Checkout and Commissioning of Electrical
Equipment
Dibi EPS Offsites
M:Engineering2311 DIBI Offsite3 - Engineering3.2 - Specifications2311-S5500
Checkout and Commissioning of Electrical Equipment2311-S5500, Rev. A2311-S5500
Checkout & Comm. of Elec. Equip, Rev. A.doc
11/04/05
Page 8 of 39
v. The correct operation of all shutdown safety devices, such as
limit switches, shall be checked.
w. The proper phasing of all connections and phase rotation of all
rotating machines shall be checked.
x. Motors shall be checked for proper rotation before coupling or
connecting to the load.
3.3.3 Ground System Tests
a. This section covers the minimum testing requirements for
grounding systems. The Contractor is responsible for the
adequate grounding of all equipment in accordance with NFPA
No. 70, National Electrical Code (NEC) and the Technical
Requirements.
b. The resistance between the grounding grid and the following
grounding points shall not exceed 1 ohm:
• Each point used to ground platform lightning protection
equipment.
• Each point used to ground electrical equipment enclosures.
• Each point used to ground wiring support systems such as
cable armor, conduits, and trays.
c. The resistance between the grounding grid and system neutrals
shall not exceed the following:
• 600-volt or less equipment - 1 ohm
• High-resistance ground system - 15 ohms
• Low-resistance ground systems - 1 ohm
3.3.4 Insulation Resistance Tests
a. Insulation resistance tests shall be conducted prior to energizing
the equipment.
b. A 500-volt DC megger shall be utilized for low-voltage
equipment (600 volts and below), and either 1000-volt or 5000-
volt DC megger shall be utilized for high-voltage equipment
(above 600 volts).
c. As applicable, Contractor shall measure and record resistances
of the following on the check sheets:

More Related Content

What's hot

power grid synchronization failure detection
power grid synchronization failure detectionpower grid synchronization failure detection
power grid synchronization failure detectionJay Hind
 
Automatic voltage regulator(avr)/voltage booster
Automatic voltage regulator(avr)/voltage boosterAutomatic voltage regulator(avr)/voltage booster
Automatic voltage regulator(avr)/voltage boosterJestem Zhou
 
Switchgear Installation Precomissioning Inspection.PPT
Switchgear Installation  Precomissioning Inspection.PPTSwitchgear Installation  Precomissioning Inspection.PPT
Switchgear Installation Precomissioning Inspection.PPTAbdullah Al Dushaishi
 
fault detection of transformer using GSM,,,,by YASASWINI.KAGITHALA
fault detection of transformer using GSM,,,,by YASASWINI.KAGITHALAfault detection of transformer using GSM,,,,by YASASWINI.KAGITHALA
fault detection of transformer using GSM,,,,by YASASWINI.KAGITHALAMAHESH294
 
Introduction on indian codes as applied in electrical design
Introduction on indian codes as applied in electrical designIntroduction on indian codes as applied in electrical design
Introduction on indian codes as applied in electrical designAsif Eqbal
 
Power Grid Control System
Power Grid Control SystemPower Grid Control System
Power Grid Control SystemJigyasa Singh
 
Transformer Diagnostics Technique
Transformer Diagnostics TechniqueTransformer Diagnostics Technique
Transformer Diagnostics TechniqueAnkit Basera
 
signal generator(pradeep to batch 08)
signal generator(pradeep to batch 08)signal generator(pradeep to batch 08)
signal generator(pradeep to batch 08)Pradeep Ragav
 
Grid synchronisation
Grid synchronisationGrid synchronisation
Grid synchronisationmanogna gwen
 
industrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradunindustrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradunsurendra rawat
 
Substation monitoring system for maintaining a data log.ppt
Substation monitoring system for maintaining a data log.pptSubstation monitoring system for maintaining a data log.ppt
Substation monitoring system for maintaining a data log.pptSAI SREE
 
Detection of power grid synchronization failure on sensing of frequency and v...
Detection of power grid synchronization failure on sensing of frequency and v...Detection of power grid synchronization failure on sensing of frequency and v...
Detection of power grid synchronization failure on sensing of frequency and v...bharath nidumolu
 
Nidec asi soft starters-mv-e
Nidec asi soft starters-mv-eNidec asi soft starters-mv-e
Nidec asi soft starters-mv-eNidec Corporation
 
07 modelling.electric.motors
07 modelling.electric.motors07 modelling.electric.motors
07 modelling.electric.motorsMahmoud Hussein
 

What's hot (20)

EEI_MV_Inverter_1
EEI_MV_Inverter_1EEI_MV_Inverter_1
EEI_MV_Inverter_1
 
power grid synchronization failure detection
power grid synchronization failure detectionpower grid synchronization failure detection
power grid synchronization failure detection
 
Standing type outdoor full sf6 gas insualted ring main unit
Standing type outdoor full sf6 gas insualted ring main unitStanding type outdoor full sf6 gas insualted ring main unit
Standing type outdoor full sf6 gas insualted ring main unit
 
Automatic voltage regulator(avr)/voltage booster
Automatic voltage regulator(avr)/voltage boosterAutomatic voltage regulator(avr)/voltage booster
Automatic voltage regulator(avr)/voltage booster
 
Switchgear Installation Precomissioning Inspection.PPT
Switchgear Installation  Precomissioning Inspection.PPTSwitchgear Installation  Precomissioning Inspection.PPT
Switchgear Installation Precomissioning Inspection.PPT
 
fault detection of transformer using GSM,,,,by YASASWINI.KAGITHALA
fault detection of transformer using GSM,,,,by YASASWINI.KAGITHALAfault detection of transformer using GSM,,,,by YASASWINI.KAGITHALA
fault detection of transformer using GSM,,,,by YASASWINI.KAGITHALA
 
RVR-1(3) automatic step voltage regulator
RVR-1(3) automatic step voltage regulatorRVR-1(3) automatic step voltage regulator
RVR-1(3) automatic step voltage regulator
 
Generator protection
Generator protectionGenerator protection
Generator protection
 
Substations
SubstationsSubstations
Substations
 
Introduction on indian codes as applied in electrical design
Introduction on indian codes as applied in electrical designIntroduction on indian codes as applied in electrical design
Introduction on indian codes as applied in electrical design
 
Power Grid Control System
Power Grid Control SystemPower Grid Control System
Power Grid Control System
 
Transformer Diagnostics Technique
Transformer Diagnostics TechniqueTransformer Diagnostics Technique
Transformer Diagnostics Technique
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
signal generator(pradeep to batch 08)
signal generator(pradeep to batch 08)signal generator(pradeep to batch 08)
signal generator(pradeep to batch 08)
 
Grid synchronisation
Grid synchronisationGrid synchronisation
Grid synchronisation
 
industrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradunindustrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradun
 
Substation monitoring system for maintaining a data log.ppt
Substation monitoring system for maintaining a data log.pptSubstation monitoring system for maintaining a data log.ppt
Substation monitoring system for maintaining a data log.ppt
 
Detection of power grid synchronization failure on sensing of frequency and v...
Detection of power grid synchronization failure on sensing of frequency and v...Detection of power grid synchronization failure on sensing of frequency and v...
Detection of power grid synchronization failure on sensing of frequency and v...
 
Nidec asi soft starters-mv-e
Nidec asi soft starters-mv-eNidec asi soft starters-mv-e
Nidec asi soft starters-mv-e
 
07 modelling.electric.motors
07 modelling.electric.motors07 modelling.electric.motors
07 modelling.electric.motors
 

Similar to 2311 s5500 checkout & comm. of elec. equip, rev. a 8

AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100Ali Sepehri
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...Ali Sepehri
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenancePremanandDesai
 
2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revisedBasudev patra
 
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdfAnonymouscj7JdRbDb
 
2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_adverts2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_advertsKhalid Sithari
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportAneel-k Suthar
 
200745907-CEA-Safety-Rules-2010.pptx
200745907-CEA-Safety-Rules-2010.pptx200745907-CEA-Safety-Rules-2010.pptx
200745907-CEA-Safety-Rules-2010.pptxAmitNag22
 
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...Living Online
 
Do's and Don'ts of Personal Protective Grounding IEEE IAS Transactions Final
Do's and Don'ts of Personal Protective Grounding IEEE IAS Transactions FinalDo's and Don'ts of Personal Protective Grounding IEEE IAS Transactions Final
Do's and Don'ts of Personal Protective Grounding IEEE IAS Transactions FinalJim White
 
Electrical Lessons learned
Electrical Lessons learnedElectrical Lessons learned
Electrical Lessons learnedmichaeljmack
 
CPUC - General Orders 95, 128 & 165
CPUC - General Orders 95, 128 & 165CPUC - General Orders 95, 128 & 165
CPUC - General Orders 95, 128 & 165michaeljmack
 
Data Teknis Gossen Metrawatt : PROFITEST EMOBILITY
Data Teknis Gossen Metrawatt : PROFITEST EMOBILITYData Teknis Gossen Metrawatt : PROFITEST EMOBILITY
Data Teknis Gossen Metrawatt : PROFITEST EMOBILITYPT. Siwali Swantika
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid designsusanta das
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTRAJPRASAD RS
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalNihal Shiroya
 

Similar to 2311 s5500 checkout & comm. of elec. equip, rev. a 8 (20)

AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenance
 
2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised
 
16950
1695016950
16950
 
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
 
Lecture 3.pdf ,
Lecture 3.pdf                                         ,Lecture 3.pdf                                         ,
Lecture 3.pdf ,
 
electrical.ppt
electrical.pptelectrical.ppt
electrical.ppt
 
2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_adverts2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_adverts
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
 
200745907-CEA-Safety-Rules-2010.pptx
200745907-CEA-Safety-Rules-2010.pptx200745907-CEA-Safety-Rules-2010.pptx
200745907-CEA-Safety-Rules-2010.pptx
 
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...
Practical Medium and High Voltage Testing of Electrical Equipment for Enginee...
 
Do's and Don'ts of Personal Protective Grounding IEEE IAS Transactions Final
Do's and Don'ts of Personal Protective Grounding IEEE IAS Transactions FinalDo's and Don'ts of Personal Protective Grounding IEEE IAS Transactions Final
Do's and Don'ts of Personal Protective Grounding IEEE IAS Transactions Final
 
11.docx
11.docx11.docx
11.docx
 
Electrical Lessons learned
Electrical Lessons learnedElectrical Lessons learned
Electrical Lessons learned
 
CPUC - General Orders 95, 128 & 165
CPUC - General Orders 95, 128 & 165CPUC - General Orders 95, 128 & 165
CPUC - General Orders 95, 128 & 165
 
Data Teknis Gossen Metrawatt : PROFITEST EMOBILITY
Data Teknis Gossen Metrawatt : PROFITEST EMOBILITYData Teknis Gossen Metrawatt : PROFITEST EMOBILITY
Data Teknis Gossen Metrawatt : PROFITEST EMOBILITY
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid design
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihal
 

Recently uploaded

Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsMathias Magdowski
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New HorizonMorshed Ahmed Rahath
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.benjamincojr
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashidFaiyazSheikh
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsVIEW
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfSkNahidulIslamShrabo
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfJNTUA
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentationsj9399037128
 
Software Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdfSoftware Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdfssuser5c9d4b1
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Studentskannan348865
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological universityMohd Saifudeen
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...drjose256
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Stationsiddharthteach18
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligencemahaffeycheryld
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdfAlexander Litvinenko
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...IJECEIAES
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 

Recently uploaded (20)

Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
Software Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdfSoftware Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdf
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 

2311 s5500 checkout & comm. of elec. equip, rev. a 8

  • 1. Checkout and Commissioning of Electrical Equipment Dibi EPS Offsites M:Engineering2311 DIBI Offsite3 - Engineering3.2 - Specifications2311-S5500 Checkout and Commissioning of Electrical Equipment2311-S5500, Rev. A2311-S5500 Checkout & Comm. of Elec. Equip, Rev. A.doc 11/04/05 Page 8 of 39 v. The correct operation of all shutdown safety devices, such as limit switches, shall be checked. w. The proper phasing of all connections and phase rotation of all rotating machines shall be checked. x. Motors shall be checked for proper rotation before coupling or connecting to the load. 3.3.3 Ground System Tests a. This section covers the minimum testing requirements for grounding systems. The Contractor is responsible for the adequate grounding of all equipment in accordance with NFPA No. 70, National Electrical Code (NEC) and the Technical Requirements. b. The resistance between the grounding grid and the following grounding points shall not exceed 1 ohm: • Each point used to ground platform lightning protection equipment. • Each point used to ground electrical equipment enclosures. • Each point used to ground wiring support systems such as cable armor, conduits, and trays. c. The resistance between the grounding grid and system neutrals shall not exceed the following: • 600-volt or less equipment - 1 ohm • High-resistance ground system - 15 ohms • Low-resistance ground systems - 1 ohm 3.3.4 Insulation Resistance Tests a. Insulation resistance tests shall be conducted prior to energizing the equipment. b. A 500-volt DC megger shall be utilized for low-voltage equipment (600 volts and below), and either 1000-volt or 5000- volt DC megger shall be utilized for high-voltage equipment (above 600 volts). c. As applicable, Contractor shall measure and record resistances of the following on the check sheets: