PROPOSAL FOR AWARENESS & IMPLEMENTATION OF 5S SYSTEM
1. Shop Floor Visit for Identification of ZONE & Sub-Zones, Formation of 5-S Steering Committee /
5-S Council in consultation with HODs / Floor Managers and Supervisors: Duration – 1 Day
2. 2. Awareness / Appreciation programme to entire grass root, supervisory, office and management
staff on 5-S & Kaizen.: In batches @ 18-20 persons max. Duration: 1 & Half hours for each Batch.
Schedule of Attendees to be decided by 5-S Council / Steering Committee. Potential contracted
workers, identified by HODs should avail this prograsmme considering their involvement in
developmental movements. Duration: 4 Days
3. Zone Activity – 1-S (Seiri-Sorting out necessary / un-necessary and shifting un-necessary items to
identified red tag area) –to be organized at 3-4 Zones parallel. Duration: 5 Days
4. Zone Activity – 2-S (Seiton – Organizing Neatness –PEEP, (A place for everything and Everything in
its place) - Duration: 5 Days.
5. Zone Activity–3-S (Sieso-Inspection/Cleaning) including all surroundings, Gardens and Greeneries,
inside approach Roads, Stair Cases, Canteens, ware house, boiler, process area, dispensary,
cabins, drawers, Almirahs/ cupboards, stores & Godowns, as per norms of EHS ACADEMY.
Duration: 5 days.
6. Zone Activity - 4- S (Sieketsu- Standardization) - Visual Managements, Notice Boards, Plant
Layout, Pathways, Area Markings, in shop floors and offices, equipment’s, Installations,
Identification marks, Labelling, under guidance EHS ACADEMY Duration: 5 Days.
7. Zone Activity - 5-S (Discipline) – Theory and practice on AUDIT, cross functional Weekly Auditing,
Council meetings, Maintaining 5-S Register Day wise –.
batch wise participation of All Zone Leaders & Members in this programme is MANDATORY.
Duration: 3 Days
8. Besides above activity, Carrying out of assignments and review visit till implementation of 5-S
Audit: Duration: 3 Days.
9. Evaluation on Status of progress: Faculty visits during the entire period of implementation will be
31 to 32 visits, spread over 4-5 Months.
ROAD MAP FOR AWARENESS AND IMPLEMENTATION OF 5 S SCOPE -A
a) Our Other terms & conditions:
b) To & Fro Journey for 2 faculty members in AC – II
c) Accommodation, Hospitality & transport for pick-up & drop of 2 faculty members to be provided
by you.
d) Visit Schedules as per Road Map:
e) After confirmation of WORK ORDER, 5-day visit in every month will be organized against the
events indicated in the Road Map.
ROAD MAP 5 S- CERTIFICATION OF 5 S SCOPE -B
.
A. For Pre-Certification & Final Certification (Optional, / If desired by the Organization)
B. Pre-Certification AUDIT Charges in all Zones:
C. Final Certification Charges for 5-S:
D. ** Accommodation, Hospitality and return AIR TRAVEL to be arranged for ED who will be awarding
Final Certification
E. A Brief on implementation duration is indicated below:
F. Theory & Practice sessions for action on 1S, 2S & 3S (5-6 months) -1st Level
G. ** Audit & action for 4S & 5S (2 month) – 2ndLevel.

More Related Content

Similar to 5S AWARENESS.docx

Project planning-and-control
Project planning-and-controlProject planning-and-control
Project planning-and-control
Jatindra Malik
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
Addisu15
 
Day 1 1410 - 1455 - pearl 2 - vijay sane
Day 1   1410 - 1455 - pearl 2 - vijay saneDay 1   1410 - 1455 - pearl 2 - vijay sane
Day 1 1410 - 1455 - pearl 2 - vijay sane
PMI2011
 
Day1 1410-1455-pearl2-vijaysane-131009043034-phpapp02
Day1 1410-1455-pearl2-vijaysane-131009043034-phpapp02Day1 1410-1455-pearl2-vijaysane-131009043034-phpapp02
Day1 1410-1455-pearl2-vijaysane-131009043034-phpapp02
PMI_IREP_TP
 
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
Robert (Bob) Owens
 
10. Working Group_Mariyryeheyehebel.pptx
10. Working Group_Mariyryeheyehebel.pptx10. Working Group_Mariyryeheyehebel.pptx
10. Working Group_Mariyryeheyehebel.pptx
EnPi
 
