SlideShare a Scribd company logo
SAIC-UT-
2001
SAIC-UT-
2002
SAIC-UT-
2003
SAIC-UT-
2010
Review of TKY Technique Procedure &
Mock-up Design for UT -
A) TKY Joint Mock-up & Design
B) Pipeline Butt Weld Mock Ups
C) Overlay/Cladding Code Blocks
D) Code Shear Wave Exam Blocks
E) AWS D1.1 Welds (IIW Type 2)
F) UT Thickness for Piping & Vessel
Remaining Wall Thickness Verification
using Calibration Step Blocks (Lo/Hi)
G) Lamination Scans for Hot Taps & Tie-
In, etc using Step Blocks (Lo/Hi)
SAUDI ARAMCO ID/PIEU -30-Oct-2017 -REV. 2017.06.00(Standards Cutoff -June 30, 2017) Rev.2017.06.00
SAUDI
ARAMCO
RH
SPECIAL PROCESS (NDE) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS.
1.1 RH
RH
Review of UT Personnel Qualifications
(UT Personnel CV/Quals/Certs, Verify SA
UT Level II Qualifications for all UT
examiners as detailed in Remarks)
QUALITY
PROCEDURE
SAIC-UT-2010
NDE Process Control Procedure*
DOCUMENT REVIEW
1.0
Review of Ultrasonic Testing Procedure
Prior to Project- (UseUltrasonic
Examination (UT) Procedures)
Applications outlined
SAIC-UT-2001
SAIC-UT-2002
MECHANICAL- NDE
INSPECTION RESPONSIBILITY
ASSIGNMENTS
30-Oct-17
RH
R
SAIC-UT-2003
UT is per OID/NDTU approved Techniques that use
certifed NDE Service Provider UT Techs that follow
approved UT Procedures.
A) TKY examiners (Offshore) per API RP2X
B) Automated UT Lev II Personnel for Pipeline
C) Overlay & Cladding Exams (all applications)
D) Code Shear Wave (All codes/Applications) Techs for
A, B, C, D above & other special applications not relevant
to SA Projects have: Current required SA Certs & passed
the SA Performance Demonstration Exam.
E) AWS D1.1 (Weld Exams & Lam scans)
F) UT Thickness Examinations for Remaining Wall
Verification (all applications)
G) Lamination Scans (Hot Taps, Tie-ins, etc)
E, F, G Techs hold current Lev II UT certs
DISCIPLINE:
REMARKS
WBS/BI/JO/NO.
PROJECT TITLE:
ITEM
NO.
CONTRACTOR/SUBCONTRACTOR
APPROVED DATE
*Combine all NDE Methods applicable
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No.
SATIP- NDE-UT-01
Ultrasonic Testing (UT) on IK Projects
PROJECT PHASE TASK / ACTIVITY
CNTRCTR
QUALITY
RECORD
RH
1.4
1.3
1.2
RH
RH*
30-Jun-17
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU -30-Oct-2017 -REV. 2017.06.00(Standards Cutoff -June 30, 2017) Rev.2017.06.00
SAUDI
ARAMCO
QUALITY
PROCEDURE
MECHANICAL- NDE
INSPECTION RESPONSIBILITY
ASSIGNMENTS
30-Oct-17
DISCIPLINE:
REMARKS
WBS/BI/JO/NO.
PROJECT TITLE:
ITEM
NO.
CONTRACTOR/SUBCONTRACTOR
APPROVED DATE
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No.
SATIP- NDE-UT-01
Ultrasonic Testing (UT) on IK Projects
PROJECT PHASE TASK / ACTIVITY
CNTRCTR
QUALITY
RECORD
30-Jun-17
Owner's Inspector approves NDE Proposed Specs using
checklists. *For UT applications
USE SATR FOR UT AS APPLICABLE
Report Welds selected for UT in Database
H H
NDE Kickoff Meeting Item. Agreement shall be reached
on all items related to NDE Specs, Process Control & any
NDE related checklist.
TEST BLOCK & CALIBRATION CHECKS:
*See General Note 1
*Except Isotope materials
IN-PROCESS INSP = DAILY SUPERVISION BY CONTRACTOR* (*Prime/Sub) OF NDT SERVICE PROVIDER, & SAEP-1160 DATABASE UPDATES
SAIC-UT-
2004
SAIC-UT-
2005
R/W
W/R
W**
SAIC-UT-2008
3.2 W**
Follows Process Control Procedure.
See Notice
APPLICATION
SAIC-UT-2007
SAIC-UT-
2007
SAIC-NDT-
2001
SAIC-UT-2004
SAIC-UT-2005
In-Process Verification of Techniques &
Procedure Impementation of UT
MATERIAL RECEIVING
1.5 SAIC-NDT-2001
NDE Kickoff Meeting
RH
