International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 03 | Mar 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 255
REPLACEMENT OF GAS BOILEIR BY GEOTHERMAL/AEROTHERMAL
VRF-HEATPUMP FOR SWIMMING POOL HEATING IN MOROCCO.
Karime MAROUF1, Said HACHIMI2
1Karime Marouf, Applied Thermodynamics and Solid Fuels, Mohammedia School of Engineering, University
Mohammed V, Rabat Morocco.
2Said Hachimi, Applied Thermodynamics and Solid Fuels, Mohammedia School of Engineering, University
Mohammed V, Rabat Morocco.
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - Faced with the challenges of the rapid increase in
energy consumption in Morocco, where more than 95% of
energy needs are imported from outside, energy efficiency has
become one of the key issues in all areas of activity. In the
latter, the energy needs are very varied and the heating
systems represent a significant part of the electricity
consumption. According to the AMEE [1], Morocco has set
itself the goal of achieving energy savings of 15% by 2030,
through the implementation of an energyefficiencyplan in the
various economic sectors. This is particularly the heating
systems.
To respond to this situation, we replaced a gas boiler system
with ground source VRF (variablerefrigerantflow)heatpump
mixed with aerothermal VRF for heating an outdoor
swimming pool in Rabat (Morocco). The objective of this
article is to analyze the electrical consumption of the new
installation and define the real ROI based on two years
running of this pilot site.
Key Words: Swimming pool heating, very low enthalpy
geothermal energy, VRF, Geothermal, Aerothermal,
Electricity consumption, ROI.
1. INTRODUCTION
Morocco is an energy importing country because it has
virtually no natural resources to meet its energy needs.
Over the past decade, the country's energy needs have
increased significantly. This is mainly due to the
industrialization of the country and the good global
economic dynamics.
In view of these elements, the exploitation of geothermal
resources in Morocco allows the production of thermal
energy in a sustainable way for the heating of swimming
pools.
2. EXISTING INSTALLATION
Most of the heat used for non-electric heating results from
the combustion of hydrocarbons. The combustion of gas
mainly emits water vapor and carbon dioxide (CO2). Thus,
Morocco notes a weakness of non-renewable resources.
The system is equipped with two propane gas boilers with
an output of 800 kW.
- Annual propane consumptionisapproximately81.4tonnes
- The average price of propane in Morocco duringtheyear of
operation is 12.9 MAD / kg
- The price paid for one year is: 1 050 000 MAD (Moroccan
dirham)
3. NEW INSTALLATION
A heat pump (VRF) is a thermal machine that uses
mechanical energy (compressor pumps) to extract low-
temperature heat from an environment and restore it at a
higher temperature to make it usable for heating needs.
We have installed a mix system between 30% geothermal
heat pump and 70% aerothermal heat pump to guarantee
energy performance.
The set temperature is 29 °C
The well is at 22 m, with a temperature of 15°C and a
capacity of 20 m3/h
To estimate the calorific power to beinstalled,a heatbalance
must be carried out takingintoaccountthemostunfavorable
external conditions of the year:
Thermal balance during the filling phase in order to deduce
the calorific power required during filling P1.
Thermal balance enabling the calorific power required to
maintain the temperature of the pool water at 28°C during
the operating period P2 to be deduced.
With:
Estimation of the heating capacity during the filling
phase:
P1 = Surface losses + Wall heat losses + Water and concrete
heating - Solar gains
-Surface losses = Losses by evaporation + losses by
convection + losses by radiation
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 03 | Mar 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 256
Evaporation loss- source ASHRAE 2019:
When the vapor pressure of the ambientairislowerthanthe
saturated vapor pressure at the surface of the water,
evaporation of water occurs.
In the literature, several scientific formulas deduced from
experiments make it possible to quantify losses by
evaporation.
In this project, I chose to use the formula from the American
ASHRAE 2019 [2]:
kW   
0,089 0,0782 0,5
evap water w a
P S P P V
    
kPa %
a w
P HR P
 
With:
0.5: is a coefficient linked to the activity in the basin. During
the filling phase, there is no swimmer. We then multiplybya
coefficient of 0.5, as shown in the following table.
The following activity factors should be applied to the areas
of specific features, and not to the entire wetted area:
Outside temperature when filling: 10 °C
Desired water temperature (setpoint): 28 °C
Ambient air speed at 1m from the pool surface: V = 1.2 m/s
Pw (saturated vapor pressure): at T = 28 °C, Pw = 3.783 kPa
Pa (saturation pressure): at T = 10 °C and for relative
humidity RH = 70%;
kPa 0,7 1,228 0,86
a
P   
Swater= 340.12 m2 (Water surface)
kW 90,89
evap
P 
Convection loss:
Convection is one of the thermal heat transfer modes. As the
air above the pool moves at any speed, the water molecules
also move, causing thermal heat transfer in the event that
there is a temperature gradient.
Also, several scientific experiments have been made in this
direction, in order to present a formula for quantifying the
heat exchange coefficient. Theformula usedinthis study was
also taken from the ASHRAE.
kW   3
10
conv water C water amb
P S h T T 
   
