What are the advantages and disadvantages of membrane structures.pptx
Â
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
1. ANUPAM DAS
CAREER OBJECTIVE
To work as a responsible team member in the leading company, to apply my knowledge,
abilities and skills to the fullest in technical field and to reach the pinnacle of my field by
working dedicatedly in challenging environment
PERSONAL DETAILS
ACEDEMIC DETAILS
B.Tech (Mechanical)
University: Gauhati University
Institute: Assam Engineering College, Guwahati
Course School / College
Board/
University
Year Of
Passing
Percentage
S.S.C
Vivekananda
Kendra Vidyalaya
CBSE 2001 79.6%
H.S.C
Vivekananda
Kendra Vidyalaya
CBSE 2003 65%
B. E.
Assam Engineering
College
Gauhati
University
2008
81%
Address
#84/A, 7th A cross, Rajashree layout, Munnekolala,
Marathahalli Post, Bangalore, Karnataka, India
Contact Number +91-8088184480, +91-8971044700
Date of Birth 19th September, 1984
Gender Male
E-mail ind.anupd@gmail.com
Known Languages English, Hindi, Bengali, Assamese, Kannada
Nationality Indian
2. CURRICULUM ACHIEVEMENTS
ī Secured a place in top three rankings based on academic performance in B.E.,
Mechanical Engineering, Gauhati University
WORK EXPERIENCE
ī GE INDIA TECHNOLOGY CENTRE PVT. LTD.
GE OIL AND GAS, BANGALORE OFFICE
DURATION- FROM 5th August, 2013 TO TILL DATE
ī LEAD ENGINEER
ī PROJECTS EXECUTED:
1) Project: Gas Turbine Model MS5002C+Gearbox+Centrifugal
compressor 2BCL406/B, Ourhoud (Algeria)
Client: Ourhoud/Sonatrach, Bonatti (EPC)
īˇ MS5002C is a heavy duty machine used to drive a compressor. As a
System Engineer in the Job I had understand the customer specifications,
implement the requirements in our documents. Attend meetings and co-
ordinate inter-department and provide all data required for smooth
progress of the job.
īˇ Preparation of Gas turbine and compressor system auxiliaries PIDs of
Lube oil system, Hydraulic/control oil system, Lube oil cooler, fuel gas
scrubber system, fuel gas system, starting system, GT sealing and cooling
system, Control and protection system, filter house system, ventilation
system, fire fighting system, gearbox system, compressor sealing system
and customer process PID indicating the Gas turbine and compressor only,
which are in GENP scope.
īˇ Preparation of Electrical load list
īˇ Preparation of Utility list
īˇ Preparation of Seal gas panel specification
īˇ Preparation of seal gas panel layout
īˇ Review of Supplier offers for seal gas panel.
īˇ Preparation of painting specification
īˇ Attended the HAZOP in Italy, Fano.
2) Project: AeroderivativeGas Turbine Model PGT25 Base+Centrifugal
compressor PCL603, HassiRâMel (Algeria) - Job in progress
Client: Sonatrach, Bonatti (EPC)
īˇ PGT25 base is a aero-derivative machine used to drive a compressor. The
application of the compressor is mainly to transport gas from one station
to another. As a System Engineer in the Job I had to understand the
3. customer specifications, implement the requirements in our documents.
All major documents are sent to Customer and project is 30% complete
from engineering design front.
īˇ Preparation of Gas turbine and compressor system auxiliaries PIDs of
Lube oil system, Hydraulic/control oil system, Lube oil cooler, fuel gas,
fuel gas system, fuel gas metering system, Synthetic oil system, Hydraulic
starting system, GT sealing and cooling system, Control and protection
system, filter house system, ventilation system, fire-fighting system,
gearbox system, compressor sealing system and customer process PID
indicating the Gas turbine and compressor only, which are in GENP
scope.
īˇ Preparation of Electrical load list
īˇ Preparation of Utility list
īˇ Preparation of Seal gas panel specification
īˇ Preparation of seal gas panel layout (in progress)
īˇ Preparation of painting specification
3) Project: Turbo-expander + Compressor EC401 Unit , Hackberry
(Lousiana, USA) - Job in progress
Client: CCJV for Cameroon LNG, LLC
This is a turbo-expander job, wherein hydrocarbon gas is expanded and the
energy generated is used in running a compressor.
īˇ Preparation of Turbo-expander and axial compressor PID indicating the
seal gas system, gas inlet lines, the sealing system and customer process
indicating the anti-surge system. Preparation of active magnetic bearing
control and instrumentation system.
īˇ Preparation of specification for heaters, valves, filters, instruments.
īˇ Review of supplier offers for various seal gas components (like heater,
valves, filters, instruments etc) and aligning with our specification
requirements.
īˇ Preparation of Electrical load list and Utility list
īˇ Carrying out meetings for jobs at various stages
4) Project: Turbo-expander-Generator, Jamnagar (India) - Job in progress
Client: Reliance Industries Limited
This is a turboexpander job, wherein hydrocarbon gas is expanded and the
energy generated is used in running a Generator. This Job is in a advance
stage and handed over to me recently.
īˇ Interdepartmental co-ordination to close all ongoing issues.
īˇ Interaction with suppliers for preparation of seal gas panel layout.
īˇ Preparation of specification for control valves, heaters, filters, instruments
etc meeting all the certifications, zone classification, testing requirements
as per Customer requirements.
4. īˇ Review of supplier offers for various Components of on baseplate and seal
gas components and aligning with our specification requirements.
īˇ Preparation of Utility list for the project.
īˇ Preparation of Electrical load list.
īˇ Sizing of safety valve and control valves using API520 and Emerson
guidelines respectively. And preparation of specifications of these items.
īˇ Working out of HAZOP action points.
ī TATA CONSULTING ENGINEERS LIMITED
POWER BUSINESS UNIT, BANGALORE OFFICE
DURATION- FROM 1st August, 2008 TO 2nd August, 2013.
ī ASISTANT MANGER -- (E2 GRADE)
ī PROJECTS EXECUTED:
1) 1X50 MW, Concentrated Solar Thermal Plant, Andhra Pradesh (Under
Execution)
Client: Megha Engineering and Infrastructure Limited
īˇ Concept Notes of (a) Boiler feed pump, (b) Condensate extraction pump,
(c) Gland steam sealing (Night/day mode), (d) Steam Generator heat
exchangers, (e) Compressed air system, (f) Fuel oil system
īˇ PIDs/Flow Diagrams of (a) Main steam, CRH & HRH system, (b) Steam
generator heat exchangers, (c) Condensate system, (d) Feedwater system,
(e) Extraction steam system, (f) Heater drain and vent system, (g)
Auxiliary steam system, (h) Blow down system, (i) HFO & LDO
Unloading System
īˇ Specification preparation for (a) Steam generator heat exchangers, (b)
Turbine cycle and auxiliaries, (c) Compressed air system (d) Moisture
separator, (e) Flash tanks (f) Fuel oil system
īˇ TG cycle equipments sizing, Flash tanksand Control valves sizing for the
entire Turbine generator and HTF cycle
īˇ Preparation of GA of Ullage (HTF purification system) system
īˇ Preparation of logics for plant PIDs
īˇ Inter-department co-ordination
2) Pre-Bid R&M Services/Engineering 3x200MW Ramagundam (Andhra
Pradesh) Thermal Power Plant, NTPC plant (Commissioned in the year
1978)
Client: General Electric
īˇ Preparation of functional specification, review of bids and preparation of
TER for Boiler feed pumps
īˇ Preparation of functional specification, review of bids and preparation of
TER for Condensate extraction pumps
īˇ Preparation of functional specification, review of bids and preparation of
TER for vacuum pumps
5. īˇ Preparation of datasheets for feed control station, motorized valves, quick
closing non-return valves, other valves and hangers, review of offers from
vendors and preparation of TER.
īˇ Study of the existing plant layouts, PIDs, HBDs and GAs to fit the new
equipments.