Project NDE Specifications
SAIC-UT-2010
SAIC-UT-
2010
H
2.0
2.1
Verification of UT Equipment &
Accessories (by Application)
R/W
1.7
2.2
Physical properties and condition of UT
Equipment and accessories
H H
SAIC-UT-2004
3.0
3.1
Inspection Requirements Prior to UT
Applications -
(Pre-Test Inspection of Exam Area)
W/R
H
2.3
Verification and/or set up of Mock-up of
TKY Joints -
A) Mock-ups (TKY Joint) & Calibration
B) Mock-ups (Pipeline) AUT Calibration &
Manual UT Proof-Up Calibrations
C) AWS D1.1 IIW Typ 2 Block Calibrat.
D) Overlay/Cladding ASME Block Cal
E) Code Butt Weld ASME Block Cal for
approved Shearwave Applications
F) UT Thickness Cal (Plate/Pipe/Shape)
H
SAIC-UT-
2008
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU -30-Oct-2017 -REV. 2017.06.00(Standards Cutoff -June 30, 2017) Rev.2017.06.00
SAUDI
ARAMCO
QUALITY
PROCEDURE
MECHANICAL- NDE
INSPECTION RESPONSIBILITY
ASSIGNMENTS
30-Oct-17
DISCIPLINE:
REMARKS
WBS/BI/JO/NO.
PROJECT TITLE:
ITEM
NO.
CONTRACTOR/SUBCONTRACTOR
APPROVED DATE
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No.
SATIP- NDE-UT-01
Ultrasonic Testing (UT) on IK Projects
PROJECT PHASE TASK / ACTIVITY
CNTRCTR
QUALITY
RECORD
30-Jun-17
SAIC-UT-
2009
SAIC-UT-2009
3.3
Evaluation of Ultrasonic Test and Test
Reports
W/RH R
SAIC-UT-2010
SAIC-UT-
2010
Complete SAIC-W-Series Checklists. Inform SA Insp on
100% of repairs that require UT as agreed upon. Perform
the required Database Reporting.
3.4
NDE Process Control incl. Repairs
A) SAIC-W-Checklists in Item 1.6
B) Database Entry for RTFI Results &
Req'd Reporting Per SAEP-1160.
C) Backlog Reporting Requirements
H/R W/R
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU -30-Oct-2017 -REV. 2017.06.00(Standards Cutoff -June 30, 2017) Rev.2017.06.00
SAUDI
ARAMCO
QUALITY
PROCEDURE
MECHANICAL- NDE
INSPECTION RESPONSIBILITY
ASSIGNMENTS
30-Oct-17
DISCIPLINE:
REMARKS
WBS/BI/JO/NO.
PROJECT TITLE:
ITEM
NO.
CONTRACTOR/SUBCONTRACTOR
APPROVED DATE
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No.
SATIP- NDE-UT-01
Ultrasonic Testing (UT) on IK Projects
PROJECT PHASE TASK / ACTIVITY
CNTRCTR
QUALITY
RECORD
30-Jun-17
NOTICE (SAEP-1160, Section 9.2): Use of Welding and NDT SAICS 9.2.1 One SAIC per day per activity is required for production welding on a daily or continual basis, e.g., fit-up, in-process, and final
inspection. Applicable weld numbers must be entered in Remarks Box on the appropriate SAIC. 9.2.2 Special welding activities such as branch connections, tie-ins, sleeve installation, hot-tap welding, and
temperature tie-ins will require a separate IR per weld per activity in accordance with the applicable SATIP. 9.2.3 NDT subcontractors must complete NDT Checklists on a daily basis per above but not as an IR
with the exception of the start of NDT activities. SAIC-W-2008 details SAEP-1160 Data Reqmts for Welding with NDE Control per SAIC-UT-2010.
Review of Documents
Witness Inspection/Test
3
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
organization representative is not present.
4
5
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization
representative in attendance.
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
levels of Saudi Aramco participation based upon the Contractor’s performance.
GENERAL NOTES
100% Contractor Inspection
LEGEND
S
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
RH
2
W
H
1
Surveillance I
Hold Point for QC Inspection/ Test R
Review and Approval of Documents
Saudi Aramco: Company General Use