W/m2.K 5,7 3,8
c
h V
  
For a wind speed of V = 1.2 m / s
kW 62,81
conv
P 
Radiation loss:
Everything emits radiation of an electromagnetic nature,
whatever its state: solid, liquid or gas. This emission of
energy comes at the expense of the body's internal energy.
Water exchanges with the environment by radiative heat
transfer.
This radiative exchange is expressed by the following
relation:
kW
8 4 4 3
5,68 10 ( 273) ( 273) 10
ray water water water sky amb
P S T T
 
 
 
      
 
0,004 0,8
sky dew
T
   
Digital Application:
For Tamb = 10 °C and RH = 70%, T dew = 4.79 °C therefore
0,82
sky
 
kW 49,04
ray
P 
Surface losses = 202.74 kW
-Losses through the walls of the basin:
Heat losses represent heat losses through the walls of the
basin. They are all the more important when the walls are
poorly thermally insulated.
The thermal losses are expressed as follows:
kW   3
10
water earth
Q U S T 
    
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 03 | Mar 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 257
Digital Application:
The surface of the concrete walls: 143 m2
Tearth: 15 °C, temperature of the earth in winter.
Twater: 28 °C
U: the transmission coefficient of concrete is around 2.5 W /
m2.K, but for safety margin, we take a coefficient of 3.5 W /
m2.K
kW 6,5
Q 
-Water and walls heating:
To reach the set temperature in the basin, it is necessary to
raise the temperature of the water and the walls of the
concrete basin, from their initial temperaturestothedesired
temperature.
Water heating:
According to the calorimetry relationship, the capacity
required to heat the volume of water in 72 hours is as
follows:
kW
 
3600
w
w w P finalwater initialw t
wat
a er
er
P
V C T T
h
   


kW 197,38
water
P 
Heating of the walls:
According to the calorimetry relationship, the capacity
required to heat the walls of the basin made especially of
concrete for a period of 48 hours is as follows:
kW
 
3600
c
c c P finalconcrete initialconcrete
wall
P
V C T T
h
   


Digital Application:
Concrete volume: S concrete x concrete thickness = 57.2 m3,
with concrete thickness = 0.4 m
Concrete Cp: 0.837 KJ / Kg.K
Concrete density = 2500 kg / m3
Initial concrete T (average): 9.5 ° C
T final concrete (average) = ((Hotwatertemperature+ earth
temperature) / 2)
kW
 
2500 57,2 0,837 21,5 10
72 3600
wall
P
  


kW 5,31
wall
P 
PHeating = Pwater+Pwalls
PHeating = 202.69 Kw
-Solar gains (in winter) = 0 W
P1 = 411.93kW
Estimation of the heating capacity during the
maintenance phase:
P2 = Surface losses + Wall heat losses + Renewed water
heater - Solar gains
-Surface losses = Losses by evaporation + losses by
convection + losses by radiation
Evaporation loss- source ASHRAE 2019:
As a result of the activity of bathers, evaporation losses tend
to increase. It is therefore necessary to take into account the
impact of the activity of bathers during this phase.
According to the ASHRAE 2019, for public swimming pools,
the equation must be multiplied by the activity factor Fa
(Factor Activity): 1
kW   
0,089 0,0782 1
evap water w a
P S P P V
    
We use the unfavorable climatic conditions:
Outdoor temperature: 4 °C
Desired water temperature (setpoint): 28 °C
Ambient air speed at 1m from the pool surface: V= 1.2 m/s
Pw (saturated vapor pressure at hot water temperature): at
T = 28 °C, Pw = 3.783 KPa
Pa (saturation pressure at ambient air temperature):atT=4
°C and for relative humidity RH = 88%
kW 190,73
evap
P 
Losses by convection:
The unfavorable external conditions being the same; during
the temperature maintenance phase, convection losses are
calculated as follows:
kW ,75
83
conv
P 
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 03 | Mar 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 258
Radiation losses:
The unfavorable external conditions being the same; during
the temperature maintenance phase, radiation losses are
calculated as follows:
kW 58,66
ray
P 
Surface losses = 333.14 kW
-Losses through the walls of the basin: kW 6,5
Q 
-Water heating renewed:
To preserve the quality and volume of water over the long
term, water must be constantlyrecycled.Accordingtoarticle
D1332-6 of the public health code in France, an intake of 30
liters per day and per bather must be respected. This rule is
also required in Morocco.
Water renewal rate per day: 30 liters per bather.
Estimated number of people per day: 90 people.
Volume of water to be renewed: Renewal rate x Number of
people.
Calculation of the volume of water to be renewed per day:
l Volume of water renewed = Renewal rate x Number of
people
l Volume of water renewed = 30 liters x 90
l Volume of water renewed = 2700 liters
m3 Volume of water renewed = 2.7 m3
The capacity required for heating the renewed water:
kW
 
3600
w
w wr P finalwater i l
r
nitia wate
en d
r
ewe
P
V C T T
h
   


kW 2,35
renewed
P 
-Solar gains (in winter) = 0 W
P2 = 341.99 kW
The capacity needed to heat the pool in 72 hours is P1 =
411.93 kW, while the temperature maintenance capacity is
P2 = 341.99 kW. The largest capacity is used to select the
equipment to be installed. Therefore, we installed a capacity
of P = 441 kW
- Installation diagram:
The entire facility contained:
- 2 geothermal unit to maketheexchangewiththe exchanger
through softened water, and with the hydro kits throughthe
refrigerant. The capacity of each outdoor unit is 63 kW.
- 5 aeraulic units to make the heat exchange with air and
with the hydro kits through the refrigerant. The calorific
power for each group is 63 kW.
- An exchanger to exchange heat between the geothermal
groups and the wells.
- 14 hydro kits for the exchange between hot water and
refrigerant.
- A submersible pump designed to fetch hot water from a
depth where it is impossible to suck it from the surface.
- A circulation pumps to float hot water in the pipes.
- The flow switches make it possible to check thepresence of
a minimum flow in the installation
- The safety valves for pressure release in case of
overheating of the installation.
- The manometers to measure the pressure.
- The thermometers to measure the temperature.
- The automatic air vents that allow the installation to
operate in the best conditions. It eliminates air, thepresence
of which disrupts heat exchange, which causes noise and
promotes circuit corrosion
- Expansion tanks to absorb variations in the volume of
water due to temperature changes in the installation.
- Anti-vibration sleeves for absorbing the vibration of
circuits and pumps.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 03 | Mar 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 259
- Non-return valves to control the direction of circulation.
- Balancing valves to control the flow and pressure.
- Drain valves.
- Shut-off valves to isolate the circuit.
- The collectors to accumulate and distribute water.
After studying the system for two years, the diagram below
clearly defines additional guidelines to optimize the
performance of the entire system.
- 2 Heat exchangers are recommended nearby swimming
pool. During maintenance, 2nd heat exchanger canallowthe
operation.
- We recommend to design heat exchanger near swimming
pool based on 40℃ inlet temp. (Originally, inlet temp. was
38℃)
- In each zone, we recommend to add a pump. During
maintenance, the pump can allow the operation.
- We recommend to use water piping expertize in order to
maintain installation quality.
- Expansion tank needs to be designed based on total piping
length and water volume.
- It is not necessary to install excessive pressure safety valve
in each pipe. We recommend to install in main line.
Hydrokit Water Piping installation :
- For the water pipe system, we used a closed loop type.
- For the drain pipe size, we used the same diameter as the
product connected or larger.
- We installed a natural drainage so that the drained water
does not back flows.
- To replace the connected device easily, we installed the
union joint.
- We installed the service port to clean the heat exchanger at
each inlet and outlet of the water pipe.
- We installed the strainer on thehorizontal pipe.(Whendirt,
trash, rusted pieces get into the water pipe system, it can
cause problems to the product by corroding the metallic
material.)
- We installed the air vent at the top of the water pipe. If the
air vent is not installed at the top of the water pipe, there
would be a lot of bubble in the water pipe. So a plate heat
exchanger burst may happen because of the reduction of
water flow rate(CH 14 is displayed in the remote controller)
caused by a lot of bubble in the water pipe.
- We installed a thermometer and pressure gaugeattheinlet
and outlet of the water pipe.
- We installed the drain valve that can be used for draining
the water inside when replacing the part or providing
service.
- We installed the shut-off valve to block thewater byclosing
the valve when replacing the part or cleaning.
- We installed excessive pressure safety valve that meetsthe
design water pressure to prevent unit or water pipe damage
at the pressure increase inside the water pipe system.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 03 | Mar 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 260
4. ROI calculation
For the ground heat source heat pumps, the heat is taken
from a well , this heat is then transferred by the heat pump
to the hot water circuit of the heating installation.
We have 2 outdoor units, the heat output of each outdoor
unit is 63 kW. [3]
The air-water heat pump is a system that relies on the use
of calories contained in the outside air to heat the water that
is present in the heating network.
We have 5 outdoor units, the heat output of each outdoor
unit is 63 kW. [4]
- The annual average consumption during two years is
approximately 204,262 kW
- The average price of electricity in Morocco is about 1.1
MAD / kWh
- The price paid for one year is: 224 688.2 MAD
- The investment cost including equipment, installation
and maintenance is: 2 000 000 MAD
 The gain in invoice in 1 year: 1 049 775.31 MAD /year
 Payback time (ROI) is approximately 1.9 years (22.86
months)
5. CONCLUSION
Very low-temperature geothermal energyinMoroccoallows
the production of thermal energy in a sustainable way.
Indeed, the installation of geothermal heat pumps insteadof
boilers gives us a return on investment time generally less
than 2 years.
REFERENCES
[1] The Thermal Regulation of Construction in Morocco
https://www.amee.ma/sites/default/files/inline-
files/guide%20chaffage%20ventilation%20et%20cilma
tisation.pdf
[2] 2019 ASHRAE HANDBOOKHeating, Ventilating,andAir-
Conditioning Applications
[3] LG MULTI V Water product Databook
[4] LG MULTI V product Databook

