1
  
Key Skills
EPCC Activities: Conceptual FEED
Design, Site Procurement,
Construction, Commissioning and
Project Handover to End-User.
Elc Load Computation for Small area,
Large Area and New City  
 
Up gradation of Space requirement
& Engineering Load Estimation,
Network Analysis: Load Flow Study,
Load Schedule, SLD, Voltage Drop,
Motor Starting, Short Circuit Study,
Overcurrent & Relay Coordination,
Arc Flash hazard Analysis.  
 
Creation of Details Shop drawings
(DWGs), Builder DWGs, MEP
Coordination & As Built DWGs
Obtaining NOCs from relevant
authorities 
 
Re-estimation & Upgradation of BOQ
as per Value Engineering
Preparation of Project Plans &
Contract Documents, Technical Bid
Evaluation / Vendor Document
Review
 
Cost & Budgetary Control during
tendering stage; Support to Tender
Department
Interact with QA/QC Dept. & Quality
Control; Rectification & Completion
of Snags Prior to Final Handover 
 
Internal & External Audits 
 
HSE, Risk & Change Management 
 
Over 2 decades’ experience in India, GCC & Middle East, with impressive success
in Project Execution, FEED Engineering, Procurement, Construction and
Commissioning (EPCC) of Lump Sum Electrical Turnkey Projects
Domain Specialization in Pre construction and Post Construction fields such as: 
Industrial Projects:
o Airport Projects, Military Base Projects (USACE),
o Downstream Onshore Oil & Gas Refinery
o Pharmaceutical Plant, Molasses Distillery Process Plant,
o District Cooling Plant, Cotton Spinning Mills, Cement Plant
o Factory Cold Storage, Jack Wells, Wastewater Treatment Plants
Mixed-use Buildings:
o Shopping Mall, Multi-story / Riser Building, Hospital, Five Star Resort
o Beach Hotel, Commercial & Non-Commercial Buildings
EHV, HV, MV and LV Substations: GIS, AIS and MTS
o Sub-transmission, Primary Substation,
o Secondary Substation, Distribution Substations and Switchyards,
Fire Alarm & Fire Protection System
Profile Summary 
Skilled in driving end-to-end Project Management including FEED Design
aspects, technical document tendering, planning, commissioning,
construction, contract management, value engineering, capital expenditure
management, waste reductions & safety
Proficient in developing detailed shop drawings, equipment selection,
applying, testing and commencing EHV, HV, MV, LV switchyard Equipment &
Building Equipment, such as:
o Switchyard Equipment: Wave Trap, LA, CCVT/PT, EMVT, SF6 Breaker, Break
Disconnector /Isolators, Earthing switch, Power Transformer, Reactor,
Capacitor bank & CTs etc.
o Control Room building Equipment: Control panel, Relay panel, Metering
panel, PLCC panel, RTU panel, Battery sets, DCDB & Charger, L.T. Panel
board, Compressor panel, C/R desk equips: PCs, Telephones, etc.
o Equipment Configurations such as 225 MW & 400 KV GIS Substation, 1350
MW, 400/132KV Breaker & Half Scheme AIS Substation, 132/33/11KV
Double Main Bus with Auxiliary Bus Scheme Substation, 400KV Switchyard
and 132/33/6.6 KV Industrial Substation, 33KV, 22KV, 15KV & 11KV Open
Type, Pole Mounting & Indoor Type Utility Substation
Strong exposure in managing all techno-commercial matters including bid
evaluation, contract management & negotiation, finalization of contracting
strategies & contracting terms and contract award & close-out
Sound understanding of Local Authority Regulation: such as ADDC, DEWA,
SEWA, FEWA, SCECOs, TECOM, LEED, DGBR, CPWD, ECBC, BEE. USACE,
Estidama, Civil Defense. & International Standards: i.e BS, IEC, CIGRE, FAA,
AEIC, NEC, NFPA, NEMA, ASTM, CIBSE, ANSI, IEEE, OSHA, IEE Wiring
regulations, BICSI, BSEN, ARI, ASHRAE, EIA/TIA (ETISALAT, DU), BIS, IS
People-friendly & approachable with strong interpersonal, analytical,
problem solving & critical thinking skills
 
 
 
SHIVA Y.C.
Applied Post: Senior Electrical Engineer -Project
[SENIOR MANAGEMENT PROFESSIONAL –
ELECTRICAL ENGINEERING, EPC PROJECT MANAGEMENT]
shiva.epcelc@gmail.com
+971-56-1282438;+93-795916116;
+91-7760573256
 shiva.aci
 
Registered Professional Engineer:
RSB for ADWEA -UAE & KPTCL India
Affiliated Member: Society of Engineers- UAE
Test Appellant & Authority Certified Engineer:
ADCD & Sharjah Civil Defence Authority in UAE
LOA: from US Army Corps of Engineers
 
2
 
 
Career Timeline
Education
 
Post Graduate Diploma in Fire Protection & Safety Engineering from
Maharashtra Institute of Technology, Pune, India with ‘A’ Grade in 2005
Bachelors in Engineering (Electrical) from Ghousia College of Engineering,/
University of Bangalore, Karnataka with 67% marks in 1989
 
Certificate Course 
Registered Professional Engineer:   
 
 
 
 Work Experience 
 
34 Hours ‘Engineer’s Registration Certificate’ at ICTD [International Centre
for Training & Development] Abu Dhabi-UAE; issued by Regulation &
Supervision Bureau (RSB) for Abu Dhabi Water & Electricity Authority
(ADWEA)-UAE. Subjects: included Electrical Design, Installation, Testing
and Commencing System for Commercial, Non-Commercial buildings and
Industrial sectors as per ‘IEE Electricity Wiring Regulations’ and other
Standards such as IEC60364, BS 7671
Advanced Constructors International LLC, ACI is Sole Agency Company
of UACE Middle East District as Lead Electrical Engineer - Project
ARCHON Engg. Consultants LLC, UAE as Lead Electrical Engineer
Emirates General Contracting LLC, Dubai, UAE a part of Al Ahli Group
as HO Electrical Engineer - MEP Dept.
Al-Babtain Group of Company, UAE & KSA as Senior Electrical Engineer
- Project - MEP Division
Kirloskar Electric Company Ltd., Bangalore, India as Electrical Engineer
- Project - PPC Dept.
Responsibilities:
Spearheading development of project WBS, project schedules, master
schedules, baseline schedule, integrated schedule, resource schedules,
execution methodologies, cost estimates, budget, project KPIs, so on
Keeping close track of project progress and schedule; managing project
governance as well as risk management process
Evaluating technical proposals, drawings and FEED of projects; conducting
techno-commercial feasibility studies, pre-FEED, screening studies and
concept & development studies
Reviewing FEED deliverables such as Engineering Load Parameters, PFDs,
P&IDs, Network Analysis, Equipment List, Data Sheets, Plant Layouts,
Equipment setting Layouts, FEED Cost Estimate, so on
Tracking the detailed engineering progress; performing design reviews,
constructability reviews, 3D model reviews & value engineering exercises
Since Oct’10 - Till Date
Jun’07 – Sep’10
Mar’03 – Sep’06
Jul’95 – Nov’02
May’90 – Apr’95
 
Projects Executed
Spanning Industrial Projects:
Mixed-use Buildings:
EHV, HV, MV & LV - GIS, AIS
and MTS substations
Primary Site Power Distribution
(Infrastructure) Duct Bank,
Internal & External Cable Tray,
Trunking System, Internal &
External Lighting & Secondary
Power LV Wiring System,
Telecommunication, Public
Address & BG Music
Kirloskar Electric
Company as
Electrical Engineer
- Project 
Al-Babtain Group
of Company as
Senior Electrical
Engineer - Project
- MEP Division 
Emirates General
Contracting LLC
as H.O Electrical
Engineer - MEP
Department 
1990 - 1995 1995 - 2002 2003 - 2006
ARCHON
Engineering
Consultants as
Lead Electrical
Engineer 
2007 - 2010
Advanced
Constructors
International as
Lead Electrical
Engineer - Project 
Since 2010
 
