SlideShare a Scribd company logo
1 of 27
INDIRA PARYAVARAN BHAWAN
Jor Bagh , New Delhi
BY: MOHIT PANCHAL & RIYA MAJOKA
INTRODUCTION:
• THIS IS A PROJECT OF MINISTRY OF
ENVIRONMENT AND FORESTS FOR
CONSTRUCTION OF NEW OFFICE
BUILDING AT NEW DELHI.
• THE BASIC DESIGN CONCEPT OF
THE PROJECT IS TO MAKE THE NET
ZERO ENERGY GREEN BUILDING.
• PLOT AREA:9565sq m
• MAXIMUM GROUND
COVERAGE:30%
• F.A.R:200
• HEIGHT:35m
• Built-up area : 3,1400 m2
• (18726 m2 – superstructure &
12675 m2- Basement)
• Year of completion : 2013
LOCATION AND ACCESSIBILITY:
PRIMARYROAD
(AUROBINDOMARG)
• THE SITE IS SURROUNDED ON EAST BY NDMC HOUSING AND 15M. ROW, ON WEST BY
12M ROW AND ON NORTH LODHI COLONY AND 12M. ROW, ON SOUTH GPRA COLONY
OF ALIGANJ.
• THE PLOT IS EASILY APPROACHABLE FROM AUROBINDO MARG AND LODHI ROAD.
• A METRO STATION "JORBAGH" IS AT WALKABLE DISTANCE OF ABOUT 300M FROM THIS
PLACE.
ACHIEVEMENTS:
• 40% SAVINGS IN ENERGY
• ZERO ELECTRICITY BILLING
• 55% SAVINGS IN WATER
• ZERO NET DISHARGE
• LARGEST ROOF TOP SOLAR
POWER SYSTEM IN ANY
MULTISTOREYED BUILDING
(930KWP)
• FIRST IN GOVERNMENT SECTOR
TARGETED FOR BOTH RATINGS OF
GREEN BUILDING (5STAR GRIHA
LEED
India PLATINUM)
CRITERIONS OF GRIHA FULFILLED
SITE PLANNING
NO. CRITERION POINTS
1 Site selection 1
2 Preserve and protect landscape during construction 5
3 Soil conservation (till post-construction) 2
4 Design to include existing site features 4
5 Reduce hard paving on-site and/or provide shaded 2
hard-paved surfaces
6 Enhance outdoor lighting system efficiency and 3
use renewable energy system for meeting outdoor
lighting requirements
7 Plan utilities efficiently and optimize on-site
circulation efficiency
3
SOURCE: GRIHAWEBSITE
MEASURES FOR SITE
• Wider Front Setback (22m) to protect front tree line
• Preserve the integrity of the green street
• Preservation of the local ecology, Tree Cutting approvals for 46, but only 19
cut
• - 11 Trees Transplanted
• - Excavated Soil reutilized at other construction sites and the Zoo
•The IPB office building for the ministry of
environment and forests has been planned in 2
parallel blocks facing the
•north south direction, with a large linear
open court in the centre.The Building blocks
create a porous block form to optimize
•air movement throughout the site and the N-
S orientation allows for optimum solar access
and shading.
•EFFECTIVE VENTILATION BY ORIENTATING THE BUILDING E-W AND BY OPTIMUM
INTEGRATION WITH NATURE BY SEPARATING OUT DIFFERENT BLOCKS WITH CONNECTING
CORRIDORS AND A HUGE CENTRAL COURT YARD.
E W
N
•More than 50% area outside
the building issoft
with plantation and grassing.
•circulation roads and pathways
soft with grass paver blocks
to enable ground water recharge
BUILDING PLANNING AND CONSTRUCTION STAGE
NO. CRITERION POINTS
10 Reduce landscape water requirement 3
11 Reduce water use in the building 2
12 Efficient water use during construction 1
13 Optimize building design to reduce conventional
energy demand
8
14 Optimize energy performance of building within
specified comfort limits
16
15 Utilization of fly-ash in building structure 6
16 Reduce volume, weight, and construction time by
adopting efficient technologies (such as pre-cast systems)
4
SOURCE: GRIHAWEBSITE
BUILDING PLANNING AND CONSTRUCTION MEASURES
Reduce landscape water requirement-
•Drip irrigation
•Use of native species of shrubs and trees having low water demand in landscaping
•Low lawn area so as to reduce water demand.
•Reuse of treated water for irrigation
Reduce water use in the building-
•Low discharge fixtures
•Dual Flushing cistern
•Waste water treatment
•Reuse of treated water for irrigation and cooling towers for HVAC
•Rain water harvesting
Efficient water use during construction-
•Use of curing compound
Site and Water Mgmt Strategies
Appropriate Shading from Summer Sun, while allowing in winter sun
Optimize building design to reduce conventional energydemand.-
• ENERGY EFFICIENT LIGHT FITTINGS TO REDUCE ENERGY DEMAND
• PART CONDENSER WATER HEAT REJECTION BY GEOTHERMAL MECHANISM. THIS WILL ALSO
HELP IN WATER CONSERVATION IN COOLING TOWERS FOR HVAC SYSTEM
• VARIABLE CHILLED WATER PUMPING SYSTEM THROUGH VFD.VFD ON COOLING TOWERS
FANS AND AHU.
• PRE COOLING OF FRESH AIR FROM TOILET EXHAUST AIR THROUGH SENSIBLE & LATENT
HEAT ENERGY RECOVERY WHEEL
• ENTIRE HOT WATER GENERATION THROUGH SOLAR PANELS.
• MAXIMUM DAYLIGHTING
• REGENERATIVE LIFTS.
• USE OF LUX LEVEL SENSOR TO OPTIMIZE OPERATION OF ARTIFICIAL LIGHTING.
• SOLAR POWERED EXTERNAL LIGHTING.
