I N F I N I T Y
BENCHMARK
Geetika Singla
K O L K A T A
Last certified on: August 07, 2009
Certification level: Platinum
Building Envelope
• External walls and roof have high insulation property
• External walls made of brick wall block with 4 inch
expanded polystyrene insulation ACP cladding
• U-factor 0.073 Btu/hr.ft2
• Roof has under deck insulation with 30 mm of rigid
polyurethane foam
• Terrace garden on roof top reduces heat island effect
• Use of overhangs on selected facades reduces the direct
solar gains through glazing.
• High performance glazing catering to 36 of total building
facade
High Performance Glazing
• Double glazed glass units increase energy efficiency of
building
• Less heat ingress into the building
• Better transmission of day light into occupied spaces
• Provides external connectivity to occupants
• Use of overhangs on selected facades reduced direct
solar gain through glazing
• Glass characteristics
1. U Value 2.64 W/m2 K
2. Solar heat gain coefficient 0.2
3. Visual Light transmittance-0.23
Eco-Friendly Energy Efficient Equipment
• Consume 25% less energy
• CFC free refrigerant to avoid ozone depletion
• HVAC equipment has been designed with no
compromise on human comfort levels
• Energy efficient water cooled chillers with CoP value of
6.3
• Primary secondary chilled water pumps with variable
speed drive to economize pump energy
Building Management System
• Optimized energy consumption resulting in operational energy
savings of 15-20%
• Typical examples of energy saving through BMS integration
• Night time purging to cool the building
• Chiller management
• Controlling AHU fan speed and chilled water pumps based on
heat loads
• Temperature, humidity and lighting control
• Monitors and controls indoor comfort condition
• Automatically monitors amount of fresh air that enters the
spaces
• Can also track occupancy status of each zone and accordingly
adjust fresh air flow
• Provides alarm systems so as to take corrective actions
Efficient Lighting
• Use of energy efficient fluorescent lamps (T5s) and
luminaries with high coefficient of utilization
• The interior lighting designed with overall lighting
power density less than 1.0 Watts per sq ft
• Minimized light trespass from the site to increase night
sky access and improve night time visibility
• External lighting designed to reduce the development
impact on nocturnal environments
Eco-Friendly Vehicle Charging
• Provision of 13 electric car charging points
• Reduces pollution and land development impacts from
automobile use
• Cost effective and environment friendly means for
commuting to work
Water Efficient Fixtures
• Consume 40% less water
• Water efficient flow flush fixtures are used in the entire
building
• Reduces burden on municipal water supply and waste
water systems
• Reuse of storm water and treated grey water for non-
potable applications such as toilet, flushing and
irrigation
Waste Collection Segregation
• Reduction of building waste diversion to landfills
• An easily accessible area in each floor is dedicated to the
collection and storage of non hazardous materials
• Separation of dry waste and wet waste materials at
source
• Segregation and storage of dry wastes such as paper,
cardboard, glass, plastics and metals to facilitate
recycling
Indoor Environmental Quality
• Occupants provided with superior indoor air quality
through energy efficient HVAC equipment
• Air conditioned spaces are maintained at 24 degree C
and 50 - 60 relative humidity through out the operation
of building
• CO2 levels and fresh air quantities are continuously
monitored and maintained at a pre-determined value to
enhance the productivity of the occupants
• Adhesives, sealants, paints, resins used in the common
areas have low volatile organic compound (VOC) content
• Day lighting views enhance productivity of occupants
Building Materials
• Use of construction materials having 20% recycled
content and 20% locally available
• Use of recycled materials reduced the impacts resulting
from extraction and processing of new virgin materials
• Illustrative list of materials with recycled content
1. False ceiling material made of industrial waste
- gypsum
2. Door panels made of bagasse
3. Aluminium door and window frames have high
recycled Aluminium content
• Use of 100% FSC certified wood for all wooden
components
Case Study on Infinity Benchmark, Kolkata

More Related Content

What's hot

case study of School of planning and architecture, delhi
case study of School of planning and architecture, delhicase study of School of planning and architecture, delhi
case study of School of planning and architecture, delhiFaizan Ahmad
 
Suzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya GumasteSuzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya GumasteTechGigDotCom
 
Indira paryavaran bhawan
Indira paryavaran bhawanIndira paryavaran bhawan
Indira paryavaran bhawanpraveen rohilla
 
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...Chandana R
 
Composite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhiComposite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhipadamatikona swapnika
 
Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Rupesh Chaurasia
 
passive design strategies in composite & warm-humid climates.
passive design strategies in composite & warm-humid climates.passive design strategies in composite & warm-humid climates.
passive design strategies in composite & warm-humid climates.Janmejoy Gupta
 
Architecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadArchitecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadOnal Kothari
 
PEARL ACADEMY OF FASHION
PEARL ACADEMY OF FASHIONPEARL ACADEMY OF FASHION
PEARL ACADEMY OF FASHIONchinyeeklin
 
The british school design case study
The british school design case studyThe british school design case study
The british school design case studyChandan kumar
 
college campus Case study
college campus Case studycollege campus Case study
college campus Case studyAdyasha Adyasha
 
Sustainable Office Buildings
Sustainable Office BuildingsSustainable Office Buildings
Sustainable Office BuildingsRohan Narvekar
 
LAURIE BAKER CENTER OF HABITAT STUDIES
LAURIE BAKER CENTER OF HABITAT STUDIESLAURIE BAKER CENTER OF HABITAT STUDIES
LAURIE BAKER CENTER OF HABITAT STUDIESSumaiya Musliim
 
Indira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaIndira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaAnchal Garg
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGgatti Teja
 
Architectural Case Study on Druk White Lotus School
Architectural Case Study on Druk White Lotus SchoolArchitectural Case Study on Druk White Lotus School
Architectural Case Study on Druk White Lotus SchoolRashmi Gautam
 

What's hot (20)

Green building delhi case study
Green building delhi case studyGreen building delhi case study
Green building delhi case study
 
case study of School of planning and architecture, delhi
case study of School of planning and architecture, delhicase study of School of planning and architecture, delhi
case study of School of planning and architecture, delhi
 
Suzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya GumasteSuzlon One Earth Case Study by Ameya Gumaste
Suzlon One Earth Case Study by Ameya Gumaste
 
Indira paryavaran bhawan
Indira paryavaran bhawanIndira paryavaran bhawan
Indira paryavaran bhawan
 
Campus planning
Campus planningCampus planning
Campus planning
 
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...
 
Composite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhiComposite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhi
 
Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)
 
passive design strategies in composite & warm-humid climates.
passive design strategies in composite & warm-humid climates.passive design strategies in composite & warm-humid climates.
passive design strategies in composite & warm-humid climates.
 
Architecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadArchitecture case study - IIM Ahemdabad
Architecture case study - IIM Ahemdabad
 
PEARL ACADEMY OF FASHION
PEARL ACADEMY OF FASHIONPEARL ACADEMY OF FASHION
PEARL ACADEMY OF FASHION
 
The british school design case study
The british school design case studyThe british school design case study
The british school design case study
 
college campus Case study
college campus Case studycollege campus Case study
college campus Case study
 
Sustainable Office Buildings
Sustainable Office BuildingsSustainable Office Buildings
Sustainable Office Buildings
 
LAURIE BAKER CENTER OF HABITAT STUDIES
LAURIE BAKER CENTER OF HABITAT STUDIESLAURIE BAKER CENTER OF HABITAT STUDIES
LAURIE BAKER CENTER OF HABITAT STUDIES
 
BV doshi design
BV doshi designBV doshi design
BV doshi design
 
Iit delhi case study
Iit delhi case studyIit delhi case study
Iit delhi case study
 
Indira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaIndira paryavaran bhawan and griha
Indira paryavaran bhawan and griha
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDING
 
Architectural Case Study on Druk White Lotus School
Architectural Case Study on Druk White Lotus SchoolArchitectural Case Study on Druk White Lotus School
Architectural Case Study on Druk White Lotus School
 

Similar to Case Study on Infinity Benchmark, Kolkata

Green Building in India with Case Study
Green Building in India with Case StudyGreen Building in India with Case Study
Green Building in India with Case StudyAjayashKekan
 
Osquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTOsquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTAnthony Osibajo
 
Rosedalefacts
RosedalefactsRosedalefacts
Rosedalefactskaufnic
 
greenbuildingppt-161123093000.pdf
greenbuildingppt-161123093000.pdfgreenbuildingppt-161123093000.pdf
greenbuildingppt-161123093000.pdfSurangaNG1
 
Green building ppt
Green building pptGreen building ppt
Green building pptSudeep Mitra
 
Green building case study - Vietnam Securities Depository new office tower - ...
Green building case study - Vietnam Securities Depository new office tower - ...Green building case study - Vietnam Securities Depository new office tower - ...
Green building case study - Vietnam Securities Depository new office tower - ...Vietnam Green Building Council
 
Design2Occupancy Services LLP Company Profile
Design2Occupancy Services LLP Company ProfileDesign2Occupancy Services LLP Company Profile
Design2Occupancy Services LLP Company ProfileAyush Maheshwari
 
LOTUS green building case study - TNG Song Cong Factory
LOTUS green building case study - TNG Song Cong FactoryLOTUS green building case study - TNG Song Cong Factory
LOTUS green building case study - TNG Song Cong FactoryVietnam Green Building Council
 
The Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case studyThe Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case studyShailja km
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research PresentationSerra's Art Studio
 
Passive-design-and-net-zero-energy-building.pptx
Passive-design-and-net-zero-energy-building.pptxPassive-design-and-net-zero-energy-building.pptx
Passive-design-and-net-zero-energy-building.pptxAKASHICWORLD
 
Turbo energy limited (active india)
Turbo energy limited (active india)Turbo energy limited (active india)
Turbo energy limited (active india)Mudra Redkar
 
Sustainable building in India
Sustainable building in India  Sustainable building in India
Sustainable building in India Satya Rachakonda
 
Lecture 10 energy efficient design
Lecture 10 energy efficient designLecture 10 energy efficient design
Lecture 10 energy efficient designNedhal Al-Tamimi
 
[Nordic GBC Conference 2013] Helga Jóhanna Bjarnadóttir: Höfðabakki 9 - Susta...
[Nordic GBC Conference 2013] Helga Jóhanna Bjarnadóttir: Höfðabakki 9 - Susta...[Nordic GBC Conference 2013] Helga Jóhanna Bjarnadóttir: Höfðabakki 9 - Susta...
[Nordic GBC Conference 2013] Helga Jóhanna Bjarnadóttir: Höfðabakki 9 - Susta...GBC Finland
 

Similar to Case Study on Infinity Benchmark, Kolkata (20)

Green Building in India with Case Study
Green Building in India with Case StudyGreen Building in India with Case Study
Green Building in India with Case Study
 
Osquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTOsquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECT
 
Rosedalefacts
RosedalefactsRosedalefacts
Rosedalefacts
 
greenbuildingppt-161123093000.pdf
greenbuildingppt-161123093000.pdfgreenbuildingppt-161123093000.pdf
greenbuildingppt-161123093000.pdf
 
Green building ppt
Green building pptGreen building ppt
Green building ppt
 
Green building case study - Vietnam Securities Depository new office tower - ...
Green building case study - Vietnam Securities Depository new office tower - ...Green building case study - Vietnam Securities Depository new office tower - ...
Green building case study - Vietnam Securities Depository new office tower - ...
 
Design2Occupancy Services LLP Company Profile
Design2Occupancy Services LLP Company ProfileDesign2Occupancy Services LLP Company Profile
Design2Occupancy Services LLP Company Profile
 
Building operation and maintenance
Building operation and maintenance  Building operation and maintenance
Building operation and maintenance
 
LOTUS green building case study - TNG Song Cong Factory
LOTUS green building case study - TNG Song Cong FactoryLOTUS green building case study - TNG Song Cong Factory
LOTUS green building case study - TNG Song Cong Factory
 
The Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case studyThe Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case study
 
Greg Shinaut on What is Green?
Greg Shinaut on What is Green?Greg Shinaut on What is Green?
Greg Shinaut on What is Green?
 
C25 wg1 dimitrios_bikas
C25 wg1 dimitrios_bikasC25 wg1 dimitrios_bikas
C25 wg1 dimitrios_bikas
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research Presentation
 
Passive-design-and-net-zero-energy-building.pptx
Passive-design-and-net-zero-energy-building.pptxPassive-design-and-net-zero-energy-building.pptx
Passive-design-and-net-zero-energy-building.pptx
 
Turbo energy limited (active india)
Turbo energy limited (active india)Turbo energy limited (active india)
Turbo energy limited (active india)
 
BREEAM
BREEAMBREEAM
BREEAM
 
Paryavaran bhawan
Paryavaran bhawanParyavaran bhawan
Paryavaran bhawan
 
Sustainable building in India
Sustainable building in India  Sustainable building in India
Sustainable building in India
 
Lecture 10 energy efficient design
Lecture 10 energy efficient designLecture 10 energy efficient design
Lecture 10 energy efficient design
 
[Nordic GBC Conference 2013] Helga Jóhanna Bjarnadóttir: Höfðabakki 9 - Susta...
[Nordic GBC Conference 2013] Helga Jóhanna Bjarnadóttir: Höfðabakki 9 - Susta...[Nordic GBC Conference 2013] Helga Jóhanna Bjarnadóttir: Höfðabakki 9 - Susta...
[Nordic GBC Conference 2013] Helga Jóhanna Bjarnadóttir: Höfðabakki 9 - Susta...
 

More from Geetika Singla

Case Study of Village in Punjab - Talania
Case Study of Village in Punjab - TalaniaCase Study of Village in Punjab - Talania
Case Study of Village in Punjab - TalaniaGeetika Singla
 
Case Study on Post Office, Haryana.pdf
Case Study on Post Office, Haryana.pdfCase Study on Post Office, Haryana.pdf
Case Study on Post Office, Haryana.pdfGeetika Singla
 
Sewage Treatment and a case study of treatment plant
Sewage Treatment and a case study of treatment plantSewage Treatment and a case study of treatment plant
Sewage Treatment and a case study of treatment plantGeetika Singla
 
GRIHA & Energy Efficient Material
GRIHA & Energy Efficient MaterialGRIHA & Energy Efficient Material
GRIHA & Energy Efficient MaterialGeetika Singla
 
Example of Spaceframes
Example of SpaceframesExample of Spaceframes
Example of SpaceframesGeetika Singla
 
Wooden Roof Trusses & Steel Roof Trusses
Wooden Roof Trusses & Steel Roof TrussesWooden Roof Trusses & Steel Roof Trusses
Wooden Roof Trusses & Steel Roof TrussesGeetika Singla
 
Geodesic Dome and Ribbed Dome
Geodesic Dome and Ribbed DomeGeodesic Dome and Ribbed Dome
Geodesic Dome and Ribbed DomeGeetika Singla
 
Case Study of Shukla Villa
Case Study of Shukla VillaCase Study of Shukla Villa
Case Study of Shukla VillaGeetika Singla
 
Raj Rewal’s philosophy
Raj Rewal’s philosophyRaj Rewal’s philosophy
Raj Rewal’s philosophyGeetika Singla
 
Glass - Building Material
Glass - Building MaterialGlass - Building Material
Glass - Building MaterialGeetika Singla
 
Marina bay sands, Singapore
Marina bay sands, SingaporeMarina bay sands, Singapore
Marina bay sands, SingaporeGeetika Singla
 

More from Geetika Singla (20)

Case Studies.pdf
Case Studies.pdfCase Studies.pdf
Case Studies.pdf
 
Case Study of Village in Punjab - Talania
Case Study of Village in Punjab - TalaniaCase Study of Village in Punjab - Talania
Case Study of Village in Punjab - Talania
 
Case Study on Post Office, Haryana.pdf
Case Study on Post Office, Haryana.pdfCase Study on Post Office, Haryana.pdf
Case Study on Post Office, Haryana.pdf
 
Sewage Treatment and a case study of treatment plant
Sewage Treatment and a case study of treatment plantSewage Treatment and a case study of treatment plant
Sewage Treatment and a case study of treatment plant
 
GRIHA & Energy Efficient Material
GRIHA & Energy Efficient MaterialGRIHA & Energy Efficient Material
GRIHA & Energy Efficient Material
 
Tyoes of Flooring
Tyoes of FlooringTyoes of Flooring
Tyoes of Flooring
 
Waffle Roof
Waffle RoofWaffle Roof
Waffle Roof
 
Example of Spaceframes
Example of SpaceframesExample of Spaceframes
Example of Spaceframes
 
Wooden Roof Trusses & Steel Roof Trusses
Wooden Roof Trusses & Steel Roof TrussesWooden Roof Trusses & Steel Roof Trusses
Wooden Roof Trusses & Steel Roof Trusses
 
Geodesic Dome and Ribbed Dome
Geodesic Dome and Ribbed DomeGeodesic Dome and Ribbed Dome
Geodesic Dome and Ribbed Dome
 
Case Study of Shukla Villa
Case Study of Shukla VillaCase Study of Shukla Villa
Case Study of Shukla Villa
 
Types of Staircase
Types of StaircaseTypes of Staircase
Types of Staircase
 
Raj Rewal’s philosophy
Raj Rewal’s philosophyRaj Rewal’s philosophy
Raj Rewal’s philosophy
 
Medha Patkar
Medha PatkarMedha Patkar
Medha Patkar
 
Glass - Building Material
Glass - Building MaterialGlass - Building Material
Glass - Building Material
 
Timber Products
Timber ProductsTimber Products
Timber Products
 
Water
WaterWater
Water
 
Humayun Tomb, Delhi
Humayun Tomb, DelhiHumayun Tomb, Delhi
Humayun Tomb, Delhi
 
Marina bay sands, Singapore
Marina bay sands, SingaporeMarina bay sands, Singapore
Marina bay sands, Singapore
 
The Oberoi, Mumbai
The Oberoi, MumbaiThe Oberoi, Mumbai
The Oberoi, Mumbai
 

Recently uploaded

Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 

Recently uploaded (20)

Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 

Case Study on Infinity Benchmark, Kolkata

  • 1. I N F I N I T Y BENCHMARK Geetika Singla K O L K A T A
  • 2.
  • 3. Last certified on: August 07, 2009 Certification level: Platinum
  • 4.
  • 5. Building Envelope • External walls and roof have high insulation property • External walls made of brick wall block with 4 inch expanded polystyrene insulation ACP cladding • U-factor 0.073 Btu/hr.ft2 • Roof has under deck insulation with 30 mm of rigid polyurethane foam • Terrace garden on roof top reduces heat island effect • Use of overhangs on selected facades reduces the direct solar gains through glazing. • High performance glazing catering to 36 of total building facade
  • 6. High Performance Glazing • Double glazed glass units increase energy efficiency of building • Less heat ingress into the building • Better transmission of day light into occupied spaces • Provides external connectivity to occupants • Use of overhangs on selected facades reduced direct solar gain through glazing • Glass characteristics 1. U Value 2.64 W/m2 K 2. Solar heat gain coefficient 0.2 3. Visual Light transmittance-0.23
  • 7.
  • 8. Eco-Friendly Energy Efficient Equipment • Consume 25% less energy • CFC free refrigerant to avoid ozone depletion • HVAC equipment has been designed with no compromise on human comfort levels • Energy efficient water cooled chillers with CoP value of 6.3 • Primary secondary chilled water pumps with variable speed drive to economize pump energy
  • 9. Building Management System • Optimized energy consumption resulting in operational energy savings of 15-20% • Typical examples of energy saving through BMS integration • Night time purging to cool the building • Chiller management • Controlling AHU fan speed and chilled water pumps based on heat loads • Temperature, humidity and lighting control • Monitors and controls indoor comfort condition • Automatically monitors amount of fresh air that enters the spaces • Can also track occupancy status of each zone and accordingly adjust fresh air flow • Provides alarm systems so as to take corrective actions
  • 10. Efficient Lighting • Use of energy efficient fluorescent lamps (T5s) and luminaries with high coefficient of utilization • The interior lighting designed with overall lighting power density less than 1.0 Watts per sq ft • Minimized light trespass from the site to increase night sky access and improve night time visibility • External lighting designed to reduce the development impact on nocturnal environments
  • 11. Eco-Friendly Vehicle Charging • Provision of 13 electric car charging points • Reduces pollution and land development impacts from automobile use • Cost effective and environment friendly means for commuting to work
  • 12.
  • 13. Water Efficient Fixtures • Consume 40% less water • Water efficient flow flush fixtures are used in the entire building • Reduces burden on municipal water supply and waste water systems • Reuse of storm water and treated grey water for non- potable applications such as toilet, flushing and irrigation
  • 14. Waste Collection Segregation • Reduction of building waste diversion to landfills • An easily accessible area in each floor is dedicated to the collection and storage of non hazardous materials • Separation of dry waste and wet waste materials at source • Segregation and storage of dry wastes such as paper, cardboard, glass, plastics and metals to facilitate recycling
  • 15.
  • 16. Indoor Environmental Quality • Occupants provided with superior indoor air quality through energy efficient HVAC equipment • Air conditioned spaces are maintained at 24 degree C and 50 - 60 relative humidity through out the operation of building • CO2 levels and fresh air quantities are continuously monitored and maintained at a pre-determined value to enhance the productivity of the occupants • Adhesives, sealants, paints, resins used in the common areas have low volatile organic compound (VOC) content • Day lighting views enhance productivity of occupants
  • 17.
  • 18. Building Materials • Use of construction materials having 20% recycled content and 20% locally available • Use of recycled materials reduced the impacts resulting from extraction and processing of new virgin materials • Illustrative list of materials with recycled content 1. False ceiling material made of industrial waste - gypsum 2. Door panels made of bagasse 3. Aluminium door and window frames have high recycled Aluminium content • Use of 100% FSC certified wood for all wooden components