3
Automation Systems:
o Lighting Control System, IBMS &
RMS System, CCTV System
o Door Access System, Centralized
Emergency Lighting System
Step-Up Substation:
o DG Power Plant of capacity 10
MW, 0.400/15KV Power Station
o Centralized ELC Power
Generation, Synchronization and
Step upping LV to MV Power
Supply & Site Distribution
System i.e. 10Nos x 1320
KVA/400V DG
o Plant Synchronization Control
Panels, 10 Nos x 1500 KVA
0.400/15KV GSU TRFs, SF6 MV
Switchgears
Primary Grid Substations:
o 225MW, 400kV GIS Substation
with 14 Feeders in a Double
Busbar Configuration
o 1350 MW, 400/132KV Breaker
and a Half Scheme AIS
Substation, including Power
Transformer and Shunt Reactors
o 132/33/11KV Double Main Bus
with Auxiliary Bus Scheme
Substation: 2Nos x 20 MVA,
132/11KVTRFs and 2Nos x
40MVA 132/33 TRFs with
Capacitor Bank and 3Nos x
160MVA 220/132KV Double bus
Scheme Substation: 220 KV
Primary Double main Bus and
Secondary side 132KV Double
bus configurations
o 400KV Switchyard & 132/33/6.6
KV Industrial Substation
Secondary & Distribution
Substation:
o 33KV, 22KV, 15KV & 11KV Open
Type, Pole Mounting & Indoor
Type Utility Substation
Fire Alarm & Fire Protection
System:
o Conventional System & Analogue
Addressable with Vice Evacuation
Fire Suppression System:
o Fire Sprinkler System (Wet and
Deluge System)
o Hydrant and House Reel System
o Gaseous Suppression System
(FM200 & CO2 System)
    
Providing strategic & technical inputs on methodologies of construction;
planning, sequencing and controlling all construction activities
Developing contract strategy for projects; monitoring preparation of EPC
tender packages, schedules, approved vendors’ list, sub-contractors’ list,
clarifications, tender board proposals, award processes and kick offs
Executing technical bid evaluation & analysis, review of techno-commercial
vendor offers and expediting orders placed with vendors
Obtaining approval for FEED, budget and FEED & technologies tenders
Reviewing quality at project site by exercising rigorous quality control plan
& procedures, implementing ISO or similar systems
Leading the project PMC teams throughout project life cycles from the
stage of requirement & scope definition till execution & handover
Setting-up Risk Management Process for the project, holding risk
workshops, updating risks in the risk register and mitigating the same
Conducting internal & external audits;
Significant Accomplishments:
Ensured successful completion of the prestigious USACE client’s ANA & ANP
Projects, within approved budget of US$ 167 Million through continuous
monitoring of budget movement and optimized utilization, as Project Lead
Ensured the implementation of engineering lessons learnt from past
projects and value-added engineering for a high net-worth project
Successfully managed the erection, testing and commissioning of:
o 10 x 1320 KVA, 400V Power DG
o 10 x 1500KVA, 400v/15KV Generator Step Up Transformer (GSU
TRFs), 15KV MV Switchgears, Synchronization Panels, MCC, DBs
o 1000 KW, 400/230V Resistive Load Bank, Control Panel
o 16 Km Site Distribution LV & MV Duct Bank, 20 x 200KVA up to
1500KVA-15/0.400KV Pad Mounting Substations and other Blocks
Electrification such as Centralized Power Plant, Waste Water
Treatment Plant, LSA and other Camp Buildings
Accomplished the timely closing of techno-commercial evaluation of EPC
contract, while ensuring a timely delivery as well as engineering &
technical compliance
 Trainings & Seminars Attended 
GE Industrial Solutions: 267 Hours Training Program; AVTS Training on
Onshore Oil & Gas Refinery, Petrochemical Process Sector, Water Treatment
Plant, Cement Plant, Health Sector and Multi-level Buildings. at Technical &
Vocational Training Corporation, Riyadh, KSA in August 1997
Caterpillar Diesel Generator: Customized Training Program (CTP): 25 hours
AVC Training at Mohamed Abdulrahman Al-Bahar Regional Training Center,
Sharjah UAE in 1996
HVAC System for Industrial & Commercial Application-CTP: 125 hours AVC
Training at United Technical Services, Abu Dhabi, UAE in 2003
Water Supply & Drainage System – CTP: 21 hours AVC Training for
Industrial, Commercial & Multi-floor Buildings by Hepworth PME’s & Nova
Therm Engineers, UAE in 2003
ISO 9000 9002 Document Implementation, Design Control & Quality
Project Management Course Using Primavera
OSHA: Occupational Safety & Health Administration for General Industry and
Construction Industry
 
4
IT Skills
 
 Professional Affiliations
Personal Details
 
 
 
 
MEP AutoCAD, ETAP, SIMARIS, ECODIL, DIALux 4.6, Elite-6
Autodesk Pro-Engineering Tool & Processional Engineering Software:
o ETAP: Electrical Power System design, Network Analysis Software
o SIMARIS 5.2Elc: Power Distribution Electrical Planning Software
o Elite: Fire Sprinkler System Design Software
Member of Society of Engineers of UAE and Sharjah Municipality
Test Appellant of Abu Dhabi Civil Defence (Fire-Fighting), UAE
1st
Class Supervisor License of Karnataka Power Transmission Corporation
Limited (KPTCL)
Date of Birth: 1st
June 1966
Languages Known: English, Hindi, Kannada & Malayalam
Permanent Address: Karnataka, Dharwad, India
Nationality: Indian
Marital Status: Married
No. of Dependents: 4
Passport Details: Passport Valid Till: 08/12/2020
Driving License: UAE Light Vehicle & Indian Driving License
 
 
5
ANNEXURE 
 
Project Details
Advanced Constructors International LLC
Pharmaceutical Plant:
Jubilant Organosys Ltd. Proposed Plants: Lead Consultant: TCE
o 4, 5, 6 & Utilities Block and Proposed Substation, including 33 KV Switchyard, 2500KVA / 33/0, 433KV Utility
Substation, 2 Nos x 725 KVA + 2000 KVA /433V DG Synchronization PCC, 1No x 500 KVAR APFCP, LV Utilities
PCCs, Electrification for Internal & External Process Plant
o 400/132-KV GIS Power Grid Station at Sudah Port and Al Hayl industrial areas of Fujairah, UAE
o ELC Power Computation of a Al-Ghubba New City at RAK; proposed study area: 67 Sq. Km, 780 MVA Supplied
with 400 KV MRSS and 3 Nos x 220/132 KV Substation
Projects in Red Zone Area: Military Base Projects (USACE),
o ANA Corps Support Battalion Camp Zafar Herath (Contract No: W5J9LE-11-C-0020);Cost: 64 Million Dollars
o ANP Regional Police Training Center Kandahar (Contract No: W5J9LE-11-C-0001); Cost: 80 Million Dollars
- Department of the Army, US Army Corps of Engineers, Afghanistan District
Lead Consultant: Smith Seckman Reid,Inc http://www.ssr-inc.com
Scope:
o FEED Design Implementation and development of shop DWGs as per Value Engineering
o Segregation of all long lead items and sending BOQ for enquiry and centralized purchase
o Development of core procurement list and consolidation of supplier base to reduce the material & its cost
budget by 12% in Electrical and 5% on other Mechanical parts, total saving of $ 12.24 Million
o Complete EPC process for Step-Up Substation and Site Distribution
o Acquisition of approval from USACE Engineering Dept. and project handover to client with as built Drawings
o The EPC process included following proposed blocks and long lead items:
• 10 x 1320 KVA, 400V Power DG, 10 x 1500KVA, 400v/15KV Generator Step-Up Transformer (GSU TRFs),
15KV MV Switchgears
• Synchronization Panels, MCC, DBs, 1000KW, 400/230V Resistive Load Bank, Control Panel
• 6 Km Site Distribution LV & MV Duct Bank, 20 x 200 to Up to 1500KVA-15/0
• 400KV Pad Mounting Substations and other Blocks Electrification such as Centralized Power Plant, Waste
Water Treatment Plant, LSA and other Camp Buildings
Responsibilities:
Performed interpretation of technical statements of work and design documentation related project planning,
budgeting, procurements, and implementation of FEED design
Developed workshop drawings as per value engineering parameters
Managed testing, training, and project related works
Interacted with lead consultant and USACE Engineers; reported & updated RFI files and other concerning
documentation, including submittals, testing, training, implementation, change orders, purchase orders, and
subcontracts to ensure high quality of work at a job site
Created process plan and quantum schedules; adjusted & maintained timelines in a fast paced
construction/installation environment while maximizing resources and optimizing budgets
In UAE Projects:
Academy of Judicial Studies 3 Different Level of Mixed Use Building (3B+GF+1+12+14 Lecturer Hall+ Students
Residential + Restaurant + 500 Seats Auditorium & HC
Owner: Emirate of Abu Dhabi Judicial Department , Consultant: ECCO Consult LLC
Project Manager: Musanada & Parson
Ambulance and Rescue Center Project, Baniyas East
Client: UAE Ministry of Interior Abu Dhabi Police GHQ, Consultant: ECCO LLC
Project Manager: Dorsch Group
Alain Airport Cloud Seeding Hanger , Consultant: ARAK Engineering
AL-FOAH LLC Cold Store, Al Marfa & Al Saada Dates Factory Cold Store – 2 Nos. 110 x 90 mtrs
Consultant: M.A.M Consult LLC Alain
Highlights:
o Reduced engineering load by 35%
o Performed re-estimation and updated the concept design as per requirements of Estidama Sustainability code
(LEED Green Building Code)
o Interacted with Lead Consultant and completed pre-construction activities of out of EPC process
o Obtained approval (NOC) from concerned authorities
Responsibilities:
Reviewed feasibility, studied architect DWGs and MEP concept design
Liaised with Lead Consultant’s Engineering Team
 
