Abstract -- The rehabilitation techniques provide an
attractive and economical solution for strengthening
masonry arch bridge to increase their stability. Bridgeshave
been important throughout history in connecting cultures,
sharing ideas, and providing the backbone of transportation
networks. It is necessary to restore and preserve these
structures for their particular functionality and cultural
heritage value. The focus of this paper is to present and
discuss the many ways of strengthening and repairing
masonry arch bridge ranging fromminimum interventionto
complete reconstruction. It is meant to provide a guide for
engineers and architects on the methods available and the
advantages and disadvantages of these methods, and to
assist in their decisions of masonry arch bridge
conservation. The main focus is on understanding and
comparing different methodsof strengtheningandrepairing
masonry arch bridge.
Keywords-VisualInspection1RehabilitationTechniques2
Irwin Bridge3
1. INTRODUCTION
In India before some years ago there are many
masonry structures were constructed. Irwin bridge is also
masonry arch bridge structure constructed in 1929atSangli
city. The bridge was constructed formanydifferentpurposes
like transport, trading, aesthetics of river etc. The Irwin
bridge was constructed 90years ago so that, The
development of a variety of strengthening and repairing
techniques has been necessary forhistoricalmasonrybridge.
Particularly the many causes of degradation, different
failures, and needs for upgrading load-bearingcapacitymust
be considered in defining the Conservationworksneededfor
a bridge. In this paper the rehabilitation techniques are
suggested by the use of conditional survey of bridge.
The general information of Irwin bridge:
 Total height of Bridge = 70 ft from bed level
 No. of Span = 13, each span of 50ft
outer to outer distance
 Total length of Bridge = 819ft
 Carriage way = 20ft
 Footpath = 3ft both side
 Arch Rise = (1/5) ratio (to the span
length)
 Pier = 12ft wide, 55ft height,
at bottom 8ft circumference
 Abutment = 14ft thick
Location of Irwin Bridge
1.1 What is rehabilitation?
Rehabilitation is the process of restoring the
structure to service level, once it had and now lost,
strengthening consists in endowing the structure with a
service level, higher than that initially planned by modifying
the structure not necessarily damaged structure.
It is evident that rehabilitation of bridges involves
addressing a myriad of problems and no single technique or
retrofit method could offer a complete solution. Therefore,
answer liesin being able to addresseach individualproblem
with an appropriate technique to result in a durable retrofit.
This article aims at providing an overview of a variety of
structural retrofit techniquesavailable to rehabilitatebridge
1.2 METHODOLOGY
A. To conduct condition survey of bridge
Analyze the data and prepare checklist for condition survey.
Also, other required documentation to be prepared.
In Visual Inspection of the Bridge- A survey of the Bridgecan
reveal the Following:
1. Cracks in deck slabs, piers and abutments.
2. Concrete disintegration and exposed steel
reinforcements photographs can be helpful.
3. To reveal deterioration in concrete by slight tapping
using hammer.
4. Corrosion in reinforcement and metal sections.
5. Status of Balconies – cracks, corrosion, concrete
deterioration etc.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 3394
6. Cracks in wing walls indicating swelling in members or
corrosion and lose joints.
7. Leakages from different part of bridge.
8. Deficiencies in arch of bridge.
8. Damages in different joints of bridge.
B. To detect damages
By using visual inspection detect the damages and inspect
level of damage
2. Rehabilitation techniques on basis of condition
survey of bridge
A. Pier and spandrel wall
Fig1-:Cracks and loosening of joints
Problem: Areas of cracking to be detected in pier and
spandrel wall
Rehabilitation techniques
Cellular Foamed Cement Grouting
To facilitate grouting, 12-mm (0.5-in.) diameter
holeswere drilled through mortar joints within the exposed
below-grade masonry to terminate within the inner-core
rubble. Injection tubeswere then installed intotheholesand
the masonry ‘rough-parged’ to facilitate containment of the
fluid grout during the subsequent core stabilization work.
A cellular foam grout was then mixed and pumped
through the injection tubes to fill any voids within the inner
core rubble of the masonry. This part of the restoration
strategy was designed to further stabilize the foundation
walls and provide for a more uniform load distribution
across the cross-section of the masonry assembly. The
cellular grout was selected for its beneficial load absorbing
characteristics, as well as its low-strength and lightweight
properties.
A methyl cellulose-type admixture was combined
with the cement/water grout to provide thixotropic
properties to the plastic grout, minimizing leakage to the
interior through cracks and gaps. To generate the foam, a
proprietary surfactant-type admixture was diluted in water
and forced through a nozzle when fed from a pressurized
steel cylindrical tank. The nozzle end was fitted with a
pressure gauge, shut-off valve and a return line, which
allowed control of the flow of grout and pumping pressures
at the grout injection point.
Fig2-: cellular foamed cement grouting
B. Abutment:
Fig3-: Delamination of stones in abutments
Problem: The most common problem observed during
inspection of abutment are vertical movement, scour and
under mining of the foundation, drainage system
malfunction, materials defects, presence of excessive or
unexplained moisture at or behind the abutmentsetc.Also,it
is most affected part of bridge.
Rehabilitation technique:
the delaminated stones are replaced using new stones. They
are properly fixed by using concrete masonry with adding
admixtures to it. The joints are filled properly with concrete
mortar. Proper finishing is provided to surface of abutment.
Fig4:- Mortar joint in stone masonry
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 3395
Concrete Apron Wall
A concrete apron wall can be utilized as a permanent
structural repair for abutmentsthat have experiencedscour.
For this repair, a concrete wall is cast against the streamside
of the abutment and extended down at least eight feet.
Riprap is typically utilized as another means of protection
against future scour. Special attention should be paid to the
riprap placement. The riprap will help to ensure that the
new apron wall is not undermined due to scour.The lost soil
below the abutment should also be filled with concrete in
order to reintroduce bearing capacity.
Fig5: - Concrete apron wall
C. Deck slab
Fig.6:-Spalling of concrete of deck slab
Problem:
The bottom joint of deck slab is damaged and loose joint
sections. There is deteriorated mortar at the edges of the
joint of deck slab and spandrel wall. Stones are loosening at
joint section decreasing bonding between deck & wing wall.
Rehabilitation technique:
All loose, disintegrated and unsound concrete shall be
removed from portions of the deck slab. There shall be take
care not to damage reinforcement bars or expansion joints
which are to remain in place. Any damage to reinforcement
bars or expansion joints shall be corrected.
Areas to be repaired will be determined and marked. A
concrete saw shall be used to provide vertical edges
approximately 3/4 in. (20 mm) deep around the perimeter
of the area to be patched when a concrete overlay is not
specified. Where high steel is present, the depth may be
reduced. A saw cut will not be required on those boundaries
along the face of the curb, parapet or joint or when sharp
vertical edges are provided by hydro-demolition.
The loose and unsound concrete shall be removed by
chipping, with power driven hand tools or by hydro-
demolition equipment. All exposed reinforcing bars and
newly exposed concrete shall be thoroughly blast cleaned.
Where the bond between existing concrete and
reinforcement steel within the patch area has been
destroyed, the concrete adjacent to the bar shall beremoved
to a depth that will permit new concrete to bond to the
entire periphery of the exposed bar. A minimum of 1 in. (25
mm) clearance will be required. There may be require
enlarging a designated removal area should inspection
indicate deterioration beyond the limits previously
designated. In this event, a new saw cut shall be made
around the extended area before additional removal is
begun. The removal area shall not be enlarged solely to
correct bonded reinforcement or deficient lap lengths.
Reinforcement Treatment
The Care shall be exercised during concrete removal to
protect the reinforcement bars and structural steel from
damage. Any damage to the reinforcement barsorstructural
steel to remain in place shall be repaired or replaced. All
existing reinforcement bars shall remain in place except as
herein provided for corroded bars. Tying of loose bars will
be required. Reinforcing bars which have been cut or have
lost 25 percent or more of their original cross-sectional area
shall be supplemented by new in-kind reinforcement bars.
New bars shall be lapped a minimum of 32 bar diameters to
existing bars. An approved mechanical bar splice capable of
developing in tension at least 125 percent of the yield
strength of the existing bar shall be used when it is not
feasible to provide the minimum bar lap. No welding of bars
will be permitted.
Immediately after completion of the concrete removal and
reinforcement repairs, the repair areas shall be cleaned of
dust and debris. Once the initial cleaning is completed, the
repair areas shall be thoroughly blast cleaned to a
roughened appearance free from all foreign matter.
Placement & Finishing of Concrete Repair
The patch area shall be cleaned and shall be thoroughly
wetted and maintained in a dampened conditionwith water
for at least 12 hours before placement of the concrete. Any
excess water shall be removed by compressed air or by
vacuuming prior to the beginning of concrete placement.
Water shall not be applied to the patch surface within one
hour before or at any time during placement of the concrete.
Concrete patches shall be cured by the Wetted Burlap or
Wetted Cotton Mat. A 72-hour minimum dryingperiod shall
be required before placing waterproofingorhot-mixasphalt
surfacing.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 3396
Other damages
1.River Bank
Fig7:- absence of training wall in river bed
Problem
The size of the river bed goeson increasing due toabsenceof
training wall on western side.
Rehabilitation techniques
The purpose of river training is to stabilize the river channel
along the certain alignment with a certain cross section. we
suggest the following methods for Krishna River Bank.
Guide Banks:
Guide banks are artificial embankments constructed along
the flow direction both upstream and downstream of the
abutment on one or both sides of the river for guiding the
river flow past a bridge (or other hydraulic structures, such
as weirs or barrages) without causing damage to the bridge
and its approaches.
The overall waterway between guide banks is obtained by
adding thickness of piers to the clear waterway. Figure 9.4
shows the plan and section of a typical guide bank. The
elevation of the top of the guide banks is kept 1.5 to 2.5 m
above the HFL of 100-year flood.
The top width of guide banks is generally kept between 6
and 9 m. Locally available earth materials are used for
constructing guide banks. To prevent erosion of thematerial
from the river-side surface of guide bank, the surface is
stone-pitched.
Fig 8:- Guide Bank
Bank Protection:
Bank failures due to either wave action or erosive action of
river flow can lead to river breach causing huge losses in
terms of human lives, property, agriculture and other
utilities. Measures of bank protection such as revetment,
riprap, etc. provide a shield against erosion of bankmaterial.
Bank revetments are mattressesof suitable material,suchas
reinforced asphalt and articulated concrete, laid over the
bank surface to be protected.
Riprap of hard angular rock fragments (or concrete blocks)
