The Benefits of Architect & Development
Firms to Hire Independent Cost Estimating
Firms.
More then ever the construction industry is a whole new business now and companies are moving in
any direction that will help keep them lean and profitable with out giving up quality of product.
So in these times why would an architect or developer pay for a cost estimate when they can get it for
free from a General Contractor?
I write this article and note these items having been a General Contractor and a General Contracting
Estimator for
the past three years and experiencing first hand the flaws in obtaining a free estimate from a G.C.
Cost Estimates can range from “bar napkin sketches” – single floor plan and elevation pages- partial
complete to fully complete drawing and specifications.
These estimates can be used to set budgets, develop architect or engineer estimates, set funding
requirements, or most importantly determine if the project will go forward or collapse all together.
Unless the GC has been selected early in the design stage and is working with the design team from
day one, they really have no interest in getting you as close to accurate information that you need.
If they are busy, chances are your request will be handled quickly or passed off to someone that is not fully experienced in
providing estimates and will call sub-contractors who maybe just as busy and will throw out quick and not complete numbers just
to stay on the GC’s good side?
• How much real time do they invest in something that could make or break your opportunity with your client?
• Are they providing low or unrealistic estimates with the full intent of staying involved in this project from the start?
• Are they representing the best interest of the architect & developer or theirs?
• How beneficial it is to have an Independent Opinion Of Probable Cost from a person that has no interest in
building the project whatsoever?
• Do they have a Certified Professional Estimator (CPE) on staff that takes pride in his estimate and adheres to the standards
set forth by the American Society of Professional Estimators (ASPE)?
• The independent estimator wants to keep you as a client forever and will be making sure that “change order creep” does not
hurt you or your reputation.
• How many GC’s still wanted to remain on the architects or developer’s team (or vice a versa) after the project is over? And
is adversity the usual outcome?
• What is it worth to have an experienced and accredited CPE as part of the team to bring fresh perspective and real world
experience of bidding and managing projects?
• Do you have to take the time to open up cost books and put something together that your not real sure of, or is there better
“ Leave the estimating to us”
A detailed cost estimate is a step by step calculation of the material and
labor required to complete a construction project. This document is prepared after
analyzing the architectural, structural, elevation and other drawings of the building
and has all details about the cost, material and labor involved in a project. For
example, it will give you the exact quantity of cement bags, bricks, sand, steel and
other raw material required and the prices in your area. This information is
immensely useful in completing a construction project within the decided cost.
1.1) Negotiate well with Contractor: It is normally seen that the contractor quote hefty amount
for a construction job if they think that the home owners do not know about the internal calculations. This
document will help you negotiate a better price with your contractor. In the current market scenarios these
negotiations can save you Lacks of rupees.
1.2) Do not overpay: At the site, a lot of contractors demand money as the work progresses. It
happens in both through rate contracts and labor rate contracts. The building owners usually do not have an
idea if the work completed at the site equals to the money paid to the contractor. We have seen several cases
where Contractors intentionally quote very less compared to the market price and then leave the project
midway as soon as the money paid to them is more than their investment. Using our report you can find out
how much you should have paid for the work completed at site.
1.3) Ensure that right quantity is used in Construction: Even after the contract is signed, the
contractor may not use optimal quantity of raw material. With detailed cost estimate you will know exactly
how much material should be used at each stage of construction. You can track the material movement and
ensure that right quantity material is used in your building as per the Architect's/Engineer's specifications.
1.4) Material procurement and planning: Material prices fluctuate a lot and can have significant
impact during construction. Also, if you know the material usage, you may buy material at bulk which saves
considerable amount of money. The detailed cost estimate will tell you exactly how much material you need
at each stage so that you can procure and budget the construction material properly.
1.5) Prevent delay in project/Prevent material leakage & theft: Majority of the money wasted
in construction is due to the delay in material procurement as each material needs some time to arrive at the
site. Use our document to ensure that right quantity of material is available at the site at all time If you know
how much material would be consumed at each stage then you can relate this with the progress of project at
site. This will help you catch the pilferage or theft of the material at the site
At the inception stage the client will be interested not only in the technical feasibility but also true probable cost
for completion of the project. The knowledge of the true probable cost at the outset of a construction project is of great
importance in taking the right decision on finance and to decide priorities of the project. The quantity surveyor is best
trained to give construction cost advice at this stage of the construction project, whether it is for Macro planning, i.e., a new
town or Micro planning, i.e., a new building or road, He is also trained to provide the construction cost input into feasibility
study of a construction project. To work out true probable cost, accurate cost data in the form which is obtained by
analyzing bills of quantities of previous projects of similar nature or work out roll bills, quantities of main items of the
project which would properly weighted will represent the cost of the project would be necessary. These quantities when
priced at market rates including other factors bearing on cost will represent fair true probable cost of the project and this can
be achieved with the help of quantity surveyors. Another important aspect at this stage is assessment of correct time for
planning and execution of a project. In order to assess correct time for completion of a project, it is necessary not only to
prepare program for completion on network technique like CPM but to assess the various inputs required including financial
requirements will enable management to assess correct completion period of a project. A Quantity Surveyor will be in a
better position to help management is this area of responsibility.
The object of good design is to provide the required strength economically within the cost limit with the use of right
type of materials. Considerable thought and ingenuity are required to decide as to how to combine various materials to provide
truly economical construction. The Quantity Surveyor can help design engineer/architect in achieving the above objectives by
preparing a cost plan by distributing total available amount into various elements of a building project, such as foundation,
superstructure walls, roof, floor, joinery and finishes. With the help of Quantity Surveyor, design engineer/architect can ensure
a
design within the elemental cost or in case of a specific clement of design exceeding the target of figure either specification can
be reduced or saving is made on another element. In the present system this check is not being exercised with the result that
cost often exceeds the target figure and the basic object of economical planning/designing of a project is not achieved.
Engagement of a Quantity Surveyor who is an expert on cost control and specification will, therefore, be required to help
management in working within the cost limit and best utilization of the specialist knowledge of an engineer/architect to effect
economy at planning/design/drawings stage of a project
Hiring costs –
Hiring is an expensive process. Significant management time is invested in gathering resumes, screening
resumes, making calls to candidates, testing, scheduling interviews, conducting interviews, evaluating and
choosing a candidate, negotiating the offer, and repeating the process if the candidate does not accept. These costs
can be reduced by using consultants. This management and human resources time can be focused in areas of
greater value to the business. For the purposes of this example, no allocation for hiring costs is included.
Bad hire costs –
It costs an average of two and a half times an individual’s salary to replace an employee who doesn’t
work out, including recruitment, training, severance costs and lost productivity. More than 4 out of 10
organizations (42%) say it costs at least three times an employee’s salary.
Separation costs –
The unfortunate situation where you choose to terminate an employee creates costs for the
company. If the employee is laid off there is severance costs, If the termination is performance-based, all of the
time invested by HR and management on counseling, deliberations and termination are avoided. While incurring
these costs are not certain, by using consultants you avoid this risk. For the purposes of this example, I’ve included
no allocation for separation costs.
Soft costs are more difficult to quantify. The opportunity cost of time spent managing
employees from a human resources perspective is the most often overlooked and underestimated
employee cost. Consultants do not require a career path, training plans, performance appraisals or
counseling sessions. It is estimated that up to 15% of a manager’s time is spent in these areas. By using
consultants, management time can be focused in areas of greater potential value to the business. One
industry benchmark shows that day-to-day management and other soft costs equate to an additional 15 to
25% of an employee’s total cost. Of note, decision makers correctly consider management costs as
fixed…they are not avoided when using consultants instead of full-time employees. Unfortunately that
misses the point. I’m specifically calling out the opportunity cost of management time, which can be
focused in higher areas
The total cost of an employee making Rs 600000 per year could be approximately double – nearly Rs 1200000
per year if all hard and soft costs are included in the equation*
In summary Rs 1200000 / 2305 hours is equal to Rs 520 per hour
While using a consultant is definitely not appropriate for every situation, it’s not as expensive as it sometimes
seems.
You need to base your decision on business strategy, not hourly pay rates.
Good consulting companies have the interest of the client in mind and want to keep them as a client.
The growth of a company should not hinge exclusively on consultants but more as a supplement as needed to
the employees they already have.
------------------------------------------------------------------------------------------------------------------------------------
*Every state differs in the cost of an employee; this information is based on an average
SUVARNA CONSULTANCY SERVICES
CLIENTEL
 