6
Developed and finalized MEP Space Requirement Report & Design Concept Report
Performed analysis and detailing of packages as per local & international standards
Updated and prepared technical specification, BOQ, design calculation reports as per Value Engineering Load
Estimation, Control Schemes & Logics, Setting Layout and Plan View Details
Performed Value Engineering Load Estimation (VELE) and its compliance activities such as:
o Electrical: Load flow & fault studies, protection, short circuit, stability and safety classification, and its actual
components and associated equipment – electrical design calculations – Voltage drop, equipment sizing,
lighting, earthling, cable sizing, so on
o Fire Suppression System: As per Fire and Life Safety Code of Practice on NFPA standards, with regards to the
Life Safety Design, Building Construction, Fire Protection, Fire Alarm and Smoke Ventilation Systems
o Obtained authorities approvals (building permits)
o Interacted with and supported procurement depts. during the stage of tendering
o Arranged technical Comity Minutes of Meeting (MOM) and rectified RFI
o Updated Authority NOCs
At ARCHON Engineering Consultants LLC
Fairmont Five Star Resort (Lagoon) Beach Hotel, Ajman
Scope: 2B+G+2Mez+Serv Flr+14 Type Floors, Plot No. 41; Total built-up area 56,327.4 Sq. Mt., 252 guestrooms
and suites
Dubai International Airport Terminal 3, Concourse 2 and Car Park. Floor area 1,713,000m2.
Client: Dubai Civil Aviation, Project Management /Consultant: Dar Al Handasah / ADPi,
Main Contractor: Al Habtoor-Murray & Roberts-Takenaka JV, Sector: Airports, Gvt Buildings
Smart Height (Dhamac Properties)
Scope: 4B+G+2P+HC+26 Type Floors, Plot No. C008-023
Client: TECOM Dubai, Dubai Technology and Media Free Zone Authority
Business Tower (Dhamac Properties)
Scope: 3B+G+3P+HC+42 Type Floors, Plot No. BB A05
Client: 012 Block-Business Bay Zoning Authority
Bunyan Emirates Properties
Scope: 3B+G+4P+20 Type Floors, Proposed Retails and Residential Developments at blOck Al-Barshaa First-373-
931, Dubai
International Media Production Zone (IMPZ)
Scope: Proposed 3B+G+8 Commercial + Office Building, Plot No. BBC02.001 & 021 Business Bay ; Total Built-up
Area: 50,577 Sq. Mt.
Sangwon Tower, Santevill Dubai, 2B+G+M+2P+DECK+26Typ+HC, On Plot No. BB.B03.015 Block – Business Bay
Dubai
Lead Consultant: KUNOWN (Korean)
Business Park West Zone Developers, Proposed 2B+G+Mez+10typ Parking and Office Blocks (49,335 Sq. Mt. /
531,042 Sq. Ft.)
Lead Consultant: B+H (China)
Dubai Studio City (DSC) SC-X-002 Proposed G+M Warehouse and Workshop
Lead Consultant: ARCHON
Borouge Phase 2 Expansion – Abu Dhabi Polymers, Facility Type: Petrochemical,
Project Management: Linde Engineering
Main Contractor: Technicas Reunidas S.A, EPC
Contract Value: 4,181$ Million
DEWA Projects: K-Station, Tanker Filling Station, Extn DEWA HO,WOM Trading
Achievement:
o 35% reduction of engineering load, re-estimation and updation of concept & schematic design as per Dubai
Green Building Regulation requirement
Responsibilities:
Developed superseded construction documents; provided technical direction to designers and drafters; assigned
and supervised Site Engineering Team (7 Nos Site ELC Engineers, 3 Nos Site Draftsman and 2 Nos QS) for specific
projects
Created conceptual designs; developed & implemented solutions for the conceptual projects
Developed MOM and independently took decisions regarding engineering complexities & methods
Interacted with Lead Consultant and completed pre-construction process; obtained necessary approval from
concerned authorities.
Supervised, coordinated, and reviewed the work of staff engineers
Performed peer review of 2nd
party design and rectified design issues
Coordinated with Resident Manager and Senior Architect at site for all aspects
Up-grade space requirements and performed Value Engineering Load Estimation (VELE) with MEP Engineering
Team; obtained design approvals from relevant local authorities
 
7
Interacted with specialist (Experts) and other necessary design provisions, such as a) Lift and Escalators b)
Sanitary Fixtures and Fittings c) Land Scape Lighting, Irrigation water features f) LEED Accreditation process g)
MEP Fit out Coordination h) Interior and Facade Lightings
Approved major MEP services installation in slab / columns before casting of same, Builders work like openings
sleeves or Box in slab
Updated projects documentation, rectified RFI and authorized NOCs
Examined the program of works submitted by contractors to ensure coordination amongst subcontractors and
timely completion of the job
Checked & approved contractors’ material submittals and shop drawings
Upgraded and supervised contractor’s works at site
Supervised testing and commissioning of installation
Coordinated with local authorities and MEP Services Infrastructure within the site boundary
Assisted the architect in preliminary and final handing over of the project
At Emirates General Contracting LLC
G+1 Dubai Outlet Mall Complex, Dubai Land Co. (LLC), on Plot No. 900-1056, Al-Ain Road Dubai (432mtrs L x
80mtrs W)
Client: Al-Ahli Group
Lead Consultant: ARENCO
Emirates Engg. Centre (Air Craft Hangars) at Dubai International Airport, 8 Nos. Hangars Spread in 89,000m2
comprising hazardous area, workshops, tier store and office area
Lead Consultant: ADPi Designers & Planners
ASAB Gas Development Phase II Project (AGD II) – GASCO
Project Management & Main Contractor: Kentech & Bechtel Ltd.
EPC Contractor Value: $1200 Million
Neopharma Pharmaceutical Manufacturing Plant, Abu Dhabi
Consultant: Dastur
Smart City: Dubai Silicon Oasis G+8 Typical F + Health Club 18,620 Sq. Mt. Residential Building (3 Blocks in
Single Compound) Plot No. 11-038
Client: Investment Group Pvt. Ltd., Consultant: National Engineering Bureau (NEB)
Achievements:
o Reduced engineering load, re-estimated & updated the FEED design as per authority regulation
o Reduced the 8% cost budgetary as per value egg.
o Completed EPC process of above projects within the time frame
Responsibilities:
Managed the quality and safety aspects related to the project
Led the multi-discipline team where scope of work ranged from contract management, project control to
construction management functions
Reported to senior management on the schedule details and ensured construction within the stipulated budget
Set-up project execution procedures as well as project execution plan such are master plan, process plan and
quantum schedules
Reviewed design output constructability
Developed cost budgetary as per value engineering
Finalized suppliers, vendors and manufacturers
Guided a team of junior engineers to complete a complex project in a short span of time
At Al-Babtain Group of Company
Chelsea Tower / Al Salam Tower II –Dubai; B + G + 9P + 49 F+R 250m (820Ft) Skyscraper
Scope: Tower occupied by a hotel and residential apartments, the 17th
tallest building in Dubai, Client:
Abdusalam Alrafi Group, Consultant: WS Atkins & Partners Overseas, Main Contractor: Dubai Contracting Co. LLC
SOW: EPC Scope included the procurement, complete installation, Test & Commissioning of Electrical Systems
which included Power Distribution, CCTV, Telephone, Access Control Systems, Lighting Control Systems, Fire
Alarm and Fire Suppression System
Jebel Ali Power and Desalination Station ‘D’ Phase II
Client: Dubai Electricity and Water Authority (DEWA), Consultant: Fichtner GmbH & Co. KG
Main Contractor: Hyundai Engineering & Construction Co. Ltd. (HDEC)
Substation SOW :3x75 MW = 225MW /400kV “D” Substation including 400kV GIS with 14 Feeders in a double
busbar configuration i.e. 3 Generator Feeders, 3 Interconnection TRFs Feeder, 2 Bus Couplers, 2 Bus
Sectionalizes, 4 Line Feeders as well as all other equipment and relevant internal and External works
National Bank of Dubai (NBD Head Quarter) B+G+ 20Typ+RF
Scope: The building is part of the old downtown of Dubai, along the creek. At 125 metres (410 ft), tallest building
in Deira between at 1995 -1998, Consultant: Carlos OTT of NORR Group Consultants
Construction Company: Al Naboodah Laing SOW: Electrical, Fire-fighting Fire Alarm Services
 