laid on a thick layer of rubble or quarry chips is cheap and
durable method of bank protection. Another way of
providing bank protection is by means of flexible brick
pitching
For this purpose, bricks having a pair of holes across their
full width are laid on the bank slope and for some distance
on the river bed at the toe of the bank. A G.I. wire passes
through the brick holes. The wires are knotted at their ends
and suitably anchored so that the bricks are held together
and also small movement of bricks is possible.
Fig10:-Bank Protection
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 3397
Embankments:
The floods may be prevented from submerging the country
by constructing earth embankments. They are generally
constructed up to a height of 12 m. They are designed and
constructed in the same way as an earth dam. The
embankments are generally constructed paralleltotheriver
channel.
Types of embankments are
i. Marginal embankments or dykes or levees,
ii. Retired embankments.
i. Marginal embankments or dykes or levees,
The marginal embankmentsareconstructedasclose
to the banks as possible to restrict the flood water from
submerging the area behind them. Figure showstheposition
of marginal embankments. They are designed to hold up the
water up to a maximum anticipated HFL without the
possibility of overtopping and with a view to withstand all
external pressures. This condition is met with by providing
sufficient freeboard, bed width, top width and stone
protection on adequate slopes.
Fig9:- Marginal embankments or levees
ii. Retired embankments.
Retired embankmentsare constructed at a distancefromthe
river banks. Thus, retired embankments are the
intermediate type between the case of marginal
embankments and river with no embankments. Retired
embankments are generally constructed on a lower ground
away from the banks.
2. Gallery of bridge
Fig11:-Gallery of bridge
Problem
The components of gallery of bridge gets eroded. There is
corrosion formed at stairs of gallery. Erosion and loosening
of joints in gallery of bridge.
Rehabilitation techniques
The rehabilitation techniques or repairs for gallery are not
suitable due to very severe damages are occurred. So, it is
necessary to reconstruct the gallery of bridge.
III. CONCLUSION
1.Worksof strengthening and repair are concerned with the
restoration of the stability, integrity and durability of the
structure together with the bridges return to service.
2.Regular general maintenance of a bridge is also important
in preserving the integrity and stability and preventing
further damages from incurring. By following a logical and
careful process of bridge conservation and using repairing
and strengthening techniques that follow conservation
guidelines such as those presented in this paper, successful
intervention which respects the needs for performance
improvementsand cultural preservation may be performed.
3.commonly used retrofitting techniques for masonry arch
bridgesand finally the suggestions regardingthedescription
of retrofitting and preserving bridge side by side adopting
suitable techniques along with their respective pictures.
4.In case of extreme unrepairable cracks and otherdamages,
we can conduct rebuilding technique with every step of
carefulness and alertness so that it does not affect the
identity of the historic structures.
5.The retrofitting techniques has been discussed in this
Project for Irwin Bridge are the personal suggestions after
understanding the level of damages in bridge, studying the
image of particular bridge.
ACKNOWLEDGEMENT
The authorscan acknowledge any person/authoritiesinthis
section. This is not mandatory.
This research was supported by Prof. C.R.
Chimanna, Prof. A.A.Mahajan , and Prpf. V. G. Awasare .
VTC patgaon, Miraj. We are thankful to our colleagues
from Civil Department, who provided expertise that
greatly assisted the research.
We have to express out -appreciation to the Prof.
C. R. Chimanna for shearing their pearlsof wisdomwithus
during the course of research.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 3398
REFERENCES
1) Study of literat Atkins (2010) “StructuresCondition
Survey of BPRN” London Bridges Engineering
Group.
2) Bhaskar S, Chellappan A, Prabakar J, andSrinivasan
P, (2007, 1973) “A review on ‘Different bond test
procedures and bond behaviour of rebars in
concrete”, SERC Research Report No. MLP-12841-
RR-02, September, 2007. Indian Standard Methods
of testing bond in reinforced concrete(PartIPullout
test), IS: 2770-1967, Indian Standards Institution,
New Delhi. RILEM/CEB/FIP Recommendation,
“Bond test for reinforcing steel”, Materials and
Structures, 6(32), (1973), 97-105.
3) James A. Kerns, P.E.(1995) “What is Conditional
Survey” Real State Journal, 1995, ACISP-153,25-42.
4) Krishnamoorthy T.S., Gopalakrishnan S.,
Balasubramanian K., Bharatkumar B.H., and Rama
Mohan Rao. P., (2002) “Investigations on the
cementitious grouts containing supplementary
cementitious materials”, International Journal of
Cement and Concrete Research, 32(9), (2002),
1395-1405. Product information sheets, Elkem
materials, 2008.
5) Maria Rashidi, Peter Gibson(2011)“AMethodology
for Bridge Condition Assessment” Australasian
Transport Research Forum 2011, Proceedings 28 -
30 September 2011, Adelaide, Australia.
6) Springfield Illinois Publication (2011) “Bridge
Condition Report Procedures & Practices” BCR
Procedures & Practices – Revised December 2011.
7) Vinod Bolle1, Prof. Santhosh Kumar Banoth(2016)
“Review On Railway Bridge &Track Condition
Monitoring System” International Journal of
Advance Research, Ideas and Innovations in
Technology ISSN: 2454-132X (Volume2, Issue4).
BIOGRAPHIES
Mr. Anirudha Patil, pursuing B.E. in civil
Engineering at Vishveshwarya Technical
Campus, Patgaon, Miraj.
Mr. Tushar Naik, pursuing B.E. in civil
Engineering at Vishveshwarya Technical
Campus, Patgaon, Miraj.
Mr.Deepak Sharma, pursuing B.E. in
civil Engineering at Vishveshwarya
Technical Campus, Patgaon, Miraj.
Mr. Vaibhav Mohite, pursuing B.E. in
civil Engineering at Vishveshwarya
Technical Campus, Patgaon, Miraj.

