SlideShare a Scribd company logo
A2 Media Studies: Filming Schedule
Title of Film: Blank
Group Members: Rhys, Safah and Aminul
Dates of Filming: 25th November - 1st December 2013

LOCATION

Shot
number

Time

Description

Cast needed

Props needed

Lighting

Weather

Other requirements

Desired
1

1-6

23rd Nov
3pm

The opening of the short
film.

'Joe'
'Robert'

Fake Knife
Fake Blood

N/A

N/A

All characters must be in track
suits. Joe track suit colour
preferred to be black.

15-16

30th Nov
4pm

Final stages of the short
film.

'Joe'
'Jack'

Fake Knife

N/A

N/A

Jack must be in track suit costume
and Joe in casual wear. (If change
is needed peoples can change in
Swiss Cottage library toilets).

Desirable

2

7-12

25th Nov
4pm

Present section of the
film where Sarah and Joe
talk about their future.

'Joe'
'Sarah'

Mobile Phone

N/A

N/A

Casual wear for Sarah and Joe
character.

3

13-14

25th Nov
4:30pm

Section where Joe
hallucinates and finds out
Joe's brother Jack is after
him.

'Joe'
'Sarah'

Fake Gun

N/A

N/A

Casual wear for Sarah and Joe
character.

Desirable

Name of production company: Kinetic Films (Aminul Islam)
Script providers/Assistant Director: Rhys Smith and Safah Shaikh
Director/Editor: Aminul Islam
Actors: Ali Alsafar (Joe), Sarah Bucinca (Sarah), Jack Bannantyne (Jack) and Rhys Smith (Robert).
Location reminders:
1. Taplow Estate car park 2. Side of leisure centre 3. Pathway leading to Taplow estate car park.

More Related Content

Viewers also liked

Đàn ông thiếu hụt testosterone có nguy cơ mắc nhiều bệnh tật
Đàn ông thiếu hụt testosterone có nguy cơ mắc nhiều bệnh tậtĐàn ông thiếu hụt testosterone có nguy cơ mắc nhiều bệnh tật
Đàn ông thiếu hụt testosterone có nguy cơ mắc nhiều bệnh tậtjonna634
 
Film schedule
Film scheduleFilm schedule
Film schedule
Rafat Said
 
Film schedule
Film scheduleFilm schedule
Film schedule
karennguyenx
 
5 film main task overview
5   film main task overview5   film main task overview
5 film main task overview
rockinmole
 
Our film opening schedule
Our film opening scheduleOur film opening schedule
Our film opening schedule
simsimma
 
Film schedule 5
Film schedule 5Film schedule 5
Film schedule 5
Tia5133
 
Introduction & Development Of Film In India
Introduction & Development Of Film In IndiaIntroduction & Development Of Film In India
Introduction & Development Of Film In India
Liya Joy
 
Film schedule
Film scheduleFilm schedule
Film schedule
mohrail
 
Call sheet example
Call sheet exampleCall sheet example
Call sheet example
rockinmole
 
Shot list and film schedule
Shot list and film scheduleShot list and film schedule
Shot list and film schedule
kayleighb96
 
Film schedule, Risk Assessment, Contingency Plan
Film schedule, Risk Assessment, Contingency PlanFilm schedule, Risk Assessment, Contingency Plan
Film schedule, Risk Assessment, Contingency Plan
HJones137
 
Film schedule
Film scheduleFilm schedule
Film schedule
joajoajoa1
 
Daily livestock report mar 22 2013
Daily livestock report mar 22 2013Daily livestock report mar 22 2013
Daily livestock report mar 22 2013
joseleorcasita
 
Film schedule
Film scheduleFilm schedule
Film schedule
hannahagnew3
 

Viewers also liked (14)

Đàn ông thiếu hụt testosterone có nguy cơ mắc nhiều bệnh tật
Đàn ông thiếu hụt testosterone có nguy cơ mắc nhiều bệnh tậtĐàn ông thiếu hụt testosterone có nguy cơ mắc nhiều bệnh tật
Đàn ông thiếu hụt testosterone có nguy cơ mắc nhiều bệnh tật
 
Film schedule
Film scheduleFilm schedule
Film schedule
 
Film schedule
Film scheduleFilm schedule
Film schedule
 
5 film main task overview
5   film main task overview5   film main task overview
5 film main task overview
 
Our film opening schedule
Our film opening scheduleOur film opening schedule
Our film opening schedule
 
Film schedule 5
Film schedule 5Film schedule 5
Film schedule 5
 
Introduction & Development Of Film In India
Introduction & Development Of Film In IndiaIntroduction & Development Of Film In India
Introduction & Development Of Film In India
 
Film schedule
Film scheduleFilm schedule
Film schedule
 
Call sheet example
Call sheet exampleCall sheet example
Call sheet example
 
Shot list and film schedule
Shot list and film scheduleShot list and film schedule
Shot list and film schedule
 
Film schedule, Risk Assessment, Contingency Plan
Film schedule, Risk Assessment, Contingency PlanFilm schedule, Risk Assessment, Contingency Plan
Film schedule, Risk Assessment, Contingency Plan
 
Film schedule
Film scheduleFilm schedule
Film schedule
 
Daily livestock report mar 22 2013
Daily livestock report mar 22 2013Daily livestock report mar 22 2013
Daily livestock report mar 22 2013
 
Film schedule
Film scheduleFilm schedule
Film schedule
 

More from AminulMedia

Radio trailer script for draft 2!
Radio trailer script for draft 2! Radio trailer script for draft 2!
Radio trailer script for draft 2!
AminulMedia
 
Opening scene
Opening sceneOpening scene
Opening scene
AminulMedia
 
Filming pictures
Filming picturesFilming pictures
Filming pictures
AminulMedia
 
Draft 2 narrative
Draft 2 narrativeDraft 2 narrative
Draft 2 narrative
AminulMedia
 
Narrative
NarrativeNarrative
Narrative
AminulMedia
 
Short Films
Short Films Short Films
Short Films
AminulMedia
 
Presentation
PresentationPresentation
Presentation
AminulMedia
 

More from AminulMedia (8)

Radio trailer script for draft 2!
Radio trailer script for draft 2! Radio trailer script for draft 2!
Radio trailer script for draft 2!
 
Opening scene
Opening sceneOpening scene
Opening scene
 
Filming pictures
Filming picturesFilming pictures
Filming pictures
 
Draft 2 narrative
Draft 2 narrativeDraft 2 narrative
Draft 2 narrative
 
Presentation1
Presentation1Presentation1
Presentation1
 
Narrative
NarrativeNarrative
Narrative
 
Short Films
Short Films Short Films
Short Films
 
Presentation
PresentationPresentation
Presentation
 

Film schedule

  • 1. A2 Media Studies: Filming Schedule Title of Film: Blank Group Members: Rhys, Safah and Aminul Dates of Filming: 25th November - 1st December 2013 LOCATION Shot number Time Description Cast needed Props needed Lighting Weather Other requirements Desired 1 1-6 23rd Nov 3pm The opening of the short film. 'Joe' 'Robert' Fake Knife Fake Blood N/A N/A All characters must be in track suits. Joe track suit colour preferred to be black. 15-16 30th Nov 4pm Final stages of the short film. 'Joe' 'Jack' Fake Knife N/A N/A Jack must be in track suit costume and Joe in casual wear. (If change is needed peoples can change in Swiss Cottage library toilets). Desirable 2 7-12 25th Nov 4pm Present section of the film where Sarah and Joe talk about their future. 'Joe' 'Sarah' Mobile Phone N/A N/A Casual wear for Sarah and Joe character. 3 13-14 25th Nov 4:30pm Section where Joe hallucinates and finds out Joe's brother Jack is after him. 'Joe' 'Sarah' Fake Gun N/A N/A Casual wear for Sarah and Joe character. Desirable Name of production company: Kinetic Films (Aminul Islam) Script providers/Assistant Director: Rhys Smith and Safah Shaikh Director/Editor: Aminul Islam Actors: Ali Alsafar (Joe), Sarah Bucinca (Sarah), Jack Bannantyne (Jack) and Rhys Smith (Robert). Location reminders: 1. Taplow Estate car park 2. Side of leisure centre 3. Pathway leading to Taplow estate car park.