More Related Content

Similar to Geothermal VRF replaces gas boilers for pool heating

CSP Training series : solar desalination (2/2)
CSP Training series : solar desalination (2/2)CSP Training series : solar desalination (2/2)
CSP Training series : solar desalination (2/2)Leonardo ENERGY
 
Energy Conservation Opportunities in Cooling Tower.pdf
Energy Conservation Opportunities in Cooling Tower.pdfEnergy Conservation Opportunities in Cooling Tower.pdf
Energy Conservation Opportunities in Cooling Tower.pdfNITIN ASNANI
 
Mathematikal model of calclation parabola-cylindirical solar hot water system...
Mathematikal model of calclation parabola-cylindirical solar hot water system...Mathematikal model of calclation parabola-cylindirical solar hot water system...
Mathematikal model of calclation parabola-cylindirical solar hot water system...SubmissionResearchpa
 
IRJET- Design and Development of a Waste Heat Recovery Unit for Household Ref...
IRJET- Design and Development of a Waste Heat Recovery Unit for Household Ref...IRJET- Design and Development of a Waste Heat Recovery Unit for Household Ref...
IRJET- Design and Development of a Waste Heat Recovery Unit for Household Ref...IRJET Journal
 
IRJET- A Review of Solar Water Heater Performance Factors
IRJET- A Review of Solar Water Heater Performance FactorsIRJET- A Review of Solar Water Heater Performance Factors
IRJET- A Review of Solar Water Heater Performance FactorsIRJET Journal
 
Green fuel generation using waste heat exhausted from milk powder spray dryers
Green fuel generation using waste heat exhausted from milk powder spray dryersGreen fuel generation using waste heat exhausted from milk powder spray dryers
Green fuel generation using waste heat exhausted from milk powder spray dryersOtago Energy Research Centre (OERC)
 
IRJET- Experimental Analysis on Power Generation Unit using R134a Powered...
IRJET-  	  Experimental Analysis on Power Generation Unit using R134a Powered...IRJET-  	  Experimental Analysis on Power Generation Unit using R134a Powered...
IRJET- Experimental Analysis on Power Generation Unit using R134a Powered...IRJET Journal
 
Experimental Investigation of Pool Boiling Enhancement on Different Structure...
Experimental Investigation of Pool Boiling Enhancement on Different Structure...Experimental Investigation of Pool Boiling Enhancement on Different Structure...
Experimental Investigation of Pool Boiling Enhancement on Different Structure...IRJET Journal
 
Waste Heat Recovery From Refrigeration Plant
Waste Heat Recovery From Refrigeration PlantWaste Heat Recovery From Refrigeration Plant
Waste Heat Recovery From Refrigeration PlantIRJET Journal
 
Seminar report on otec
Seminar report on otecSeminar report on otec
Seminar report on otecDebanjan Paul
 
Seminar Report On OCEAN THERMAL ENERGY CONVERSION
Seminar Report On OCEAN THERMAL ENERGY CONVERSIONSeminar Report On OCEAN THERMAL ENERGY CONVERSION
Seminar Report On OCEAN THERMAL ENERGY CONVERSIONAnik Samaddar
 
solar vapour absourtion system
solar vapour absourtion systemsolar vapour absourtion system
solar vapour absourtion systemankit singh
 
Self Sufficient Atmospheric Water Generator using Renewable Energy
Self Sufficient Atmospheric Water Generator using Renewable EnergySelf Sufficient Atmospheric Water Generator using Renewable Energy
Self Sufficient Atmospheric Water Generator using Renewable EnergyIRJET Journal
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plantsagar20jain
 
Energy transfer and heat load analysis
Energy transfer and heat load analysisEnergy transfer and heat load analysis
Energy transfer and heat load analysisSatwinder Singh
 
Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...
Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...
Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...IRJET Journal
 
NanoFluids_in_SMART_Reactor
NanoFluids_in_SMART_ReactorNanoFluids_in_SMART_Reactor
NanoFluids_in_SMART_ReactorRami Saeed
 