More Related Content

What's hot

Inspection and maintenance of bridges In India
Inspection and maintenance of bridges In IndiaInspection and maintenance of bridges In India
Inspection and maintenance of bridges In IndiaKhyati Saggu
 
Flexible Pavement in Metro Manila Skyway
Flexible Pavement in Metro Manila SkywayFlexible Pavement in Metro Manila Skyway
Flexible Pavement in Metro Manila Skywayharoldtaylor1113
 
Study of failures on flexible pavements & problems on road users
   Study of failures on flexible pavements & problems on road users   Study of failures on flexible pavements & problems on road users
Study of failures on flexible pavements & problems on road usersShaik Asif Ahmed
 
"Pavement failures and their Maintenance" Technical Seminar report
"Pavement failures and their Maintenance" Technical Seminar report"Pavement failures and their Maintenance" Technical Seminar report
"Pavement failures and their Maintenance" Technical Seminar reportctakshaykumar1
 
Rigid pavement in Magallanes Interchange
Rigid pavement in Magallanes InterchangeRigid pavement in Magallanes Interchange
Rigid pavement in Magallanes Interchangeharoldtaylor1113
 
RMI DOT Presentation
RMI DOT PresentationRMI DOT Presentation
RMI DOT Presentationguest846d36
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)Sukhdarshan Singh
 
Rehabilitation of foundation
Rehabilitation of foundationRehabilitation of foundation
Rehabilitation of foundationABIRAMI G
 
Repair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationRepair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationIshwar Chauhan
 
CABLE STAYED BRIDGE-SIGNATURE BRIDGE
CABLE STAYED BRIDGE-SIGNATURE BRIDGECABLE STAYED BRIDGE-SIGNATURE BRIDGE
CABLE STAYED BRIDGE-SIGNATURE BRIDGEPravin Gaurav
 
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEMROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEMVineeshkumar K V
 
SSRC Presentation of Telmo Andres Sanchez
SSRC Presentation of Telmo Andres SanchezSSRC Presentation of Telmo Andres Sanchez
SSRC Presentation of Telmo Andres SanchezEva Lantsoght
 
Forms & materials for speedy construction
Forms & materials for speedy construction Forms & materials for speedy construction
Forms & materials for speedy construction somitra bhardwaj
 
Construction errors and their case studies
Construction errors and their case studiesConstruction errors and their case studies
Construction errors and their case studiesYogi Yogesh
 
Repair Options for Concrete Roadways
Repair Options for Concrete RoadwaysRepair Options for Concrete Roadways
Repair Options for Concrete RoadwaysJill Reeves
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete constructionJenilPatel22
 
Speedy construction presentation
Speedy construction presentationSpeedy construction presentation
Speedy construction presentationsomitra bhardwaj
 

What's hot (20)