Adriaan Jacobus-Du-Plessis-CV 2016
Adriaan Jacobus-Du-Plessis-CV 2016Adriaan Jacobus-Du-Plessis-CV 2016
Adriaan Jacobus-Du-Plessis-CV 2016
Riaan Du Plessis
 
JD - WASTE MANAGEMENT COORDINATOR
JD - WASTE MANAGEMENT COORDINATORJD - WASTE MANAGEMENT COORDINATOR
JD - WASTE MANAGEMENT COORDINATOR
Erica Eskander
 
(Pakistan) 20 tes-appk03 training of trainer - kaizen practitioners program
(Pakistan) 20 tes-appk03 training of trainer - kaizen practitioners program(Pakistan) 20 tes-appk03 training of trainer - kaizen practitioners program
(Pakistan) 20 tes-appk03 training of trainer - kaizen practitioners program
abdulqayoom72
 
2014 LOOP Verification - Members' Briefing
2014 LOOP Verification - Members' Briefing2014 LOOP Verification - Members' Briefing
2014 LOOP Verification - Members' Briefing
loop_wwf
 

Similar to 5S AWARENESS.docx (20)

CAREN.pptx
CAREN.pptxCAREN.pptx
CAREN.pptx
 
Planning service delivery system
Planning service delivery systemPlanning service delivery system
Planning service delivery system
 
The SSU Lead - General Training
The SSU Lead - General TrainingThe SSU Lead - General Training
The SSU Lead - General Training
 
landfill
landfilllandfill
landfill
 
Project planning-and-control
Project planning-and-controlProject planning-and-control
Project planning-and-control
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
 
Day 1 1410 - 1455 - pearl 2 - vijay sane
Day 1   1410 - 1455 - pearl 2 - vijay saneDay 1   1410 - 1455 - pearl 2 - vijay sane
Day 1 1410 - 1455 - pearl 2 - vijay sane
 
Day1 1410-1455-pearl2-vijaysane-131009043034-phpapp02
Day1 1410-1455-pearl2-vijaysane-131009043034-phpapp02Day1 1410-1455-pearl2-vijaysane-131009043034-phpapp02
Day1 1410-1455-pearl2-vijaysane-131009043034-phpapp02
 
Vivek G
Vivek GVivek G
Vivek G
 
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
 
10. Working Group_Mariyryeheyehebel.pptx
10. Working Group_Mariyryeheyehebel.pptx10. Working Group_Mariyryeheyehebel.pptx
10. Working Group_Mariyryeheyehebel.pptx
 
Adriaan Jacobus-Du-Plessis-CV 2016
Adriaan Jacobus-Du-Plessis-CV 2016Adriaan Jacobus-Du-Plessis-CV 2016
Adriaan Jacobus-Du-Plessis-CV 2016
 
JD - WASTE MANAGEMENT COORDINATOR
JD - WASTE MANAGEMENT COORDINATORJD - WASTE MANAGEMENT COORDINATOR
JD - WASTE MANAGEMENT COORDINATOR
 
(Pakistan) 20 tes-appk03 training of trainer - kaizen practitioners program
(Pakistan) 20 tes-appk03 training of trainer - kaizen practitioners program(Pakistan) 20 tes-appk03 training of trainer - kaizen practitioners program
(Pakistan) 20 tes-appk03 training of trainer - kaizen practitioners program
 
2014 LOOP Verification - Members' Briefing
2014 LOOP Verification - Members' Briefing2014 LOOP Verification - Members' Briefing
2014 LOOP Verification - Members' Briefing
 
App dec 12
App dec 12App dec 12
App dec 12
 
Timekeeping refresher 2015 vote
Timekeeping refresher 2015 voteTimekeeping refresher 2015 vote
Timekeeping refresher 2015 vote
 
Project EHS Plan
Project EHS PlanProject EHS Plan
Project EHS Plan
 
Improve patient satisfaction 2.docx
Improve patient satisfaction 2.docxImprove patient satisfaction 2.docx
Improve patient satisfaction 2.docx
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 

Recently uploaded

Recently uploaded (20)

BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
 
Climbers and Creepers used in landscaping
Climbers and Creepers used in landscapingClimbers and Creepers used in landscaping
Climbers and Creepers used in landscaping
 
PSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptxPSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptx
 
An Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge AppAn Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge App
 
Scopus Indexed Journals 2024 - ISCOPUS Publications
Scopus Indexed Journals 2024 - ISCOPUS PublicationsScopus Indexed Journals 2024 - ISCOPUS Publications
Scopus Indexed Journals 2024 - ISCOPUS Publications
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategies
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
MOOD STABLIZERS DRUGS.pptx
MOOD     STABLIZERS           DRUGS.pptxMOOD     STABLIZERS           DRUGS.pptx
MOOD STABLIZERS DRUGS.pptx
 
How to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptxHow to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptx
 
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading RoomSternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
 
Including Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdfIncluding Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdf
 
The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDF
 
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinhĐề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
 
Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...
 