• SR NO PARTICULARS PROJECT SITE AT AREA UNIT ARCHITECHTS STRUCTURAL DESINER
1 KARIYA DEVLOPERS KONARK VISTA HADAPSAR 450000 SQ.FT HAFEEJ CONTRACTOR J &W (Y S SANE)
2 MIRCHANDANI GROUP
PALM RAHATANI 450000 SQ.FT
MANDVIWALA QUTUB &
ASSO.
HANSAL PARIKH & ASSO.
BELLAGIO UNDRI-PISOLI 225000 SQ.FT
HORRIZONE
ARCHITECTS(HEMAL SHAHA)
HANSAL PARIKH & ASSO.
HAPPY THOUGTS
MALL
RAHATANI 340000 SQ.FT RAHUL VEDPATHAK BHILLARE & ASSO.
3 SLP DEVLOPERS
KALP KHARADI 90000 SQ.FT ENVIRON AJIT GIJARE
JUBILY PARK WARAJE 325000 SQ.FT DILIP KALE STRUDCOM (INAMDAR)
4 ACROPOLIS PURPLE
NINE HILLS NIBM 650000 SQ.FT KIPA (KIRIT VORA) MUTALIK & ASSO.
SAINIK VIHAR NIBM 120000 SQ.FT KIPA (KIRIT VORA) MUTALIK & ASSO.
5
SAMARTHA PROPERTIES
SOLLANA
DANGE
CHOWK
625000 SQ.FT
DESIGN 11 (SWAPNIL
KHIRSAGAR)
MARATHE & ASSO.
METROPOLE
DANGE
CHOWK
250000 SQ.FT A.B.BHAT R K RANDHAVE
SAMARTHA RANKA
DEV.CORPORATION
GOLDVILLE
DANGE
CHOWK
650000 SQ.FT A.B.BHAT R K RANDHAVE
LUXMI PROPERTIES EVANA WAKAD 675000 SQ.FT A.B.BHAT R K RANDHAVE
6 TRIMURTI DEVLOPER TRIMURTI HEIGHTS BANER 55000 SQ.FT NILLESH SASWADE BHILLARE & ASSO.
7 AXIS PARADIGIUM   BAVDHAN 425000 SQ.FT
AXIS PARADIGIUM (AJAY
PANDIT)
SUHAS JOSHI
8 ABHINAV GROUP PEBBLE 02 BAVDHAN 650000 SQ.FT ABHIKALP HANSAL PARIKH & ASSO.
Rahul Pimpale
(Business Development Manager)
Suvarna Consultancy Services
Mobile No. +91 8796808436
Email Id. :- consultancysuvarna@gmail.com

