Timekeeping
Refresher Training
Fiscal Year 2015
2
• Timekeeping
– Importance
– Responsibilities
– Remote Access
– Compliance
• Resources
• DOD Hotline
• DCAA Audit Floor Check
• Timesheet Scenarios
Agenda
3
Why are Timesheets Important?
Our timesheets…
• Are LEGAL documents that capture all hours
worked by an employee
• Provide supporting documentation for proper
invoicing on government contracts
• Assist project management by providing visibility
to all hours charged to a specific project
The accuracy and complete preparation of timesheets is a part of the employee's responsibility. Careless
or improper preparation could lead to disciplinary actions under company policies (CNA Policy Manual Section
4.5.2.7), as well as applicable federal regulations.
Polling Question #1
When should an employee complete their timesheet?
a) By 10a.m. daily
b) At the end of the timesheet period
c) At the end of every workday
4
33% 33% 33%
What is the best response?
1. Answer a
2. Answer b
3. Answer c
5
0
6
Employee Responsibilities
• Employees must accurately record all hours worked
by the end of each work day, but no later than 10:00
am EST the following business day
– Hours recorded may exceed 8 hours per day
– Hours may be logged on Saturdays, Sundays, and Holidays
• Record all hours worked based on work performed
• Make all timesheet corrections as soon as they are
known and provide an explanation for any changes
• Sign timesheet at the end of each biweekly period or
by 10:00am EST the Monday after pay day
7
Supervisor Responsibilities
• Know where an employee is working (i.e. office, home,
client-site)
• Provide the employee with the correct project
number in writing prior to starting an assignment
• Approve/Reject employee timesheets by 12:00pm
EST the Monday after pay day
– Approval certifies they are in agreement with the hours recorded and
any related corrections for accuracy and completeness
– If rejected, an explanation must be provided to the employee for
correction
8
Supervisor Responsibilities (cont’d)
• A supervisor may elect to delegate authority to
another person to review & approve their timesheets
if they are not available for an extended time period
– Email Etimecard@cna.org for assistance & instructions
• A supervisor cannot complete and approve an
employee's timesheet in the same biweekly period
– Request the assistance of your group timekeeper or timesheet
administrator for completion
– If a timesheet is completed by someone else, then the employee must
re-sign the timesheet when they return to acknowledge the hours
recorded are complete & accurate
Polling Question #2
On what occasion, can an employee record hours in
advance on their timesheet?
a) Prior to going on leave
b) Prior to leaving for business travel
c) When you know the timekeeping system will be
inaccessible
d) All of the above
9
25% 25% 25% 25%
What is the best response?
1. Answer a
2. Answer b
3. Answer c
4. Answer d
10
0
Remote Access into Deltek T&E
• Three available options to access your timesheet remotely:
– CISCO VPN – Provides access to the network remotely via VPN
on your CNA-issued laptop. Username, password, & RSA token*
are required.
– SSL VPN – Provides remote access through a webpage
(https://web.cna.org) from any computer or smart device with
internet access. Username, password, & RSA token* are
required.
– GOOD App – Provides remote access to a link to timesheet via
Cruiser. Your username and password are required for access.
Currently, this functionality is only available on Apple devices.
11
* If your physical RSA token is not available, contact the IT
Help Desk for assistance.
Timesheet Corrections
• Make timesheet corrections as soon as they become
known
• Provide a proper explanation for all timesheet
changes for the permanent record
• Must be signed by employee & approved by the
supervisor or manager
12
Timesheet Corrections (cont’d)
13
Unacceptable
Reasons/ Explanations
Didn’t know the correct project
number so I charged time to
another project number
Project number was not available
so I charged to overhead project
number until project number
became available
Manager provided incorrect
project number
Acceptable
Reasons/Explanations
Charged to vacation leave number
but had to work while on vacation
Group timekeeper could not reach
me and entered time on my behalf,
so I made adjustments to reflect
time worked
Moving hours from “at risks” project
number to fully funded project
number
Timekeeping Compliance
• Pop-Up reminder when you log off your system
• Automated email reminder at 9:30am
• Late time entry reporting
– Monthly report sent to senior management and VP with results by employee/division
14
2014-01 2014-02 2014-03 2014-04 2014-05 Total
Team Status
FT 3 0 0 0 3 6
PT 1 2 0 0 0 3
FT 1 0 0 0 0 1
Employee Name Approver
DIV Employee A (99999) Supervisor
Employee B (99999) Supervisor
Employee C (99999) Supervisor
Late Time
Timesheet Period (late entries)
Compliance rate less than
90% (>2 late entries per
accounting period)
Timekeeping Resources
• Cruiser
– Rules & Reg/ Timekeeping
 User’s Guides
 Training Materials
 FAQs
– CNA Policy Manual
 Section 4.5.2
• Supervisor/ Project Mgr
• Group Timekeeper
• Etimecard@cna.org – technical assistance
• Timekeeping@cna.org – compliance questions
When in doubt, please utilize one of the resources above for guidance.
15
Polling Question #3
Where are the DOD Hotline posters located?
a) On Cruiser
b) In the 4th floor Café
c) In the galley on every floor
d) All of the above
16
25% 25% 25% 25%
What is the best response?
1. Answer a
2. Answer b
3. Answer c
4. Answer d
17
0
18
Department of Defense (DOD) Hotline
• CNA has a responsibility to guard against labor fraud and waste.
• The DOD established this hotline for employees who work on
government contracts to report fraud, waste or abuse without
fear of reprisal.
 (800) 424-9098
 Email: hotline@dodig.osd.mil
 Internet: http:www.dodig.osd.mil/hotline
19
DCAA Floor Check Audit
Defense Contract Audit Agency (DCAA) provides audit
oversight for the government on our timekeeping
practices. DCAA auditors periodically perform
unannounced physical observations of work areas and
make inquiries of employees known as a Floor Check.
• Employees are randomly selected for an interview
– If selected, an employee cannot alert other employees that a
floor check audit is in progress.
• CFO personnel will escort the auditors to every
employee interview, but cannot speak unless permitted
20
DCAA Floor Check Audit (cont’d)
• The scope of the floor check audit is to determine if
an employee:
– Is actually at work & performing job/project related tasks
– Charging time to the appropriate charge code
– Is familiar with CNA’s timekeeping policies/procedures
– Knows what resources are available and where to locate
them
21
DCAA Floor Check FAQs
• How often do you record your time?
• When was your last timekeeping training class?
• Do you know where you can find information on timekeeping
policies and procedures?
• Who provides you the tasks that you are currently supporting
and the related charge numbers?
• Did you provide a reason for recording time to a previous work
day?
• Do you ever temporarily charge time to a code with the intention
of correcting it later?
• If you knew of an instance of time mischarging, who would you
contact?
• Where are the DOD Hotline posters located?
**Only answer the auditor’s specific question. Do not feel obligated to provide an answer if you’re not sure**
Timesheet Scenarios
Polling Question #4
If an employee attends a Soapbox, how should they
charge their time?
a) As time to the project
b) As training & development
c) Don’t charge anything – it was during lunch
23
33% 33% 33%
What’s the best response?
1. Answer a
2. Answer b
3. Answer c
24
0
Timekeeping Scenario 1 of 6
25
Response
All CNA employees are encouraged to attend soapboxes. But whether you charge
direct vs. indirect would depend on your circumstances.
 Direct – project related
 Indirect – training & development
 Lunchtime – personal interest
4.5.2.2 Timekeeping standards and guidelines – General
Research managers at all levels as well as analysts, project administrators, secretaries, editors, programmers, research assistants,
librarians, and graphic artists should use direct charge numbers (including numbers for general concept development & project
development) for such activities as:
• Performing research and related activities (e.g., literature searches, data collection, data reduction, programming, preparation of
proposals for the “core” FFRDC program, project oversight and administration by a project director or team leader)
• Preparing papers, reports, and briefings—or contributing to their preparation by typing, creating graphs, proofreading, editing, etc.
• Discussing current research (ideas, plans, progress, results)
1. with other employees, consultants, and subcontractors whether or not they are assigned formally to the project
2. with a group of peers or managers at any type of meeting
3. with clients, other outside groups, and the Board of Trustees or any of its members or committees
• Reviewing project papers, reports, and briefings in any stage of preparation
• Doing professional reading related to the development or execution of a research project
• Acquiring beneficial knowledge and skills through training activities that are charged directly.
Polling Question #5
Two employees are traveling for a site visit for a study.
Employee A charges the travel time from the time he
leaves his house to go to the airport through arrival at
the hotel and any additional time that day spent on
work (confirming meetings, reviewing emails, etc.).
Employee B chooses not to charge all of the time on
travel because he slept on the flight and doesn’t feel
that time should be charged to the study.
26
Polling Question #5 (cont’d)
Who is properly calculating their travel time?
a) Employee A
b) Employee B
c) Neither, because the client will not reimburse for it
27
33% 33% 33%
What’s the best response?
1. Answer a
2. Answer b
3. Answer c
28
0
Timesheet Scenario 2 of 6
29
Response
Employee A is correct. The employee would not have been on the flight
otherwise. However, employees are encouraged to maximize their time and
be as productive as possible.
4.5.2.2 Timekeeping standards and guidelines – Business travel time
The outgoing leg of business travel begins when you leave your home or office and ends on arrival at your initial destination
(e.g., hotel or military installation). Once you've reached your destination, time is not chargeable until you are actively
attempting to accomplish work. The return leg of business travel begins when you leave your hotel or site being visited and
ends on arrival at your home or office.
Examples of chargeable activities during business travel include drive to the airport, waiting at the airport to leave, flying or
driving to destination, reviewing meeting notes prior to or after meetings, and attendance at work activities. Examples of
activities not chargeable are personal recreation and routines such as exercising, meal breaks, unpacking, and packing.
Travel time includes delays and layovers, to the extent time is actually spent traveling. If the delay or layover spans more than
one day, all time may not be chargeable. For example, if you check into a hotel during a delay or layover, time spent at the
hotel taking care of personal business is not chargeable. Examples include showering, sleeping, exercising, or eating meals.
Travel to the hotel and back to the airport to catch the flight at its scheduled departure is chargeable as business travel time.
Polling Question #6
Two analysts visit a US Navy command to update their
sponsor on their project. They arrive at 0700 and attend
two daily briefings (not directly related to their project).
Afterwards, the Field Rep says the Admiral will see the CNA
team in the afternoon. Analyst A goes to lunch with the
Rep and members of Navy staff, while Analyst B returns to
the hotel to check email. They reconvene at 1400, but the
Admiral pushes the meeting until 1500. At 1730 they wrap
for the day, but run into a potential sponsor and decide to
go to dinner which lasts until 2000.
30
Polling Question #6
How much of the their time is chargeable?
a)Both analysts can charge direct for the mornings hours
b)Analyst B’s lunch time may be direct if email correspondence
is related to a specific project and adds value to the sponsor
c)Dinner may be a seen as marketing if discussions with the
potential sponsor result in future business opportunities
d)All of the above are correct
31
25% 25% 25% 25%
What’s the best response?
1. Answer a
2. Answer b
3. Answer c
4. Answer d
32
0
Appendix: Timesheet Scenarios 3 of 6
33
Response
Answer D, all of the above.
The reason for the business meeting was to report on project status, therefore, any related
hours should be charged directly to the project. The analysts were prepared and ready to
present upon arrival, but scheduling changes delayed the meeting. Unless the analysts were
able to perform other project tasks (i.e. emails, conference calls, review deliverables), their
time should be charged to the sponsor’s project.
• The morning hours are chargeable as direct, because the employees traveled and made
themselves available for the meeting.
• The afternoon hours may be treated differently depending on the circumstances:
Analyst A – the lunch may be deemed as either a business meal or personal depending on
the nature of the conversation.
Analyst B – the time checking & responding to email may be chargeable as direct, if it
relates to a specific project and adds value to the customer/sponsor.
• The dinner may be defined as a marketing effort since it was with a “potential sponsor” that
may result in future business opportunities.
Polling Question #7
An analyst is being sent overseas to an exercise. When
the exercise is done, there will be a few days of down
time, and then a second exercise they are supporting
(for the same project) will begin. Rather than bring
them home after the first exercise ends and then send
them back again, they will stay until the second
exercise begins. The cost of the travel time, airfare,
lodging & per diem is more expensive than just leaving
them in place.
34
Polling Question #7
Should the analyst record any leave while they are
waiting for the second exercise to begin?
a)No, all their time is chargeable to the projects
b)Yes, only the hours that were legitimately taken
35
50% 50%
What’s the best response?
1. Answer a
2. Answer b
36
0
Timesheet Scenario 4 of 6
37
Response
Answer B is correct.
Employee should not charge leave unless it was legitimately taken. Since it was not
cost beneficial for the employee to come home and then return, they should treat
this situation like a travel layover. Since the employee was assigned to support both
efforts, they can in essence charge a proportionate share as travel time to each
project and document in the comment section of the timesheet.
The employee should not charge 24 hours per day, because not all travel time is
chargeable (i.e. personal activities) as defined in Section 4.5.2.2 of the policy
manual.
But, if the employee has the ability performed some other work, they are
encouraged to maximize any downtime and be as productive as possible.
Polling Question #8
If a salary employee worked over 100 hours on a
project during a biweekly period, how should they
record their time?
a)Only record 80 hours
b)Record all hours worked to that project
c)Only record the hours that can be covered by
remaining project funding
38
33% 33% 33%
What’s the best response?
1. Answer a
2. Answer b
3. Answer c
39
0
Timesheet Scenario 5 of 6
40
Response
Answer B is correct.
We have a Total Time Accounting policy, so employees must record all hours worked.
The time charged to work must reflect the work actually performed without regard
to budgetary restrictions or other financial considerations.
The labor costs are proportionately allocated to projects at the effective rate.
Polling Question #9
A couple of CNA’ers meet over lunch only to discuss a
particular project. This time is considered work and is
chargeable to the project.
a)TRUE
b)FALSE
41
50% 50%
What’s the best response?
1. Answer a
2. Answer b
42
0
Timesheet Scenario 6 of 6
43
Management Response
Answer is TRUE.
A lunch may be deemed as either a business or personal depending on the original
intent or outcome.
 If lunch was the only available slot to meet regarding an issue/topic, then it may
be considered business meal.
 If the lunch conversation is general and not specific to work, then it would be
considered personal.
The amount of time chargeable to project is subjective, so the employee should
consider how much of the conversation added value to a project and its final
objective.
Questions
If you have any questions, please contact one of the
following individuals:
Scott Teng ext. 2890, Timesheet Administrator
Tiffany Poindexter ext. 2378, Timesheet Amendments
Yolanda Brooks ext. 2987, Timekeeping Compliance
44