8
Modern Central Laundry –Al AHSA Al Hofuf
Scope: Semi-Automatic Wet to dry and steam iron process large laundry for Military, Hospital, Hotels and other
sector service provider with capacity of more than 4.3 tons a day
Client: Hafr Al Batin Group,Consultant: RK Engineering Consultant, Main Contractor: Al Babtain Contractor
SOW: EPC for MEP process of Industrial (Ind) Laundry equipment such as Steam Boiler, large Ind Washing
Machine, Ind RO Water Treatment System, Emergency & Utility Substation
Four Seasons Hotel & Resorts Jeddah - Saudi Arabia
Consultant: Skidmore, Owings & Merrill LLP , Contractor: Al Babtain Contractor
Scope: Five Star Hotel Resort consists of 180 Guest Rooms including Royal and Presidential Suites, 112 Luxury
Flats, 32 VIP Villas, World Class Restaurants, Swimming Pools, Fitness Centre, Tennis Courts, Office and
Reception building, Staff housing and De-Mineralized (DM) water treatment Plant, Gray Water Treatment Plant,
etc.
SOW: Electrical, Drainage, Cold & Hot Water supply, RO System, Water treatment, Air conditioning, Heating &
Ventilation works, Central Heating System, Steam works for Laundry equipment, Building Management System
IBN ZAHR Polypropylene II Project -Expansion, Jubail at Saudi Arabia
Project Management: Saudi European Petrochemical Company
Main Contractor: Saudi Arabian Parsons Ltd.
Scope: Polypropylene Plant (PP I) at IBN ZAHR complex in Al-Jubail, Saudi Arabia was extended by a new plant
and associated facilities (PP II) to increase the polypropylene capacity to 320 KTA.
SOW: Installation of Electrical and Mechanical utilities (Substation, HVAC, Fire-Fighting, Plumbing) including
material supply (6 buildings)
380/115/13.8 KV Hawiyah, South Gawar area for Saudi Aramco Substation
Client: Saudi Consolidated Electricity Companies (SCECOs) – East
Consultant: Kennedy & Donkin
SOW: FEED -Design, procure, construct, test & commencement; Substation including 380kV GIS with 4 numbers
diameters of bays arranged in a one and half Breaker configuration. 115 kV GIS with 26 numbers diameters of
bays,13.8kV SWGR along with 42 numbers breakers,2 Numbers of 502 MVA, 380/230/13.8 kV Power TRFs, 3 nos.
of 67 MVA TRFs and 380 KV 150 MVAR shunt reactors
Saudi Aramco Gas processing plant (Hawiyah) Saudi Arabia
Client: Saudi Aramco, Project Management: JGC Corporation, Main Contractor: Technip Italy S.p.A.
Achievements:
o Completed the projects as per specified and agreed standards, accordance with company’s quality standard
procedures
o Led Project Engineering Team of 4 Nos. of Electrical Engineers + 2 QS+ 2 Nos. Draftsman com Authority,
Office Document Controller and Subcontractor Site Engineers
o Assisted the Project Manager for delivering the project as per specified quality, time and cost budget
o Entangled project’s stages to entire EPC process that’s performing Concept Design Developing during the
FEED Stage
o Supported the Tender Department (PPC) during tendering stage; released control copy on site and to
subcontractors, cost control, quality management while on execute stage
o Developed documentation; tested and supervised all related commencing activities
o Rectified and completed snags prior to final handover
At Kirloskar Electric Company
220/132 KV Substation at Maningpura, Bagalkote
Client: Karnataka Power Transmission Corporation Limited (KPTCL)
SOW: Design, Engineering, Supply, Installation, Testing & Commencing
Substation Consistence: 3x80MVA, 220/132KV TRFs & Double Bus Scheme Substation. Its Configurations are –
Switch yard Equipment: Such as L.A,CCVT/PT, Wave Trap, SF6 Breaker, Isolators, Earthing Switch, Power
Transformer, Reactor, Capacitor Bank & CTs
Control Room Building Equipment: Control Panel, Relay Panel, Metering Panel, PLCC Panel, RTU Panel, Battery
Sets, DCDB & Charger, L.T. Panel Board, Compressor Panel, C/R Desk Equipment
400/220/132 KV Power Station at Nelanamgala, Bangalore
Scope: One-Breaker-and-a- Half Switching Scheme comprising between the 400KV 2 nos. Double main Bus and
along with 13 Line bays, Capacity: 2 x 167 MVA -420/220/132KV TRFs+ 2 Future, 2 x 150/112MVA- 420/15.75
TRFs, 2 x 230/184/138 MVA -420/ 15.75 KV Auto TRFs + 2 Future and 3 x 63 MVAR line Reactor, Transmission of
Power (All 7lines are 220 KV) Project Area: 118 acres
Cost: Rs.74 Crores, Design & Execution: Siemens Ltd. Mumbai,Client: KPTCL
Equipment in Substation: Lightening arresters, Wave trap, Current Transformer (C.T.), Potential Transformer
(P.T.), Electromagnetic Voltage TRFs (EMVT), Line Isolator with Earthing Switch, SF6 Circuit Breaker with Starting
Resistance, Bus Isolator, 3 Phase Reactor +NGR, Fire-fighting Facility
Responsibilities:
 
9
o Executed the project as per prevailing industry standards & quality systems
o Performed Project Planning and Controlling (PPC) of respective works such as FEED Design development,
Submission of Engineering submittals writ MEP Services
o Procured major items; prepared construction program including shop drawings and coordination drawings &
tracking schedules
o Liaised with main contractor for site works coordination and interacted with subcontractors for smooth
progress of works
o Attended project progress meeting and developed corrective actions
o Held meetings with consultant and local authority for technical approval & related issues
o Worked in close coordination with internal QS/Main contractors QS for invoicing
o Reviewed progress reports and implemented appropriate actions to achieve the end result
o Performed execution, testing, and commissioning with preparation of related documents, As-built drawings
and O&M manuals
o Coordinated safety related aspects for industrial and commercial projects
o Ensured QA/QC related issues and implemented the projects
BK Cements Limited, Bagalkote
Scope: Integrated project for modernization of cement plant for increase of Clinker production From 2 mtpa to 3.5
mtpa and Up-gradation of Power Plant Substation
Responsibilities:
o Performed ordering & detail engineering of HT & LT Motors (2 x 17.5 MW Captive Power Plant), Power &
Distribution Transformers- 2 x 20 MVA, 132/33/6.6 KV Substation, HT & LT Switchgears, Cable & Cable Tray
and all electrical equipment and Earthing System, Cable Routing System, Load Center Equipment Layout
Engineering
o Undertook FEED Perform system calculations and studies for Electrical Network Analysis and its included with
Power Distribution Systems – Load Flow, Voltage Drop, Motor Starting, Short Circuit Studies, Over Current &
Relay Coordination Analysis and Arc Flash Hazard Analysis
o Created electrical power distribution network & single line diagrams, electrical equipment location drawings,
plan drawings, details, schematics, wiring diagrams of technical vendor submittals for installation
requirements
o Prepared Drive List, PCC and MCC Feeder List
o Managed procurement assistance activities such as preparation of specification & requisitions, quotation offer
evaluation and approval of vendor documents for HT/LT Motors, Transformers
o Assisted seniors for ordering major electrical equipment
o Managed project planning, designing, testing, material management and commencement
 
