Shaft Definitions
Shaft- A rotating member used to transmit power.
Axle- A stationary member used as support for rotating elements such as
wheels, idler gears, etc.
Spindle- A short shaft or axle (e.g., head-stock spindle of a lathe).
Stub shaft- A shaft that is integral with a motor, engine or prime mover
and is of a size, shape, and projection as to permit easy connection to
other shafts
Line shaft- A shaft connected to a prime mover and used to transmit
power to one or several machines
Jackshaft- (Sometimes called countershaft). A short shaft that connects a
prime mover with a line shaft or a machine
Flexible shaft- A connector which permits transmission of motion between
two members whose axes are at an angle with each other
What does it mean “shaft design”? shaft design ?
1. Material selection
2. Geometric layout
3. Stress and strength: static and fatigue
4. Deflection and rigidity: bending defl., torsional, twisting,
slope at bearings and shaft- supported elements, and shear
deflection due to transverse loading on short shafts.
5. Vibration: critical speed
Material selection
• Many shafts are made from low carbon, cold-drawn or hot-rolled
steel.
• Alloy steel: Nickel chromium and vanadium are steel Nickel, some
of the common alloying materials. However alloy steel is expensive.
• Shafts usually don’t need to be surface hardened unless they serve
as the actual journal of a bearing surface.
• Hardening of surface (wear resistant): case hardening and
carburizing ; cyaniding and nitriding.
Purpose of a Shafts
• To access an ore body .
• To transport men and material to from underground workings .
• For hoisting ore and waste from underground.
• Storage of nuclear waste
Shaft Cross Sections
1. Rectangular Shafts
Most shafts that were constructed in the 1900’s were of a rectangular cross-
section because of the shape of the pieces of equipment that were taken
down the shaft i.e. cages, skips, and counterweights were all square or
rectangular in nature and so it made a lot of sense to sink or mine
rectangular shafts. Breaking a square / rectangular shutter was however
problematic and this slowed down the rate of sinking.
2 Circular Shafts
Almost all the hard rock mines now have circular shafts because the
cross section provides good geometry for airflow and good rock
support characteristics. The circular shutter is ease to move when
doing concurrent lining resulting in faster work progress during
sinking operations. This is an important aspect when it comes to the
cash flow of the project.
3 Elliptical Shafts
Elliptical shafts were designed as an alternative to large circular
shafts by simply adding half moons along the main axis. This had the
effect of reducing the circular excavation and therefore the cost of
sinking the shaft.
• Identify possible mining layouts
• Define standard mining block (stope or panel size) per
layout
• Calculate steady state conditions per level
• Define steady state inputs/outputs requirements per level
• Determine minimum access dimensions to cater for
equipment and ventilation
• Calculate development requirements to get to steady state
• Simulate full level production from start of block to ore
body extremity
• Determine the maximum number of levels that will operate
simultaneously
Determining the rate of mining can be as follows:
1 Criteria for choosing a Vertical Shaft
A vertical shaft should be chosen under the following conditions:
• Ore body should be steep dipping
• Ideal for deep ore bodies
• Provides quick access to ore body
• Most economic hoisting method for depths exceeding 500m
• Quicker return on capital investment
2 Criteria for choosing a Decline or Inclined Shaft
A decline or inclined shaft should be considered under the
scenarios:
• Flat dipping ore body
• Shallow ore bodies
• Require high throughput
• Require low initial capital costs
• Want to avoid some of the environmental concerns
(headgear)
Choosing the Right Shaft
The size or dimensions of each shaft will differ according to the
intended duty for each unit. There are three types, namely:
vertical, decline and
inclined shafts.
a) Narrow tabular deposits (steep & flat dipping – gold,
platinum, etc)
b) Wide tabular deposits (coal, potash)
c) Massive deposits (copper, nickel, iron ore)
Different types of shafts
Shaft type Diameters (m) Depths (m)
Mining ventilation 1-6 50-1500
Mining ore passes 3-7 50-1500
Mining access shafts 5-10 50-1500
Water treatment shafts 1-3 20-100
Tunnel access shaft 5-20 10-50
Objectives
Introduction
Definition
Shaft collar
Shaft sinking methods
Down-the-hole shaft sinking method
Wood/steel piling
Open caisson
Cementing process
Freezing process
Types of shafts
Introduction
shaft sinking, excavation from the surface of an opening in the earth.
Shafts, which are generally vertical, are usually distinguished from tunnels,
which are horizontal.
Little difficulty is experienced in shaft sinking through solid rock, which
contains little water.
Shafts sunk in loose water-bearing soils and lined with cast iron or with concrete
masonry 1 to 2 ft (30-61 cm) thick, built in sections as the work advances.
Shaft sinking through rock is generally accomplished by blasting.
Diameter and depth depends upon the type of the shaft
Shafts are usually circular or rectangular.
Definition
Shaft: A vertical or inclined tunnel from surface for the conveyance of
men, materials, hoisting ore, pumping water and providing ventilation.
Sinking: The work in excavating a shaft.
Shaft sinking:
It may be described as an excavation of vertical or inclined tunnel from
surface for conveyance of men, materials, ventilation, pumping water, in
addition to hoisting ore and waste rock.
It is also called Shaft Construction or Shaft Mining.
Shaft collar
On the surface of an underground
mine, a collar is required for a shaft or
raise entry, Collars are also required
For ventilation shafts, service shafts,
and for all raises that reach surface.
collars are normally lined with
concrete
Methods of shaft
sinking
There are different methods of shaft sinking/construction. Actually
three possible methods allowing a shaft to me sunk through highly
weathered over burden on the basis of Excavation and Wall support.
These are;
Down-the-hole Shaft sinking Methods
Remote Shaft sinking Methods
Raiseboring Method
Down-the-hole-Shaft
sinking method
1. Rock bolting & meshing
2. cast-in-place lining
3. pre-cast lining
1. Drilling & blasting
2. shaft-boring mucking
3. V-mole with pilot hole
Excavation method
Drilling & blasting:
A shaft is constructed by drilling holes and filling them with explosives.
Using this method, drilling and blasting can sink around 5-10 metres in one
blast.
This is very labour-intensive, unsafe and has high running costs.
The most viable alternative for shafts up to 100m in length.
Mucking:
The operation of loading broken rock by hand or machine, usually in shafts
tunnels.
Note: Muck, any useless material produced in mining.
mucking out cuttings from the bottom of the shaft.
Usually this would require some skip-hoisting, bucket-hoisting or clam-
grab equipment.
V-mole with pilot hole
The V-mole is an improvement on the concept of the shaft boring machine.
Before boring, a pilot-hole is drilled, to assist in both cuttings removal and
guiding the machine along the correct path.
The V-mole uses grippers to hold on to the side of the shaft .
The V-mole is a costly machine not suited for drilling short shafts.
Wall supporting methods
Rock bolting and meshing
A wire mesh is fastened to the walls with evenly spaced rock bolts.
Rock bolting is a commonly used, cheap method. The rock-bolts increase
normal stresses on joints so that shear failure along joints becomes more
difficult.
Often rock bolts and mesh are used as a basis for shotcreting.
Water in-flow during shotcreting severely reduces the quality of shotcrete.
Cast-in-place lining
It is possible to cast concrete rings as the shaft sink progresses.
This method provides a smooth, watertight and permanent lining for the
shaft.
The casing can be reinforced to cope with horizontal stresses (i.e. ring-
shaped reinforcement) making the casing elements more economical.
Pre-cast lining segments
In sands, mudstone and sandstone, steel, pre-stressed concrete or composite liners
with a smaller diameter (i.e. up to the 4.5 dia: )than the shaft are lowered after drilling
out the hole.
Concrete can then be poured behind the walls to create the lining.
Shaft sinking methods
a) Wood/Steel Piling
The first set of piles, forming a circle around
the shaft site is started at the surface. As
the piles are driven down, the ground is
excavated, and a circular crib is put in every
few feet. In this way the shaft is sunk in a
series of short wooden cylinders.
b) Open Caisson
In this method the shaft is started by
digging a shallow excavation and placing a
cutting shoe on the bottom of the pit. The
ground inside and just under the shoe is
excavated and the lining is built up as the
shoe sinks.
c) Cementation Process
Cavities and fissures are filled with quick-setting cement under high
pressure then allowed to set. Cement pumps are designed for
pressure as high as 5000 lb/sqin.
d) Freezing Process
This method was first used in 1883. The wet round is artificially frozen
and then blasted and excavated as though it were solid rock. From 20
50 holes are drilled on the circumference of a circle. Circulating pipes
placed in the holes and a calcium or magnesium chloride solution is
pumped through the pipes to freeze the ground.
CONCLUSION
• Shafts for a newly founded ore body or indeed existing ore
reserves.
• The methodology is cannot be avoid the optimization
process to come up with best economic option.
• Shaft must have adequate torsional strength to
transmit torque and not be over stressed.
• Shafts are mounted in bearings and transmit power
through devices such as gears, pulleys, cams and
clutches.
• Shaft must sustain a combination of bending and
torsional loads
REFERENCE
1. J.E Shigley and C.R Mischke , Mechanical Engineering
Design , McGraw Hill Publication, 5th Edition. 1989.
2. M.F Spotts, Design of Machine Elements, Prentice Hall
India Pvt. Limited, 6th Edition, 1991.
3. Khurmi, R.S. and Gupta J.K., Text book on Machine
Design, Eurasia Publishing House, New Delhi.
4. Sharma, C.S. and Purohit Kamalesh, Design of Machine
Elements, Prentice Hall of India, New Delhi, 2003.
shaftab-170524171214.pdf