More Related Content

What's hot

JAMES AJIBOYE RESUME-2016
JAMES AJIBOYE  RESUME-2016JAMES AJIBOYE  RESUME-2016
JAMES AJIBOYE RESUME-2016
"James" Afolabi Ajiboye
 
Cswip 11-01 - plant inspection- Week 1 cours
Cswip 11-01 - plant inspection- Week 1 coursCswip 11-01 - plant inspection- Week 1 cours
Cswip 11-01 - plant inspection- Week 1 cours
Rafik Guerbous
 
Muhammad Imran QAQC (Welding Inspector)CSWIP
Muhammad Imran QAQC (Welding Inspector)CSWIPMuhammad Imran QAQC (Welding Inspector)CSWIP
Muhammad Imran QAQC (Welding Inspector)CSWIP
Muhammad Imran
 
MOODY S.A GTW ER70S-6 SMW E7018
MOODY S.A   GTW ER70S-6      SMW E7018MOODY S.A   GTW ER70S-6      SMW E7018
MOODY S.A GTW ER70S-6 SMW E7018
THEODORE AVRAMIDIS
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
kalyanasundaram veerasekaran
 
S. Vibin CV
S. Vibin CVS. Vibin CV
S. Vibin CV
Vibin Kumar
 
SSolano2016new
SSolano2016newSSolano2016new
SSolano2016new
Sandy Solano Jr.
 
NDT Resume
NDT ResumeNDT Resume
NDT Resume
suresh ndt
 
Chris Blakey API Resume
Chris Blakey API ResumeChris Blakey API Resume
Chris Blakey API Resume
Chris Blakey
 
Resume
ResumeResume
API 510 Practice questions
API 510 Practice questions API 510 Practice questions
API 510 Practice questions
hariqwe
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
Ganesan Chinnadurai
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipeline
IEI GSC
 
Nasir Siddique Curriculum Vitae TM
Nasir Siddique Curriculum Vitae TMNasir Siddique Curriculum Vitae TM
Nasir Siddique Curriculum Vitae TM
Nasir Siddique
 
C-0131 Mechanical Calibration
C-0131 Mechanical CalibrationC-0131 Mechanical Calibration
C-0131 Mechanical Calibration
Maxpromotion
 
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CVCertified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
idris lawal
 
VIKAS CV
VIKAS CVVIKAS CV
VIKAS CV
vikas chandra
 
CV FOR N.R.IYER
CV FOR N.R.IYERCV FOR N.R.IYER
CV FOR N.R.IYER
NAGANATHAN IYER
 

What's hot (18)

JAMES AJIBOYE RESUME-2016
JAMES AJIBOYE  RESUME-2016JAMES AJIBOYE  RESUME-2016
JAMES AJIBOYE RESUME-2016
 
Cswip 11-01 - plant inspection- Week 1 cours
Cswip 11-01 - plant inspection- Week 1 coursCswip 11-01 - plant inspection- Week 1 cours
Cswip 11-01 - plant inspection- Week 1 cours
 
Muhammad Imran QAQC (Welding Inspector)CSWIP
Muhammad Imran QAQC (Welding Inspector)CSWIPMuhammad Imran QAQC (Welding Inspector)CSWIP
Muhammad Imran QAQC (Welding Inspector)CSWIP
 
MOODY S.A GTW ER70S-6 SMW E7018
MOODY S.A   GTW ER70S-6      SMW E7018MOODY S.A   GTW ER70S-6      SMW E7018
MOODY S.A GTW ER70S-6 SMW E7018
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
 
S. Vibin CV
S. Vibin CVS. Vibin CV
S. Vibin CV
 
SSolano2016new
SSolano2016newSSolano2016new
SSolano2016new
 
NDT Resume
NDT ResumeNDT Resume
NDT Resume
 
Chris Blakey API Resume
Chris Blakey API ResumeChris Blakey API Resume
Chris Blakey API Resume
 
Resume
ResumeResume
Resume
 
API 510 Practice questions
API 510 Practice questions API 510 Practice questions
API 510 Practice questions
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipeline
 
Nasir Siddique Curriculum Vitae TM
Nasir Siddique Curriculum Vitae TMNasir Siddique Curriculum Vitae TM
Nasir Siddique Curriculum Vitae TM
 
C-0131 Mechanical Calibration
C-0131 Mechanical CalibrationC-0131 Mechanical Calibration
C-0131 Mechanical Calibration
 
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CVCertified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
 
VIKAS CV
VIKAS CVVIKAS CV
VIKAS CV
 
CV FOR N.R.IYER
CV FOR N.R.IYERCV FOR N.R.IYER
CV FOR N.R.IYER
 

Similar to Satip nde-ut-01

CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
Prasath ravanan
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
nader rizq
 
kamran arif
kamran arifkamran arif
kamran arif
kamran arif
 
Resume Tariq QA
Resume Tariq QAResume Tariq QA
Resume Tariq QA
Tariq mohd
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
Saif Ali
 
Amar Resume
Amar ResumeAmar Resume
Amar Resume
Amar Desai
 
Arafat Syed Rashid Latest Updated 20.04.2015
Arafat Syed Rashid  Latest Updated 20.04.2015Arafat Syed Rashid  Latest Updated 20.04.2015
Arafat Syed Rashid Latest Updated 20.04.2015
rashid Arafat
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
Assignment Help
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last updateMomen Mohamed
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
Anil Singh
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
Robin Parayil
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of exp
Vijay Raghavan
 
MUHAMMAD KALEEM U LLAH (2)
MUHAMMAD KALEEM U LLAH (2)MUHAMMAD KALEEM U LLAH (2)
MUHAMMAD KALEEM U LLAH (2)
Muhammad Ullah
 
sonu jaiswal resume 17.02.2017
sonu jaiswal resume  17.02.2017sonu jaiswal resume  17.02.2017
sonu jaiswal resume 17.02.2017
sonu jaiswal
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Sangilimuthu Samiayyah
 
IMRAN YAMEEN CV
IMRAN YAMEEN CV IMRAN YAMEEN CV
IMRAN YAMEEN CV
Imran Malik
 
Kumar.R Multi Inspector cv -5 - Copy
Kumar.R   Multi Inspector cv   -5 - CopyKumar.R   Multi Inspector cv   -5 - Copy
Kumar.R Multi Inspector cv -5 - Copy
Kumar ramalingam
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
ABDUL RAZAK SHANAWAS
 
CV QC
CV QCCV QC
CV QC
PRA BHU
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.
Vijay Sekaran
 

Similar to Satip nde-ut-01 (20)

CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
 
kamran arif
kamran arifkamran arif
kamran arif
 
Resume Tariq QA
Resume Tariq QAResume Tariq QA
Resume Tariq QA
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
Amar Resume
Amar ResumeAmar Resume
Amar Resume
 
Arafat Syed Rashid Latest Updated 20.04.2015
Arafat Syed Rashid  Latest Updated 20.04.2015Arafat Syed Rashid  Latest Updated 20.04.2015
Arafat Syed Rashid Latest Updated 20.04.2015
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last update
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of exp
 
MUHAMMAD KALEEM U LLAH (2)
MUHAMMAD KALEEM U LLAH (2)MUHAMMAD KALEEM U LLAH (2)
MUHAMMAD KALEEM U LLAH (2)
 
sonu jaiswal resume 17.02.2017
sonu jaiswal resume  17.02.2017sonu jaiswal resume  17.02.2017
sonu jaiswal resume 17.02.2017
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
IMRAN YAMEEN CV
IMRAN YAMEEN CV IMRAN YAMEEN CV
IMRAN YAMEEN CV
 
Kumar.R Multi Inspector cv -5 - Copy
Kumar.R   Multi Inspector cv   -5 - CopyKumar.R   Multi Inspector cv   -5 - Copy
Kumar.R Multi Inspector cv -5 - Copy
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
 
CV QC
CV QCCV QC
CV QC
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.
 

Recently uploaded

官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
2zjra9bn
 
IT Career Hacks Navigate the Tech Jungle with a Roadmap
IT Career Hacks Navigate the Tech Jungle with a RoadmapIT Career Hacks Navigate the Tech Jungle with a Roadmap
IT Career Hacks Navigate the Tech Jungle with a Roadmap
Base Camp
 
Learnings from Successful Jobs Searchers
Learnings from Successful Jobs SearchersLearnings from Successful Jobs Searchers
Learnings from Successful Jobs Searchers
Bruce Bennett
 
lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789
Ghh
 
How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?
How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?
How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?
NWEXAM
 
A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024
Bruce Bennett
 
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
2zjra9bn
 
Job Finding Apps Everything You Need to Know in 2024
Job Finding Apps Everything You Need to Know in 2024Job Finding Apps Everything You Need to Know in 2024
Job Finding Apps Everything You Need to Know in 2024
SnapJob
 
labb123456789123456789123456789123456789
labb123456789123456789123456789123456789labb123456789123456789123456789123456789
labb123456789123456789123456789123456789
Ghh
 
0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf
Thomas GIRARD BDes
 
Switching Careers Slides - JoyceMSullivan SocMediaFin - 2024Jun11.pdf
Switching Careers Slides - JoyceMSullivan SocMediaFin -  2024Jun11.pdfSwitching Careers Slides - JoyceMSullivan SocMediaFin -  2024Jun11.pdf
Switching Careers Slides - JoyceMSullivan SocMediaFin - 2024Jun11.pdf
SocMediaFin - Joyce Sullivan
 
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAANBUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
cahgading001
 
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptxStatus of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
MuhammadWaqasBaloch1
 
Leadership Ambassador club Adventist module
Leadership Ambassador club Adventist moduleLeadership Ambassador club Adventist module
Leadership Ambassador club Adventist module
kakomaeric00
 
Resumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineResumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying Online
Bruce Bennett
 
Tape Measure Training & Practice Assessments.pdf
Tape Measure Training & Practice Assessments.pdfTape Measure Training & Practice Assessments.pdf
Tape Measure Training & Practice Assessments.pdf
KateRobinson68
 
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
dsnow9802
 
thyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatialthyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatial
Aditya Raghav
 
Leave-rules.ppt CCS leave rules 1972 for central govt employees
Leave-rules.ppt CCS leave rules 1972 for central govt employeesLeave-rules.ppt CCS leave rules 1972 for central govt employees
Leave-rules.ppt CCS leave rules 1972 for central govt employees
Sreenivas702647
 