ICEEE Poster_YoannGuinard
ICEEE Poster_YoannGuinardICEEE Poster_YoannGuinard
ICEEE Poster_YoannGuinardYoann Guinard
 
IRJET- Application of Nanofluids to Improve Performance of a Flat Plate Solar...
IRJET- Application of Nanofluids to Improve Performance of a Flat Plate Solar...IRJET- Application of Nanofluids to Improve Performance of a Flat Plate Solar...
IRJET- Application of Nanofluids to Improve Performance of a Flat Plate Solar...IRJET Journal
 

Similar to Geothermal VRF replaces gas boilers for pool heating (20)

CSP Training series : solar desalination (2/2)
CSP Training series : solar desalination (2/2)CSP Training series : solar desalination (2/2)
CSP Training series : solar desalination (2/2)
 
Energy Conservation Opportunities in Cooling Tower.pdf
Energy Conservation Opportunities in Cooling Tower.pdfEnergy Conservation Opportunities in Cooling Tower.pdf
Energy Conservation Opportunities in Cooling Tower.pdf
 
Mathematikal model of calclation parabola-cylindirical solar hot water system...
Mathematikal model of calclation parabola-cylindirical solar hot water system...Mathematikal model of calclation parabola-cylindirical solar hot water system...
Mathematikal model of calclation parabola-cylindirical solar hot water system...
 
IRJET- Design and Development of a Waste Heat Recovery Unit for Household Ref...
IRJET- Design and Development of a Waste Heat Recovery Unit for Household Ref...IRJET- Design and Development of a Waste Heat Recovery Unit for Household Ref...
IRJET- Design and Development of a Waste Heat Recovery Unit for Household Ref...
 
IRJET- A Review of Solar Water Heater Performance Factors
IRJET- A Review of Solar Water Heater Performance FactorsIRJET- A Review of Solar Water Heater Performance Factors
IRJET- A Review of Solar Water Heater Performance Factors
 
Green fuel generation using waste heat exhausted from milk powder spray dryers
Green fuel generation using waste heat exhausted from milk powder spray dryersGreen fuel generation using waste heat exhausted from milk powder spray dryers
Green fuel generation using waste heat exhausted from milk powder spray dryers
 
IRJET- Experimental Analysis on Power Generation Unit using R134a Powered...
IRJET-  	  Experimental Analysis on Power Generation Unit using R134a Powered...IRJET-  	  Experimental Analysis on Power Generation Unit using R134a Powered...
IRJET- Experimental Analysis on Power Generation Unit using R134a Powered...
 
Experimental Investigation of Pool Boiling Enhancement on Different Structure...
Experimental Investigation of Pool Boiling Enhancement on Different Structure...Experimental Investigation of Pool Boiling Enhancement on Different Structure...
Experimental Investigation of Pool Boiling Enhancement on Different Structure...
 
Waste Heat Recovery From Refrigeration Plant
Waste Heat Recovery From Refrigeration PlantWaste Heat Recovery From Refrigeration Plant
Waste Heat Recovery From Refrigeration Plant
 
Seminar report on otec
Seminar report on otecSeminar report on otec
Seminar report on otec
 
Seminar Report On OCEAN THERMAL ENERGY CONVERSION
Seminar Report On OCEAN THERMAL ENERGY CONVERSIONSeminar Report On OCEAN THERMAL ENERGY CONVERSION
Seminar Report On OCEAN THERMAL ENERGY CONVERSION
 
solar vapour absourtion system
solar vapour absourtion systemsolar vapour absourtion system
solar vapour absourtion system
 
Self Sufficient Atmospheric Water Generator using Renewable Energy
Self Sufficient Atmospheric Water Generator using Renewable EnergySelf Sufficient Atmospheric Water Generator using Renewable Energy
Self Sufficient Atmospheric Water Generator using Renewable Energy
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
Energy transfer and heat load analysis
Energy transfer and heat load analysisEnergy transfer and heat load analysis
Energy transfer and heat load analysis
 
Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...
Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...
Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...
 
NanoFluids_in_SMART_Reactor
NanoFluids_in_SMART_ReactorNanoFluids_in_SMART_Reactor
NanoFluids_in_SMART_Reactor
 
ICEEE Poster_YoannGuinard
ICEEE Poster_YoannGuinardICEEE Poster_YoannGuinard
ICEEE Poster_YoannGuinard
 
IRJET- Application of Nanofluids to Improve Performance of a Flat Plate Solar...
IRJET- Application of Nanofluids to Improve Performance of a Flat Plate Solar...IRJET- Application of Nanofluids to Improve Performance of a Flat Plate Solar...
IRJET- Application of Nanofluids to Improve Performance of a Flat Plate Solar...
 
