SlideShare a Scribd company logo
1 of 14
AC High voltage Air Break Disconnector Switch Routine
Test According to IEC 62271-102 Standard
Article 9(09.10.2018)
The function of air-break disconnectors in high voltage power systems is to provide
electrical and visible isolation of one part of the system. The isolation generally
takes two forms:
Isolation related to normal day-to-day operation of the power system. For
example, shunt reactors required only during light load periods are switched out
using circuit breakers and then isolated by disconnectors during peak load periods.
Isolation related to repair or maintenance on transmission lines or station
equipment such as transformers, circuit breakers and so on.
High voltage air-break disconnectors and earthing switch come in a variety of types
and mounting arrangements. The four most commonly used types are:
• Vertical break type
• Centre side break type
• Double side break type
The high voltage disconnector and earthing switch routine tests are for the
purpose of revealing faults in material or construction. They do not impair the
properties and reliability of a test object. The routine tests shall be made wherever
reasonably practicable at the manufacturer's works on each apparatus
manufactured, to ensure that the product is in accordance with the equipment on
which the type tests have been passed. By agreement, any routine test may be
made on site.
The following items are the routine testing items of high voltage disconnector
switch according to IEC 62271-1,IEC 62271-102 Standards:
1-Dielectric test on the main circuit:
A dry, short-duration power-frequency with 50 or 60 Hz voltage test
shall be applied.The test voltage shall be that specified in column 2 of
the following tables , according to the relevant IEC standards.In these
values, the altitude factor should be considered.
Dielectric power frequency test manufacture by High Volt company
When the insulation of disconnector and earth switch is
provided only by solid-core insulators and air at ambient
pressure, the power-frequency voltage withstand test may be
omitted if the dimensions between the conductive parts –
between phases, across open switching devices and between
conductive parts and the frame – are checked by dimensional
measurements.
power frequency dielectric test tables
When dielectric test applied on earthing switches, the test voltage shall
be applied with the earthing switch in the open position in these
condition:
– between adjacent insulated terminals with the bases earthed.
– between all the insulated terminals connected together and the bases
earthed.
2-Dielectric test on auxiliary and control circuits in operating
mechanism:
A:Inspection of auxiliary and control circuits, and verification of conformity to the
circuit diagrams and wiring diagrams:
The nature of the materials, the quality of assembly, the finish and, if necessary,
the protective coatings against corrosion shall be checked. A visual inspection is
also necessary to check the satisfactory installation of the thermal insulation.The
conductors and cables and heaters(resistance check)shall be checked for proper
routing.
B:Functional tests:
A functional test of all low-voltage circuits(such relays , contactor,
interlocking magnet) shall be made to verify the proper functioning of
auxiliary and control circuits in conjunction with the other parts of the
disconnector switch . interlocking cassette must be checked.
C:Verification of protection against electrical shock:
Protection against direct contact with the main circuit and safe
accessibility to the auxiliary and control equipment parts liable to be
touched during normal operation shall be checked by visual inspection.
D:Dielectric tests:
Only power frequency tests shall be performed. The test voltage shall be
1 kV or 2 kV with a duration of 1 s with 50 or 60 HZ frequency.
3-Measurement of the resistance of the main circuit:
For the routine test, the DC voltage drop or resistance of each pole of the main
circuit shall be measured under conditions as nearly as possible similar, with regard
to ambient air temperature and points of measurement, to those under which the
corresponding type test was made. The measured resistance shall not exceed 1,2 ×
Ru, where Ru is equal to the resistance measured before the temperature-rise test.
Contact
resistance
measurement
equipment
manufacture by
vanguard
instrument
company
4-Design and visual checks:
The disconnector and earthing switches shall be checked to verify its
compliance with the purchase specification.
5-Mechanical operating tests:
Operating tests are made to ensure that the disconnectors or earthing
switches show the specified operating behavior within the specified
voltage and supply pressure limits of their operating mechanisms.
During these tests, which are performed without voltage on, or current
flowing through the main circuit, it shall be verified that the
disconnectors or earthing switches open and close correctly when their
operating mechanisms are energized.
This item also must be check:
*angle of operating mechanism out put shaft.
*measuring torque of operating mechanism output.
*operating mechanism motor current.
*operating times.
– 10 close-open operating cycles at the minimum(85%)supply voltage.
– 10 close-open operating cycles at the maximum (110%)supply
voltage.
–50 close-open operating cycles at the nominal (100%)supply voltage.
During these operating cycles the operating characteristics such as operating
time and maximum energy consumption shall be recorded or evaluated. With
disconnectors having manual mechanisms only, the maximum forces shall be
recorded. Satisfactory operation of the auxiliary contacts and position
indicating devices (if any) shall be verified.
After these tests, no parts of the disconnector or earthing switch shall
be damaged. For disconnectors and earthing switches with a rated
voltage of 52 kV and above, the mechanical operating routine tests may
be performed on sub-assemblies.
The main circuit resistance shall be measured before and after the
mechanical endurance test. The resistance shall not vary by more than
20 % from the value measured before the test.
References:
* International Standard :IEC 62271-1 High-voltage switchgear and
controlgear
Part 1: Common specifications .
* International Standard :IEC 62271-102 High-voltage switchgear and
controlgear –
Part 102: Alternating current disconnectors and earthing switches.
* Current interruption using high voltage air-break disconnectors
Article by Peelo, D.F. hindhoven: Technische Universiteit Eindhoven
* High Volt Company catalogue.
*vanguard instruments company(doble) catalogue.
*Alpha Elektrotechnik AG Company disconnector switch catalogue.

More Related Content

What's hot

3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
3. INTRODUCTION TO PROTECTIVE RELAYING.pptxMuhd Hafizi Idris
 
Testing of Transformers.
Testing of Transformers.Testing of Transformers.
Testing of Transformers.Geetesh Verma
 
High voltage testing of electrical transformer
High voltage testing of electrical transformerHigh voltage testing of electrical transformer
High voltage testing of electrical transformerPraveenKumar5880
 
Simple Disconnector Switch (DS) Testing for Switchyard Equipment
Simple Disconnector Switch (DS) Testing for Switchyard EquipmentSimple Disconnector Switch (DS) Testing for Switchyard Equipment
Simple Disconnector Switch (DS) Testing for Switchyard EquipmentSARAVANAN A
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.Sheikh Nazmul Islam
 
Power system protection devices
Power system protection devicesPower system protection devices
Power system protection devicesPrakash_13209
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenancekarikalan123
 
LV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxLV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxshivendra68
 
Power system protection
Power system protectionPower system protection
Power system protectionAnu Priya
 
Vacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing MethodsVacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing MethodsAli Sepehri
 
Transformer testing on sight and off sight
Transformer testing on sight and off sightTransformer testing on sight and off sight
Transformer testing on sight and off sightDHAVALKUMAR JULASANA
 

What's hot (20)

3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
Relay testing procedure
Relay testing procedure Relay testing procedure
Relay testing procedure
 
Testing of Transformers.
Testing of Transformers.Testing of Transformers.
Testing of Transformers.
 
LV switchgear FINAL.pptx
LV switchgear FINAL.pptxLV switchgear FINAL.pptx
LV switchgear FINAL.pptx
 
High voltage testing of electrical transformer
High voltage testing of electrical transformerHigh voltage testing of electrical transformer
High voltage testing of electrical transformer
 
Simple Disconnector Switch (DS) Testing for Switchyard Equipment
Simple Disconnector Switch (DS) Testing for Switchyard EquipmentSimple Disconnector Switch (DS) Testing for Switchyard Equipment
Simple Disconnector Switch (DS) Testing for Switchyard Equipment
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Electrical SUBSTATION ppt
Electrical SUBSTATION pptElectrical SUBSTATION ppt
Electrical SUBSTATION ppt
 
Basics of Wires and Cables
Basics of Wires and CablesBasics of Wires and Cables
Basics of Wires and Cables
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.
 
Power system protection devices
Power system protection devicesPower system protection devices
Power system protection devices
 
BUSBAR PROTECTION
BUSBAR PROTECTIONBUSBAR PROTECTION
BUSBAR PROTECTION
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
 
Transformer tests
Transformer testsTransformer tests
Transformer tests
 
LV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxLV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptx
 
Power system protection
Power system protectionPower system protection
Power system protection
 
Vacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing MethodsVacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing Methods
 
Transformer testing on sight and off sight
Transformer testing on sight and off sightTransformer testing on sight and off sight
Transformer testing on sight and off sight
 
TRANSFORMERS
TRANSFORMERSTRANSFORMERS
TRANSFORMERS
 

Similar to AC High voltage Air Break Disconnector Switch Routine Test According to IEC 62271-102 Standard

AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100Ali Sepehri
 
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...Ali Sepehri
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalNihal Shiroya
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenancePremanandDesai
 
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015Gabriel Emeka Ojeah
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxRAJKIRANR3
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushingNovia Putri
 
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdfvikram desai
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxDrNiveditaSingh3
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNadir Baloch
 
Emc standards
Emc standardsEmc standards
Emc standardskandira
 
Relay testing.............................
Relay testing.............................Relay testing.............................
Relay testing.............................hiiarindam
 
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015Gabriel Emeka Ojeah
 

Similar to AC High voltage Air Break Disconnector Switch Routine Test According to IEC 62271-102 Standard (20)

AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100
 
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihal
 
16950
1695016950
16950
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenance
 
ET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptxET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptx
 
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptx
 
High potential test
High potential testHigh potential test
High potential test
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Emc standards
Emc standardsEmc standards
Emc standards
 
Relay testing.............................
Relay testing.............................Relay testing.............................
Relay testing.............................
 