Lbs last rank 2023 9988kr47h4744j445.pdf
Lbs last rank 2023 9988kr47h4744j445.pdfLbs last rank 2023 9988kr47h4744j445.pdf
Lbs last rank 2023 9988kr47h4744j445.pdf
ashiquepa3
 

Recently uploaded (20)

官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
 
IT Career Hacks Navigate the Tech Jungle with a Roadmap
IT Career Hacks Navigate the Tech Jungle with a RoadmapIT Career Hacks Navigate the Tech Jungle with a Roadmap
IT Career Hacks Navigate the Tech Jungle with a Roadmap
 
Learnings from Successful Jobs Searchers
Learnings from Successful Jobs SearchersLearnings from Successful Jobs Searchers
Learnings from Successful Jobs Searchers
 
lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789
 
How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?
How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?
How to Prepare for Fortinet FCP_FAC_AD-6.5 Certification?
 
A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024
 
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
 
Job Finding Apps Everything You Need to Know in 2024
Job Finding Apps Everything You Need to Know in 2024Job Finding Apps Everything You Need to Know in 2024
Job Finding Apps Everything You Need to Know in 2024
 
labb123456789123456789123456789123456789
labb123456789123456789123456789123456789labb123456789123456789123456789123456789
labb123456789123456789123456789123456789
 
0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf
 
Switching Careers Slides - JoyceMSullivan SocMediaFin - 2024Jun11.pdf
Switching Careers Slides - JoyceMSullivan SocMediaFin -  2024Jun11.pdfSwitching Careers Slides - JoyceMSullivan SocMediaFin -  2024Jun11.pdf
Switching Careers Slides - JoyceMSullivan SocMediaFin - 2024Jun11.pdf
 
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAANBUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
 
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptxStatus of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
 
Leadership Ambassador club Adventist module
Leadership Ambassador club Adventist moduleLeadership Ambassador club Adventist module
Leadership Ambassador club Adventist module
 
Resumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineResumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying Online
 
Tape Measure Training & Practice Assessments.pdf
Tape Measure Training & Practice Assessments.pdfTape Measure Training & Practice Assessments.pdf
Tape Measure Training & Practice Assessments.pdf
 
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
 
thyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatialthyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatial
 
Leave-rules.ppt CCS leave rules 1972 for central govt employees
Leave-rules.ppt CCS leave rules 1972 for central govt employeesLeave-rules.ppt CCS leave rules 1972 for central govt employees
Leave-rules.ppt CCS leave rules 1972 for central govt employees
 
Lbs last rank 2023 9988kr47h4744j445.pdf
Lbs last rank 2023 9988kr47h4744j445.pdfLbs last rank 2023 9988kr47h4744j445.pdf
Lbs last rank 2023 9988kr47h4744j445.pdf
 