More Related Content

Similar to shaftab-170524171214.pdf

Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-pptDYPCET
 
Wel Planing
Wel PlaningWel Planing
Wel Planingsaqib129
 
CHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.pptCHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.pptbryankalindo888
 
Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)Mayur Rahangdale
 
Pile foundation -sunil kumar mohapatra
Pile foundation -sunil kumar mohapatraPile foundation -sunil kumar mohapatra
Pile foundation -sunil kumar mohapatraSUNIL KUMAR MOHAPATRA
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdfSuryoNegoro3
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...Arman Hashmi
 
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSPILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSShivananda Roy
 
Trenching & Excavation
Trenching & ExcavationTrenching & Excavation
Trenching & ExcavationShivananda Roy
 
Casting Process and different types of casting defects
Casting Process and different types of casting defectsCasting Process and different types of casting defects
Casting Process and different types of casting defectsSheetalUdgave1
 

Similar to shaftab-170524171214.pdf (20)

Tunnelling
TunnellingTunnelling
Tunnelling
 
Well foundation
Well foundationWell foundation
Well foundation
 
Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-ppt
 
Well Foundation
Well FoundationWell Foundation
Well Foundation
 
Wel Planing
Wel PlaningWel Planing
Wel Planing
 
u1t4tunneling.pptx
u1t4tunneling.pptxu1t4tunneling.pptx
u1t4tunneling.pptx
 
CHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.pptCHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
 
Basics of drilling 1
Basics of drilling 1Basics of drilling 1
Basics of drilling 1
 
Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)
 
Tunnel Engineering.pptx
Tunnel Engineering.pptxTunnel Engineering.pptx
Tunnel Engineering.pptx
 
pile_foundation_1.ppt
pile_foundation_1.pptpile_foundation_1.ppt
pile_foundation_1.ppt
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Pile foundation -sunil kumar mohapatra
Pile foundation -sunil kumar mohapatraPile foundation -sunil kumar mohapatra
Pile foundation -sunil kumar mohapatra
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...
 
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSPILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
 
Deep foundation
Deep foundationDeep foundation
Deep foundation
 
Trenching & Excavation
Trenching & ExcavationTrenching & Excavation
Trenching & Excavation
 
Casting Process and different types of casting defects
Casting Process and different types of casting defectsCasting Process and different types of casting defects
Casting Process and different types of casting defects
 

Recently uploaded

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Recently uploaded (20)