Testing of cb
Testing of cbTesting of cb
Testing of cb
 
Sharp 32 pulg 32c24
Sharp 32 pulg 32c24Sharp 32 pulg 32c24
Sharp 32 pulg 32c24
 
Dialectirc tests
Dialectirc testsDialectirc tests
Dialectirc tests
 
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
 
SEMA 2016 - Introduction to Transformer Rated Metering
SEMA 2016 -  Introduction to Transformer Rated MeteringSEMA 2016 -  Introduction to Transformer Rated Metering
SEMA 2016 - Introduction to Transformer Rated Metering
 

More from Ali Sepehri

End of-life factors in high voltage gas insulated switchgear with sf6 or with...
End of-life factors in high voltage gas insulated switchgear with sf6 or with...End of-life factors in high voltage gas insulated switchgear with sf6 or with...
End of-life factors in high voltage gas insulated switchgear with sf6 or with...Ali Sepehri
 
My CV with photo
My CV with photoMy CV with photo
My CV with photoAli Sepehri
 
Technical information for high voltage disconnector & earthing switch in enqu...
Technical information for high voltage disconnector & earthing switch in enqu...Technical information for high voltage disconnector & earthing switch in enqu...
Technical information for high voltage disconnector & earthing switch in enqu...Ali Sepehri
 
Out of phase current switching in High Voltage Circuit Breakers
Out of phase current switching in High Voltage Circuit BreakersOut of phase current switching in High Voltage Circuit Breakers
Out of phase current switching in High Voltage Circuit BreakersAli Sepehri
 
Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...
Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...
Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...Ali Sepehri
 
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...Ali Sepehri
 
Voltage Escalation in Shunt Reactor Switching in Circuit Breakers
Voltage Escalation in Shunt Reactor Switching in Circuit BreakersVoltage Escalation in Shunt Reactor Switching in Circuit Breakers
Voltage Escalation in Shunt Reactor Switching in Circuit BreakersAli Sepehri
 
Hybrid HVDC Circuit Breaker Definitions
Hybrid HVDC Circuit Breaker  DefinitionsHybrid HVDC Circuit Breaker  Definitions
Hybrid HVDC Circuit Breaker DefinitionsAli Sepehri
 

More from Ali Sepehri (8)

End of-life factors in high voltage gas insulated switchgear with sf6 or with...
End of-life factors in high voltage gas insulated switchgear with sf6 or with...End of-life factors in high voltage gas insulated switchgear with sf6 or with...
End of-life factors in high voltage gas insulated switchgear with sf6 or with...
 
My CV with photo
My CV with photoMy CV with photo
My CV with photo
 
Technical information for high voltage disconnector & earthing switch in enqu...
Technical information for high voltage disconnector & earthing switch in enqu...Technical information for high voltage disconnector & earthing switch in enqu...
Technical information for high voltage disconnector & earthing switch in enqu...
 
Out of phase current switching in High Voltage Circuit Breakers
Out of phase current switching in High Voltage Circuit BreakersOut of phase current switching in High Voltage Circuit Breakers
Out of phase current switching in High Voltage Circuit Breakers
 
Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...
Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...
Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...
 
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
 
Voltage Escalation in Shunt Reactor Switching in Circuit Breakers
Voltage Escalation in Shunt Reactor Switching in Circuit BreakersVoltage Escalation in Shunt Reactor Switching in Circuit Breakers
Voltage Escalation in Shunt Reactor Switching in Circuit Breakers
 
Hybrid HVDC Circuit Breaker Definitions
Hybrid HVDC Circuit Breaker  DefinitionsHybrid HVDC Circuit Breaker  Definitions
Hybrid HVDC Circuit Breaker Definitions
 

Recently uploaded

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Recently uploaded (20)

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

AC High voltage Air Break Disconnector Switch Routine Test According to IEC 62271-102 Standard