Optimize energy performance of building within
specified comfort limits-
• Reducing energy consumption (compared to GRIHA benchmarks) while
maintaining occupant comfort:
• o For achieving visual comfort:
• • Direct line of sight to the outdoor environment to vision glazing for building
occupants for more than 90% of the occupied spaces.
• Avoiding Deep floor plates to create maximum daylighted spaces.
• • Landscaping planned with native species and water body features in central
court and all around the building.
• o For achieving thermal comfort:
• • All circulation spaces or passages were naturally ventilated / shaded / not air
conditioned.
• • Energy Efficient Chilled beam based Cooling system proposed together with
condenser water cooling through ground pipes.
• • Openable windows were proposed in conditioned areas to be able to utilize
favourable outdoor conditions.
• • Insulated Walls through using an integrated AAC + Rockwool combination
together with high efficiency DGU’s and UPVC
• frames for the windows.
Energy Conservation Measures
NO. CRITERION POINTS
17 Use low-energy material in interiors 4
18 Renewable energy utilization 5
19 Renewable-energy-based hot water system 3
20 Waste water treatment 2
21 Water recycle and reuse (including rainwater) 5
RECYCLE,RECHARGE &REUSE
WASTE MANAGEMENT
NO. CRITERION POINTS
22 Reduction in waste during construction 1
23 Efficient waste segregation 1
24 Storage and disposal of wastes 1
25 Resource recovery from waste 2
SOURCE: GRIHAWEBSITE
SOURCE: GRIHAWEBSITE
HEALTH &WELL BEING
NO. CRITERION POINTS
26 Use low-VOC paints/adhesives/sealants 3
27 Minimize ozone depleting substances 1
28 Ensure water quality 2
29 Acceptable outdoor and indoor noise levels 2
30 Tobacco smoke control 1
31 Provide at least the minimum level of accessibility for persons
with disabilities
1
32 Energy audit and validation MANDATORY
33 Operation and maintenance 2
34 Innovation points 4
SOURCE: GRIHAWEBSITE
19
ENERGY SCENARIO
(Average Annual)
Power Requirement (Base
Case)
22.0 lakh KWh
Power Requirement(Design
Case)
13.6 lakh KWh
Percentage savings
40% (approx)
Targeted Solar Power
Generation
14.3 lakh KWh
Net Power generation
0.7 lakh KWh
(Surplus)
20
Energy Efficiency
ECBC 2007 ACTUAL
Lighting Power
Density (LPD)
11.8 W/sqm 5 W/sqm
HVAC load 20 sqm/Tr 40 sqm/Tr
Total 100W/sqm 40 W/sqm
SOURCE- AR,DEEPENDRA PARSAAD REPORT
20
SOLAR PV SYSTEM
TOTAL AREA
TOTAL AREA OF PANELS
ANNUAL ENERGY Generation
930KWp CAPACITY
6000 M2
4650 M2
14.3 lakh units
Highest efficiency (20%) Solar PV panels
Grid Interactive System
NET ZERO ENERGY
CHILLED BEAMS INDUCTION
UNITS OVERVIEW:
Chilled Water
Hot Water
Total room mixing
is achieved
through
Convection
currents
within the space
Primary air ventilation
from Dedicated Outdoor
Air Source
CHILLED BEAM INSTALLED
AT SITE:
23
Flexible Duct (6 Inch dia.)
Chilled Beam
Drain Pipe (¾” dia.)
Chilled Water Supply Pipe (½” dia.)
Chilled Water Return Pipe (½” dia.)
Supply
Air
Induce
dAir
ANGEGEOTHERMAL HEAT EXCH
AT SITE:• There are 180 vertical bores at the
Depth of 80 meter all along the
Building Premises. Minimum 3
meter distance is maintained
between any two bores.
• Each bore is lowered with HDPE
pipe U-loop (32mm outer Dia.) and
grouted with Bentonite Slurry.
• Each U-Loop is connected to MS
Header Pipe(100mm Dia.)which
finally joins the Condenser Water
Line in Plant Room.
• Condenser hot water is sent at
100°F (37.8° C) & back at 900 F
(32.2° C).
• One U-Loop has 0.9 TR Heat
Rejection capacity, so all together
160 TR of Heat rejection is obtained
without using a cooling tower.
• Enormous water saving since no
make up water is required.
• • Make up water pumping &
treatment cost get eliminated.
• • Saves cooling tower fan energy.
MATERIALS
•Stone available in nearby area for flooring
•Terrazzo flooring with locally available stone
materials.
•Fly ash brick.
•AAC blocks.
•Jute bamboo composite for door frames &
shutters.
•UPVC windows with hermetically sealed double
using low heat transmittance index glass.
•Use of high reflectance terrace tiles for low heat
ingress.
•Avoided aluminum as it has high embedded
energy
•Sandstone Jalis.
• Stone and Ferrocement Jalis
Satisfies all the quality parameters that
a normal flush door does
•Bamboo Jute Composite Doors and frames & flooring
• High Efficiency Glass, high VLT,low SHGC & Low U-value,
•Optimized by shading
• Light Shelves for bringing in diffused sunlight
•Use of material available having Recycled content

More Related Content

What's hot

Climate responsive Contemporary architecture
Climate responsive Contemporary architectureClimate responsive Contemporary architecture
Climate responsive Contemporary architectureShreerang Bhagat
 
Vernacular architecture case study with examples
Vernacular architecture case study with examplesVernacular architecture case study with examples
Vernacular architecture case study with examplesVISHAKA BOTHRA
 
Secretariat building, chandigarh
Secretariat building, chandigarhSecretariat building, chandigarh
Secretariat building, chandigarhSagar Panchal
 
Passive Architecture Case Examples
Passive Architecture Case ExamplesPassive Architecture Case Examples
Passive Architecture Case ExamplesHarpreet Oberoi
 
Indira Paryawaran Bhawan
  Indira Paryawaran Bhawan  Indira Paryawaran Bhawan
Indira Paryawaran BhawanshreyaGupta396
 
Sheikh sarai housing complex
Sheikh sarai housing complexSheikh sarai housing complex
Sheikh sarai housing complexHarshita Singh
 
Low Cost Housing India
Low Cost Housing IndiaLow Cost Housing India
Low Cost Housing IndiaRohan Zagade
 
Hot and dry climate case study.
Hot and dry climate case study.Hot and dry climate case study.
Hot and dry climate case study.chetna rana
 
Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Amir Azhar
 
sustainable housing case study
sustainable housing case studysustainable housing case study
sustainable housing case studyAr. Prerna Chouhan
 
Case study selaqui school doon
Case study selaqui school doonCase study selaqui school doon
Case study selaqui school doonDeepikaAgarwal42
 
composite climate low cost techniques
composite climate low cost techniques composite climate low cost techniques
composite climate low cost techniques Amit Singh
 
Cold and Cloudy climatic region
Cold and Cloudy climatic regionCold and Cloudy climatic region
Cold and Cloudy climatic regionM.I.T.,AURANGABAD
 
Vernacular architecture and factors
Vernacular architecture and factorsVernacular architecture and factors
Vernacular architecture and factorsayushi04j
 
Tara housing by Charles correa
Tara housing by Charles correa Tara housing by Charles correa
Tara housing by Charles correa Sonali Shah
 
Architectural Appraisal - CII- Sohrabji Godrej Green Business Centre Hyderabad
Architectural Appraisal  - CII- Sohrabji Godrej Green Business Centre HyderabadArchitectural Appraisal  - CII- Sohrabji Godrej Green Business Centre Hyderabad
Architectural Appraisal - CII- Sohrabji Godrej Green Business Centre HyderabadPrastara Architects
 
Need of climate responsive measures for buildings
Need of climate responsive measures for buildingsNeed of climate responsive measures for buildings
Need of climate responsive measures for buildingsSukhneet Kaur
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architectureAbhishek Tiwari
 
Architect Ashok B Lall
Architect Ashok B LallArchitect Ashok B Lall
Architect Ashok B Lallanjali s
 

What's hot (20)

Climate responsive Contemporary architecture
Climate responsive Contemporary architectureClimate responsive Contemporary architecture
Climate responsive Contemporary architecture
 
Vernacular architecture case study with examples
Vernacular architecture case study with examplesVernacular architecture case study with examples
Vernacular architecture case study with examples
 
Secretariat building, chandigarh
Secretariat building, chandigarhSecretariat building, chandigarh
Secretariat building, chandigarh
 
Passive Architecture Case Examples
Passive Architecture Case ExamplesPassive Architecture Case Examples
Passive Architecture Case Examples
 
Indira Paryawaran Bhawan
  Indira Paryawaran Bhawan  Indira Paryawaran Bhawan
Indira Paryawaran Bhawan
 
Sheikh sarai housing complex
Sheikh sarai housing complexSheikh sarai housing complex
Sheikh sarai housing complex
 
Low Cost Housing India
Low Cost Housing IndiaLow Cost Housing India
Low Cost Housing India
 
Hot and dry climate case study.
Hot and dry climate case study.Hot and dry climate case study.
Hot and dry climate case study.
 
Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)
 
sustainable housing case study
sustainable housing case studysustainable housing case study
sustainable housing case study
 
Case study selaqui school doon
Case study selaqui school doonCase study selaqui school doon
Case study selaqui school doon
 
Ews housing (2)
Ews housing (2)Ews housing (2)
Ews housing (2)
 
composite climate low cost techniques
composite climate low cost techniques composite climate low cost techniques
composite climate low cost techniques
 
Cold and Cloudy climatic region
Cold and Cloudy climatic regionCold and Cloudy climatic region
Cold and Cloudy climatic region
 
Vernacular architecture and factors
Vernacular architecture and factorsVernacular architecture and factors
Vernacular architecture and factors
 
Tara housing by Charles correa
Tara housing by Charles correa Tara housing by Charles correa
Tara housing by Charles correa
 
Architectural Appraisal - CII- Sohrabji Godrej Green Business Centre Hyderabad
Architectural Appraisal  - CII- Sohrabji Godrej Green Business Centre HyderabadArchitectural Appraisal  - CII- Sohrabji Godrej Green Business Centre Hyderabad
Architectural Appraisal - CII- Sohrabji Godrej Green Business Centre Hyderabad
 
Need of climate responsive measures for buildings
Need of climate responsive measures for buildingsNeed of climate responsive measures for buildings
Need of climate responsive measures for buildings
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architecture
 
Architect Ashok B Lall
Architect Ashok B LallArchitect Ashok B Lall
Architect Ashok B Lall
 

Viewers also liked

Indira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaIndira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaAnchal Garg
 
Indira paryavaran bhawan-Photo Essay on the green initiatives taken
Indira paryavaran bhawan-Photo Essay on the green initiatives taken Indira paryavaran bhawan-Photo Essay on the green initiatives taken
Indira paryavaran bhawan-Photo Essay on the green initiatives taken GRIHA India
 
Architectural design
Architectural designArchitectural design
Architectural designSunita Sinha
 
VVIP Circuit House Pune
VVIP Circuit House PuneVVIP Circuit House Pune
VVIP Circuit House PuneGRIHA India
 
Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Rupesh Chaurasia
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Vinay M
 
Vvip Addresses Raj Nagar Extension Go to : www.Flats4free.com
Vvip Addresses Raj Nagar Extension  Go to : www.Flats4free.comVvip Addresses Raj Nagar Extension  Go to : www.Flats4free.com
Vvip Addresses Raj Nagar Extension Go to : www.Flats4free.comD C
 
Green building, MSU students
Green building, MSU studentsGreen building, MSU students
Green building, MSU studentsNilesh Kachot
 
Shanghai tower(Sustainability specifications )
Shanghai tower(Sustainability specifications )Shanghai tower(Sustainability specifications )
Shanghai tower(Sustainability specifications )MOHIT PANCHAL
 
Energy efficiency in Green Building
Energy efficiency in Green BuildingEnergy efficiency in Green Building
Energy efficiency in Green Buildingshiva prakash
 
TERI -BANGLORE_Case study
TERI -BANGLORE_Case study TERI -BANGLORE_Case study
TERI -BANGLORE_Case study Ar Naveen Naveen
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGgatti Teja
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Centerbaburajiv2007
 

Viewers also liked (20)

Indira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaIndira paryavaran bhawan and griha
Indira paryavaran bhawan and griha
 
Indira paryavaran bhawan-Photo Essay on the green initiatives taken
Indira paryavaran bhawan-Photo Essay on the green initiatives taken Indira paryavaran bhawan-Photo Essay on the green initiatives taken
Indira paryavaran bhawan-Photo Essay on the green initiatives taken
 
Architectural design
Architectural designArchitectural design
Architectural design
 
VVIP Circuit House Pune
VVIP Circuit House PuneVVIP Circuit House Pune
VVIP Circuit House Pune
 
Teri
TeriTeri
Teri
 
Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
 
projects
projectsprojects
projects
 
Vvip Addresses Raj Nagar Extension Go to : www.Flats4free.com
Vvip Addresses Raj Nagar Extension  Go to : www.Flats4free.comVvip Addresses Raj Nagar Extension  Go to : www.Flats4free.com
Vvip Addresses Raj Nagar Extension Go to : www.Flats4free.com
 
Green building, MSU students
Green building, MSU studentsGreen building, MSU students
Green building, MSU students
 
Shanghai tower(Sustainability specifications )
Shanghai tower(Sustainability specifications )Shanghai tower(Sustainability specifications )
Shanghai tower(Sustainability specifications )
 
The statesman
The statesmanThe statesman
The statesman
 
Elderly Care Dissertation(Gautam)
Elderly Care Dissertation(Gautam)Elderly Care Dissertation(Gautam)
Elderly Care Dissertation(Gautam)
 
GRIHA
GRIHAGRIHA
GRIHA
 
Energy efficiency in Green Building
Energy efficiency in Green BuildingEnergy efficiency in Green Building
Energy efficiency in Green Building
 
TERI -BANGLORE_Case study
TERI -BANGLORE_Case study TERI -BANGLORE_Case study
TERI -BANGLORE_Case study
 
Teri
Teri Teri
Teri
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDING
 
Presentation on lic of india
Presentation on lic of indiaPresentation on lic of india
Presentation on lic of india
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
 

Similar to Paryavaran bhawan

Indira paryavaran bhawan
 Indira paryavaran bhawan Indira paryavaran bhawan
Indira paryavaran bhawanShamitha Reddy
 
casestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdfcasestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdfBossGold
 
casestudyonpassivecoolingandheating-200404053837.pdf
casestudyonpassivecoolingandheating-200404053837.pdfcasestudyonpassivecoolingandheating-200404053837.pdf
casestudyonpassivecoolingandheating-200404053837.pdfBossGold
 
casestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdfcasestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdfBossGold
 
Case study on passive cooling and heating
Case study on passive cooling and heatingCase study on passive cooling and heating
Case study on passive cooling and heatingShubhamJangra15
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research PresentationSerra's Art Studio
 
Green Building in India with Case Study
Green Building in India with Case StudyGreen Building in India with Case Study
Green Building in India with Case StudyAjayashKekan
 
Sustainable Development in Architecture
Sustainable Development in ArchitectureSustainable Development in Architecture
Sustainable Development in ArchitectureGargi Bhatele
 
Sustainable Architecture Assignment-Nizya1.pptx
Sustainable Architecture Assignment-Nizya1.pptxSustainable Architecture Assignment-Nizya1.pptx
Sustainable Architecture Assignment-Nizya1.pptxneemanizya
 
Rosedalefacts
RosedalefactsRosedalefacts
Rosedalefactskaufnic
 
Bullitt center ,seattle
Bullitt center ,seattleBullitt center ,seattle
Bullitt center ,seattleApurwa Kumari
 
Leed rating system with case study
Leed rating system with case studyLeed rating system with case study
Leed rating system with case studyInu shakya
 
Green bldgs 19 12 16
Green bldgs 19 12 16Green bldgs 19 12 16
Green bldgs 19 12 16Usha Batra
 
Osquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTOsquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTAnthony Osibajo
 
Case Study on Infinity Benchmark, Kolkata
Case Study on Infinity Benchmark, KolkataCase Study on Infinity Benchmark, Kolkata
Case Study on Infinity Benchmark, KolkataGeetika Singla
 

Similar to Paryavaran bhawan (20)

SUSTAINABLE BUILDING.pptx
SUSTAINABLE BUILDING.pptxSUSTAINABLE BUILDING.pptx
SUSTAINABLE BUILDING.pptx
 
Indira paryavaran bhawan
 Indira paryavaran bhawan Indira paryavaran bhawan
Indira paryavaran bhawan
 
Green certified buildings
Green certified buildingsGreen certified buildings
Green certified buildings
 
casestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdfcasestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdf
 
casestudyonpassivecoolingandheating-200404053837.pdf
casestudyonpassivecoolingandheating-200404053837.pdfcasestudyonpassivecoolingandheating-200404053837.pdf
casestudyonpassivecoolingandheating-200404053837.pdf
 
casestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdfcasestudyonpassivecoolingandheating-200404053837 (2).pdf
casestudyonpassivecoolingandheating-200404053837 (2).pdf
 
Case study on passive cooling and heating
Case study on passive cooling and heatingCase study on passive cooling and heating
Case study on passive cooling and heating
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research Presentation
 
Green Building in India with Case Study
Green Building in India with Case StudyGreen Building in India with Case Study
Green Building in India with Case Study
 
Sustainable Development in Architecture
Sustainable Development in ArchitectureSustainable Development in Architecture
Sustainable Development in Architecture
 
Sustainable Architecture Assignment-Nizya1.pptx
Sustainable Architecture Assignment-Nizya1.pptxSustainable Architecture Assignment-Nizya1.pptx
Sustainable Architecture Assignment-Nizya1.pptx
 
Rosedalefacts
RosedalefactsRosedalefacts
Rosedalefacts
 
Bullitt center ,seattle
Bullitt center ,seattleBullitt center ,seattle
Bullitt center ,seattle
 
Sangath Architect Studio
Sangath Architect StudioSangath Architect Studio
Sangath Architect Studio
 
GREEN BUILDING.pdf
GREEN BUILDING.pdfGREEN BUILDING.pdf
GREEN BUILDING.pdf
 
Leed rating system with case study
Leed rating system with case studyLeed rating system with case study
Leed rating system with case study
 
Green bldgs 19 12 16
Green bldgs 19 12 16Green bldgs 19 12 16
Green bldgs 19 12 16
 
Osquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTOsquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECT
 
Case Study on Infinity Benchmark, Kolkata
Case Study on Infinity Benchmark, KolkataCase Study on Infinity Benchmark, Kolkata
Case Study on Infinity Benchmark, Kolkata
 
BREEAM
BREEAMBREEAM
BREEAM
 

More from MOHIT PANCHAL

Correlation and regression
Correlation and regressionCorrelation and regression
Correlation and regressionMOHIT PANCHAL
 
Fibre reinforced concrete
Fibre reinforced concreteFibre reinforced concrete
Fibre reinforced concreteMOHIT PANCHAL
 
Sustainable transport planning
Sustainable transport planning Sustainable transport planning
Sustainable transport planning MOHIT PANCHAL
 
MATERIALS FOR REPAIR
MATERIALS FOR REPAIRMATERIALS FOR REPAIR
MATERIALS FOR REPAIRMOHIT PANCHAL
 
KNOWLEDGE BASED MODEL FOR SUSTAINABLE HOUSING RENOVATION
KNOWLEDGE BASED MODEL FOR SUSTAINABLE HOUSING RENOVATIONKNOWLEDGE BASED MODEL FOR SUSTAINABLE HOUSING RENOVATION
KNOWLEDGE BASED MODEL FOR SUSTAINABLE HOUSING RENOVATIONMOHIT PANCHAL
 
BARRIERS TO COMMUNICATION
BARRIERS TO COMMUNICATIONBARRIERS TO COMMUNICATION
BARRIERS TO COMMUNICATIONMOHIT PANCHAL
 
law of marginal benefit
law of marginal benefitlaw of marginal benefit
law of marginal benefitMOHIT PANCHAL
 
Facility management safety
Facility management  safetyFacility management  safety
Facility management safetyMOHIT PANCHAL
 
information technology
information technologyinformation technology
information technologyMOHIT PANCHAL
 

More from MOHIT PANCHAL (13)

Correlation and regression
Correlation and regressionCorrelation and regression
Correlation and regression
 
Aquisition
AquisitionAquisition
Aquisition
 
Fibre reinforced concrete
Fibre reinforced concreteFibre reinforced concrete
Fibre reinforced concrete
 
Sustainable transport planning
Sustainable transport planning Sustainable transport planning
Sustainable transport planning
 
MATERIALS FOR REPAIR
MATERIALS FOR REPAIRMATERIALS FOR REPAIR
MATERIALS FOR REPAIR
 
KNOWLEDGE BASED MODEL FOR SUSTAINABLE HOUSING RENOVATION
KNOWLEDGE BASED MODEL FOR SUSTAINABLE HOUSING RENOVATIONKNOWLEDGE BASED MODEL FOR SUSTAINABLE HOUSING RENOVATION
KNOWLEDGE BASED MODEL FOR SUSTAINABLE HOUSING RENOVATION
 
BARRIERS TO COMMUNICATION
BARRIERS TO COMMUNICATIONBARRIERS TO COMMUNICATION
BARRIERS TO COMMUNICATION
 
Smart city
Smart city Smart city
Smart city
 
law of marginal benefit
law of marginal benefitlaw of marginal benefit
law of marginal benefit
 
Facility management safety
Facility management  safetyFacility management  safety
Facility management safety
 
Mall managment
Mall managment Mall managment
Mall managment
 
information technology
information technologyinformation technology
information technology
 
Project cash flow
Project cash flowProject cash flow
Project cash flow
 

Recently uploaded

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 

Recently uploaded (20)

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 

Paryavaran bhawan

  • 1. INDIRA PARYAVARAN BHAWAN Jor Bagh , New Delhi BY: MOHIT PANCHAL & RIYA MAJOKA
  • 2. INTRODUCTION: • THIS IS A PROJECT OF MINISTRY OF ENVIRONMENT AND FORESTS FOR CONSTRUCTION OF NEW OFFICE BUILDING AT NEW DELHI. • THE BASIC DESIGN CONCEPT OF THE PROJECT IS TO MAKE THE NET ZERO ENERGY GREEN BUILDING. • PLOT AREA:9565sq m • MAXIMUM GROUND COVERAGE:30% • F.A.R:200 • HEIGHT:35m • Built-up area : 3,1400 m2 • (18726 m2 – superstructure & 12675 m2- Basement) • Year of completion : 2013
  • 3. LOCATION AND ACCESSIBILITY: PRIMARYROAD (AUROBINDOMARG) • THE SITE IS SURROUNDED ON EAST BY NDMC HOUSING AND 15M. ROW, ON WEST BY 12M ROW AND ON NORTH LODHI COLONY AND 12M. ROW, ON SOUTH GPRA COLONY OF ALIGANJ. • THE PLOT IS EASILY APPROACHABLE FROM AUROBINDO MARG AND LODHI ROAD. • A METRO STATION "JORBAGH" IS AT WALKABLE DISTANCE OF ABOUT 300M FROM THIS PLACE.
  • 4. ACHIEVEMENTS: • 40% SAVINGS IN ENERGY • ZERO ELECTRICITY BILLING • 55% SAVINGS IN WATER • ZERO NET DISHARGE • LARGEST ROOF TOP SOLAR POWER SYSTEM IN ANY MULTISTOREYED BUILDING (930KWP) • FIRST IN GOVERNMENT SECTOR TARGETED FOR BOTH RATINGS OF GREEN BUILDING (5STAR GRIHA LEED India PLATINUM)
  • 5.
  • 6. CRITERIONS OF GRIHA FULFILLED SITE PLANNING NO. CRITERION POINTS 1 Site selection 1 2 Preserve and protect landscape during construction 5 3 Soil conservation (till post-construction) 2 4 Design to include existing site features 4 5 Reduce hard paving on-site and/or provide shaded 2 hard-paved surfaces 6 Enhance outdoor lighting system efficiency and 3 use renewable energy system for meeting outdoor lighting requirements 7 Plan utilities efficiently and optimize on-site circulation efficiency 3 SOURCE: GRIHAWEBSITE
  • 7. MEASURES FOR SITE • Wider Front Setback (22m) to protect front tree line • Preserve the integrity of the green street • Preservation of the local ecology, Tree Cutting approvals for 46, but only 19 cut • - 11 Trees Transplanted • - Excavated Soil reutilized at other construction sites and the Zoo •The IPB office building for the ministry of environment and forests has been planned in 2 parallel blocks facing the •north south direction, with a large linear open court in the centre.The Building blocks create a porous block form to optimize •air movement throughout the site and the N- S orientation allows for optimum solar access and shading.
  • 8.
  • 9. •EFFECTIVE VENTILATION BY ORIENTATING THE BUILDING E-W AND BY OPTIMUM INTEGRATION WITH NATURE BY SEPARATING OUT DIFFERENT BLOCKS WITH CONNECTING CORRIDORS AND A HUGE CENTRAL COURT YARD. E W N
  • 10. •More than 50% area outside the building issoft with plantation and grassing. •circulation roads and pathways soft with grass paver blocks to enable ground water recharge
  • 11. BUILDING PLANNING AND CONSTRUCTION STAGE NO. CRITERION POINTS 10 Reduce landscape water requirement 3 11 Reduce water use in the building 2 12 Efficient water use during construction 1 13 Optimize building design to reduce conventional energy demand 8 14 Optimize energy performance of building within specified comfort limits 16 15 Utilization of fly-ash in building structure 6 16 Reduce volume, weight, and construction time by adopting efficient technologies (such as pre-cast systems) 4 SOURCE: GRIHAWEBSITE
  • 12. BUILDING PLANNING AND CONSTRUCTION MEASURES Reduce landscape water requirement- •Drip irrigation •Use of native species of shrubs and trees having low water demand in landscaping •Low lawn area so as to reduce water demand. •Reuse of treated water for irrigation Reduce water use in the building- •Low discharge fixtures •Dual Flushing cistern •Waste water treatment •Reuse of treated water for irrigation and cooling towers for HVAC •Rain water harvesting Efficient water use during construction- •Use of curing compound
  • 13. Site and Water Mgmt Strategies Appropriate Shading from Summer Sun, while allowing in winter sun
  • 14. Optimize building design to reduce conventional energydemand.- • ENERGY EFFICIENT LIGHT FITTINGS TO REDUCE ENERGY DEMAND • PART CONDENSER WATER HEAT REJECTION BY GEOTHERMAL MECHANISM. THIS WILL ALSO HELP IN WATER CONSERVATION IN COOLING TOWERS FOR HVAC SYSTEM • VARIABLE CHILLED WATER PUMPING SYSTEM THROUGH VFD.VFD ON COOLING TOWERS FANS AND AHU. • PRE COOLING OF FRESH AIR FROM TOILET EXHAUST AIR THROUGH SENSIBLE & LATENT HEAT ENERGY RECOVERY WHEEL • ENTIRE HOT WATER GENERATION THROUGH SOLAR PANELS. • MAXIMUM DAYLIGHTING • REGENERATIVE LIFTS. • USE OF LUX LEVEL SENSOR TO OPTIMIZE OPERATION OF ARTIFICIAL LIGHTING. • SOLAR POWERED EXTERNAL LIGHTING.
  • 15. Optimize energy performance of building within specified comfort limits- • Reducing energy consumption (compared to GRIHA benchmarks) while maintaining occupant comfort: • o For achieving visual comfort: • • Direct line of sight to the outdoor environment to vision glazing for building occupants for more than 90% of the occupied spaces. • Avoiding Deep floor plates to create maximum daylighted spaces. • • Landscaping planned with native species and water body features in central court and all around the building. • o For achieving thermal comfort: • • All circulation spaces or passages were naturally ventilated / shaded / not air conditioned. • • Energy Efficient Chilled beam based Cooling system proposed together with condenser water cooling through ground pipes. • • Openable windows were proposed in conditioned areas to be able to utilize favourable outdoor conditions. • • Insulated Walls through using an integrated AAC + Rockwool combination together with high efficiency DGU’s and UPVC • frames for the windows.
  • 17. NO. CRITERION POINTS 17 Use low-energy material in interiors 4 18 Renewable energy utilization 5 19 Renewable-energy-based hot water system 3 20 Waste water treatment 2 21 Water recycle and reuse (including rainwater) 5 RECYCLE,RECHARGE &REUSE WASTE MANAGEMENT NO. CRITERION POINTS 22 Reduction in waste during construction 1 23 Efficient waste segregation 1 24 Storage and disposal of wastes 1 25 Resource recovery from waste 2 SOURCE: GRIHAWEBSITE SOURCE: GRIHAWEBSITE
  • 18. HEALTH &WELL BEING NO. CRITERION POINTS 26 Use low-VOC paints/adhesives/sealants 3 27 Minimize ozone depleting substances 1 28 Ensure water quality 2 29 Acceptable outdoor and indoor noise levels 2 30 Tobacco smoke control 1 31 Provide at least the minimum level of accessibility for persons with disabilities 1 32 Energy audit and validation MANDATORY 33 Operation and maintenance 2 34 Innovation points 4 SOURCE: GRIHAWEBSITE
  • 19. 19 ENERGY SCENARIO (Average Annual) Power Requirement (Base Case) 22.0 lakh KWh Power Requirement(Design Case) 13.6 lakh KWh Percentage savings 40% (approx) Targeted Solar Power Generation 14.3 lakh KWh Net Power generation 0.7 lakh KWh (Surplus)
  • 20. 20 Energy Efficiency ECBC 2007 ACTUAL Lighting Power Density (LPD) 11.8 W/sqm 5 W/sqm HVAC load 20 sqm/Tr 40 sqm/Tr Total 100W/sqm 40 W/sqm
  • 22. 20 SOLAR PV SYSTEM TOTAL AREA TOTAL AREA OF PANELS ANNUAL ENERGY Generation 930KWp CAPACITY 6000 M2 4650 M2 14.3 lakh units Highest efficiency (20%) Solar PV panels Grid Interactive System NET ZERO ENERGY
  • 23. CHILLED BEAMS INDUCTION UNITS OVERVIEW: Chilled Water Hot Water Total room mixing is achieved through Convection currents within the space Primary air ventilation from Dedicated Outdoor Air Source
  • 24. CHILLED BEAM INSTALLED AT SITE: 23 Flexible Duct (6 Inch dia.) Chilled Beam Drain Pipe (¾” dia.) Chilled Water Supply Pipe (½” dia.) Chilled Water Return Pipe (½” dia.) Supply Air Induce dAir
  • 25. ANGEGEOTHERMAL HEAT EXCH AT SITE:• There are 180 vertical bores at the Depth of 80 meter all along the Building Premises. Minimum 3 meter distance is maintained between any two bores. • Each bore is lowered with HDPE pipe U-loop (32mm outer Dia.) and grouted with Bentonite Slurry. • Each U-Loop is connected to MS Header Pipe(100mm Dia.)which finally joins the Condenser Water Line in Plant Room. • Condenser hot water is sent at 100°F (37.8° C) & back at 900 F (32.2° C). • One U-Loop has 0.9 TR Heat Rejection capacity, so all together 160 TR of Heat rejection is obtained without using a cooling tower. • Enormous water saving since no make up water is required. • • Make up water pumping & treatment cost get eliminated. • • Saves cooling tower fan energy.
  • 26. MATERIALS •Stone available in nearby area for flooring •Terrazzo flooring with locally available stone materials. •Fly ash brick. •AAC blocks. •Jute bamboo composite for door frames & shutters. •UPVC windows with hermetically sealed double using low heat transmittance index glass. •Use of high reflectance terrace tiles for low heat ingress. •Avoided aluminum as it has high embedded energy •Sandstone Jalis. • Stone and Ferrocement Jalis Satisfies all the quality parameters that a normal flush door does
  • 27. •Bamboo Jute Composite Doors and frames & flooring • High Efficiency Glass, high VLT,low SHGC & Low U-value, •Optimized by shading • Light Shelves for bringing in diffused sunlight •Use of material available having Recycled content