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

shaftab-170524171214.pdf

  • 1. PRESENTATION TOPIC SHAFT DESIGN AND SINKING Presented By Under guidance of Pramoda G Dr. Balasubramanian A 2nd semester, Geology Professor
  • 2. Shaft Definitions Shaft- A rotating member used to transmit power. Axle- A stationary member used as support for rotating elements such as wheels, idler gears, etc. Spindle- A short shaft or axle (e.g., head-stock spindle of a lathe). Stub shaft- A shaft that is integral with a motor, engine or prime mover and is of a size, shape, and projection as to permit easy connection to other shafts Line shaft- A shaft connected to a prime mover and used to transmit power to one or several machines Jackshaft- (Sometimes called countershaft). A short shaft that connects a prime mover with a line shaft or a machine Flexible shaft- A connector which permits transmission of motion between two members whose axes are at an angle with each other
  • 3. What does it mean “shaft design”? shaft design ? 1. Material selection 2. Geometric layout 3. Stress and strength: static and fatigue 4. Deflection and rigidity: bending defl., torsional, twisting, slope at bearings and shaft- supported elements, and shear deflection due to transverse loading on short shafts. 5. Vibration: critical speed Material selection • Many shafts are made from low carbon, cold-drawn or hot-rolled steel. • Alloy steel: Nickel chromium and vanadium are steel Nickel, some of the common alloying materials. However alloy steel is expensive. • Shafts usually don’t need to be surface hardened unless they serve as the actual journal of a bearing surface. • Hardening of surface (wear resistant): case hardening and carburizing ; cyaniding and nitriding.
  • 4. Purpose of a Shafts • To access an ore body . • To transport men and material to from underground workings . • For hoisting ore and waste from underground. • Storage of nuclear waste Shaft Cross Sections 1. Rectangular Shafts Most shafts that were constructed in the 1900’s were of a rectangular cross- section because of the shape of the pieces of equipment that were taken down the shaft i.e. cages, skips, and counterweights were all square or rectangular in nature and so it made a lot of sense to sink or mine rectangular shafts. Breaking a square / rectangular shutter was however problematic and this slowed down the rate of sinking.
  • 5. 2 Circular Shafts Almost all the hard rock mines now have circular shafts because the cross section provides good geometry for airflow and good rock support characteristics. The circular shutter is ease to move when doing concurrent lining resulting in faster work progress during sinking operations. This is an important aspect when it comes to the cash flow of the project. 3 Elliptical Shafts Elliptical shafts were designed as an alternative to large circular shafts by simply adding half moons along the main axis. This had the effect of reducing the circular excavation and therefore the cost of sinking the shaft.
  • 6. • Identify possible mining layouts • Define standard mining block (stope or panel size) per layout • Calculate steady state conditions per level • Define steady state inputs/outputs requirements per level • Determine minimum access dimensions to cater for equipment and ventilation • Calculate development requirements to get to steady state • Simulate full level production from start of block to ore body extremity • Determine the maximum number of levels that will operate simultaneously Determining the rate of mining can be as follows:
  • 7. 1 Criteria for choosing a Vertical Shaft A vertical shaft should be chosen under the following conditions: • Ore body should be steep dipping • Ideal for deep ore bodies • Provides quick access to ore body • Most economic hoisting method for depths exceeding 500m • Quicker return on capital investment 2 Criteria for choosing a Decline or Inclined Shaft A decline or inclined shaft should be considered under the scenarios: • Flat dipping ore body • Shallow ore bodies • Require high throughput • Require low initial capital costs • Want to avoid some of the environmental concerns (headgear)
  • 8. Choosing the Right Shaft The size or dimensions of each shaft will differ according to the intended duty for each unit. There are three types, namely: vertical, decline and inclined shafts. a) Narrow tabular deposits (steep & flat dipping – gold, platinum, etc) b) Wide tabular deposits (coal, potash) c) Massive deposits (copper, nickel, iron ore)
  • 9. Different types of shafts Shaft type Diameters (m) Depths (m) Mining ventilation 1-6 50-1500 Mining ore passes 3-7 50-1500 Mining access shafts 5-10 50-1500 Water treatment shafts 1-3 20-100 Tunnel access shaft 5-20 10-50
  • 10.
  • 11. Objectives Introduction Definition Shaft collar Shaft sinking methods Down-the-hole shaft sinking method Wood/steel piling Open caisson Cementing process Freezing process Types of shafts
  • 12. Introduction shaft sinking, excavation from the surface of an opening in the earth. Shafts, which are generally vertical, are usually distinguished from tunnels, which are horizontal. Little difficulty is experienced in shaft sinking through solid rock, which contains little water. Shafts sunk in loose water-bearing soils and lined with cast iron or with concrete masonry 1 to 2 ft (30-61 cm) thick, built in sections as the work advances. Shaft sinking through rock is generally accomplished by blasting. Diameter and depth depends upon the type of the shaft Shafts are usually circular or rectangular.