Inspection and maintenance of bridges In India
Inspection and maintenance of bridges In IndiaInspection and maintenance of bridges In India
Inspection and maintenance of bridges In India
 
Flexible Pavement in Metro Manila Skyway
Flexible Pavement in Metro Manila SkywayFlexible Pavement in Metro Manila Skyway
Flexible Pavement in Metro Manila Skyway
 
Study of failures on flexible pavements & problems on road users
   Study of failures on flexible pavements & problems on road users   Study of failures on flexible pavements & problems on road users
Study of failures on flexible pavements & problems on road users
 
"Pavement failures and their Maintenance" Technical Seminar report
"Pavement failures and their Maintenance" Technical Seminar report"Pavement failures and their Maintenance" Technical Seminar report
"Pavement failures and their Maintenance" Technical Seminar report
 
Speedy construction
Speedy constructionSpeedy construction
Speedy construction
 
Rigid pavement in Magallanes Interchange
Rigid pavement in Magallanes InterchangeRigid pavement in Magallanes Interchange
Rigid pavement in Magallanes Interchange
 
Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
 
RMI DOT Presentation
RMI DOT PresentationRMI DOT Presentation
RMI DOT Presentation
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
 
Rehabilitation of foundation
Rehabilitation of foundationRehabilitation of foundation
Rehabilitation of foundation
 
Repair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationRepair,Retrofitting and Rehabilitation
Repair,Retrofitting and Rehabilitation
 
CABLE STAYED BRIDGE-SIGNATURE BRIDGE
CABLE STAYED BRIDGE-SIGNATURE BRIDGECABLE STAYED BRIDGE-SIGNATURE BRIDGE
CABLE STAYED BRIDGE-SIGNATURE BRIDGE
 
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEMROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
 
SSRC Presentation of Telmo Andres Sanchez
SSRC Presentation of Telmo Andres SanchezSSRC Presentation of Telmo Andres Sanchez
SSRC Presentation of Telmo Andres Sanchez
 
Forms & materials for speedy construction
Forms & materials for speedy construction Forms & materials for speedy construction
Forms & materials for speedy construction
 
Construction errors and their case studies
Construction errors and their case studiesConstruction errors and their case studies
Construction errors and their case studies
 
Repair Options for Concrete Roadways
Repair Options for Concrete RoadwaysRepair Options for Concrete Roadways
Repair Options for Concrete Roadways
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Concrete repair
Concrete repairConcrete repair
Concrete repair
 
Speedy construction presentation
Speedy construction presentationSpeedy construction presentation
Speedy construction presentation
 

Similar to IRJET- The Rehabilitation Techniques for Irwin Bridge

Case study: Widening an existing bridge structure Challenges and solutions
Case study: Widening an existing bridge structure Challenges and solutionsCase study: Widening an existing bridge structure Challenges and solutions
Case study: Widening an existing bridge structure Challenges and solutionsIRJET Journal
 
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...IRJET Journal
 
IRJET- Experimental Evaluation of Strength of Damaged RCC Beam Repaired us...
IRJET- 	  Experimental Evaluation of Strength of Damaged RCC Beam Repaired us...IRJET- 	  Experimental Evaluation of Strength of Damaged RCC Beam Repaired us...
IRJET- Experimental Evaluation of Strength of Damaged RCC Beam Repaired us...IRJET Journal
 
IRJET- Study on Failure of Interlocking Pavements
IRJET-  	  Study on Failure of Interlocking PavementsIRJET-  	  Study on Failure of Interlocking Pavements
IRJET- Study on Failure of Interlocking PavementsIRJET Journal
 
REVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURES
REVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURESREVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURES
REVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURESIRJET Journal
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxsfQyoom
 
Enhancement of torsional resistance in fibrous normal strength concrete beams
Enhancement of torsional resistance in fibrous normal strength concrete beamsEnhancement of torsional resistance in fibrous normal strength concrete beams
Enhancement of torsional resistance in fibrous normal strength concrete beamseSAT Journals
 
Analysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyAnalysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyIRJET Journal
 
IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...
IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...
IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...IRJET Journal
 
Final Presentation
Final PresentationFinal Presentation
Final PresentationMonique F M
 
IRJET-Email Tracking System
IRJET-Email Tracking SystemIRJET-Email Tracking System
IRJET-Email Tracking SystemIRJET Journal
 
Retrofitting rehabilitation and repair of structure
Retrofitting rehabilitation and repair of structureRetrofitting rehabilitation and repair of structure
Retrofitting rehabilitation and repair of structureKumarS250747
 
Expansion joints in bridge
Expansion joints in bridgeExpansion joints in bridge
Expansion joints in bridgeDivya Vishnoi
 
IRJET- Seismic Retrofitting
IRJET- Seismic RetrofittingIRJET- Seismic Retrofitting
IRJET- Seismic RetrofittingIRJET Journal
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints Hanzlahakhlaq
 