Satip nde-ut-01

  • 1. SAIC-UT- 2001 SAIC-UT- 2002 SAIC-UT- 2003 SAIC-UT- 2010 Review of TKY Technique Procedure & Mock-up Design for UT - A) TKY Joint Mock-up & Design B) Pipeline Butt Weld Mock Ups C) Overlay/Cladding Code Blocks D) Code Shear Wave Exam Blocks E) AWS D1.1 Welds (IIW Type 2) F) UT Thickness for Piping & Vessel Remaining Wall Thickness Verification using Calibration Step Blocks (Lo/Hi) G) Lamination Scans for Hot Taps & Tie- In, etc using Step Blocks (Lo/Hi) SAUDI ARAMCO ID/PIEU -30-Oct-2017 -REV. 2017.06.00(Standards Cutoff -June 30, 2017) Rev.2017.06.00 SAUDI ARAMCO RH SPECIAL PROCESS (NDE) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS. 1.1 RH RH Review of UT Personnel Qualifications (UT Personnel CV/Quals/Certs, Verify SA UT Level II Qualifications for all UT examiners as detailed in Remarks) QUALITY PROCEDURE SAIC-UT-2010 NDE Process Control Procedure* DOCUMENT REVIEW 1.0 Review of Ultrasonic Testing Procedure Prior to Project- (UseUltrasonic Examination (UT) Procedures) Applications outlined SAIC-UT-2001 SAIC-UT-2002 MECHANICAL- NDE INSPECTION RESPONSIBILITY ASSIGNMENTS 30-Oct-17 RH R SAIC-UT-2003 UT is per OID/NDTU approved Techniques that use certifed NDE Service Provider UT Techs that follow approved UT Procedures. A) TKY examiners (Offshore) per API RP2X B) Automated UT Lev II Personnel for Pipeline C) Overlay & Cladding Exams (all applications) D) Code Shear Wave (All codes/Applications) Techs for A, B, C, D above & other special applications not relevant to SA Projects have: Current required SA Certs & passed the SA Performance Demonstration Exam. E) AWS D1.1 (Weld Exams & Lam scans) F) UT Thickness Examinations for Remaining Wall Verification (all applications) G) Lamination Scans (Hot Taps, Tie-ins, etc) E, F, G Techs hold current Lev II UT certs DISCIPLINE: REMARKS WBS/BI/JO/NO. PROJECT TITLE: ITEM NO. CONTRACTOR/SUBCONTRACTOR APPROVED DATE *Combine all NDE Methods applicable SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. SATIP- NDE-UT-01 Ultrasonic Testing (UT) on IK Projects PROJECT PHASE TASK / ACTIVITY CNTRCTR QUALITY RECORD RH 1.4 1.3 1.2 RH RH* 30-Jun-17 Saudi Aramco: Company General Use
  • 2. SAUDI ARAMCO ID/PIEU -30-Oct-2017 -REV. 2017.06.00(Standards Cutoff -June 30, 2017) Rev.2017.06.00 SAUDI ARAMCO QUALITY PROCEDURE MECHANICAL- NDE INSPECTION RESPONSIBILITY ASSIGNMENTS 30-Oct-17 DISCIPLINE: REMARKS WBS/BI/JO/NO. PROJECT TITLE: ITEM NO. CONTRACTOR/SUBCONTRACTOR APPROVED DATE SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. SATIP- NDE-UT-01 Ultrasonic Testing (UT) on IK Projects PROJECT PHASE TASK / ACTIVITY CNTRCTR QUALITY RECORD 30-Jun-17 Owner's Inspector approves NDE Proposed Specs using checklists. *For UT applications USE SATR FOR UT AS APPLICABLE Report Welds selected for UT in Database H H NDE Kickoff Meeting Item. Agreement shall be reached on all items related to NDE Specs, Process Control & any NDE related checklist. TEST BLOCK & CALIBRATION CHECKS: *See General Note 1 *Except Isotope materials IN-PROCESS INSP = DAILY SUPERVISION BY CONTRACTOR* (*Prime/Sub) OF NDT SERVICE PROVIDER, & SAEP-1160 DATABASE UPDATES SAIC-UT- 2004 SAIC-UT- 2005 R/W W/R W** SAIC-UT-2008 3.2 W** Follows Process Control Procedure. See Notice APPLICATION SAIC-UT-2007 SAIC-UT- 2007 SAIC-NDT- 2001 SAIC-UT-2004 SAIC-UT-2005 In-Process Verification of Techniques & Procedure Impementation of UT MATERIAL RECEIVING 1.5 SAIC-NDT-2001 NDE Kickoff Meeting