More Related Content

What's hot

Project Cost Estimation Methods PowerPoint Presentation Slides
Project Cost Estimation Methods PowerPoint Presentation Slides Project Cost Estimation Methods PowerPoint Presentation Slides
Project Cost Estimation Methods PowerPoint Presentation Slides SlideTeam
 
Planning can we do with out it?
Planning can we do with out it?Planning can we do with out it?
Planning can we do with out it?Catherine Bendell
 
10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation Steps10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation StepsSHAZEBALIKHAN1
 
Project Management
Project ManagementProject Management
Project ManagementDr K M SONI
 
Pp1 assignment group 8
Pp1 assignment group 8Pp1 assignment group 8
Pp1 assignment group 8lohwenjun
 
Guide to Construction Procurement Strategies
Guide to Construction Procurement StrategiesGuide to Construction Procurement Strategies
Guide to Construction Procurement StrategiesSarah Fox
 
Project Cost.pdf
Project Cost.pdfProject Cost.pdf
Project Cost.pdf341741357
 
Construction Documents
Construction DocumentsConstruction Documents
Construction DocumentsAllan Berry
 
Procurement Strategies: A Seminar
Procurement Strategies: A SeminarProcurement Strategies: A Seminar
Procurement Strategies: A SeminarPang Khai Shuen
 
Estimating Cost & Time.ppt
Estimating Cost & Time.pptEstimating Cost & Time.ppt
Estimating Cost & Time.ppt341741357
 
Project Schedule PowerPoint Presentation Slides
Project Schedule PowerPoint Presentation Slides Project Schedule PowerPoint Presentation Slides
Project Schedule PowerPoint Presentation Slides SlideTeam
 