H2P_Energy_Final_Presentation_ENCH_531
H2P_Energy_Final_Presentation_ENCH_531H2P_Energy_Final_Presentation_ENCH_531
H2P_Energy_Final_Presentation_ENCH_531
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Recently uploaded (20)

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

Geothermal VRF replaces gas boilers for pool heating

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 03 | Mar 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 255 REPLACEMENT OF GAS BOILEIR BY GEOTHERMAL/AEROTHERMAL VRF-HEATPUMP FOR SWIMMING POOL HEATING IN MOROCCO. Karime MAROUF1, Said HACHIMI2 1Karime Marouf, Applied Thermodynamics and Solid Fuels, Mohammedia School of Engineering, University Mohammed V, Rabat Morocco. 2Said Hachimi, Applied Thermodynamics and Solid Fuels, Mohammedia School of Engineering, University Mohammed V, Rabat Morocco. ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - Faced with the challenges of the rapid increase in energy consumption in Morocco, where more than 95% of energy needs are imported from outside, energy efficiency has become one of the key issues in all areas of activity. In the latter, the energy needs are very varied and the heating systems represent a significant part of the electricity consumption. According to the AMEE [1], Morocco has set itself the goal of achieving energy savings of 15% by 2030, through the implementation of an energyefficiencyplan in the various economic sectors. This is particularly the heating systems. To respond to this situation, we replaced a gas boiler system with ground source VRF (variablerefrigerantflow)heatpump mixed with aerothermal VRF for heating an outdoor swimming pool in Rabat (Morocco). The objective of this article is to analyze the electrical consumption of the new installation and define the real ROI based on two years running of this pilot site. Key Words: Swimming pool heating, very low enthalpy geothermal energy, VRF, Geothermal, Aerothermal, Electricity consumption, ROI. 1. INTRODUCTION Morocco is an energy importing country because it has virtually no natural resources to meet its energy needs. Over the past decade, the country's energy needs have increased significantly. This is mainly due to the industrialization of the country and the good global economic dynamics. In view of these elements, the exploitation of geothermal resources in Morocco allows the production of thermal energy in a sustainable way for the heating of swimming pools. 2. EXISTING INSTALLATION Most of the heat used for non-electric heating results from the combustion of hydrocarbons. The combustion of gas mainly emits water vapor and carbon dioxide (CO2). Thus, Morocco notes a weakness of non-renewable resources. The system is equipped with two propane gas boilers with an output of 800 kW. - Annual propane consumptionisapproximately81.4tonnes - The average price of propane in Morocco duringtheyear of operation is 12.9 MAD / kg - The price paid for one year is: 1 050 000 MAD (Moroccan dirham) 3. NEW INSTALLATION A heat pump (VRF) is a thermal machine that uses mechanical energy (compressor pumps) to extract low- temperature heat from an environment and restore it at a higher temperature to make it usable for heating needs. We have installed a mix system between 30% geothermal heat pump and 70% aerothermal heat pump to guarantee energy performance. The set temperature is 29 °C The well is at 22 m, with a temperature of 15°C and a capacity of 20 m3/h To estimate the calorific power to beinstalled,a heatbalance must be carried out takingintoaccountthemostunfavorable external conditions of the year: Thermal balance during the filling phase in order to deduce the calorific power required during filling P1. Thermal balance enabling the calorific power required to maintain the temperature of the pool water at 28°C during the operating period P2 to be deduced. With: Estimation of the heating capacity during the filling phase: P1 = Surface losses + Wall heat losses + Water and concrete heating - Solar gains -Surface losses = Losses by evaporation + losses by convection + losses by radiation
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 03 | Mar 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 256 Evaporation loss- source ASHRAE 2019: When the vapor pressure of the ambientairislowerthanthe saturated vapor pressure at the surface of the water, evaporation of water occurs. In the literature, several scientific formulas deduced from experiments make it possible to quantify losses by evaporation. In this project, I chose to use the formula from the American ASHRAE 2019 [2]: kW    0,089 0,0782 0,5 evap water w a P S P P V      kPa % a w P HR P   With: 0.5: is a coefficient linked to the activity in the basin. During the filling phase, there is no swimmer. We then multiplybya coefficient of 0.5, as shown in the following table. The following activity factors should be applied to the areas of specific features, and not to the entire wetted area: Outside temperature when filling: 10 °C Desired water temperature (setpoint): 28 °C Ambient air speed at 1m from the pool surface: V = 1.2 m/s Pw (saturated vapor pressure): at T = 28 °C, Pw = 3.783 kPa Pa (saturation pressure): at T = 10 °C and for relative humidity RH = 70%; kPa 0,7 1,228 0,86 a P    Swater= 340.12 m2 (Water surface) kW 90,89 evap P  Convection loss: Convection is one of the thermal heat transfer modes. As the air above the pool moves at any speed, the water molecules also move, causing