I here by Certified that the Information furnished above are correct to the best of my Knowledge and belief. And also
I would like to be declaring here proudly as I did not have any Habit –such as Tobacco, Alcohol and other Drugs. I am
well and healthy fit and active vegan –yogic body
Er. Shiva Y. C Date: 

A-Shiva YC@EPCC- 219KB

  • 1.
      1    Key Skills EPCC Activities:Conceptual FEED Design, Site Procurement, Construction, Commissioning and Project Handover to End-User. Elc Load Computation for Small area, Large Area and New City     Up gradation of Space requirement & Engineering Load Estimation, Network Analysis: Load Flow Study, Load Schedule, SLD, Voltage Drop, Motor Starting, Short Circuit Study, Overcurrent & Relay Coordination, Arc Flash hazard Analysis.     Creation of Details Shop drawings (DWGs), Builder DWGs, MEP Coordination & As Built DWGs Obtaining NOCs from relevant authorities    Re-estimation & Upgradation of BOQ as per Value Engineering Preparation of Project Plans & Contract Documents, Technical Bid Evaluation / Vendor Document Review   Cost & Budgetary Control during tendering stage; Support to Tender Department Interact with QA/QC Dept. & Quality Control; Rectification & Completion of Snags Prior to Final Handover    Internal & External Audits    HSE, Risk & Change Management    Over 2 decades’ experience in India, GCC & Middle East, with impressive success in Project Execution, FEED Engineering, Procurement, Construction and Commissioning (EPCC) of Lump Sum Electrical Turnkey Projects Domain Specialization in Pre construction and Post Construction fields such as:  Industrial Projects: o Airport Projects, Military Base Projects (USACE), o Downstream Onshore Oil & Gas Refinery o Pharmaceutical Plant, Molasses Distillery Process Plant, o District Cooling Plant, Cotton Spinning Mills, Cement Plant o Factory Cold Storage, Jack Wells, Wastewater Treatment Plants Mixed-use Buildings: o Shopping Mall, Multi-story / Riser Building, Hospital, Five Star Resort o Beach Hotel, Commercial & Non-Commercial Buildings EHV, HV, MV and LV Substations: GIS, AIS and MTS o Sub-transmission, Primary Substation, o Secondary Substation, Distribution Substations and Switchyards, Fire Alarm & Fire Protection System Profile Summary  Skilled in driving end-to-end Project Management including FEED Design aspects, technical document tendering, planning, commissioning, construction, contract management, value engineering, capital expenditure management, waste reductions & safety Proficient in developing detailed shop drawings, equipment selection, applying, testing and commencing EHV, HV, MV, LV switchyard Equipment & Building Equipment, such as: o Switchyard Equipment: Wave Trap, LA, CCVT/PT, EMVT, SF6 Breaker, Break Disconnector /Isolators, Earthing switch, Power Transformer, Reactor, Capacitor bank & CTs etc. o Control Room building Equipment: Control panel, Relay panel, Metering panel, PLCC panel, RTU panel, Battery sets, DCDB & Charger, L.T. Panel board, Compressor panel, C/R desk equips: PCs, Telephones, etc. o Equipment Configurations such as 225 MW & 400 KV GIS Substation, 1350 MW, 400/132KV Breaker & Half Scheme AIS Substation, 132/33/11KV Double Main Bus with Auxiliary Bus Scheme Substation, 400KV Switchyard and 132/33/6.6 KV Industrial Substation, 33KV, 22KV, 15KV & 11KV Open Type, Pole Mounting & Indoor Type Utility Substation Strong exposure in managing all techno-commercial matters including bid evaluation, contract management & negotiation, finalization of contracting strategies & contracting terms and contract award & close-out Sound understanding of Local Authority Regulation: such as ADDC, DEWA, SEWA, FEWA, SCECOs, TECOM, LEED, DGBR, CPWD, ECBC, BEE. USACE, Estidama, Civil Defense. & International Standards: i.e BS, IEC, CIGRE, FAA, AEIC, NEC, NFPA, NEMA, ASTM, CIBSE, ANSI, IEEE, OSHA, IEE Wiring regulations, BICSI, BSEN, ARI, ASHRAE, EIA/TIA (ETISALAT, DU), BIS, IS People-friendly & approachable with strong interpersonal, analytical, problem solving & critical thinking skills       SHIVA Y.C. Applied Post: Senior Electrical Engineer -Project [SENIOR MANAGEMENT PROFESSIONAL – ELECTRICAL ENGINEERING, EPC PROJECT MANAGEMENT] shiva.epcelc@gmail.com +971-56-1282438;+93-795916116; +91-7760573256  shiva.aci   Registered Professional Engineer: RSB for ADWEA -UAE & KPTCL India Affiliated Member: Society of Engineers- UAE Test Appellant & Authority Certified Engineer: ADCD & Sharjah Civil Defence Authority in UAE LOA: from US Army Corps of Engineers
  • 2.
      2     Career Timeline Education   Post GraduateDiploma in Fire Protection & Safety Engineering from Maharashtra Institute of Technology, Pune, India with ‘A’ Grade in 2005 Bachelors in Engineering (Electrical) from Ghousia College of Engineering,/ University of Bangalore, Karnataka with 67% marks in 1989   Certificate Course  Registered Professional Engineer:           Work Experience    34 Hours ‘Engineer’s Registration Certificate’ at ICTD [International Centre for Training & Development] Abu Dhabi-UAE; issued by Regulation & Supervision Bureau (RSB) for Abu Dhabi Water & Electricity Authority (ADWEA)-UAE. Subjects: included Electrical Design, Installation, Testing and Commencing System for Commercial, Non-Commercial buildings and Industrial sectors as per ‘IEE Electricity Wiring Regulations’ and other Standards such as IEC60364, BS 7671 Advanced Constructors International LLC, ACI is Sole Agency Company of UACE Middle East District as Lead Electrical Engineer - Project ARCHON Engg. Consultants LLC, UAE as Lead Electrical Engineer Emirates General Contracting LLC, Dubai, UAE a part of Al Ahli Group as HO Electrical Engineer - MEP Dept. Al-Babtain Group of Company, UAE & KSA as Senior Electrical Engineer - Project - MEP Division Kirloskar Electric Company Ltd., Bangalore, India as Electrical Engineer - Project - PPC Dept. Responsibilities: Spearheading development of project WBS, project schedules, master schedules, baseline schedule, integrated schedule, resource schedules, execution methodologies, cost estimates, budget, project KPIs, so on Keeping close track of project progress and schedule; managing project governance as well as risk management process Evaluating technical proposals, drawings and FEED of projects; conducting techno-commercial feasibility studies, pre-FEED, screening studies and concept & development studies Reviewing FEED deliverables such as Engineering Load Parameters, PFDs, P&IDs, Network Analysis, Equipment List, Data Sheets, Plant Layouts, Equipment setting Layouts, FEED Cost Estimate, so on Tracking the detailed engineering progress; performing design reviews, constructability reviews, 3D model reviews & value engineering exercises Since Oct’10 - Till Date Jun’07 – Sep’10 Mar’03 – Sep’06 Jul’95 – Nov’02 May’90 – Apr’95   Projects Executed Spanning Industrial Projects: Mixed-use Buildings: EHV, HV, MV & LV - GIS, AIS and MTS substations Primary Site Power Distribution (Infrastructure) Duct Bank, Internal & External Cable Tray, Trunking System, Internal & External Lighting & Secondary Power LV Wiring System, Telecommunication, Public Address & BG Music Kirloskar Electric Company as Electrical Engineer - Project  Al-Babtain Group of Company as Senior Electrical Engineer - Project - MEP Division  Emirates General Contracting LLC as H.O Electrical Engineer - MEP Department  1990 - 1995 1995 - 2002 2003 - 2006 ARCHON Engineering Consultants as Lead Electrical Engineer  2007 - 2010 Advanced Constructors International as Lead Electrical Engineer - Project  Since 2010
  • 3.
      3 Automation Systems: o LightingControl System, IBMS & RMS System, CCTV System o Door Access System, Centralized Emergency Lighting System Step-Up Substation: o DG Power Plant of capacity 10 MW, 0.400/15KV Power Station o Centralized ELC Power Generation, Synchronization and Step upping LV to MV Power Supply & Site Distribution System i.e. 10Nos x 1320 KVA/400V DG o Plant Synchronization Control Panels, 10 Nos x 1500 KVA 0.400/15KV GSU TRFs, SF6 MV Switchgears Primary Grid Substations: o 225MW, 400kV GIS Substation with 14 Feeders in a Double Busbar Configuration o 1350 MW, 400/132KV Breaker and a Half Scheme AIS Substation, including Power Transformer and Shunt Reactors o 132/33/11KV Double Main Bus with Auxiliary Bus Scheme Substation: 2Nos x 20 MVA, 132/11KVTRFs and 2Nos x 40MVA 132/33 TRFs with Capacitor Bank and 3Nos x 160MVA 220/132KV Double bus Scheme Substation: 220 KV Primary Double main Bus and Secondary side 132KV Double bus configurations o 400KV Switchyard & 132/33/6.6 KV Industrial Substation Secondary & Distribution Substation: o 33KV, 22KV, 15KV & 11KV Open Type, Pole Mounting & Indoor Type Utility Substation Fire Alarm & Fire Protection System: o Conventional System & Analogue Addressable with Vice Evacuation Fire Suppression System: o Fire Sprinkler System (Wet and Deluge System) o Hydrant and House Reel System o Gaseous Suppression System (FM200 & CO2 System)      Providing strategic & technical inputs on methodologies of construction; planning, sequencing and controlling all construction activities Developing contract strategy for projects; monitoring preparation of EPC tender packages, schedules, approved vendors’ list, sub-contractors’ list, clarifications, tender board proposals, award processes and kick offs Executing technical bid evaluation & analysis, review of techno-commercial vendor offers and expediting orders placed with vendors Obtaining approval for FEED, budget and FEED & technologies tenders Reviewing quality at project site by exercising rigorous quality control plan & procedures, implementing ISO or similar systems Leading the project PMC teams throughout project life cycles from the stage of requirement & scope definition till execution & handover Setting-up Risk Management Process for the project, holding risk workshops, updating risks in the risk register and mitigating the same Conducting internal & external audits; Significant Accomplishments: Ensured successful completion of the prestigious USACE client’s ANA & ANP Projects, within approved budget of US$ 167 Million through continuous monitoring of budget movement and optimized utilization, as Project Lead Ensured the implementation of engineering lessons learnt from past projects and value-added engineering for a high net-worth project Successfully managed the erection, testing and commissioning of: o 10 x 1320 KVA, 400V Power DG o 10 x 1500KVA, 400v/15KV Generator Step Up Transformer (GSU TRFs), 15KV MV Switchgears, Synchronization Panels, MCC, DBs o 1000 KW, 400/230V Resistive Load Bank, Control Panel o 16 Km Site Distribution LV & MV Duct Bank, 20 x 200KVA up to 1500KVA-15/0.400KV Pad Mounting Substations and other Blocks Electrification such as Centralized Power Plant, Waste Water Treatment Plant, LSA and other Camp Buildings Accomplished the timely closing of techno-commercial evaluation of EPC contract, while ensuring a timely delivery as well as engineering & technical compliance  Trainings & Seminars Attended  GE Industrial Solutions: 267 Hours Training Program; AVTS Training on Onshore Oil & Gas Refinery, Petrochemical Process Sector, Water Treatment Plant, Cement Plant, Health Sector and Multi-level Buildings. at Technical & Vocational Training Corporation, Riyadh, KSA in August 1997 Caterpillar Diesel Generator: Customized Training Program (CTP): 25 hours AVC Training at Mohamed Abdulrahman Al-Bahar Regional Training Center, Sharjah UAE in 1996 HVAC System for Industrial & Commercial Application-CTP: 125 hours AVC Training at United Technical Services, Abu Dhabi, UAE in 2003 Water Supply & Drainage System – CTP: 21 hours AVC Training for Industrial, Commercial & Multi-floor Buildings by Hepworth PME’s & Nova Therm Engineers, UAE in 2003 ISO 9000 9002 Document Implementation, Design Control & Quality Project Management Course Using Primavera OSHA: Occupational Safety & Health Administration for General Industry and Construction Industry
  • 4.
      4 IT Skills    Professional Affiliations PersonalDetails         MEP AutoCAD, ETAP, SIMARIS, ECODIL, DIALux 4.6, Elite-6 Autodesk Pro-Engineering Tool & Processional Engineering Software: o ETAP: Electrical Power System design, Network Analysis Software o SIMARIS 5.2Elc: Power Distribution Electrical Planning Software o Elite: Fire Sprinkler System Design Software Member of Society of Engineers of UAE and Sharjah Municipality Test Appellant of Abu Dhabi Civil Defence (Fire-Fighting), UAE 1st Class Supervisor License of Karnataka Power Transmission Corporation Limited (KPTCL) Date of Birth: 1st June 1966 Languages Known: English, Hindi, Kannada & Malayalam Permanent Address: Karnataka, Dharwad, India Nationality: Indian Marital Status: Married No. of Dependents: 4 Passport Details: Passport Valid Till: 08/12/2020 Driving License: UAE Light Vehicle & Indian Driving License  
  • 5.
      5 ANNEXURE    Project Details Advanced ConstructorsInternational LLC Pharmaceutical Plant: Jubilant Organosys Ltd. Proposed Plants: Lead Consultant: TCE o 4, 5, 6 & Utilities Block and Proposed Substation, including 33 KV Switchyard, 2500KVA / 33/0, 433KV Utility Substation, 2 Nos x 725 KVA + 2000 KVA /433V DG Synchronization PCC, 1No x 500 KVAR APFCP, LV Utilities PCCs, Electrification for Internal & External Process Plant o 400/132-KV GIS Power Grid Station at Sudah Port and Al Hayl industrial areas of Fujairah, UAE o ELC Power Computation of a Al-Ghubba New City at RAK; proposed study area: 67 Sq. Km, 780 MVA Supplied with 400 KV MRSS and 3 Nos x 220/132 KV Substation Projects in Red Zone Area: Military Base Projects (USACE), o ANA Corps Support Battalion Camp Zafar Herath (Contract No: W5J9LE-11-C-0020);Cost: 64 Million Dollars o ANP Regional Police Training Center Kandahar (Contract No: W5J9LE-11-C-0001); Cost: 80 Million Dollars - Department of the Army, US Army Corps of Engineers, Afghanistan District Lead Consultant: Smith Seckman Reid,Inc http://www.ssr-inc.com Scope: o FEED Design Implementation and development of shop DWGs as per Value Engineering o Segregation of all long lead items and sending BOQ for enquiry and centralized purchase o Development of core procurement list and consolidation of supplier base to reduce the material & its cost budget by 12% in Electrical and 5% on other Mechanical parts, total saving of $ 12.24 Million o Complete EPC process for Step-Up Substation and Site Distribution o Acquisition of approval from USACE Engineering Dept. and project handover to client with as built Drawings o The EPC process included following proposed blocks and long lead items: • 10 x 1320 KVA, 400V Power DG, 10 x 1500KVA, 400v/15KV Generator Step-Up Transformer (GSU TRFs), 15KV MV Switchgears • Synchronization Panels, MCC, DBs, 1000KW, 400/230V Resistive Load Bank, Control Panel • 6 Km Site Distribution LV & MV Duct Bank, 20 x 200 to Up to 1500KVA-15/0 • 400KV Pad Mounting Substations and other Blocks Electrification such as Centralized Power Plant, Waste Water Treatment Plant, LSA and other Camp Buildings Responsibilities: Performed interpretation of technical statements of work and design documentation related project planning, budgeting, procurements, and implementation of FEED design Developed workshop drawings as per value engineering parameters Managed testing, training, and project related works Interacted with lead consultant and USACE Engineers; reported & updated RFI files and other concerning documentation, including submittals, testing, training, implementation, change orders, purchase orders, and subcontracts to ensure high quality of work at a job site Created process plan and quantum schedules; adjusted & maintained timelines in a fast paced construction/installation environment while maximizing resources and optimizing budgets In UAE Projects: Academy of Judicial Studies 3 Different Level of Mixed Use Building (3B+GF+1+12+14 Lecturer Hall+ Students Residential + Restaurant + 500 Seats Auditorium & HC Owner: Emirate of Abu Dhabi Judicial Department , Consultant: ECCO Consult LLC Project Manager: Musanada & Parson Ambulance and Rescue Center Project, Baniyas East Client: UAE Ministry of Interior Abu Dhabi Police GHQ, Consultant: ECCO LLC Project Manager: Dorsch Group Alain Airport Cloud Seeding Hanger , Consultant: ARAK Engineering AL-FOAH LLC Cold Store, Al Marfa & Al Saada Dates Factory Cold Store – 2 Nos. 110 x 90 mtrs Consultant: M.A.M Consult LLC Alain Highlights: o Reduced engineering load by 35% o Performed re-estimation and updated the concept design as per requirements of Estidama Sustainability code (LEED Green Building Code) o Interacted with Lead Consultant and completed pre-construction activities of out of EPC process o Obtained approval (NOC) from concerned authorities Responsibilities: Reviewed feasibility, studied architect DWGs and MEP concept design Liaised with Lead Consultant’s Engineering Team