Cost and time estimation methods pros and cons
Cost and time estimation methods pros and consCost and time estimation methods pros and cons
Cost and time estimation methods pros and consPragnendra Rahevar
 
5.0 Subcontractor Selection Ass3 Sem2 '09
5.0 Subcontractor Selection Ass3 Sem2 '095.0 Subcontractor Selection Ass3 Sem2 '09
5.0 Subcontractor Selection Ass3 Sem2 '09Praveen Premkumar
 

What's hot (20)

Project Cost Estimation Methods PowerPoint Presentation Slides
Project Cost Estimation Methods PowerPoint Presentation Slides Project Cost Estimation Methods PowerPoint Presentation Slides
Project Cost Estimation Methods PowerPoint Presentation Slides
 
Sharp Printing,AG
Sharp Printing,AGSharp Printing,AG
Sharp Printing,AG
 
Planning can we do with out it?
Planning can we do with out it?Planning can we do with out it?
Planning can we do with out it?
 
10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation Steps10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation Steps
 
Project Management
Project ManagementProject Management
Project Management
 
Estimating 101
Estimating 101Estimating 101
Estimating 101
 
Contract management
Contract managementContract management
Contract management
 
Pp1 assignment group 8
Pp1 assignment group 8Pp1 assignment group 8
Pp1 assignment group 8
 
Greenfield Projects
Greenfield ProjectsGreenfield Projects
Greenfield Projects
 
Guide to Construction Procurement Strategies
Guide to Construction Procurement StrategiesGuide to Construction Procurement Strategies
Guide to Construction Procurement Strategies
 
Procurement system
Procurement systemProcurement system
Procurement system
 
Project Cost.pdf
Project Cost.pdfProject Cost.pdf
Project Cost.pdf
 
Construction Documents
Construction DocumentsConstruction Documents
Construction Documents
 
Procurement Strategies: A Seminar
Procurement Strategies: A SeminarProcurement Strategies: A Seminar
Procurement Strategies: A Seminar
 
Project cost management
Project cost management Project cost management
Project cost management
 
Estimating Cost & Time.ppt
Estimating Cost & Time.pptEstimating Cost & Time.ppt
Estimating Cost & Time.ppt
 
Project Schedule PowerPoint Presentation Slides
Project Schedule PowerPoint Presentation Slides Project Schedule PowerPoint Presentation Slides
Project Schedule PowerPoint Presentation Slides
 
Common contract types
Common contract typesCommon contract types
Common contract types
 
Cost and time estimation methods pros and cons
Cost and time estimation methods pros and consCost and time estimation methods pros and cons
Cost and time estimation methods pros and cons
 
5.0 Subcontractor Selection Ass3 Sem2 '09
5.0 Subcontractor Selection Ass3 Sem2 '095.0 Subcontractor Selection Ass3 Sem2 '09
5.0 Subcontractor Selection Ass3 Sem2 '09
 

Similar to Suvarna consultancy services

Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Lee Pei Gie
 
Lec.1 Introduction to Estimation
Lec.1   Introduction to EstimationLec.1   Introduction to Estimation
Lec.1 Introduction to EstimationMuthanna Abbu
 
Module Three Exercises 2BA 1200 Foundations of Business.docx
Module Three Exercises  2BA 1200 Foundations of Business.docxModule Three Exercises  2BA 1200 Foundations of Business.docx
Module Three Exercises 2BA 1200 Foundations of Business.docxroushhsiu
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14마 이환
 
Raistec PMC (PPT)
Raistec PMC (PPT)Raistec PMC (PPT)
Raistec PMC (PPT)Rajesh Rai
 
CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementChris Gorga
 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignmentwendyteosy
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016Chris Nash
 
Introduction of civil engineering.pdf
Introduction of civil engineering.pdfIntroduction of civil engineering.pdf
Introduction of civil engineering.pdfbkbk37
 
Reduction of cost in construction
Reduction of cost in constructionReduction of cost in construction
Reduction of cost in constructionSaravana murthy
 
Cbb 512 assignment_1
Cbb 512 assignment_1Cbb 512 assignment_1
Cbb 512 assignment_1Maatla Moadi
 
092811 Updated Contech Brochure
092811 Updated Contech Brochure092811 Updated Contech Brochure
092811 Updated Contech BrochurePaul Smith
 