RH Project NDE Specifications SAIC-UT-2010 SAIC-UT- 2010 H 2.0 2.1 Verification of UT Equipment & Accessories (by Application) R/W 1.7 2.2 Physical properties and condition of UT Equipment and accessories H H SAIC-UT-2004 3.0 3.1 Inspection Requirements Prior to UT Applications - (Pre-Test Inspection of Exam Area) W/R H 2.3 Verification and/or set up of Mock-up of TKY Joints - A) Mock-ups (TKY Joint) & Calibration B) Mock-ups (Pipeline) AUT Calibration & Manual UT Proof-Up Calibrations C) AWS D1.1 IIW Typ 2 Block Calibrat. D) Overlay/Cladding ASME Block Cal E) Code Butt Weld ASME Block Cal for approved Shearwave Applications F) UT Thickness Cal (Plate/Pipe/Shape) H SAIC-UT- 2008 Saudi Aramco: Company General Use
  • 3. SAUDI ARAMCO ID/PIEU -30-Oct-2017 -REV. 2017.06.00(Standards Cutoff -June 30, 2017) Rev.2017.06.00 SAUDI ARAMCO QUALITY PROCEDURE MECHANICAL- NDE INSPECTION RESPONSIBILITY ASSIGNMENTS 30-Oct-17 DISCIPLINE: REMARKS WBS/BI/JO/NO. PROJECT TITLE: ITEM NO. CONTRACTOR/SUBCONTRACTOR APPROVED DATE SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. SATIP- NDE-UT-01 Ultrasonic Testing (UT) on IK Projects PROJECT PHASE TASK / ACTIVITY CNTRCTR QUALITY RECORD 30-Jun-17 SAIC-UT- 2009 SAIC-UT-2009 3.3 Evaluation of Ultrasonic Test and Test Reports W/RH R SAIC-UT-2010 SAIC-UT- 2010 Complete SAIC-W-Series Checklists. Inform SA Insp on 100% of repairs that require UT as agreed upon. Perform the required Database Reporting. 3.4 NDE Process Control incl. Repairs A) SAIC-W-Checklists in Item 1.6 B) Database Entry for RTFI Results & Req'd Reporting Per SAEP-1160. C) Backlog Reporting Requirements H/R W/R Saudi Aramco: Company General Use
  • 4. SAUDI ARAMCO ID/PIEU -30-Oct-2017 -REV. 2017.06.00(Standards Cutoff -June 30, 2017) Rev.2017.06.00 SAUDI ARAMCO QUALITY PROCEDURE MECHANICAL- NDE INSPECTION RESPONSIBILITY ASSIGNMENTS 30-Oct-17 DISCIPLINE: REMARKS WBS/BI/JO/NO. PROJECT TITLE: ITEM NO. CONTRACTOR/SUBCONTRACTOR APPROVED DATE SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. SATIP- NDE-UT-01 Ultrasonic Testing (UT) on IK Projects PROJECT PHASE TASK / ACTIVITY CNTRCTR QUALITY RECORD 30-Jun-17 NOTICE (SAEP-1160, Section 9.2): Use of Welding and NDT SAICS 9.2.1 One SAIC per day per activity is required for production welding on a daily or continual basis, e.g., fit-up, in-process, and final inspection. Applicable weld numbers must be entered in Remarks Box on the appropriate SAIC. 9.2.2 Special welding activities such as branch connections, tie-ins, sleeve installation, hot-tap welding, and temperature tie-ins will require a separate IR per weld per activity in accordance with the applicable SATIP. 9.2.3 NDT subcontractors must complete NDT Checklists on a daily basis per above but not as an IR with the exception of the start of NDT activities. SAIC-W-2008 details SAEP-1160 Data Reqmts for Welding with NDE Control per SAIC-UT-2010. Review of Documents Witness Inspection/Test 3 Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not present. 4 5 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance. If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco. The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon the Contractor’s performance. GENERAL NOTES 100% Contractor Inspection LEGEND S Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization RH 2 W H 1 Surveillance I Hold Point for QC Inspection/ Test R Review and Approval of Documents Saudi Aramco: Company General Use