This document outlines procedures for checkout and commissioning of electrical equipment. It discusses checking the correct operation of safety devices, phasing of connections, and motor rotation. It also covers minimum requirements for ground system tests, including maximum resistance limits between the grounding grid and various grounding points. Finally, it specifies that insulation resistance tests shall be conducted prior to energizing equipment using an appropriate DC megger voltage.