Construction Compliance Consultants
Construction Compliance ConsultantsConstruction Compliance Consultants
Construction Compliance Consultantsbfitzsimons1974
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONAr Naveen Naveen
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - siteAbdulaziz Kaya
 

Similar to Suvarna consultancy services (20)

Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Lec.1 Introduction to Estimation
Lec.1   Introduction to EstimationLec.1   Introduction to Estimation
Lec.1 Introduction to Estimation
 
Aiab089228
Aiab089228Aiab089228
Aiab089228
 
Module Three Exercises 2BA 1200 Foundations of Business.docx
Module Three Exercises  2BA 1200 Foundations of Business.docxModule Three Exercises  2BA 1200 Foundations of Business.docx
Module Three Exercises 2BA 1200 Foundations of Business.docx
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14
 
Raistec PMC (PPT)
Raistec PMC (PPT)Raistec PMC (PPT)
Raistec PMC (PPT)
 
Pp report
Pp reportPp report
Pp report
 
CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project Management
 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignment
 
uap doc 207-208
uap doc 207-208uap doc 207-208
uap doc 207-208
 
Purpose
PurposePurpose
Purpose
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016
 
Introduction of civil engineering.pdf
Introduction of civil engineering.pdfIntroduction of civil engineering.pdf
Introduction of civil engineering.pdf
 
Reduction of cost in construction
Reduction of cost in constructionReduction of cost in construction
Reduction of cost in construction
 
Pp1 final
Pp1 finalPp1 final
Pp1 final
 
Cbb 512 assignment_1
Cbb 512 assignment_1Cbb 512 assignment_1
Cbb 512 assignment_1
 
092811 Updated Contech Brochure
092811 Updated Contech Brochure092811 Updated Contech Brochure
092811 Updated Contech Brochure
 
Construction Compliance Consultants
Construction Compliance ConsultantsConstruction Compliance Consultants
Construction Compliance Consultants
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 

Recently uploaded

Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 

Recently uploaded (20)

Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 

Suvarna consultancy services

  • 1.
  • 2.
  • 3. The Benefits of Architect & Development Firms to Hire Independent Cost Estimating Firms.
  • 4. More then ever the construction industry is a whole new business now and companies are moving in any direction that will help keep them lean and profitable with out giving up quality of product. So in these times why would an architect or developer pay for a cost estimate when they can get it for free from a General Contractor? I write this article and note these items having been a General Contractor and a General Contracting Estimator for the past three years and experiencing first hand the flaws in obtaining a free estimate from a G.C. Cost Estimates can range from “bar napkin sketches” – single floor plan and elevation pages- partial complete to fully complete drawing and specifications. These estimates can be used to set budgets, develop architect or engineer estimates, set funding requirements, or most importantly determine if the project will go forward or collapse all together. Unless the GC has been selected early in the design stage and is working with the design team from day one, they really have no interest in getting you as close to accurate information that you need.
  • 5. If they are busy, chances are your request will be handled quickly or passed off to someone that is not fully experienced in providing estimates and will call sub-contractors who maybe just as busy and will throw out quick and not complete numbers just to stay on the GC’s good side? • How much real time do they invest in something that could make or break your opportunity with your client? • Are they providing low or unrealistic estimates with the full intent of staying involved in this project from the start? • Are they representing the best interest of the architect & developer or theirs? • How beneficial it is to have an Independent Opinion Of Probable Cost from a person that has no interest in building the project whatsoever? • Do they have a Certified Professional Estimator (CPE) on staff that takes pride in his estimate and adheres to the standards set forth by the American Society of Professional Estimators (ASPE)? • The independent estimator wants to keep you as a client forever and will be making sure that “change order creep” does not hurt you or your reputation. • How many GC’s still wanted to remain on the architects or developer’s team (or vice a versa) after the project is over? And is adversity the usual outcome? • What is it worth to have an experienced and accredited CPE as part of the team to bring fresh perspective and real world experience of bidding and managing projects? • Do you have to take the time to open up cost books and put something together that your not real sure of, or is there better
  • 6. “ Leave the estimating to us”
  • 7. A detailed cost estimate is a step by step calculation of the material and labor required to complete a construction project. This document is prepared after analyzing the architectural, structural, elevation and other drawings of the building and has all details about the cost, material and labor involved in a project. For example, it will give you the exact quantity of cement bags, bricks, sand, steel and other raw material required and the prices in your area. This information is immensely useful in completing a construction project within the decided cost.
  • 8. 1.1) Negotiate well with Contractor: It is normally seen that the contractor quote hefty amount for a construction job if they think that the home owners do not know about the internal calculations. This document will help you negotiate a better price with your contractor. In the current market scenarios these negotiations can save you Lacks of rupees. 1.2) Do not overpay: At the site, a lot of contractors demand money as the work progresses. It happens in both through rate contracts and labor rate contracts. The building owners usually do not have an idea if the work completed at the site equals to the money paid to the contractor. We have seen several cases where Contractors intentionally quote very less compared to the market price and then leave the project midway as soon as the money paid to them is more than their investment. Using our report you can find out how much you should have paid for the work completed at site.
  • 9. 1.3) Ensure that right quantity is used in Construction: Even after the contract is signed, the contractor may not use optimal quantity of raw material. With detailed cost estimate you will know exactly how much material should be used at each stage of construction. You can track the material movement and ensure that right quantity material is used in your building as per the Architect's/Engineer's specifications. 1.4) Material procurement and planning: Material prices fluctuate a lot and can have significant impact during construction. Also, if you know the material usage, you may buy material at bulk which saves considerable amount of money. The detailed cost estimate will tell you exactly how much material you need at each stage so that you can procure and budget the construction material properly. 1.5) Prevent delay in project/Prevent material leakage & theft: Majority of the money wasted in construction is due to the delay in material procurement as each material needs some time to arrive at the site. Use our document to ensure that right quantity of material is available at the site at all time If you know how much material would be consumed at each stage then you can relate this with the progress of project at site. This will help you catch the pilferage or theft of the material at the site
  • 10. At the inception stage the client will be interested not only in the technical feasibility but also true probable cost for completion of the project. The knowledge of the true probable cost at the outset of a construction project is of great importance in taking the right decision on finance and to decide priorities of the project. The quantity surveyor is best trained to give construction cost advice at this stage of the construction project, whether it is for Macro planning, i.e., a new town or Micro planning, i.e., a new building or road, He is also trained to provide the construction cost input into feasibility study of a construction project. To work out true probable cost, accurate cost data in the form which is obtained by analyzing bills of quantities of previous projects of similar nature or work out roll bills, quantities of main items of the project which would properly weighted will represent the cost of the project would be necessary. These quantities when priced at market rates including other factors bearing on cost will represent fair true probable cost of the project and this can be achieved with the help of quantity surveyors. Another important aspect at this stage is assessment of correct time for planning and execution of a project. In order to assess correct time for completion of a project, it is necessary not only to prepare program for completion on network technique like CPM but to assess the various inputs required including financial requirements will enable management to assess correct completion period of a project. A Quantity Surveyor will be in a better position to help management is this area of responsibility.
  • 11. The object of good design is to provide the required strength economically within the cost limit with the use of right type of materials. Considerable thought and ingenuity are required to decide as to how to combine various materials to provide truly economical construction. The Quantity Surveyor can help design engineer/architect in achieving the above objectives by preparing a cost plan by distributing total available amount into various elements of a building project, such as foundation, superstructure walls, roof, floor, joinery and finishes. With the help of Quantity Surveyor, design engineer/architect can ensure a design within the elemental cost or in case of a specific clement of design exceeding the target of figure either specification can be reduced or saving is made on another element. In the present system this check is not being exercised with the result that cost often exceeds the target figure and the basic object of economical planning/designing of a project is not achieved. Engagement of a Quantity Surveyor who is an expert on cost control and specification will, therefore, be required to help management in working within the cost limit and best utilization of the specialist knowledge of an engineer/architect to effect economy at planning/design/drawings stage of a project
  • 12.
  • 13. Hiring costs – Hiring is an expensive process. Significant management time is invested in gathering resumes, screening resumes, making calls to candidates, testing, scheduling interviews, conducting interviews, evaluating and choosing a candidate, negotiating the offer, and repeating the process if the candidate does not accept. These costs can be reduced by using consultants. This management and human resources time can be focused in areas of greater value to the business. For the purposes of this example, no allocation for hiring costs is included. Bad hire costs – It costs an average of two and a half times an individual’s salary to replace an employee who doesn’t work out, including recruitment, training, severance costs and lost productivity. More than 4 out of 10 organizations (42%) say it costs at least three times an employee’s salary. Separation costs – The unfortunate situation where you choose to terminate an employee creates costs for the company. If the employee is laid off there is severance costs, If the termination is performance-based, all of the time invested by HR and management on counseling, deliberations and termination are avoided. While incurring these costs are not certain, by using consultants you avoid this risk. For the purposes of this example, I’ve included no allocation for separation costs.
  • 14. Soft costs are more difficult to quantify. The opportunity cost of time spent managing employees from a human resources perspective is the most often overlooked and underestimated employee cost. Consultants do not require a career path, training plans, performance appraisals or counseling sessions. It is estimated that up to 15% of a manager’s time is spent in these areas. By using consultants, management time can be focused in areas of greater potential value to the business. One industry benchmark shows that day-to-day management and other soft costs equate to an additional 15 to 25% of an employee’s total cost. Of note, decision makers correctly consider management costs as fixed…they are not avoided when using consultants instead of full-time employees. Unfortunately that misses the point. I’m specifically calling out the opportunity cost of management time, which can be focused in higher areas
  • 15. The total cost of an employee making Rs 600000 per year could be approximately double – nearly Rs 1200000 per year if all hard and soft costs are included in the equation* In summary Rs 1200000 / 2305 hours is equal to Rs 520 per hour While using a consultant is definitely not appropriate for every situation, it’s not as expensive as it sometimes seems. You need to base your decision on business strategy, not hourly pay rates. Good consulting companies have the interest of the client in mind and want to keep them as a client. The growth of a company should not hinge exclusively on consultants but more as a supplement as needed to the employees they already have. ------------------------------------------------------------------------------------------------------------------------------------ *Every state differs in the cost of an employee; this information is based on an average
  • 16. SUVARNA CONSULTANCY SERVICES CLIENTEL   • SR NO PARTICULARS PROJECT SITE AT AREA UNIT ARCHITECHTS STRUCTURAL DESINER 1 KARIYA DEVLOPERS KONARK VISTA HADAPSAR 450000 SQ.FT HAFEEJ CONTRACTOR J &W (Y S SANE) 2 MIRCHANDANI GROUP PALM RAHATANI 450000 SQ.FT MANDVIWALA QUTUB & ASSO. HANSAL PARIKH & ASSO. BELLAGIO UNDRI-PISOLI 225000 SQ.FT HORRIZONE ARCHITECTS(HEMAL SHAHA) HANSAL PARIKH & ASSO. HAPPY THOUGTS MALL RAHATANI 340000 SQ.FT RAHUL VEDPATHAK BHILLARE & ASSO. 3 SLP DEVLOPERS KALP KHARADI 90000 SQ.FT ENVIRON AJIT GIJARE JUBILY PARK WARAJE 325000 SQ.FT DILIP KALE STRUDCOM (INAMDAR) 4 ACROPOLIS PURPLE NINE HILLS NIBM 650000 SQ.FT KIPA (KIRIT VORA) MUTALIK & ASSO. SAINIK VIHAR NIBM 120000 SQ.FT KIPA (KIRIT VORA) MUTALIK & ASSO. 5 SAMARTHA PROPERTIES SOLLANA DANGE CHOWK 625000 SQ.FT DESIGN 11 (SWAPNIL KHIRSAGAR) MARATHE & ASSO. METROPOLE DANGE CHOWK 250000 SQ.FT A.B.BHAT R K RANDHAVE SAMARTHA RANKA DEV.CORPORATION GOLDVILLE DANGE CHOWK 650000 SQ.FT A.B.BHAT R K RANDHAVE LUXMI PROPERTIES EVANA WAKAD 675000 SQ.FT A.B.BHAT R K RANDHAVE 6 TRIMURTI DEVLOPER TRIMURTI HEIGHTS BANER 55000 SQ.FT NILLESH SASWADE BHILLARE & ASSO. 7 AXIS PARADIGIUM   BAVDHAN 425000 SQ.FT AXIS PARADIGIUM (AJAY PANDIT) SUHAS JOSHI 8 ABHINAV GROUP PEBBLE 02 BAVDHAN 650000 SQ.FT ABHIKALP HANSAL PARIKH & ASSO.
  • 17. Rahul Pimpale (Business Development Manager) Suvarna Consultancy Services Mobile No. +91 8796808436 Email Id. :- consultancysuvarna@gmail.com