPS :
  • 18. SITE @0˚ SITE @30˚ SITE @ 60˚ SITE @ 90˚
  • 19. SITE @ 120˚ SITE @ 150˚ SITE @ 180˚ SITE @ 210˚
  • 20. SITE @ 240˚ SITE @ 270˚ SITE @ 300˚ SITE @ 330˚
  • 21. ANTENNA 1 @0˚ ANTENNA 2@ 60˚ ANTENNA @240˚
  • 22. RF Planning : The three steps are as follows STEP 1:- PREPLANNING OF NETWORK STEP 2:-SURVEY STEP 3:-POST PLANNING OF NETWORK
  • 23. Preplanning of network : • In Preplanning of a network, sites are established on the map in the software without taking into consideration the feasibility of the sites.
  • 24. Open the ATOLL SOFTWARE and select the 3GPP MULTI-RAT.
  • 25.
  • 26.
  • 27.
  • 28. Place the sites 0-5 of GSM UMTS and LTE.
  • 29. Select an antenna and open the properties dialogue box appears.
  • 30. Now define the neighbours ( intra-technology , GSM and UMTS ) of each antenna.
  • 31.
  • 32.
  • 33.
  • 34. Now provide the coverage using signal level.
  • 35.
  • 36.
  • 37.
  • 38. POST PLANNING : In post planning of the network the site is moved to the actual feasible location, all the parameters are adjusted to give coverage to the targeted location in this case telcocrats technologies as shown in the pictures. Change the angles of the antennas.
  • 39.
  • 40.
  • 41. Now define the neighbours of all the antennas.
  • 42. Now calculate the coverage of sites by signal level.