thermal heat transfer in the event that there is a temperature gradient. Also, several scientific experiments have been made in this direction, in order to present a formula for quantifying the heat exchange coefficient. Theformula usedinthis study was also taken from the ASHRAE. kW   3 10 conv water C water amb P S h T T      W/m2.K 5,7 3,8 c h V    For a wind speed of V = 1.2 m / s kW 62,81 conv P  Radiation loss: Everything emits radiation of an electromagnetic nature, whatever its state: solid, liquid or gas. This emission of energy comes at the expense of the body's internal energy. Water exchanges with the environment by radiative heat transfer. This radiative exchange is expressed by the following relation: kW 8 4 4 3 5,68 10 ( 273) ( 273) 10 ray water water water sky amb P S T T                0,004 0,8 sky dew T     Digital Application: For Tamb = 10 °C and RH = 70%, T dew = 4.79 °C therefore 0,82 sky   kW 49,04 ray P  Surface losses = 202.74 kW -Losses through the walls of the basin: Heat losses represent heat losses through the walls of the basin. They are all the more important when the walls are poorly thermally insulated. The thermal losses are expressed as follows: kW   3 10 water earth Q U S T      
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 03 | Mar 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 257 Digital Application: The surface of the concrete walls: 143 m2 Tearth: 15 °C, temperature of the earth in winter. Twater: 28 °C U: the transmission coefficient of concrete is around 2.5 W / m2.K, but for safety margin, we take a coefficient of 3.5 W / m2.K kW 6,5 Q  -Water and walls heating: To reach the set temperature in the basin, it is necessary to raise the temperature of the water and the walls of the concrete basin, from their initial temperaturestothedesired temperature. Water heating: According to the calorimetry relationship, the capacity required to heat the volume of water in 72 hours is as follows: kW   3600 w w w P finalwater initialw t wat a er er P V C T T h       kW 197,38 water P  Heating of the walls: According to the calorimetry relationship, the capacity required to heat the walls of the basin made especially of concrete for a period of 48 hours is as follows: kW   3600 c c c P finalconcrete initialconcrete wall P V C T T h       Digital Application: Concrete volume: S concrete x concrete thickness = 57.2 m3, with concrete thickness = 0.4 m Concrete Cp: 0.837 KJ / Kg.K Concrete density = 2500 kg / m3 Initial concrete T (average): 9.5 ° C T final concrete (average) = ((Hotwatertemperature+ earth temperature) / 2) kW   2500 57,2 0,837 21,5 10 72 3600 wall P      kW 5,31 wall P  PHeating = Pwater+Pwalls PHeating = 202.69 Kw -Solar gains (in winter) = 0 W P1 = 411.93kW Estimation of the heating capacity during the maintenance phase: P2 = Surface losses + Wall heat losses + Renewed water heater - Solar gains -Surface losses = Losses by evaporation + losses by convection + losses by radiation Evaporation loss- source ASHRAE 2019: As a result of the activity of bathers, evaporation losses tend to increase. It is therefore necessary to take into account the impact of the activity of bathers during this phase. According to the ASHRAE 2019, for public swimming pools, the equation must be multiplied by the activity factor Fa (Factor Activity): 1 kW    0,089 0,0782 1 evap water w a P S P P V      We use the unfavorable climatic conditions: Outdoor temperature: 4 °C Desired water temperature (setpoint): 28 °C Ambient air speed at 1m from the pool surface: V= 1.2 m/s Pw (saturated vapor pressure at hot water temperature): at T = 28 °C, Pw = 3.783 KPa Pa (saturation pressure at ambient air temperature):atT=4 °C and for relative humidity RH = 88% kW 190,73 evap P  Losses by convection: The unfavorable external conditions being the same; during the temperature maintenance phase, convection losses are calculated as follows: kW ,75 83 conv P 
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 03 | Mar 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 258 Radiation losses: The unfavorable external conditions being the same; during the temperature maintenance phase, radiation losses are calculated as follows: kW 58,66 ray P  Surface losses = 333.14 kW -Losses through the walls of the basin: kW 6,5 Q  -Water heating renewed: To preserve the quality and volume of water over the long term, water must be constantlyrecycled.Accordingtoarticle D1332-6 of the public health code in France, an intake of 30 liters per day and per bather must be respected. This rule is also required in Morocco. Water renewal rate per day: 30 liters per bather. Estimated number of people per day: 90 people. Volume of water to be renewed: Renewal rate x Number of people. Calculation of the volume of water to be renewed per day: l Volume of water renewed = Renewal rate x Number of people l Volume of water renewed = 30 liters x 90 l Volume of water renewed = 2700 liters m3 Volume of water renewed = 2.7 m3 The capacity required for heating the renewed water: kW   3600 w w wr P finalwater i l r nitia wate en d r ewe P V C T T h       kW 2,35 renewed P  -Solar gains (in winter) = 0 W P2 = 341.99 kW The capacity needed to heat the pool in 72 hours is P1 = 411.93 kW, while the temperature maintenance capacity is P2 = 341.99 kW. The largest capacity is used to select the equipment to be installed. Therefore, we installed a capacity of P = 441 kW - Installation diagram: The entire facility