  • 6.
      6 Developed and finalizedMEP Space Requirement Report & Design Concept Report Performed analysis and detailing of packages as per local & international standards Updated and prepared technical specification, BOQ, design calculation reports as per Value Engineering Load Estimation, Control Schemes & Logics, Setting Layout and Plan View Details Performed Value Engineering Load Estimation (VELE) and its compliance activities such as: o Electrical: Load flow & fault studies, protection, short circuit, stability and safety classification, and its actual components and associated equipment – electrical design calculations – Voltage drop, equipment sizing, lighting, earthling, cable sizing, so on o Fire Suppression System: As per Fire and Life Safety Code of Practice on NFPA standards, with regards to the Life Safety Design, Building Construction, Fire Protection, Fire Alarm and Smoke Ventilation Systems o Obtained authorities approvals (building permits) o Interacted with and supported procurement depts. during the stage of tendering o Arranged technical Comity Minutes of Meeting (MOM) and rectified RFI o Updated Authority NOCs At ARCHON Engineering Consultants LLC Fairmont Five Star Resort (Lagoon) Beach Hotel, Ajman Scope: 2B+G+2Mez+Serv Flr+14 Type Floors, Plot No. 41; Total built-up area 56,327.4 Sq. Mt., 252 guestrooms and suites Dubai International Airport Terminal 3, Concourse 2 and Car Park. Floor area 1,713,000m2. Client: Dubai Civil Aviation, Project Management /Consultant: Dar Al Handasah / ADPi, Main Contractor: Al Habtoor-Murray & Roberts-Takenaka JV, Sector: Airports, Gvt Buildings Smart Height (Dhamac Properties) Scope: 4B+G+2P+HC+26 Type Floors, Plot No. C008-023 Client: TECOM Dubai, Dubai Technology and Media Free Zone Authority Business Tower (Dhamac Properties) Scope: 3B+G+3P+HC+42 Type Floors, Plot No. BB A05 Client: 012 Block-Business Bay Zoning Authority Bunyan Emirates Properties Scope: 3B+G+4P+20 Type Floors, Proposed Retails and Residential Developments at blOck Al-Barshaa First-373- 931, Dubai International Media Production Zone (IMPZ) Scope: Proposed 3B+G+8 Commercial + Office Building, Plot No. BBC02.001 & 021 Business Bay ; Total Built-up Area: 50,577 Sq. Mt. Sangwon Tower, Santevill Dubai, 2B+G+M+2P+DECK+26Typ+HC, On Plot No. BB.B03.015 Block – Business Bay Dubai Lead Consultant: KUNOWN (Korean) Business Park West Zone Developers, Proposed 2B+G+Mez+10typ Parking and Office Blocks (49,335 Sq. Mt. / 531,042 Sq. Ft.) Lead Consultant: B+H (China) Dubai Studio City (DSC) SC-X-002 Proposed G+M Warehouse and Workshop Lead Consultant: ARCHON Borouge Phase 2 Expansion – Abu Dhabi Polymers, Facility Type: Petrochemical, Project Management: Linde Engineering Main Contractor: Technicas Reunidas S.A, EPC Contract Value: 4,181$ Million DEWA Projects: K-Station, Tanker Filling Station, Extn DEWA HO,WOM Trading Achievement: o 35% reduction of engineering load, re-estimation and updation of concept & schematic design as per Dubai Green Building Regulation requirement Responsibilities: Developed superseded construction documents; provided technical direction to designers and drafters; assigned and supervised Site Engineering Team (7 Nos Site ELC Engineers, 3 Nos Site Draftsman and 2 Nos QS) for specific projects Created conceptual designs; developed & implemented solutions for the conceptual projects Developed MOM and independently took decisions regarding engineering complexities & methods Interacted with Lead Consultant and completed pre-construction process; obtained necessary approval from concerned authorities. Supervised, coordinated, and reviewed the work of staff engineers Performed peer review of 2nd party design and rectified design issues Coordinated with Resident Manager and Senior Architect at site for all aspects Up-grade space requirements and performed Value Engineering Load Estimation (VELE) with MEP Engineering Team; obtained design approvals from relevant local authorities
  • 7.
      7 Interacted with specialist(Experts) and other necessary design provisions, such as a) Lift and Escalators b) Sanitary Fixtures and Fittings c) Land Scape Lighting, Irrigation water features f) LEED Accreditation process g) MEP Fit out Coordination h) Interior and Facade Lightings Approved major MEP services installation in slab / columns before casting of same, Builders work like openings sleeves or Box in slab Updated projects documentation, rectified RFI and authorized NOCs Examined the program of works submitted by contractors to ensure coordination amongst subcontractors and timely completion of the job Checked & approved contractors’ material submittals and shop drawings Upgraded and supervised contractor’s works at site Supervised testing and commissioning of installation Coordinated with local authorities and MEP Services Infrastructure within the site boundary Assisted the architect in preliminary and final handing over of the project At Emirates General Contracting LLC G+1 Dubai Outlet Mall Complex, Dubai Land Co. (LLC), on Plot No. 900-1056, Al-Ain Road Dubai (432mtrs L x 80mtrs W) Client: Al-Ahli Group Lead Consultant: ARENCO Emirates Engg. Centre (Air Craft Hangars) at Dubai International Airport, 8 Nos. Hangars Spread in 89,000m2 comprising hazardous area, workshops, tier store and office area Lead Consultant: ADPi Designers & Planners ASAB Gas Development Phase II Project (AGD II) – GASCO Project Management & Main Contractor: Kentech & Bechtel Ltd. EPC Contractor Value: $1200 Million Neopharma Pharmaceutical Manufacturing Plant, Abu Dhabi Consultant: Dastur Smart City: Dubai Silicon Oasis G+8 Typical F + Health Club 18,620 Sq. Mt. Residential Building (3 Blocks in Single Compound) Plot No. 11-038 Client: Investment Group Pvt. Ltd., Consultant: National Engineering Bureau (NEB) Achievements: o Reduced engineering load, re-estimated & updated the FEED design as per authority regulation o Reduced the 8% cost budgetary as per value egg. o Completed EPC process of above projects within the time frame Responsibilities: Managed the quality and safety aspects related to the project Led the multi-discipline team where scope of work ranged from contract management, project control to construction management functions Reported to senior management on the schedule details and ensured construction within the stipulated budget Set-up project execution procedures as well as project execution plan such are master plan, process plan and quantum schedules Reviewed design output constructability Developed cost budgetary as per value engineering Finalized suppliers, vendors and manufacturers Guided a team of junior engineers to complete a complex project in a short span of time At Al-Babtain Group of Company Chelsea Tower / Al Salam Tower II –Dubai; B + G + 9P + 49 F+R 250m (820Ft) Skyscraper Scope: Tower occupied by a hotel and residential apartments, the 17th tallest building in Dubai, Client: Abdusalam Alrafi Group, Consultant: WS Atkins & Partners Overseas, Main Contractor: Dubai Contracting Co. LLC SOW: EPC Scope included the procurement, complete installation, Test & Commissioning of Electrical Systems which included Power Distribution, CCTV, Telephone, Access Control Systems, Lighting Control Systems, Fire Alarm and Fire Suppression System Jebel Ali Power and Desalination Station ‘D’ Phase II Client: Dubai Electricity and Water Authority (DEWA), Consultant: Fichtner GmbH & Co. KG Main Contractor: Hyundai Engineering & Construction Co. Ltd. (HDEC) Substation SOW :3x75 MW = 225MW /400kV “D” Substation including 400kV GIS with 14 Feeders in a double busbar configuration i.e. 3 Generator Feeders, 3 Interconnection TRFs Feeder, 2 Bus Couplers, 2 Bus Sectionalizes, 4 Line Feeders as well as all other equipment and relevant internal and External works National Bank of Dubai (NBD Head Quarter) B+G+ 20Typ+RF Scope: The building is part of the old downtown of Dubai, along the creek. At 125 metres (410 ft), tallest building in Deira between at 1995 -1998, Consultant: Carlos OTT of NORR Group Consultants Construction Company: Al Naboodah Laing SOW: Electrical, Fire-fighting Fire Alarm Services