Retrofitting of Bridge with Voided Slab to raise the Deck Level
Retrofitting of Bridge with Voided Slab to raise the Deck LevelRetrofitting of Bridge with Voided Slab to raise the Deck Level
Retrofitting of Bridge with Voided Slab to raise the Deck LevelIRJET Journal
 
IRJET- Strengthening of New Building
IRJET- Strengthening of New BuildingIRJET- Strengthening of New Building
IRJET- Strengthening of New BuildingIRJET Journal
 
IRJET- Techno-Economical Analysis of Gabion Retaining Wall Against Convention...
IRJET- Techno-Economical Analysis of Gabion Retaining Wall Against Convention...IRJET- Techno-Economical Analysis of Gabion Retaining Wall Against Convention...
IRJET- Techno-Economical Analysis of Gabion Retaining Wall Against Convention...IRJET Journal
 

Similar to IRJET- The Rehabilitation Techniques for Irwin Bridge (20)

Case study: Widening an existing bridge structure Challenges and solutions
Case study: Widening an existing bridge structure Challenges and solutionsCase study: Widening an existing bridge structure Challenges and solutions
Case study: Widening an existing bridge structure Challenges and solutions
 
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
 
IRJET- Experimental Evaluation of Strength of Damaged RCC Beam Repaired us...
IRJET- 	  Experimental Evaluation of Strength of Damaged RCC Beam Repaired us...IRJET- 	  Experimental Evaluation of Strength of Damaged RCC Beam Repaired us...
IRJET- Experimental Evaluation of Strength of Damaged RCC Beam Repaired us...
 
IRJET- Study on Failure of Interlocking Pavements
IRJET-  	  Study on Failure of Interlocking PavementsIRJET-  	  Study on Failure of Interlocking Pavements
IRJET- Study on Failure of Interlocking Pavements
 
REVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURES
REVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURESREVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURES
REVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURES
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
Enhancement of torsional resistance in fibrous normal strength concrete beams
Enhancement of torsional resistance in fibrous normal strength concrete beamsEnhancement of torsional resistance in fibrous normal strength concrete beams
Enhancement of torsional resistance in fibrous normal strength concrete beams
 
Analysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyAnalysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case study
 
IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...
IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...
IRJET- Behavioral Study of Scaled GFRG Wall Panel Containing Opening Subjecte...
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 
IRJET-Email Tracking System
IRJET-Email Tracking SystemIRJET-Email Tracking System
IRJET-Email Tracking System
 
Retrofitting rehabilitation and repair of structure
Retrofitting rehabilitation and repair of structureRetrofitting rehabilitation and repair of structure
Retrofitting rehabilitation and repair of structure
 
Expansion joints in bridge
Expansion joints in bridgeExpansion joints in bridge
Expansion joints in bridge
 
chpt_6.pptx
chpt_6.pptxchpt_6.pptx
chpt_6.pptx
 
IRJET- Seismic Retrofitting
IRJET- Seismic RetrofittingIRJET- Seismic Retrofitting
IRJET- Seismic Retrofitting
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints
 
Retrofitting of Bridge with Voided Slab to raise the Deck Level
Retrofitting of Bridge with Voided Slab to raise the Deck LevelRetrofitting of Bridge with Voided Slab to raise the Deck Level
Retrofitting of Bridge with Voided Slab to raise the Deck Level
 
IRJET- Strengthening of New Building
IRJET- Strengthening of New BuildingIRJET- Strengthening of New Building
IRJET- Strengthening of New Building
 
IRJET- Techno-Economical Analysis of Gabion Retaining Wall Against Convention...
IRJET- Techno-Economical Analysis of Gabion Retaining Wall Against Convention...IRJET- Techno-Economical Analysis of Gabion Retaining Wall Against Convention...
IRJET- Techno-Economical Analysis of Gabion Retaining Wall Against Convention...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 

Recently uploaded (20)

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 

IRJET- The Rehabilitation Techniques for Irwin Bridge

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 3393 The Rehabilitation Techniques for Irwin Bridge Anirudha Patil¹, Tushar Naik², Vaibhav Mohite³, Deepak Sharma⁴, Prof. Chaitali Chimanna⁵ 1,2,3,4,5 Vishveshwarya Technical Campus, Patgaon, Miraj. ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract -- The rehabilitation techniques provide an attractive and economical solution for strengthening masonry arch bridge to increase their stability. Bridgeshave been important throughout history in connecting cultures, sharing ideas, and providing the backbone of transportation networks. It is necessary to restore and preserve these structures for their particular functionality and cultural heritage value. The focus of this paper is to present and discuss the many ways of strengthening and repairing masonry arch bridge ranging fromminimum interventionto complete reconstruction. It is meant to provide a guide for engineers and architects on the methods available and the advantages and disadvantages of these methods, and to assist in their decisions of masonry arch bridge conservation. The main focus is on understanding and comparing different methodsof strengtheningandrepairing masonry arch bridge. Keywords-VisualInspection1RehabilitationTechniques2 Irwin Bridge3 1. INTRODUCTION In India before some years ago there are many masonry structures were constructed. Irwin bridge is also masonry arch bridge structure constructed in 1929atSangli city. The bridge was constructed formanydifferentpurposes like transport, trading, aesthetics of river etc. The Irwin bridge was constructed 90years ago so that, The development of a variety of strengthening and repairing techniques has been necessary forhistoricalmasonrybridge. Particularly the many causes of degradation, different failures, and needs for upgrading load-bearingcapacitymust be considered in defining the Conservationworksneededfor a bridge. In this paper the rehabilitation techniques are suggested by the use of conditional survey of bridge. The general information of Irwin bridge:  Total height of Bridge = 70 ft from bed level  No. of Span = 13, each span of 50ft outer to outer distance  Total length of Bridge = 819ft  Carriage way = 20ft  Footpath = 3ft both side  Arch Rise = (1/5) ratio (to the span length)  Pier = 12ft wide, 55ft height, at bottom 8ft circumference  Abutment = 14ft thick Location of Irwin Bridge 1.1 What is rehabilitation? Rehabilitation is the process of restoring the structure to service level, once it had and now lost, strengthening consists in endowing the structure with a service level, higher than that initially planned by modifying the structure not necessarily damaged structure. It is evident that rehabilitation of bridges involves addressing a myriad of problems and no single technique or retrofit method could offer a complete solution. Therefore, answer liesin being able to addresseach individualproblem with an appropriate technique to result in a durable retrofit. This article aims at providing an overview of a variety of structural retrofit techniquesavailable to rehabilitatebridge 1.2 METHODOLOGY A. To conduct condition survey of bridge Analyze the data and prepare checklist for condition survey. Also, other required documentation to be prepared. In Visual Inspection of the Bridge- A survey of the Bridgecan reveal the Following: 1. Cracks in deck slabs, piers and abutments. 2. Concrete disintegration and exposed steel reinforcements photographs can be helpful. 3. To reveal deterioration in concrete by slight tapping using hammer. 4. Corrosion in reinforcement and metal sections. 5. Status of Balconies – cracks, corrosion, concrete deterioration etc.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 3394 6. Cracks in wing walls indicating swelling in members or corrosion and lose joints. 7. Leakages from different part of bridge. 8. Deficiencies in arch of bridge. 8. Damages in different joints of bridge. B. To detect damages By using visual inspection detect the damages and inspect level of damage 2. Rehabilitation techniques on basis of condition survey of bridge A. Pier and spandrel wall Fig1-:Cracks and loosening of joints Problem: Areas of cracking to be detected in pier and spandrel wall Rehabilitation techniques Cellular Foamed Cement Grouting To facilitate grouting, 12-mm (0.5-in.) diameter holeswere drilled through mortar joints within the exposed below-grade masonry to terminate within the inner-core rubble. Injection tubeswere then installed intotheholesand the masonry ‘rough-parged’ to facilitate containment of the fluid grout during the subsequent core stabilization work. A cellular foam grout was then mixed and pumped through the injection tubes to fill any voids within the inner core rubble of the masonry. This part of the restoration strategy was designed to further stabilize the foundation walls and provide for a more uniform load distribution across the cross-section of the masonry assembly. The cellular grout was selected for its beneficial load absorbing characteristics, as well as its low-strength and lightweight properties. A methyl cellulose-type admixture was combined with the cement/water grout to provide thixotropic properties to the plastic grout, minimizing leakage to the interior through cracks and gaps. To generate the foam, a proprietary surfactant-type admixture was diluted in water and forced through a nozzle when fed from a pressurized steel cylindrical tank. The nozzle end was fitted with a pressure gauge, shut-off valve and a return line, which allowed control of the flow of grout and pumping pressures at the grout injection point. Fig2-: cellular foamed cement grouting B. Abutment: Fig3-: Delamination of stones in abutments Problem: The most common problem observed during inspection of abutment are vertical movement, scour and under mining of the foundation, drainage system malfunction, materials defects, presence of excessive or unexplained moisture at or behind the abutmentsetc.Also,it is most affected part of bridge. Rehabilitation technique: the delaminated stones are replaced using new stones. They are properly fixed by using concrete masonry with adding admixtures to it. The joints are filled properly with concrete mortar. Proper finishing is provided to surface of abutment. Fig4:- Mortar joint in stone masonry