  • 13. Definition Shaft: A vertical or inclined tunnel from surface for the conveyance of men, materials, hoisting ore, pumping water and providing ventilation. Sinking: The work in excavating a shaft. Shaft sinking: It may be described as an excavation of vertical or inclined tunnel from surface for conveyance of men, materials, ventilation, pumping water, in addition to hoisting ore and waste rock. It is also called Shaft Construction or Shaft Mining.
  • 14. Shaft collar On the surface of an underground mine, a collar is required for a shaft or raise entry, Collars are also required For ventilation shafts, service shafts, and for all raises that reach surface. collars are normally lined with concrete Methods of shaft sinking There are different methods of shaft sinking/construction. Actually three possible methods allowing a shaft to me sunk through highly weathered over burden on the basis of Excavation and Wall support. These are; Down-the-hole Shaft sinking Methods Remote Shaft sinking Methods Raiseboring Method
  • 15. Down-the-hole-Shaft sinking method 1. Rock bolting & meshing 2. cast-in-place lining 3. pre-cast lining 1. Drilling & blasting 2. shaft-boring mucking 3. V-mole with pilot hole
  • 16. Excavation method Drilling & blasting: A shaft is constructed by drilling holes and filling them with explosives. Using this method, drilling and blasting can sink around 5-10 metres in one blast. This is very labour-intensive, unsafe and has high running costs. The most viable alternative for shafts up to 100m in length.
  • 17. Mucking: The operation of loading broken rock by hand or machine, usually in shafts tunnels. Note: Muck, any useless material produced in mining. mucking out cuttings from the bottom of the shaft. Usually this would require some skip-hoisting, bucket-hoisting or clam- grab equipment.
  • 18.
  • 19. V-mole with pilot hole The V-mole is an improvement on the concept of the shaft boring machine. Before boring, a pilot-hole is drilled, to assist in both cuttings removal and guiding the machine along the correct path. The V-mole uses grippers to hold on to the side of the shaft . The V-mole is a costly machine not suited for drilling short shafts.
  • 20. Wall supporting methods Rock bolting and meshing A wire mesh is fastened to the walls with evenly spaced rock bolts. Rock bolting is a commonly used, cheap method. The rock-bolts increase normal stresses on joints so that shear failure along joints becomes more difficult. Often rock bolts and mesh are used as a basis for shotcreting. Water in-flow during shotcreting severely reduces the quality of shotcrete.
  • 21.
  • 22. Cast-in-place lining It is possible to cast concrete rings as the shaft sink progresses. This method provides a smooth, watertight and permanent lining for the shaft. The casing can be reinforced to cope with horizontal stresses (i.e. ring- shaped reinforcement) making the casing elements more economical.
  • 23.
  • 24. Pre-cast lining segments In sands, mudstone and sandstone, steel, pre-stressed concrete or composite liners with a smaller diameter (i.e. up to the 4.5 dia: )than the shaft are lowered after drilling out the hole. Concrete can then be poured behind the walls to create the lining.
  • 25. Shaft sinking methods a) Wood/Steel Piling The first set of piles, forming a circle around the shaft site is started at the surface. As the piles are driven down, the ground is excavated, and a circular crib is put in every few feet. In this way the shaft is sunk in a series of short wooden cylinders. b) Open Caisson In this method the shaft is started by digging a shallow excavation and placing a cutting shoe on the bottom of the pit. The ground inside and just under the shoe is excavated and the lining is built up as the shoe sinks.
  • 26. c) Cementation Process Cavities and fissures are filled with quick-setting cement under high pressure then allowed to set. Cement pumps are designed for pressure as high as 5000 lb/sqin. d) Freezing Process This method was first used in 1883. The wet round is artificially frozen and then blasted and excavated as though it were solid rock. From 20 50 holes are drilled on the circumference of a circle. Circulating pipes placed in the holes and a calcium or magnesium chloride solution is pumped through the pipes to freeze the ground.
  • 27. CONCLUSION • Shafts for a newly founded ore body or indeed existing ore reserves. • The methodology is cannot be avoid the optimization process to come up with best economic option. • Shaft must have adequate torsional strength to transmit torque and not be over stressed. • Shafts are mounted in bearings and transmit power through devices such as gears, pulleys, cams and clutches. • Shaft must sustain a combination of bending and torsional loads
  • 28. REFERENCE 1. J.E Shigley and C.R Mischke , Mechanical Engineering Design , McGraw Hill Publication, 5th Edition. 1989. 2. M.F Spotts, Design of Machine Elements, Prentice Hall India Pvt. Limited, 6th Edition, 1991. 3. Khurmi, R.S. and Gupta J.K., Text book on Machine Design, Eurasia Publishing House, New Delhi. 4. Sharma, C.S. and Purohit Kamalesh, Design of Machine Elements, Prentice Hall of India, New Delhi, 2003.