  • 8.
      8 Modern Central Laundry–Al AHSA Al Hofuf Scope: Semi-Automatic Wet to dry and steam iron process large laundry for Military, Hospital, Hotels and other sector service provider with capacity of more than 4.3 tons a day Client: Hafr Al Batin Group,Consultant: RK Engineering Consultant, Main Contractor: Al Babtain Contractor SOW: EPC for MEP process of Industrial (Ind) Laundry equipment such as Steam Boiler, large Ind Washing Machine, Ind RO Water Treatment System, Emergency & Utility Substation Four Seasons Hotel & Resorts Jeddah - Saudi Arabia Consultant: Skidmore, Owings & Merrill LLP , Contractor: Al Babtain Contractor Scope: Five Star Hotel Resort consists of 180 Guest Rooms including Royal and Presidential Suites, 112 Luxury Flats, 32 VIP Villas, World Class Restaurants, Swimming Pools, Fitness Centre, Tennis Courts, Office and Reception building, Staff housing and De-Mineralized (DM) water treatment Plant, Gray Water Treatment Plant, etc. SOW: Electrical, Drainage, Cold & Hot Water supply, RO System, Water treatment, Air conditioning, Heating & Ventilation works, Central Heating System, Steam works for Laundry equipment, Building Management System IBN ZAHR Polypropylene II Project -Expansion, Jubail at Saudi Arabia Project Management: Saudi European Petrochemical Company Main Contractor: Saudi Arabian Parsons Ltd. Scope: Polypropylene Plant (PP I) at IBN ZAHR complex in Al-Jubail, Saudi Arabia was extended by a new plant and associated facilities (PP II) to increase the polypropylene capacity to 320 KTA. SOW: Installation of Electrical and Mechanical utilities (Substation, HVAC, Fire-Fighting, Plumbing) including material supply (6 buildings) 380/115/13.8 KV Hawiyah, South Gawar area for Saudi Aramco Substation Client: Saudi Consolidated Electricity Companies (SCECOs) – East Consultant: Kennedy & Donkin SOW: FEED -Design, procure, construct, test & commencement; Substation including 380kV GIS with 4 numbers diameters of bays arranged in a one and half Breaker configuration. 115 kV GIS with 26 numbers diameters of bays,13.8kV SWGR along with 42 numbers breakers,2 Numbers of 502 MVA, 380/230/13.8 kV Power TRFs, 3 nos. of 67 MVA TRFs and 380 KV 150 MVAR shunt reactors Saudi Aramco Gas processing plant (Hawiyah) Saudi Arabia Client: Saudi Aramco, Project Management: JGC Corporation, Main Contractor: Technip Italy S.p.A. Achievements: o Completed the projects as per specified and agreed standards, accordance with company’s quality standard procedures o Led Project Engineering Team of 4 Nos. of Electrical Engineers + 2 QS+ 2 Nos. Draftsman com Authority, Office Document Controller and Subcontractor Site Engineers o Assisted the Project Manager for delivering the project as per specified quality, time and cost budget o Entangled project’s stages to entire EPC process that’s performing Concept Design Developing during the FEED Stage o Supported the Tender Department (PPC) during tendering stage; released control copy on site and to subcontractors, cost control, quality management while on execute stage o Developed documentation; tested and supervised all related commencing activities o Rectified and completed snags prior to final handover At Kirloskar Electric Company 220/132 KV Substation at Maningpura, Bagalkote Client: Karnataka Power Transmission Corporation Limited (KPTCL) SOW: Design, Engineering, Supply, Installation, Testing & Commencing Substation Consistence: 3x80MVA, 220/132KV TRFs & Double Bus Scheme Substation. Its Configurations are – Switch yard Equipment: Such as L.A,CCVT/PT, Wave Trap, SF6 Breaker, Isolators, Earthing Switch, Power Transformer, Reactor, Capacitor Bank & CTs Control Room Building Equipment: Control Panel, Relay Panel, Metering Panel, PLCC Panel, RTU Panel, Battery Sets, DCDB & Charger, L.T. Panel Board, Compressor Panel, C/R Desk Equipment 400/220/132 KV Power Station at Nelanamgala, Bangalore Scope: One-Breaker-and-a- Half Switching Scheme comprising between the 400KV 2 nos. Double main Bus and along with 13 Line bays, Capacity: 2 x 167 MVA -420/220/132KV TRFs+ 2 Future, 2 x 150/112MVA- 420/15.75 TRFs, 2 x 230/184/138 MVA -420/ 15.75 KV Auto TRFs + 2 Future and 3 x 63 MVAR line Reactor, Transmission of Power (All 7lines are 220 KV) Project Area: 118 acres Cost: Rs.74 Crores, Design & Execution: Siemens Ltd. Mumbai,Client: KPTCL Equipment in Substation: Lightening arresters, Wave trap, Current Transformer (C.T.), Potential Transformer (P.T.), Electromagnetic Voltage TRFs (EMVT), Line Isolator with Earthing Switch, SF6 Circuit Breaker with Starting Resistance, Bus Isolator, 3 Phase Reactor +NGR, Fire-fighting Facility Responsibilities:
  • 9.
      9 o Executed theproject as per prevailing industry standards & quality systems o Performed Project Planning and Controlling (PPC) of respective works such as FEED Design development, Submission of Engineering submittals writ MEP Services o Procured major items; prepared construction program including shop drawings and coordination drawings & tracking schedules o Liaised with main contractor for site works coordination and interacted with subcontractors for smooth progress of works o Attended project progress meeting and developed corrective actions o Held meetings with consultant and local authority for technical approval & related issues o Worked in close coordination with internal QS/Main contractors QS for invoicing o Reviewed progress reports and implemented appropriate actions to achieve the end result o Performed execution, testing, and commissioning with preparation of related documents, As-built drawings and O&M manuals o Coordinated safety related aspects for industrial and commercial projects o Ensured QA/QC related issues and implemented the projects BK Cements Limited, Bagalkote Scope: Integrated project for modernization of cement plant for increase of Clinker production From 2 mtpa to 3.5 mtpa and Up-gradation of Power Plant Substation Responsibilities: o Performed ordering & detail engineering of HT & LT Motors (2 x 17.5 MW Captive Power Plant), Power & Distribution Transformers- 2 x 20 MVA, 132/33/6.6 KV Substation, HT & LT Switchgears, Cable & Cable Tray and all electrical equipment and Earthing System, Cable Routing System, Load Center Equipment Layout Engineering o Undertook FEED Perform system calculations and studies for Electrical Network Analysis and its included with Power Distribution Systems – Load Flow, Voltage Drop, Motor Starting, Short Circuit Studies, Over Current & Relay Coordination Analysis and Arc Flash Hazard Analysis o Created electrical power distribution network & single line diagrams, electrical equipment location drawings, plan drawings, details, schematics, wiring diagrams of technical vendor submittals for installation requirements o Prepared Drive List, PCC and MCC Feeder List o Managed procurement assistance activities such as preparation of specification & requisitions, quotation offer evaluation and approval of vendor documents for HT/LT Motors, Transformers o Assisted seniors for ordering major electrical equipment o Managed project planning, designing, testing, material management and commencement   I here by Certified that the Information furnished above are correct to the best of my Knowledge and belief. And also I would like to be declaring here proudly as I did not have any Habit –such as Tobacco, Alcohol and other Drugs. I am well and healthy fit and active vegan –yogic body Er. Shiva Y. C Date: