Well Foundations
( Caissons )
 Well foundations are being used in India from
very early days.
 Taj Mahal was built on such foundations.
 Wells are classified as deep foundations.
 The main difference between a well and a pile
foundation:
 Pile is flexible like a beam under horizontal
loads
 well undergoes rigid body movement under
such loads
Wells have different shapes and
accordingly they are named as
( According to shape in plan)
• Circular Wells
• Dumb bell
• Double-D Wells
• Double Octagonal Wells
• Single and Double Rectangular Wells
• Multiple Dredged Holed Wells
( According to Material Used for Construction)
• Wood
• Steel
• Reinforced Concrete
Classification according to shape in cross section
Classification according to cutting edge type
• Large diameter, can be extended up to large depths.
• Similar to piles, but shorter
• If large bearing capacity soil (rock) is between 3-7 m, it can be
very effective
• If loads are not too large, but the upper 3-7 m of the soil is not
appropriate, can be applied effectively
• Cost of Construction is relatively less on bed level or lower
side.
• Since the placing of concrete is done for concrete seal
under water, it may not be satisfactory.
• If any obstruction of boulders or logs are encountered,
then progress of work becomes slow.
• Through cleaning and inspection at the bottom of
caisson is very difficult and hence not possible.
• The help of divers may be required for excavation near
haunches at the cutting edges.
The various component of
a well foundations are
1. Cutting Edge
2. Well Curb
3. Bottom Plug
4. Steining
5. Top Plug
6. Well Cap
Open Caisson
Cutting Edge:
• Sharp edge which is provided at the lower end of the
well or open and pneumatic caisson for accelerating
sinking operation is called cutting edge. It is made up
steel or it is made in R.C.C. Its angle to vertical is 30 0
and normally slope of 1 horizontal to 2 vertical given
better result.
• In concrete caissons, the lower part of the cutting
edge is rigidly fastened with 12 mm steel plates.
• The cutting edge should be sharp so as to penetrate
into the soil and it should resist the various stresses
caused by blows, boulders, blasting, etc.
• A sharp vertical edge is generally provided to the
outside face of the caisson. Edge facilities the rate of
sinking.
Well Curbs
• It is made of concrete or brick.
• Cutting edge of well or caisson is attached to well
curb.
• During sinking operation well curb impart to the
well steining and facilities the formation of bottom
Bottom Plug
• After final grounding of
the well to the required
foundation level, a
concrete plug is provided.
• The bottom plug transfer the
entire load to the ground.
• The bottom plug functions
as an inverted dome
supported along the periphery
of the steining.
• As it is not feasible to
provide reinforcement at the
bottom, it is generally made
thick and a rich concrete
mix (M20) is used.
Sand Filling
The bottom plug concrete is
cured and after curing, the well is
filled with sand in saturated
condition. Sand filling provides
1. Stability to the bottom of the well.
2. Eliminate the tensile forces at the
base
3. Cancels hoop stresses steining
induced in
Steining
• Steining is constructed in concrete or
masonry work.
• Use of steining is to provide dead load
during sinking operation.
Topping
• Covering provided over the well or caisson
is called as topping.
• Sand is filled in between topping and
bottom plug. Topping also acts as a part of
shuttering for laying the well cap.
Top Plug• The top plug is provided
after the filling is
completed.
• Top plug helps in transferring
the load of the pier and
superstructure to the
steining.
• The thickness of the top
plug is generally kept
greater than 50 % of the smaller
dimension of the dredge hole.
• If sand filling is used, the top
plug is simply constructed using
PCC of 1:2:4 otherwise it is
reinforced with steel bars and
lean concrete of 1:3:6 is used.
Well Cap
• As the shape of the well pier and cap are different, the
well cap forms an interim (acting) layer to accommodate
the pier.
• The well cap is so designed that the base of the pier is
provided with aminimum all round offset.
• The centre of the well cap is made to
coincide with that of the pier and not with
that of the well.
• Such positioning nullifies the effect of the
minor shifts which might have occurred
during well sinking.
Construction
Sequences
Well foundation> construction sequences
A well foundation supporting a bridge pier is
subjected to vertical and horizontal forces. The
various forces acting on the well are
1. Self weight of the well and its superstructure
2. Live loads
3. Water currents and buoyancy
4. Temperature, wind and earth quake
5. Breaking and tracking forces
6. Resistance of the well walls
7. Base and skin friction
The IRC and IS 3955 publications recommend
the following procedure for design of well
foundations in sand deposits (for clay the
expressions should be suitably modified)
1 Check the stability of well under working
loads, assuming elastic theory
2. Find the factor of safety of the well against ultimate
failure using ultimate load theory
Design of wells basically involves finding
1. Depth of the well
2. Size of the well and
3. Design of the other components.
1. Non uniform bearing capacity
2. Obstruction on one side of the well
3. Sand blowing in wells during sinking. It will cause sudden
sinking of well
4. Method of sinking: Material should be removed from all sides
equally otherwise the well may experience tilt
5. Sudden sinking due to blasting may also cause tilting of well
6. Irregular casting of steining will cause less friction on one side
leads to chances of tilting of well.
Precautions to be taken to avoid tilts and shift
• The cutting edge of caisson must be thick and sharp
pointed
• The external surface of steining and caisson curb should be
smooth.
• Dredging should be done uniformly on all sides and in all
pockets of caisson.
• Caisson should be symmetrically placed.
• The diameter (D) of the curb must be placed from 40 mm to
80 mm or larger or more than external diameter of steining.
1. Eccentric grabbing
2. Eccentric loading
3. Water jetting
4. Arresting the cutting edge
5. Pulling the well
6. Strutting the well
7. Pushing the well by jacks
Pushing the caissons or well with jack:
Eccentric loading
Water jetting
Providing temporary obstacles below the cutting edge:
Pulling the well or caisson
Strutting the caissons or well
Caisson Diseases
In case of sinking process of pneumatic caisson, workers or
workmen have to work in working chamber under compressed
air. If the compressed air pressure is less than 0.35 N/mm 2 to
0.4 N/ mm 2, then workmen may suffer from the following
pains:
 Workmen may suffer from giddiness
 There is pains in ears of workmen
 There is breaking of ear drums of workmen
 There is bursting of blood vessels in the nose or ears of workmen
 The above mentioned pains are not that serious or fatal, but
workmen is actually suffering during decompression and effect
causing depression is called caisson disease.
Following are the caisson disease caused by decompression:
 Severe pains in joints leading to bends
 It may cause paralytic death
 Excessive oxygen get absorbed in the blood may cause bursting
of vessels.
 If bubbles are developed in joints it causes bends
 If the bubbles are developed in spinal cord, it causes paralysis
and if the bubble are developed in heart, it causes heart attack.
 Caisson diseases can be controlled by recompression followed
by slow decompression.

More Related Content

What's hot (20)

1.1 box jacking
1.1 box jacking1.1 box jacking
1.1 box jacking
 
Pile load test
Pile load testPile load test
Pile load test
 
Caisson
CaissonCaisson
Caisson
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
BCT MODULE 2 - Caisson
BCT MODULE 2 - CaissonBCT MODULE 2 - Caisson
BCT MODULE 2 - Caisson
 
Type of caissons
Type of caissonsType of caissons
Type of caissons
 
Prestressed composite beams
Prestressed composite beamsPrestressed composite beams
Prestressed composite beams
 
Well foundations notes
 Well foundations notes Well foundations notes
Well foundations notes
 
Different types of pile
Different types of pile Different types of pile
Different types of pile
 
Chapter 3 shallow foundations
Chapter 3 shallow foundationsChapter 3 shallow foundations
Chapter 3 shallow foundations
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)
 
Earth pressure
Earth pressureEarth pressure
Earth pressure
 
Stone column
Stone columnStone column
Stone column
 
SINKING , TILTING AND DISEASE OF CAISSON
SINKING , TILTING AND DISEASE OF CAISSONSINKING , TILTING AND DISEASE OF CAISSON
SINKING , TILTING AND DISEASE OF CAISSON
 
Subsurface Investigation
Subsurface InvestigationSubsurface Investigation
Subsurface Investigation
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 
Earth pressure( soil mechanics)
Earth pressure( soil mechanics)Earth pressure( soil mechanics)
Earth pressure( soil mechanics)
 
Unit 1 sheet pile-converted
Unit 1   sheet pile-convertedUnit 1   sheet pile-converted
Unit 1 sheet pile-converted
 

Similar to Chapter 4.3 well foundation-final-ppt

Chapter 4.2 coffer dam, well foundation-final1
Chapter 4.2   coffer dam, well foundation-final1Chapter 4.2   coffer dam, well foundation-final1
Chapter 4.2 coffer dam, well foundation-final1DYPCET
 
CHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.pptCHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.pptbryankalindo888
 
caissons and cofferdam in substructure construction
caissons and cofferdam in substructure constructioncaissons and cofferdam in substructure construction
caissons and cofferdam in substructure constructionChinnuNinan
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...Arman Hashmi
 
Types of pile according to their composition
Types of pile according to their compositionTypes of pile according to their composition
Types of pile according to their compositionMdDiluarHossain1
 
2. CAISSONS (ACE) 2160601 GTU
2. CAISSONS (ACE) 2160601 GTU2. CAISSONS (ACE) 2160601 GTU
2. CAISSONS (ACE) 2160601 GTUVATSAL PATEL
 
Piles and drilled shaft - Deep Foundations
Piles and drilled shaft - Deep FoundationsPiles and drilled shaft - Deep Foundations
Piles and drilled shaft - Deep FoundationsWakarusaCo
 
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)Pratik Solanki
 
BC-II lec 6 pierand deep fdn.pptx
BC-II lec 6 pierand deep fdn.pptxBC-II lec 6 pierand deep fdn.pptx
BC-II lec 6 pierand deep fdn.pptxNisthaPathak2
 
WRE II construction of galleries in gravity dams
WRE II construction of galleries in gravity damsWRE II construction of galleries in gravity dams
WRE II construction of galleries in gravity damsMitaliShelke
 
shaftab-170524171214.pdf
shaftab-170524171214.pdfshaftab-170524171214.pdf
shaftab-170524171214.pdfSaimHaq
 

Similar to Chapter 4.3 well foundation-final-ppt (20)

Chapter 4.2 coffer dam, well foundation-final1
Chapter 4.2   coffer dam, well foundation-final1Chapter 4.2   coffer dam, well foundation-final1
Chapter 4.2 coffer dam, well foundation-final1
 
Well Foundation
Well FoundationWell Foundation
Well Foundation
 
Pile foundation
Pile foundation Pile foundation
Pile foundation
 
Chapter 15
Chapter 15Chapter 15
Chapter 15
 
CAISSON PPT.pptx
CAISSON PPT.pptxCAISSON PPT.pptx
CAISSON PPT.pptx
 
CHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.pptCHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
 
caissons and cofferdam in substructure construction
caissons and cofferdam in substructure constructioncaissons and cofferdam in substructure construction
caissons and cofferdam in substructure construction
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...
 
Presentation tos
Presentation tosPresentation tos
Presentation tos
 
Types of pile according to their composition
Types of pile according to their compositionTypes of pile according to their composition
Types of pile according to their composition
 
2. CAISSONS (ACE) 2160601 GTU
2. CAISSONS (ACE) 2160601 GTU2. CAISSONS (ACE) 2160601 GTU
2. CAISSONS (ACE) 2160601 GTU
 
Piles and drilled shaft - Deep Foundations
Piles and drilled shaft - Deep FoundationsPiles and drilled shaft - Deep Foundations
Piles and drilled shaft - Deep Foundations
 
Caissons
Caissons Caissons
Caissons
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
caissons.pptx
caissons.pptxcaissons.pptx
caissons.pptx
 
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
 
BC-II lec 6 pierand deep fdn.pptx
BC-II lec 6 pierand deep fdn.pptxBC-II lec 6 pierand deep fdn.pptx
BC-II lec 6 pierand deep fdn.pptx
 
Form Work
Form Work Form Work
Form Work
 
WRE II construction of galleries in gravity dams
WRE II construction of galleries in gravity damsWRE II construction of galleries in gravity dams
WRE II construction of galleries in gravity dams
 
shaftab-170524171214.pdf
shaftab-170524171214.pdfshaftab-170524171214.pdf
shaftab-170524171214.pdf
 

More from DYPCET

Design of concrete structures-I- Design Steps
Design of concrete structures-I- Design StepsDesign of concrete structures-I- Design Steps
Design of concrete structures-I- Design StepsDYPCET
 
Chapter 6 earth pressure
Chapter 6 earth pressureChapter 6 earth pressure
Chapter 6 earth pressureDYPCET
 
Chapter 3 compaction and consolidation
Chapter 3 compaction and consolidationChapter 3 compaction and consolidation
Chapter 3 compaction and consolidationDYPCET
 
Modern trends in optimization techniques
Modern trends in optimization techniquesModern trends in optimization techniques
Modern trends in optimization techniquesDYPCET
 
Productivity tools for students
Productivity tools for studentsProductivity tools for students
Productivity tools for studentsDYPCET
 
Emotional intelligence at glance
Emotional intelligence at glanceEmotional intelligence at glance
Emotional intelligence at glanceDYPCET
 
Unit 2 building planning-final
Unit 2 building planning-finalUnit 2 building planning-final
Unit 2 building planning-finalDYPCET
 
Unit 1-introduction to civil engg final
Unit 1-introduction to civil engg finalUnit 1-introduction to civil engg final
Unit 1-introduction to civil engg finalDYPCET
 
BCE assignments
BCE assignmentsBCE assignments
BCE assignmentsDYPCET
 
Rcc member design steps
Rcc member design stepsRcc member design steps
Rcc member design stepsDYPCET
 
Assignments 1 to 8
Assignments 1 to 8Assignments 1 to 8
Assignments 1 to 8DYPCET
 
Chapter 3 -consolidation notes
Chapter 3 -consolidation notesChapter 3 -consolidation notes
Chapter 3 -consolidation notesDYPCET
 
Chapter 6.0 modern foundation tech. & ground improvement
Chapter 6.0   modern foundation tech. & ground improvement Chapter 6.0   modern foundation tech. & ground improvement
Chapter 6.0 modern foundation tech. & ground improvement DYPCET
 
Chapter 1.0 soil exploration
Chapter 1.0   soil explorationChapter 1.0   soil exploration
Chapter 1.0 soil explorationDYPCET
 
Section 2-gte-i
Section  2-gte-iSection  2-gte-i
Section 2-gte-iDYPCET
 
Chapter 3 -consolidation notes
Chapter 3 -consolidation notesChapter 3 -consolidation notes
Chapter 3 -consolidation notesDYPCET
 

More from DYPCET (16)

Design of concrete structures-I- Design Steps
Design of concrete structures-I- Design StepsDesign of concrete structures-I- Design Steps
Design of concrete structures-I- Design Steps
 
Chapter 6 earth pressure
Chapter 6 earth pressureChapter 6 earth pressure
Chapter 6 earth pressure
 
Chapter 3 compaction and consolidation
Chapter 3 compaction and consolidationChapter 3 compaction and consolidation
Chapter 3 compaction and consolidation
 
Modern trends in optimization techniques
Modern trends in optimization techniquesModern trends in optimization techniques
Modern trends in optimization techniques
 
Productivity tools for students
Productivity tools for studentsProductivity tools for students
Productivity tools for students
 
Emotional intelligence at glance
Emotional intelligence at glanceEmotional intelligence at glance
Emotional intelligence at glance
 
Unit 2 building planning-final
Unit 2 building planning-finalUnit 2 building planning-final
Unit 2 building planning-final
 
Unit 1-introduction to civil engg final
Unit 1-introduction to civil engg finalUnit 1-introduction to civil engg final
Unit 1-introduction to civil engg final
 
BCE assignments
BCE assignmentsBCE assignments
BCE assignments
 
Rcc member design steps
Rcc member design stepsRcc member design steps
Rcc member design steps
 
Assignments 1 to 8
Assignments 1 to 8Assignments 1 to 8
Assignments 1 to 8
 
Chapter 3 -consolidation notes
Chapter 3 -consolidation notesChapter 3 -consolidation notes
Chapter 3 -consolidation notes
 
Chapter 6.0 modern foundation tech. & ground improvement
Chapter 6.0   modern foundation tech. & ground improvement Chapter 6.0   modern foundation tech. & ground improvement
Chapter 6.0 modern foundation tech. & ground improvement
 
Chapter 1.0 soil exploration
Chapter 1.0   soil explorationChapter 1.0   soil exploration
Chapter 1.0 soil exploration
 
Section 2-gte-i
Section  2-gte-iSection  2-gte-i
Section 2-gte-i
 
Chapter 3 -consolidation notes
Chapter 3 -consolidation notesChapter 3 -consolidation notes
Chapter 3 -consolidation notes
 

Recently uploaded

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 

Recently uploaded (20)

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 

Chapter 4.3 well foundation-final-ppt

  • 2.  Well foundations are being used in India from very early days.  Taj Mahal was built on such foundations.  Wells are classified as deep foundations.  The main difference between a well and a pile foundation:  Pile is flexible like a beam under horizontal loads  well undergoes rigid body movement under such loads
  • 3.
  • 4. Wells have different shapes and accordingly they are named as ( According to shape in plan) • Circular Wells • Dumb bell • Double-D Wells • Double Octagonal Wells • Single and Double Rectangular Wells • Multiple Dredged Holed Wells ( According to Material Used for Construction) • Wood • Steel • Reinforced Concrete
  • 5.
  • 6.
  • 7. Classification according to shape in cross section Classification according to cutting edge type
  • 8. • Large diameter, can be extended up to large depths. • Similar to piles, but shorter • If large bearing capacity soil (rock) is between 3-7 m, it can be very effective • If loads are not too large, but the upper 3-7 m of the soil is not appropriate, can be applied effectively • Cost of Construction is relatively less on bed level or lower side.
  • 9. • Since the placing of concrete is done for concrete seal under water, it may not be satisfactory. • If any obstruction of boulders or logs are encountered, then progress of work becomes slow. • Through cleaning and inspection at the bottom of caisson is very difficult and hence not possible. • The help of divers may be required for excavation near haunches at the cutting edges.
  • 10.
  • 11. The various component of a well foundations are 1. Cutting Edge 2. Well Curb 3. Bottom Plug 4. Steining 5. Top Plug 6. Well Cap
  • 12.
  • 14. Cutting Edge: • Sharp edge which is provided at the lower end of the well or open and pneumatic caisson for accelerating sinking operation is called cutting edge. It is made up steel or it is made in R.C.C. Its angle to vertical is 30 0 and normally slope of 1 horizontal to 2 vertical given better result. • In concrete caissons, the lower part of the cutting edge is rigidly fastened with 12 mm steel plates. • The cutting edge should be sharp so as to penetrate into the soil and it should resist the various stresses caused by blows, boulders, blasting, etc. • A sharp vertical edge is generally provided to the outside face of the caisson. Edge facilities the rate of sinking.
  • 15. Well Curbs • It is made of concrete or brick. • Cutting edge of well or caisson is attached to well curb. • During sinking operation well curb impart to the well steining and facilities the formation of bottom
  • 16. Bottom Plug • After final grounding of the well to the required foundation level, a concrete plug is provided. • The bottom plug transfer the entire load to the ground. • The bottom plug functions as an inverted dome supported along the periphery of the steining. • As it is not feasible to provide reinforcement at the bottom, it is generally made thick and a rich concrete mix (M20) is used.
  • 17. Sand Filling The bottom plug concrete is cured and after curing, the well is filled with sand in saturated condition. Sand filling provides 1. Stability to the bottom of the well. 2. Eliminate the tensile forces at the base 3. Cancels hoop stresses steining induced in
  • 18. Steining • Steining is constructed in concrete or masonry work. • Use of steining is to provide dead load during sinking operation. Topping • Covering provided over the well or caisson is called as topping. • Sand is filled in between topping and bottom plug. Topping also acts as a part of shuttering for laying the well cap.
  • 19. Top Plug• The top plug is provided after the filling is completed. • Top plug helps in transferring the load of the pier and superstructure to the steining. • The thickness of the top plug is generally kept greater than 50 % of the smaller dimension of the dredge hole. • If sand filling is used, the top plug is simply constructed using PCC of 1:2:4 otherwise it is reinforced with steel bars and lean concrete of 1:3:6 is used.
  • 20. Well Cap • As the shape of the well pier and cap are different, the well cap forms an interim (acting) layer to accommodate the pier. • The well cap is so designed that the base of the pier is provided with aminimum all round offset. • The centre of the well cap is made to coincide with that of the pier and not with that of the well. • Such positioning nullifies the effect of the minor shifts which might have occurred during well sinking.
  • 23.
  • 24. A well foundation supporting a bridge pier is subjected to vertical and horizontal forces. The various forces acting on the well are 1. Self weight of the well and its superstructure 2. Live loads 3. Water currents and buoyancy 4. Temperature, wind and earth quake 5. Breaking and tracking forces 6. Resistance of the well walls 7. Base and skin friction
  • 25. The IRC and IS 3955 publications recommend the following procedure for design of well foundations in sand deposits (for clay the expressions should be suitably modified) 1 Check the stability of well under working loads, assuming elastic theory 2. Find the factor of safety of the well against ultimate failure using ultimate load theory
  • 26. Design of wells basically involves finding 1. Depth of the well 2. Size of the well and 3. Design of the other components.
  • 27.
  • 28. 1. Non uniform bearing capacity 2. Obstruction on one side of the well 3. Sand blowing in wells during sinking. It will cause sudden sinking of well 4. Method of sinking: Material should be removed from all sides equally otherwise the well may experience tilt 5. Sudden sinking due to blasting may also cause tilting of well 6. Irregular casting of steining will cause less friction on one side leads to chances of tilting of well.
  • 29.
  • 30. Precautions to be taken to avoid tilts and shift • The cutting edge of caisson must be thick and sharp pointed • The external surface of steining and caisson curb should be smooth. • Dredging should be done uniformly on all sides and in all pockets of caisson. • Caisson should be symmetrically placed. • The diameter (D) of the curb must be placed from 40 mm to 80 mm or larger or more than external diameter of steining.
  • 31. 1. Eccentric grabbing 2. Eccentric loading 3. Water jetting 4. Arresting the cutting edge 5. Pulling the well 6. Strutting the well 7. Pushing the well by jacks
  • 32. Pushing the caissons or well with jack:
  • 35.
  • 36. Providing temporary obstacles below the cutting edge:
  • 37. Pulling the well or caisson
  • 40. In case of sinking process of pneumatic caisson, workers or workmen have to work in working chamber under compressed air. If the compressed air pressure is less than 0.35 N/mm 2 to 0.4 N/ mm 2, then workmen may suffer from the following pains:  Workmen may suffer from giddiness  There is pains in ears of workmen  There is breaking of ear drums of workmen  There is bursting of blood vessels in the nose or ears of workmen  The above mentioned pains are not that serious or fatal, but workmen is actually suffering during decompression and effect causing depression is called caisson disease.
  • 41. Following are the caisson disease caused by decompression:  Severe pains in joints leading to bends  It may cause paralytic death  Excessive oxygen get absorbed in the blood may cause bursting of vessels.  If bubbles are developed in joints it causes bends  If the bubbles are developed in spinal cord, it causes paralysis and if the bubble are developed in heart, it causes heart attack.  Caisson diseases can be controlled by recompression followed by slow decompression.