More Related Content

Similar to Timekeeping refresher 2015 vote

Assignment .pdf
Assignment .pdfAssignment .pdf
Assignment .pdf
MUHTASIMALBUYESSHETA
 
Training presentation .pptx
Training presentation .pptxTraining presentation .pptx
Training presentation .pptx
GeethikaChandrasiri1
 
City of Lakeland - Rapid Process Improvement - Pension Claims
City of Lakeland - Rapid Process Improvement - Pension ClaimsCity of Lakeland - Rapid Process Improvement - Pension Claims
City of Lakeland - Rapid Process Improvement - Pension Claims
Jennifer Kerr, MBA
 
Projects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFailProjects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFailBarbara Franks
 
IECEx-Assessor-Survey-Results-Remote-Assessments-2021SecFinal-aspectnormal.pptx
IECEx-Assessor-Survey-Results-Remote-Assessments-2021SecFinal-aspectnormal.pptxIECEx-Assessor-Survey-Results-Remote-Assessments-2021SecFinal-aspectnormal.pptx
IECEx-Assessor-Survey-Results-Remote-Assessments-2021SecFinal-aspectnormal.pptx
WasifAli345722
 
Management Science - Krimzen Tech
Management Science - Krimzen TechManagement Science - Krimzen Tech
Management Science - Krimzen Tech
DarrenTofu
 
8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)Steve Nails
 
Your project selected_for_audit_sip18_project_auditors
Your project selected_for_audit_sip18_project_auditorsYour project selected_for_audit_sip18_project_auditors
Your project selected_for_audit_sip18_project_auditors
Joy Gumz
 
Devendra Kushwah Resume
Devendra Kushwah ResumeDevendra Kushwah Resume
Devendra Kushwah ResumeDev Singh
 
Gap Analysis & Improvement Tactics for Your EH&S Program
Gap Analysis & Improvement Tactics for Your EH&S ProgramGap Analysis & Improvement Tactics for Your EH&S Program
Gap Analysis & Improvement Tactics for Your EH&S ProgramTriumvirate Environmental
 
Doing It On Your Own: When to Call in the Consultants, When to Leave Them Out
Doing It On Your Own: When to Call in the Consultants, When to Leave Them OutDoing It On Your Own: When to Call in the Consultants, When to Leave Them Out
Doing It On Your Own: When to Call in the Consultants, When to Leave Them OutNTEN
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdf
Project Cubicle
 
CaseStudy - Business Analyst Project Objectives
CaseStudy - Business Analyst Project ObjectivesCaseStudy - Business Analyst Project Objectives
CaseStudy - Business Analyst Project Objectives
ZaranTech LLC
 
Interview questions-answers-for-planning-engineers-r.00
Interview questions-answers-for-planning-engineers-r.00Interview questions-answers-for-planning-engineers-r.00
Interview questions-answers-for-planning-engineers-r.00
Praveen Krishna
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling
Ricky Smith CMRP, CMRT
 
Program challenges - TPM Problem Solver
Program challenges - TPM Problem SolverProgram challenges - TPM Problem Solver
Program challenges - TPM Problem Solver
Sachidananda Panda (SPC5, SP, CSM)
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt
Deepgaichor1
 
Finance Presentation
Finance PresentationFinance Presentation
Finance PresentationTim Demorais
 
Software project management tools
Software project management toolsSoftware project management tools
Software project management tools
Darshak Mehta
 

Similar to Timekeeping refresher 2015 vote (20)

Assignment .pdf
Assignment .pdfAssignment .pdf
Assignment .pdf
 
Training presentation .pptx
Training presentation .pptxTraining presentation .pptx
Training presentation .pptx
 
City of Lakeland - Rapid Process Improvement - Pension Claims
City of Lakeland - Rapid Process Improvement - Pension ClaimsCity of Lakeland - Rapid Process Improvement - Pension Claims
City of Lakeland - Rapid Process Improvement - Pension Claims
 
Projects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFailProjects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFail
 
IECEx-Assessor-Survey-Results-Remote-Assessments-2021SecFinal-aspectnormal.pptx
IECEx-Assessor-Survey-Results-Remote-Assessments-2021SecFinal-aspectnormal.pptxIECEx-Assessor-Survey-Results-Remote-Assessments-2021SecFinal-aspectnormal.pptx
IECEx-Assessor-Survey-Results-Remote-Assessments-2021SecFinal-aspectnormal.pptx
 
Management Science - Krimzen Tech
Management Science - Krimzen TechManagement Science - Krimzen Tech
Management Science - Krimzen Tech
 
8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)
 
Your project selected_for_audit_sip18_project_auditors
Your project selected_for_audit_sip18_project_auditorsYour project selected_for_audit_sip18_project_auditors
Your project selected_for_audit_sip18_project_auditors
 
Devendra Kushwah Resume
Devendra Kushwah ResumeDevendra Kushwah Resume
Devendra Kushwah Resume
 
Gap Analysis & Improvement Tactics for Your EH&S Program
Gap Analysis & Improvement Tactics for Your EH&S ProgramGap Analysis & Improvement Tactics for Your EH&S Program
Gap Analysis & Improvement Tactics for Your EH&S Program
 
Doing It On Your Own: When to Call in the Consultants, When to Leave Them Out
Doing It On Your Own: When to Call in the Consultants, When to Leave Them OutDoing It On Your Own: When to Call in the Consultants, When to Leave Them Out
Doing It On Your Own: When to Call in the Consultants, When to Leave Them Out
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdf
 
CaseStudy - Business Analyst Project Objectives
CaseStudy - Business Analyst Project ObjectivesCaseStudy - Business Analyst Project Objectives
CaseStudy - Business Analyst Project Objectives
 
Interview questions-answers-for-planning-engineers-r.00
Interview questions-answers-for-planning-engineers-r.00Interview questions-answers-for-planning-engineers-r.00
Interview questions-answers-for-planning-engineers-r.00
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling
 
Program challenges - TPM Problem Solver
Program challenges - TPM Problem SolverProgram challenges - TPM Problem Solver
Program challenges - TPM Problem Solver
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt
 
Finance Presentation
Finance PresentationFinance Presentation
Finance Presentation
 
Mary Fisher Portfolio
Mary Fisher PortfolioMary Fisher Portfolio
Mary Fisher Portfolio
 
Software project management tools
Software project management toolsSoftware project management tools
Software project management tools
 

Recently uploaded

Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
LuanWise
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
daothibichhang1
 

Recently uploaded (20)

Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
 

Timekeeping refresher 2015 vote

  • 2. 2 • Timekeeping – Importance – Responsibilities – Remote Access – Compliance • Resources • DOD Hotline • DCAA Audit Floor Check • Timesheet Scenarios Agenda
  • 3. 3 Why are Timesheets Important? Our timesheets… • Are LEGAL documents that capture all hours worked by an employee • Provide supporting documentation for proper invoicing on government contracts • Assist project management by providing visibility to all hours charged to a specific project The accuracy and complete preparation of timesheets is a part of the employee's responsibility. Careless or improper preparation could lead to disciplinary actions under company policies (CNA Policy Manual Section 4.5.2.7), as well as applicable federal regulations.
  • 4. Polling Question #1 When should an employee complete their timesheet? a) By 10a.m. daily b) At the end of the timesheet period c) At the end of every workday 4
  • 5. 33% 33% 33% What is the best response? 1. Answer a 2. Answer b 3. Answer c 5 0
  • 6. 6 Employee Responsibilities • Employees must accurately record all hours worked by the end of each work day, but no later than 10:00 am EST the following business day – Hours recorded may exceed 8 hours per day – Hours may be logged on Saturdays, Sundays, and Holidays • Record all hours worked based on work performed • Make all timesheet corrections as soon as they are known and provide an explanation for any changes • Sign timesheet at the end of each biweekly period or by 10:00am EST the Monday after pay day
  • 7. 7 Supervisor Responsibilities • Know where an employee is working (i.e. office, home, client-site) • Provide the employee with the correct project number in writing prior to starting an assignment • Approve/Reject employee timesheets by 12:00pm EST the Monday after pay day – Approval certifies they are in agreement with the hours recorded and any related corrections for accuracy and completeness – If rejected, an explanation must be provided to the employee for correction
  • 8. 8 Supervisor Responsibilities (cont’d) • A supervisor may elect to delegate authority to another person to review & approve their timesheets if they are not available for an extended time period – Email Etimecard@cna.org for assistance & instructions • A supervisor cannot complete and approve an employee's timesheet in the same biweekly period – Request the assistance of your group timekeeper or timesheet administrator for completion – If a timesheet is completed by someone else, then the employee must re-sign the timesheet when they return to acknowledge the hours recorded are complete & accurate
  • 9. Polling Question #2 On what occasion, can an employee record hours in advance on their timesheet? a) Prior to going on leave b) Prior to leaving for business travel c) When you know the timekeeping system will be inaccessible d) All of the above 9
  • 10. 25% 25% 25% 25% What is the best response? 1. Answer a 2. Answer b 3. Answer c 4. Answer d 10 0
  • 11. Remote Access into Deltek T&E • Three available options to access your timesheet remotely: – CISCO VPN – Provides access to the network remotely via VPN on your CNA-issued laptop. Username, password, & RSA token* are required. – SSL VPN – Provides remote access through a webpage (https://web.cna.org) from any computer or smart device with internet access. Username, password, & RSA token* are required. – GOOD App – Provides remote access to a link to timesheet via Cruiser. Your username and password are required for access. Currently, this functionality is only available on Apple devices. 11 * If your physical RSA token is not available, contact the IT Help Desk for assistance.
  • 12. Timesheet Corrections • Make timesheet corrections as soon as they become known • Provide a proper explanation for all timesheet changes for the permanent record • Must be signed by employee & approved by the supervisor or manager 12
  • 13. Timesheet Corrections (cont’d) 13 Unacceptable Reasons/ Explanations Didn’t know the correct project number so I charged time to another project number Project number was not available so I charged to overhead project number until project number became available Manager provided incorrect project number Acceptable Reasons/Explanations Charged to vacation leave number but had to work while on vacation Group timekeeper could not reach me and entered time on my behalf, so I made adjustments to reflect time worked Moving hours from “at risks” project number to fully funded project number
  • 14. Timekeeping Compliance • Pop-Up reminder when you log off your system • Automated email reminder at 9:30am • Late time entry reporting – Monthly report sent to senior management and VP with results by employee/division 14 2014-01 2014-02 2014-03 2014-04 2014-05 Total Team Status FT 3 0 0 0 3 6 PT 1 2 0 0 0 3 FT 1 0 0 0 0 1 Employee Name Approver DIV Employee A (99999) Supervisor Employee B (99999) Supervisor Employee C (99999) Supervisor Late Time Timesheet Period (late entries) Compliance rate less than 90% (>2 late entries per accounting period)
  • 15. Timekeeping Resources • Cruiser – Rules & Reg/ Timekeeping  User’s Guides  Training Materials  FAQs – CNA Policy Manual  Section 4.5.2 • Supervisor/ Project Mgr • Group Timekeeper • Etimecard@cna.org – technical assistance • Timekeeping@cna.org – compliance questions When in doubt, please utilize one of the resources above for guidance. 15
  • 16. Polling Question #3 Where are the DOD Hotline posters located? a) On Cruiser b) In the 4th floor Café c) In the galley on every floor d) All of the above 16
  • 17. 25% 25% 25% 25% What is the best response? 1. Answer a 2. Answer b 3. Answer c 4. Answer d 17 0
  • 18. 18 Department of Defense (DOD) Hotline • CNA has a responsibility to guard against labor fraud and waste. • The DOD established this hotline for employees who work on government contracts to report fraud, waste or abuse without fear of reprisal.  (800) 424-9098  Email: hotline@dodig.osd.mil  Internet: http:www.dodig.osd.mil/hotline
  • 19. 19 DCAA Floor Check Audit Defense Contract Audit Agency (DCAA) provides audit oversight for the government on our timekeeping practices. DCAA auditors periodically perform unannounced physical observations of work areas and make inquiries of employees known as a Floor Check. • Employees are randomly selected for an interview – If selected, an employee cannot alert other employees that a floor check audit is in progress. • CFO personnel will escort the auditors to every employee interview, but cannot speak unless permitted
  • 20. 20 DCAA Floor Check Audit (cont’d) • The scope of the floor check audit is to determine if an employee: – Is actually at work & performing job/project related tasks – Charging time to the appropriate charge code – Is familiar with CNA’s timekeeping policies/procedures – Knows what resources are available and where to locate them
  • 21. 21 DCAA Floor Check FAQs • How often do you record your time? • When was your last timekeeping training class? • Do you know where you can find information on timekeeping policies and procedures? • Who provides you the tasks that you are currently supporting and the related charge numbers? • Did you provide a reason for recording time to a previous work day? • Do you ever temporarily charge time to a code with the intention of correcting it later? • If you knew of an instance of time mischarging, who would you contact? • Where are the DOD Hotline posters located? **Only answer the auditor’s specific question. Do not feel obligated to provide an answer if you’re not sure**
  • 23. Polling Question #4 If an employee attends a Soapbox, how should they charge their time? a) As time to the project b) As training & development c) Don’t charge anything – it was during lunch 23
  • 24. 33% 33% 33% What’s the best response? 1. Answer a 2. Answer b 3. Answer c 24 0
  • 25. Timekeeping Scenario 1 of 6 25 Response All CNA employees are encouraged to attend soapboxes. But whether you charge direct vs. indirect would depend on your circumstances.  Direct – project related  Indirect – training & development  Lunchtime – personal interest 4.5.2.2 Timekeeping standards and guidelines – General Research managers at all levels as well as analysts, project administrators, secretaries, editors, programmers, research assistants, librarians, and graphic artists should use direct charge numbers (including numbers for general concept development & project development) for such activities as: • Performing research and related activities (e.g., literature searches, data collection, data reduction, programming, preparation of proposals for the “core” FFRDC program, project oversight and administration by a project director or team leader) • Preparing papers, reports, and briefings—or contributing to their preparation by typing, creating graphs, proofreading, editing, etc. • Discussing current research (ideas, plans, progress, results) 1. with other employees, consultants, and subcontractors whether or not they are assigned formally to the project 2. with a group of peers or managers at any type of meeting 3. with clients, other outside groups, and the Board of Trustees or any of its members or committees • Reviewing project papers, reports, and briefings in any stage of preparation • Doing professional reading related to the development or execution of a research project • Acquiring beneficial knowledge and skills through training activities that are charged directly.
  • 26. Polling Question #5 Two employees are traveling for a site visit for a study. Employee A charges the travel time from the time he leaves his house to go to the airport through arrival at the hotel and any additional time that day spent on work (confirming meetings, reviewing emails, etc.). Employee B chooses not to charge all of the time on travel because he slept on the flight and doesn’t feel that time should be charged to the study. 26
  • 27. Polling Question #5 (cont’d) Who is properly calculating their travel time? a) Employee A b) Employee B c) Neither, because the client will not reimburse for it 27
  • 28. 33% 33% 33% What’s the best response? 1. Answer a 2. Answer b 3. Answer c 28 0
  • 29. Timesheet Scenario 2 of 6 29 Response Employee A is correct. The employee would not have been on the flight otherwise. However, employees are encouraged to maximize their time and be as productive as possible. 4.5.2.2 Timekeeping standards and guidelines – Business travel time The outgoing leg of business travel begins when you leave your home or office and ends on arrival at your initial destination (e.g., hotel or military installation). Once you've reached your destination, time is not chargeable until you are actively attempting to accomplish work. The return leg of business travel begins when you leave your hotel or site being visited and ends on arrival at your home or office. Examples of chargeable activities during business travel include drive to the airport, waiting at the airport to leave, flying or driving to destination, reviewing meeting notes prior to or after meetings, and attendance at work activities. Examples of activities not chargeable are personal recreation and routines such as exercising, meal breaks, unpacking, and packing. Travel time includes delays and layovers, to the extent time is actually spent traveling. If the delay or layover spans more than one day, all time may not be chargeable. For example, if you check into a hotel during a delay or layover, time spent at the hotel taking care of personal business is not chargeable. Examples include showering, sleeping, exercising, or eating meals. Travel to the hotel and back to the airport to catch the flight at its scheduled departure is chargeable as business travel time.
  • 30. Polling Question #6 Two analysts visit a US Navy command to update their sponsor on their project. They arrive at 0700 and attend two daily briefings (not directly related to their project). Afterwards, the Field Rep says the Admiral will see the CNA team in the afternoon. Analyst A goes to lunch with the Rep and members of Navy staff, while Analyst B returns to the hotel to check email. They reconvene at 1400, but the Admiral pushes the meeting until 1500. At 1730 they wrap for the day, but run into a potential sponsor and decide to go to dinner which lasts until 2000. 30
  • 31. Polling Question #6 How much of the their time is chargeable? a)Both analysts can charge direct for the mornings hours b)Analyst B’s lunch time may be direct if email correspondence is related to a specific project and adds value to the sponsor c)Dinner may be a seen as marketing if discussions with the potential sponsor result in future business opportunities d)All of the above are correct 31
  • 32. 25% 25% 25% 25% What’s the best response? 1. Answer a 2. Answer b 3. Answer c 4. Answer d 32 0
  • 33. Appendix: Timesheet Scenarios 3 of 6 33 Response Answer D, all of the above. The reason for the business meeting was to report on project status, therefore, any related hours should be charged directly to the project. The analysts were prepared and ready to present upon arrival, but scheduling changes delayed the meeting. Unless the analysts were able to perform other project tasks (i.e. emails, conference calls, review deliverables), their time should be charged to the sponsor’s project. • The morning hours are chargeable as direct, because the employees traveled and made themselves available for the meeting. • The afternoon hours may be treated differently depending on the circumstances: Analyst A – the lunch may be deemed as either a business meal or personal depending on the nature of the conversation. Analyst B – the time checking & responding to email may be chargeable as direct, if it relates to a specific project and adds value to the customer/sponsor. • The dinner may be defined as a marketing effort since it was with a “potential sponsor” that may result in future business opportunities.
  • 34. Polling Question #7 An analyst is being sent overseas to an exercise. When the exercise is done, there will be a few days of down time, and then a second exercise they are supporting (for the same project) will begin. Rather than bring them home after the first exercise ends and then send them back again, they will stay until the second exercise begins. The cost of the travel time, airfare, lodging & per diem is more expensive than just leaving them in place. 34
  • 35. Polling Question #7 Should the analyst record any leave while they are waiting for the second exercise to begin? a)No, all their time is chargeable to the projects b)Yes, only the hours that were legitimately taken 35
  • 36. 50% 50% What’s the best response? 1. Answer a 2. Answer b 36 0
  • 37. Timesheet Scenario 4 of 6 37 Response Answer B is correct. Employee should not charge leave unless it was legitimately taken. Since it was not cost beneficial for the employee to come home and then return, they should treat this situation like a travel layover. Since the employee was assigned to support both efforts, they can in essence charge a proportionate share as travel time to each project and document in the comment section of the timesheet. The employee should not charge 24 hours per day, because not all travel time is chargeable (i.e. personal activities) as defined in Section 4.5.2.2 of the policy manual. But, if the employee has the ability performed some other work, they are encouraged to maximize any downtime and be as productive as possible.
  • 38. Polling Question #8 If a salary employee worked over 100 hours on a project during a biweekly period, how should they record their time? a)Only record 80 hours b)Record all hours worked to that project c)Only record the hours that can be covered by remaining project funding 38
  • 39. 33% 33% 33% What’s the best response? 1. Answer a 2. Answer b 3. Answer c 39 0
  • 40. Timesheet Scenario 5 of 6 40 Response Answer B is correct. We have a Total Time Accounting policy, so employees must record all hours worked. The time charged to work must reflect the work actually performed without regard to budgetary restrictions or other financial considerations. The labor costs are proportionately allocated to projects at the effective rate.
  • 41. Polling Question #9 A couple of CNA’ers meet over lunch only to discuss a particular project. This time is considered work and is chargeable to the project. a)TRUE b)FALSE 41
  • 42. 50% 50% What’s the best response? 1. Answer a 2. Answer b 42 0
  • 43. Timesheet Scenario 6 of 6 43 Management Response Answer is TRUE. A lunch may be deemed as either a business or personal depending on the original intent or outcome.  If lunch was the only available slot to meet regarding an issue/topic, then it may be considered business meal.  If the lunch conversation is general and not specific to work, then it would be considered personal. The amount of time chargeable to project is subjective, so the employee should consider how much of the conversation added value to a project and its final objective.
  • 44. Questions If you have any questions, please contact one of the following individuals: Scott Teng ext. 2890, Timesheet Administrator Tiffany Poindexter ext. 2378, Timesheet Amendments Yolanda Brooks ext. 2987, Timekeeping Compliance 44