contained: - 2 geothermal unit to maketheexchangewiththe exchanger through softened water, and with the hydro kits throughthe refrigerant. The capacity of each outdoor unit is 63 kW. - 5 aeraulic units to make the heat exchange with air and with the hydro kits through the refrigerant. The calorific power for each group is 63 kW. - An exchanger to exchange heat between the geothermal groups and the wells. - 14 hydro kits for the exchange between hot water and refrigerant. - A submersible pump designed to fetch hot water from a depth where it is impossible to suck it from the surface. - A circulation pumps to float hot water in the pipes. - The flow switches make it possible to check thepresence of a minimum flow in the installation - The safety valves for pressure release in case of overheating of the installation. - The manometers to measure the pressure. - The thermometers to measure the temperature. - The automatic air vents that allow the installation to operate in the best conditions. It eliminates air, thepresence of which disrupts heat exchange, which causes noise and promotes circuit corrosion - Expansion tanks to absorb variations in the volume of water due to temperature changes in the installation. - Anti-vibration sleeves for absorbing the vibration of circuits and pumps.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 03 | Mar 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 259 - Non-return valves to control the direction of circulation. - Balancing valves to control the flow and pressure. - Drain valves. - Shut-off valves to isolate the circuit. - The collectors to accumulate and distribute water. After studying the system for two years, the diagram below clearly defines additional guidelines to optimize the performance of the entire system. - 2 Heat exchangers are recommended nearby swimming pool. During maintenance, 2nd heat exchanger canallowthe operation. - We recommend to design heat exchanger near swimming pool based on 40℃ inlet temp. (Originally, inlet temp. was 38℃) - In each zone, we recommend to add a pump. During maintenance, the pump can allow the operation. - We recommend to use water piping expertize in order to maintain installation quality. - Expansion tank needs to be designed based on total piping length and water volume. - It is not necessary to install excessive pressure safety valve in each pipe. We recommend to install in main line. Hydrokit Water Piping installation : - For the water pipe system, we used a closed loop type. - For the drain pipe size, we used the same diameter as the product connected or larger. - We installed a natural drainage so that the drained water does not back flows. - To replace the connected device easily, we installed the union joint. - We installed the service port to clean the heat exchanger at each inlet and outlet of the water pipe. - We installed the strainer on thehorizontal pipe.(Whendirt, trash, rusted pieces get into the water pipe system, it can cause problems to the product by corroding the metallic material.) - We installed the air vent at the top of the water pipe. If the air vent is not installed at the top of the water pipe, there would be a lot of bubble in the water pipe. So a plate heat exchanger burst may happen because of the reduction of water flow rate(CH 14 is displayed in the remote controller) caused by a lot of bubble in the water pipe. - We installed a thermometer and pressure gaugeattheinlet and outlet of the water pipe. - We installed the drain valve that can be used for draining the water inside when replacing the part or providing service. - We installed the shut-off valve to block thewater byclosing the valve when replacing the part or cleaning. - We installed excessive pressure safety valve that meetsthe design water pressure to prevent unit or water pipe damage at the pressure increase inside the water pipe system.
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 03 | Mar 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 260 4. ROI calculation For the ground heat source heat pumps, the heat is taken from a well , this heat is then transferred by the heat pump to the hot water circuit of the heating installation. We have 2 outdoor units, the heat output of each outdoor unit is 63 kW. [3] The air-water heat pump is a system that relies on the use of calories contained in the outside air to heat the water that is present in the heating network. We have 5 outdoor units, the heat output of each outdoor unit is 63 kW. [4] - The annual average consumption during two years is approximately 204,262 kW - The average price of electricity in Morocco is about 1.1 MAD / kWh - The price paid for one year is: 224 688.2 MAD - The investment cost including equipment, installation and maintenance is: 2 000 000 MAD  The gain in invoice in 1 year: 1 049 775.31 MAD /year  Payback time (ROI) is approximately 1.9 years (22.86 months) 5. CONCLUSION Very low-temperature geothermal energyinMoroccoallows the production of thermal energy in a sustainable way. Indeed, the installation of geothermal heat pumps insteadof boilers gives us a return on investment time generally less than 2 years. REFERENCES [1] The Thermal Regulation of Construction in Morocco https://www.amee.ma/sites/default/files/inline- files/guide%20chaffage%20ventilation%20et%20cilma tisation.pdf [2] 2019 ASHRAE HANDBOOKHeating, Ventilating,andAir- Conditioning Applications [3] LG MULTI V Water product Databook [4] LG MULTI V product Databook