Mattingly "AI & Prompt Design: Named Entity Recognition"
Mattingly "AI & Prompt Design: Named Entity Recognition"Mattingly "AI & Prompt Design: Named Entity Recognition"
Mattingly "AI & Prompt Design: Named Entity Recognition"
 
Trauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical PrinciplesTrauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical Principles
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
 
The Liver & Gallbladder (Anatomy & Physiology).pptx
The Liver &  Gallbladder (Anatomy & Physiology).pptxThe Liver &  Gallbladder (Anatomy & Physiology).pptx
The Liver & Gallbladder (Anatomy & Physiology).pptx
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptx
 

5S AWARENESS.docx

  • 1. PROPOSAL FOR AWARENESS & IMPLEMENTATION OF 5S SYSTEM 1. Shop Floor Visit for Identification of ZONE & Sub-Zones, Formation of 5-S Steering Committee / 5-S Council in consultation with HODs / Floor Managers and Supervisors: Duration – 1 Day 2. 2. Awareness / Appreciation programme to entire grass root, supervisory, office and management staff on 5-S & Kaizen.: In batches @ 18-20 persons max. Duration: 1 & Half hours for each Batch. Schedule of Attendees to be decided by 5-S Council / Steering Committee. Potential contracted workers, identified by HODs should avail this prograsmme considering their involvement in developmental movements. Duration: 4 Days 3. Zone Activity – 1-S (Seiri-Sorting out necessary / un-necessary and shifting un-necessary items to identified red tag area) –to be organized at 3-4 Zones parallel. Duration: 5 Days 4. Zone Activity – 2-S (Seiton – Organizing Neatness –PEEP, (A place for everything and Everything in its place) - Duration: 5 Days. 5. Zone Activity–3-S (Sieso-Inspection/Cleaning) including all surroundings, Gardens and Greeneries, inside approach Roads, Stair Cases, Canteens, ware house, boiler, process area, dispensary, cabins, drawers, Almirahs/ cupboards, stores & Godowns, as per norms of EHS ACADEMY. Duration: 5 days. 6. Zone Activity - 4- S (Sieketsu- Standardization) - Visual Managements, Notice Boards, Plant Layout, Pathways, Area Markings, in shop floors and offices, equipment’s, Installations, Identification marks, Labelling, under guidance EHS ACADEMY Duration: 5 Days. 7. Zone Activity - 5-S (Discipline) – Theory and practice on AUDIT, cross functional Weekly Auditing, Council meetings, Maintaining 5-S Register Day wise –. batch wise participation of All Zone Leaders & Members in this programme is MANDATORY. Duration: 3 Days 8. Besides above activity, Carrying out of assignments and review visit till implementation of 5-S Audit: Duration: 3 Days. 9. Evaluation on Status of progress: Faculty visits during the entire period of implementation will be 31 to 32 visits, spread over 4-5 Months. ROAD MAP FOR AWARENESS AND IMPLEMENTATION OF 5 S SCOPE -A a) Our Other terms & conditions: b) To & Fro Journey for 2 faculty members in AC – II c) Accommodation, Hospitality & transport for pick-up & drop of 2 faculty members to be provided by you. d) Visit Schedules as per Road Map: e) After confirmation of WORK ORDER, 5-day visit in every month will be organized against the events indicated in the Road Map. ROAD MAP 5 S- CERTIFICATION OF 5 S SCOPE -B . A. For Pre-Certification & Final Certification (Optional, / If desired by the Organization) B. Pre-Certification AUDIT Charges in all Zones: C. Final Certification Charges for 5-S: D. ** Accommodation, Hospitality and return AIR TRAVEL to be arranged for ED who will be awarding Final Certification E. A Brief on implementation duration is indicated below: F. Theory & Practice sessions for action on 1S, 2S & 3S (5-6 months) -1st Level G. ** Audit & action for 4S & 5S (2 month) – 2ndLevel.