Three single-phase transformers are connected in a Y-Δ configuration to form a three-phase transformer bank supplying a 120 kVA, 230 V, 0.85 pf lag load. Calculations show the primary phase current is 17.39 A and since it is a Y connection, the primary line current is also 17.39 A.