3) Prebid Engineering Services for 1 x 300 MW Masinloc Thermal Power,
Phillipines
ProjectClient: Daewoo
īˇ Calculation and sizing of HP-LP bypass system.
4) Detail Engineering Services for 1131.1 MW Combined cycle [power plant
in Algeria.
ProjectClient: Daewoo
īˇ Preparation of General arrangement of Hydrogen generation and storage
building.
5) 700 MW Class GE reference plant, Coal based Thermal Power Plant,
India
Client: GE
īˇ Preparation of basic study for (a) Extraction steam system, (b) HP-LP
bypass system
īˇ Preparation of PID for (a) Extraction steam system, (b) HP-LP bypass
system
īˇ Specification preparation for HP-LP bypass system
īˇ Preparation of Technical Evaluation Report (TER) for HP-LP bypass
system
6) 5X270 MW, Thermal Power Plant, Amravati & Nasik,Maharastra
Client: Indiabulls Power Limited
īˇ Review of (a) BTG (BHEL), (b) Hydrogen generation system, (c)
Compressed air system documents/drawings
īˇ Preparation of basic study for (a) Fuel oil system (b) Compressed air
system
īˇ Preparation of specification of (a) Fuel oil system, (b) Compressed air
system
īˇ Preparation of system and distribution PIDs for (a) Compressed air system
īˇ Preparation of technical evaluation report for (a) Fuel oil system, (b)
Compressed air system
īˇ Inter-department co-ordination
7) 2X150 MW, Thermal Power Plant, Bhadreswar, Gujarat
Client: OPG
6. īˇ Review of BTG (BHEL) documents/drawings
īˇ Concept Notes of (a) Stack sizing, (b) Fuel oil system
īˇ PIDs/Flow Diagrams of Fuel oil system
īˇ Specification preparation for (a) Fuel oil system, (b) Plate heat exchanger,
(c) Cooling water pumps, (d) Miscellaneous pumps
īˇ Preparation of technical evaluation report for (a) Fuel oil system, (b) Plate
heat exchanger, (c) Cooling water system, (d) Miscellaneous pumps
īˇ Inter-department co-ordination
ī TECHNICAL SKILLS:
īˇ Thermoflow & Thermoflex for HBD generation, Intools for control valve
and orifice sizing, HYSYS
īˇ Basic Understanding of ASME pressure vessel Codes and Standards
īˇ Understanding of P&IDs and process
īˇ System design and calculations
COMPUTER KNOWLEDGE
HBD generation THERMOFLOW
Drafting Software AUTO CAD
Programming Languages C basics
General Pro E, CNC, Microsoft Excel, Word, Power
Point, In-tools (control valves & orifice design)
INDUSTRIAL EXPOSURE
ī Visited GE Nuovo Pignone (Italy) Workshop to get exposure to the manufacturing
of the Gas Turbine and Centrifugal compressor.
ī Visited the 1X50 MW, Concentrated Solar Thermal Plant (Andhra Pradesh) during
the commissioning phase.
ī Undergone one month vocational summer training at Hindustan Machine Tools
(HMT), Pinjore, Haryana in Tractor division during summer of 2007
7. ī Undergone one month training in CNC technology at tool room and training center
(TRTC), Guwahati during summer vacation 2005
ī Anticipated team members in workshop during component manufacture in TRTC
for client.
ī Undergone 10 days training program in Dibrugarh Railway workshop, Assam
during summer vacation 2005.
ī Visited IIT, MumbaiâsConcentrated Solar Thermal power plant in Gurgaon,
August 2012.
ī Tata Consulting Engineers Limited in-house training in Process and technology of
conventional and non-conventional power plants
EXTRA CURRICULAR ACTIVITIES
ī Actively participated in the Corporate Social Responsibility activities in Tata
Consulting Engineers from past 4 years 9 months
DECLARATION
I hereby declare that the information furnished above is true the best of my
knowledge.
Name : Anupam Das
Place : Bangalore, Karnataka