Film task
Preliminary exercise: 
• Continuity task involving filming and editing a 
character opening a door, crossing a room and 
sitting down in a chair opposite another 
character, with whom she/he then exchanges a 
couple of lines of dialogue. This task should 
demonstrate match on action, shot/reverse 
shot and the 180-degree rule. 
– Notes on 3 shot types. 
– Brainstorm to show ideas for film 
– Storyboard for film 
– Script for the dialogue to film 
– Edited film 
– Evaluation/analysis of preliminary production (Keep 
it brief – must say what was learnt and how the 
preliminary task will help you in your main project.
• Examples from previous years 
http://jakehayesmediacoursework.blogspot.co. 
uk/2012/11/preliminary-task.html 
http://kelseyduffyasmedia.blogspot.co.uk/201 
2/11/preliminary-task.html 
http://maxcanningasmedia.blogspot.co.uk/201 
2/11/scream-cover-analysis.html 
http://kelseyduffyasmedia.blogspot.co.uk/201 
3/01/final-preliminary-task.html
Main task 
• the titles and opening of a new fiction 
film, to last a maximum of two minutes. 
• All video and audio material must be 
original, produced by the candidate(s), 
with the exception of music or audio 
effects from a copyright-free source.
Research 
• Camera shot types 
• Conventions of horror films 
• Conventions of film openings in general (look at content, style, 
features) 
• Different genres of films (list films linked to the genre) 
• Questions on ‘What is suspense’ 
• Institution research (2 companies) 
• Notes on at least 8 film openings 
• Conventions of openings of films from horror films (such as 
regular features, specific techniques, ways narrative is 
explained) 
• Detailed analysis of AT LEAST 4 existing film openings (at least 
2 must be horror) 
• 9 frame storyboard for films 
• Opening timelines 
• Audience profile for horror genre 
• Horror location shot types
Research 
• Camera shot types 
• Conventions of horror films 
• Conventions of film openings in general (look at content, style, 
features) 
• Different genres of films (list films linked to the genre) 
• Questions on ‘What is suspense’ 
• Institution research (2 companies) 
• Notes on at least 8 film openings 
• Conventions of openings of films from horror films (such as 
regular features, specific techniques, ways narrative is 
explained) 
• Detailed analysis of AT LEAST 4 existing film openings (at least 
2 must be horror) 
• 9 frame storyboard for films 
• Opening timelines 
• Audience profile for horror genre 
• Horror location shot types
Planning 
• Brainstorm/plan ideas for your film (to include narrative, ideas for opening sequence, 
styles, colours, styles of copy, inspiration) 
• Brainstorm names for your film/state why you chose a particular name for your film. 
• Suitable institution to produce your film. And why. 
• Survey of your target audience to find out what hooks them onto a film from this 
genre. 
• Audience profile for your film. 
• Storyboard ideas for the opening, with annotations to show development of ideas. 
• Script for film 
• Animatic storyboard 
• Locations photographs with comments on suitability and when they could be used. 
• Costume plans 
• Prop list 
• A range of photographs for the storyboard/opening – blocking out your film. 
• Explanation of your film’s concept in 25 words or less. 
• A production schedule/shooting schedule. 
• A final draft version – with annotations/commentary on good and bad aspects of the 
production. 
• Survey/feedback of the target audience again to get their opinions on your 
production and any changes.
Planning 
Underline = easy to do 
digitally 
• Brainstorm/plan ideas for your film (to include narrative, ideas for opening sequence, 
styles, colours, styles of copy, inspiration) 
• Brainstorm names for your film/state why you chose a particular name for your film. 
• Suitable institution to produce your film. And why. 
• Survey of your target audience to find out what hooks them onto a film from this 
genre. 
• Audience profile for your film. 
• Storyboard ideas for the opening, with annotations to show development of ideas. 
• Script for film 
• Animatic storyboard 
• Locations photographs with comments on suitability and when they could be used. 
• Costume plans 
• Prop list 
• A range of photographs for the storyboard/opening – blocking out your film. 
• Explanation of your film’s concept in 25 words or less. 
• A production schedule/shooting schedule. 
• A final draft version – with annotations/commentary on good and bad aspects of the 
production. 
• Survey/feedback of the target audience again to get their opinions on your 
production and any changes.
• RESEARCH + PLANNING = 
20 marks (1/5 of total but 
SOOOOOOOOOOOOOOOOOOOOOO 
OOOOOOOOOOOOOOOOOOOOOOO 
OOOOOOOOOOOOOOOOOOOOOOO 
OOOOOOOOOOOOOOOOOOOOOOO 
OOOOOOOOOOOOOOOOOOOO 
important.
Construction 
• Final opening and titles to your film 
– lasting no more than 2 minutes 
– upload final version to your blog as well as recording 
onto a DVD. 
• 60 MARKS!!! 3/5 of total project 
• Marks gained (and lost) for 
– camera work, 
– shot choice (distance, angle, movement) 
– lighting, 
– editing, 
– soundtrack, 
– conventions, 
– Prop choice 
– Mise en scene
Evaluation 
• Of whole project (MUST answer ALL of the set questions and 
NOT just as an essay) 
1. In what ways does your media product use, develop or 
challenge forms and conventions of real media products? 
2. How does your media product represent particular social 
groups? 
3. What kind of media institution might distribute your media 
product and why? 
4. Who would be the audience for your media product? 
5. How did you attract/address your audience? 
6. What have you learnt about technologies from the process of 
constructing this product? 
7. Looking back at your preliminary task, what do you feel you 
have learnt in the progression from it to the full product? 
• 20 Marks (1/5 of project) 
• Digitally – BE CREATIVE. Do not ‘write’ your answers. 
• Be analytical. Don’t just describe.
Finally 
•All this is to be included on your BLOG. Keep uploading work to your blog 
regularly. 
•The evaluation MUST go on to the end of your blog. 
•You must present your work using creative and digital media forms where 
possible – avoid ‘essay’/text based answers as much as you can. 
•Make clear the roles each person plays in all aspects of the filming and 
editing process. 
•Remember to check http://ktsasmedia2012-13.blogspot.co.uk/ regularly 
for guidance, resources, and tasks, as well as comments from teachers on 
work done. 
•The unit is marked out of a total of 100 marks: 
o20 marks for the presentation of the planning and research; 
o60 marks for the construction; 
o20 marks for the evaluation.
Dave 
Brailsford
Lots of small 
things add up 
to get you 
better marks
9 steps to a better mark 
1) Take time to understand the task. 
• what’s the task? 
• what’s the assessment and criteria? 
• what’s the timeframe? 
• what’s the equipment?
2) Blog – detailed, technologically sound and 
evidence of all work.
3) Develop skills: 
camerawork, 
sound, 
editing
4) Investigate 
• what do film openings actually look like? 
• what does other student work look like? 
• what do you need to know about titles? 
• how are you going to do something that 
stands out?
5) Brainstorm ideas 
• possible scenarios for 
pitches/treatments 
• 25 word pitch 
• moodboard treatment 
• peer and teacher feedback 
• realistic expectations- keep it simple
6) Planning 
• experimenting with camera and editing 
• recce shots of locations 
• examples of shots, costumes, props, etc 
onto blog 
• post-it storyboard, animatic, moodboard 
• logistics planning- including risk 
assessment
7) The shoot 
• people, places, props, costumes 
• rehearsing, directing 
• equipment, jobs on the day 
• keeping a record of the process
8) Edit 
• all having a voice/hand in it 
• screengrabs of process 
• importance of audio and titles 
• foley - not just music 
• rough cut deadline and peer feedback
9) Evaluation 
• Seven guiding questions 
• 20 of the 100 marks 
• need to be creative in execution 
• digital depth 
• act on teacher advice!
Six most common student film 
openings 
• Saw: victim tied up in shed 
• Scream: hooded stalker follows female 
victim 
• Se7en: killer sticks knife in polaroid photos 
• Lock, Stock: gangsters play cards and kill 
each other 
• Waking up: clean teeth, brush hair, leave 
house 
• Flashback or Flash forward: “2 weeks later...”
Six most common problems 
• looks more like a trailer or a short 
film 
• insufficient titles 
• poor sound, poor lighting 
• poorly directed actors, not costumed 
• confusing for the viewer 
• uses one of the six common 
openings(badly)
Key features 
• Genre 
• Narrative (enigma) 
• Character 
• Atmosphere 
• Setting
Blogs
Task 
• Start working through your research and planning for 
your project. 
• Week beginning the 13th October you will do 
presentations to the class on your film idea. 
• This presentation needs to include information on overall 
storyline of your film, location, props, costume, actors, 
information you would include in your titles and any other 
info you feel is relevant. 
• These will be filmed and uploaded to your blogs – the 
rest of the class will provide feedback which you must 
also use to shape your ideas.

5 film main task overview

  • 1.
  • 2.
    Preliminary exercise: •Continuity task involving filming and editing a character opening a door, crossing a room and sitting down in a chair opposite another character, with whom she/he then exchanges a couple of lines of dialogue. This task should demonstrate match on action, shot/reverse shot and the 180-degree rule. – Notes on 3 shot types. – Brainstorm to show ideas for film – Storyboard for film – Script for the dialogue to film – Edited film – Evaluation/analysis of preliminary production (Keep it brief – must say what was learnt and how the preliminary task will help you in your main project.
  • 3.
    • Examples fromprevious years http://jakehayesmediacoursework.blogspot.co. uk/2012/11/preliminary-task.html http://kelseyduffyasmedia.blogspot.co.uk/201 2/11/preliminary-task.html http://maxcanningasmedia.blogspot.co.uk/201 2/11/scream-cover-analysis.html http://kelseyduffyasmedia.blogspot.co.uk/201 3/01/final-preliminary-task.html
  • 4.
    Main task •the titles and opening of a new fiction film, to last a maximum of two minutes. • All video and audio material must be original, produced by the candidate(s), with the exception of music or audio effects from a copyright-free source.
  • 5.
    Research • Camerashot types • Conventions of horror films • Conventions of film openings in general (look at content, style, features) • Different genres of films (list films linked to the genre) • Questions on ‘What is suspense’ • Institution research (2 companies) • Notes on at least 8 film openings • Conventions of openings of films from horror films (such as regular features, specific techniques, ways narrative is explained) • Detailed analysis of AT LEAST 4 existing film openings (at least 2 must be horror) • 9 frame storyboard for films • Opening timelines • Audience profile for horror genre • Horror location shot types
  • 6.
    Research • Camerashot types • Conventions of horror films • Conventions of film openings in general (look at content, style, features) • Different genres of films (list films linked to the genre) • Questions on ‘What is suspense’ • Institution research (2 companies) • Notes on at least 8 film openings • Conventions of openings of films from horror films (such as regular features, specific techniques, ways narrative is explained) • Detailed analysis of AT LEAST 4 existing film openings (at least 2 must be horror) • 9 frame storyboard for films • Opening timelines • Audience profile for horror genre • Horror location shot types
  • 7.
    Planning • Brainstorm/planideas for your film (to include narrative, ideas for opening sequence, styles, colours, styles of copy, inspiration) • Brainstorm names for your film/state why you chose a particular name for your film. • Suitable institution to produce your film. And why. • Survey of your target audience to find out what hooks them onto a film from this genre. • Audience profile for your film. • Storyboard ideas for the opening, with annotations to show development of ideas. • Script for film • Animatic storyboard • Locations photographs with comments on suitability and when they could be used. • Costume plans • Prop list • A range of photographs for the storyboard/opening – blocking out your film. • Explanation of your film’s concept in 25 words or less. • A production schedule/shooting schedule. • A final draft version – with annotations/commentary on good and bad aspects of the production. • Survey/feedback of the target audience again to get their opinions on your production and any changes.
  • 8.
    Planning Underline =easy to do digitally • Brainstorm/plan ideas for your film (to include narrative, ideas for opening sequence, styles, colours, styles of copy, inspiration) • Brainstorm names for your film/state why you chose a particular name for your film. • Suitable institution to produce your film. And why. • Survey of your target audience to find out what hooks them onto a film from this genre. • Audience profile for your film. • Storyboard ideas for the opening, with annotations to show development of ideas. • Script for film • Animatic storyboard • Locations photographs with comments on suitability and when they could be used. • Costume plans • Prop list • A range of photographs for the storyboard/opening – blocking out your film. • Explanation of your film’s concept in 25 words or less. • A production schedule/shooting schedule. • A final draft version – with annotations/commentary on good and bad aspects of the production. • Survey/feedback of the target audience again to get their opinions on your production and any changes.
  • 9.
    • RESEARCH +PLANNING = 20 marks (1/5 of total but SOOOOOOOOOOOOOOOOOOOOOO OOOOOOOOOOOOOOOOOOOOOOO OOOOOOOOOOOOOOOOOOOOOOO OOOOOOOOOOOOOOOOOOOOOOO OOOOOOOOOOOOOOOOOOOO important.
  • 10.
    Construction • Finalopening and titles to your film – lasting no more than 2 minutes – upload final version to your blog as well as recording onto a DVD. • 60 MARKS!!! 3/5 of total project • Marks gained (and lost) for – camera work, – shot choice (distance, angle, movement) – lighting, – editing, – soundtrack, – conventions, – Prop choice – Mise en scene
  • 11.
    Evaluation • Ofwhole project (MUST answer ALL of the set questions and NOT just as an essay) 1. In what ways does your media product use, develop or challenge forms and conventions of real media products? 2. How does your media product represent particular social groups? 3. What kind of media institution might distribute your media product and why? 4. Who would be the audience for your media product? 5. How did you attract/address your audience? 6. What have you learnt about technologies from the process of constructing this product? 7. Looking back at your preliminary task, what do you feel you have learnt in the progression from it to the full product? • 20 Marks (1/5 of project) • Digitally – BE CREATIVE. Do not ‘write’ your answers. • Be analytical. Don’t just describe.
  • 12.
    Finally •All thisis to be included on your BLOG. Keep uploading work to your blog regularly. •The evaluation MUST go on to the end of your blog. •You must present your work using creative and digital media forms where possible – avoid ‘essay’/text based answers as much as you can. •Make clear the roles each person plays in all aspects of the filming and editing process. •Remember to check http://ktsasmedia2012-13.blogspot.co.uk/ regularly for guidance, resources, and tasks, as well as comments from teachers on work done. •The unit is marked out of a total of 100 marks: o20 marks for the presentation of the planning and research; o60 marks for the construction; o20 marks for the evaluation.
  • 13.
  • 14.
    Lots of small things add up to get you better marks
  • 15.
    9 steps toa better mark 1) Take time to understand the task. • what’s the task? • what’s the assessment and criteria? • what’s the timeframe? • what’s the equipment?
  • 16.
    2) Blog –detailed, technologically sound and evidence of all work.
  • 17.
    3) Develop skills: camerawork, sound, editing
  • 18.
    4) Investigate •what do film openings actually look like? • what does other student work look like? • what do you need to know about titles? • how are you going to do something that stands out?
  • 19.
    5) Brainstorm ideas • possible scenarios for pitches/treatments • 25 word pitch • moodboard treatment • peer and teacher feedback • realistic expectations- keep it simple
  • 20.
    6) Planning •experimenting with camera and editing • recce shots of locations • examples of shots, costumes, props, etc onto blog • post-it storyboard, animatic, moodboard • logistics planning- including risk assessment
  • 21.
    7) The shoot • people, places, props, costumes • rehearsing, directing • equipment, jobs on the day • keeping a record of the process
  • 22.
    8) Edit •all having a voice/hand in it • screengrabs of process • importance of audio and titles • foley - not just music • rough cut deadline and peer feedback
  • 23.
    9) Evaluation •Seven guiding questions • 20 of the 100 marks • need to be creative in execution • digital depth • act on teacher advice!
  • 24.
    Six most commonstudent film openings • Saw: victim tied up in shed • Scream: hooded stalker follows female victim • Se7en: killer sticks knife in polaroid photos • Lock, Stock: gangsters play cards and kill each other • Waking up: clean teeth, brush hair, leave house • Flashback or Flash forward: “2 weeks later...”
  • 25.
    Six most commonproblems • looks more like a trailer or a short film • insufficient titles • poor sound, poor lighting • poorly directed actors, not costumed • confusing for the viewer • uses one of the six common openings(badly)
  • 26.
    Key features •Genre • Narrative (enigma) • Character • Atmosphere • Setting
  • 27.
  • 28.
    Task • Startworking through your research and planning for your project. • Week beginning the 13th October you will do presentations to the class on your film idea. • This presentation needs to include information on overall storyline of your film, location, props, costume, actors, information you would include in your titles and any other info you feel is relevant. • These will be filmed and uploaded to your blogs – the rest of the class will provide feedback which you must also use to shape your ideas.