  • 1. AC High voltage Air Break Disconnector Switch Routine Test According to IEC 62271-102 Standard
  • 2. Article 9(09.10.2018) The function of air-break disconnectors in high voltage power systems is to provide electrical and visible isolation of one part of the system. The isolation generally takes two forms: Isolation related to normal day-to-day operation of the power system. For example, shunt reactors required only during light load periods are switched out using circuit breakers and then isolated by disconnectors during peak load periods. Isolation related to repair or maintenance on transmission lines or station equipment such as transformers, circuit breakers and so on. High voltage air-break disconnectors and earthing switch come in a variety of types and mounting arrangements. The four most commonly used types are: • Vertical break type • Centre side break type • Double side break type
  • 3. The high voltage disconnector and earthing switch routine tests are for the purpose of revealing faults in material or construction. They do not impair the properties and reliability of a test object. The routine tests shall be made wherever reasonably practicable at the manufacturer's works on each apparatus manufactured, to ensure that the product is in accordance with the equipment on which the type tests have been passed. By agreement, any routine test may be made on site. The following items are the routine testing items of high voltage disconnector switch according to IEC 62271-1,IEC 62271-102 Standards: 1-Dielectric test on the main circuit: A dry, short-duration power-frequency with 50 or 60 Hz voltage test shall be applied.The test voltage shall be that specified in column 2 of the following tables , according to the relevant IEC standards.In these values, the altitude factor should be considered.
  • 4. Dielectric power frequency test manufacture by High Volt company
  • 5. When the insulation of disconnector and earth switch is provided only by solid-core insulators and air at ambient pressure, the power-frequency voltage withstand test may be omitted if the dimensions between the conductive parts – between phases, across open switching devices and between conductive parts and the frame – are checked by dimensional measurements.
  • 6.
  • 8. When dielectric test applied on earthing switches, the test voltage shall be applied with the earthing switch in the open position in these condition: – between adjacent insulated terminals with the bases earthed. – between all the insulated terminals connected together and the bases earthed. 2-Dielectric test on auxiliary and control circuits in operating mechanism: A:Inspection of auxiliary and control circuits, and verification of conformity to the circuit diagrams and wiring diagrams: The nature of the materials, the quality of assembly, the finish and, if necessary, the protective coatings against corrosion shall be checked. A visual inspection is also necessary to check the satisfactory installation of the thermal insulation.The conductors and cables and heaters(resistance check)shall be checked for proper routing.
  • 9. B:Functional tests: A functional test of all low-voltage circuits(such relays , contactor, interlocking magnet) shall be made to verify the proper functioning of auxiliary and control circuits in conjunction with the other parts of the disconnector switch . interlocking cassette must be checked. C:Verification of protection against electrical shock: Protection against direct contact with the main circuit and safe accessibility to the auxiliary and control equipment parts liable to be touched during normal operation shall be checked by visual inspection. D:Dielectric tests: Only power frequency tests shall be performed. The test voltage shall be 1 kV or 2 kV with a duration of 1 s with 50 or 60 HZ frequency.
  • 10. 3-Measurement of the resistance of the main circuit: For the routine test, the DC voltage drop or resistance of each pole of the main circuit shall be measured under conditions as nearly as possible similar, with regard to ambient air temperature and points of measurement, to those under which the corresponding type test was made. The measured resistance shall not exceed 1,2 × Ru, where Ru is equal to the resistance measured before the temperature-rise test. Contact resistance measurement equipment manufacture by vanguard instrument company
  • 11. 4-Design and visual checks: The disconnector and earthing switches shall be checked to verify its compliance with the purchase specification. 5-Mechanical operating tests: Operating tests are made to ensure that the disconnectors or earthing switches show the specified operating behavior within the specified voltage and supply pressure limits of their operating mechanisms. During these tests, which are performed without voltage on, or current flowing through the main circuit, it shall be verified that the disconnectors or earthing switches open and close correctly when their operating mechanisms are energized.
  • 12. This item also must be check: *angle of operating mechanism out put shaft. *measuring torque of operating mechanism output. *operating mechanism motor current. *operating times. – 10 close-open operating cycles at the minimum(85%)supply voltage. – 10 close-open operating cycles at the maximum (110%)supply voltage. –50 close-open operating cycles at the nominal (100%)supply voltage. During these operating cycles the operating characteristics such as operating time and maximum energy consumption shall be recorded or evaluated. With disconnectors having manual mechanisms only, the maximum forces shall be recorded. Satisfactory operation of the auxiliary contacts and position indicating devices (if any) shall be verified.
  • 13. After these tests, no parts of the disconnector or earthing switch shall be damaged. For disconnectors and earthing switches with a rated voltage of 52 kV and above, the mechanical operating routine tests may be performed on sub-assemblies. The main circuit resistance shall be measured before and after the mechanical endurance test. The resistance shall not vary by more than 20 % from the value measured before the test.
  • 14. References: * International Standard :IEC 62271-1 High-voltage switchgear and controlgear Part 1: Common specifications . * International Standard :IEC 62271-102 High-voltage switchgear and controlgear – Part 102: Alternating current disconnectors and earthing switches. * Current interruption using high voltage air-break disconnectors Article by Peelo, D.F. hindhoven: Technische Universiteit Eindhoven * High Volt Company catalogue. *vanguard instruments company(doble) catalogue. *Alpha Elektrotechnik AG Company disconnector switch catalogue.