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 3395 Concrete Apron Wall A concrete apron wall can be utilized as a permanent structural repair for abutmentsthat have experiencedscour. For this repair, a concrete wall is cast against the streamside of the abutment and extended down at least eight feet. Riprap is typically utilized as another means of protection against future scour. Special attention should be paid to the riprap placement. The riprap will help to ensure that the new apron wall is not undermined due to scour.The lost soil below the abutment should also be filled with concrete in order to reintroduce bearing capacity. Fig5: - Concrete apron wall C. Deck slab Fig.6:-Spalling of concrete of deck slab Problem: The bottom joint of deck slab is damaged and loose joint sections. There is deteriorated mortar at the edges of the joint of deck slab and spandrel wall. Stones are loosening at joint section decreasing bonding between deck & wing wall. Rehabilitation technique: All loose, disintegrated and unsound concrete shall be removed from portions of the deck slab. There shall be take care not to damage reinforcement bars or expansion joints which are to remain in place. Any damage to reinforcement bars or expansion joints shall be corrected. Areas to be repaired will be determined and marked. A concrete saw shall be used to provide vertical edges approximately 3/4 in. (20 mm) deep around the perimeter of the area to be patched when a concrete overlay is not specified. Where high steel is present, the depth may be reduced. A saw cut will not be required on those boundaries along the face of the curb, parapet or joint or when sharp vertical edges are provided by hydro-demolition. The loose and unsound concrete shall be removed by chipping, with power driven hand tools or by hydro- demolition equipment. All exposed reinforcing bars and newly exposed concrete shall be thoroughly blast cleaned. Where the bond between existing concrete and reinforcement steel within the patch area has been destroyed, the concrete adjacent to the bar shall beremoved to a depth that will permit new concrete to bond to the entire periphery of the exposed bar. A minimum of 1 in. (25 mm) clearance will be required. There may be require enlarging a designated removal area should inspection indicate deterioration beyond the limits previously designated. In this event, a new saw cut shall be made around the extended area before additional removal is begun. The removal area shall not be enlarged solely to correct bonded reinforcement or deficient lap lengths. Reinforcement Treatment The Care shall be exercised during concrete removal to protect the reinforcement bars and structural steel from damage. Any damage to the reinforcement barsorstructural steel to remain in place shall be repaired or replaced. All existing reinforcement bars shall remain in place except as herein provided for corroded bars. Tying of loose bars will be required. Reinforcing bars which have been cut or have lost 25 percent or more of their original cross-sectional area shall be supplemented by new in-kind reinforcement bars. New bars shall be lapped a minimum of 32 bar diameters to existing bars. An approved mechanical bar splice capable of developing in tension at least 125 percent of the yield strength of the existing bar shall be used when it is not feasible to provide the minimum bar lap. No welding of bars will be permitted. Immediately after completion of the concrete removal and reinforcement repairs, the repair areas shall be cleaned of dust and debris. Once the initial cleaning is completed, the repair areas shall be thoroughly blast cleaned to a roughened appearance free from all foreign matter. Placement & Finishing of Concrete Repair The patch area shall be cleaned and shall be thoroughly wetted and maintained in a dampened conditionwith water for at least 12 hours before placement of the concrete. Any excess water shall be removed by compressed air or by vacuuming prior to the beginning of concrete placement. Water shall not be applied to the patch surface within one hour before or at any time during placement of the concrete. Concrete patches shall be cured by the Wetted Burlap or Wetted Cotton Mat. A 72-hour minimum dryingperiod shall be required before placing waterproofingorhot-mixasphalt surfacing.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 3396 Other damages 1.River Bank Fig7:- absence of training wall in river bed Problem The size of the river bed goeson increasing due toabsenceof training wall on western side. Rehabilitation techniques The purpose of river training is to stabilize the river channel along the certain alignment with a certain cross section. we suggest the following methods for Krishna River Bank. Guide Banks: Guide banks are artificial embankments constructed along the flow direction both upstream and downstream of the abutment on one or both sides of the river for guiding the river flow past a bridge (or other hydraulic structures, such as weirs or barrages) without causing damage to the bridge and its approaches. The overall waterway between guide banks is obtained by adding thickness of piers to the clear waterway. Figure 9.4 shows the plan and section of a typical guide bank. The elevation of the top of the guide banks is kept 1.5 to 2.5 m above the HFL of 100-year flood. The top width of guide banks is generally kept between 6 and 9 m. Locally available earth materials are used for constructing guide banks. To prevent erosion of thematerial from the river-side surface of guide bank, the surface is stone-pitched. Fig 8:- Guide Bank Bank Protection: Bank failures due to either wave action or erosive action of river flow can lead to river breach causing huge losses in terms of human lives, property, agriculture and other utilities. Measures of bank protection such as revetment, riprap, etc. provide a shield against erosion of bankmaterial. Bank revetments are mattressesof suitable material,suchas reinforced asphalt and articulated concrete, laid over the bank surface to be protected. Riprap of hard angular rock fragments (or concrete blocks) laid on a thick layer of rubble or quarry chips is cheap and durable method of bank protection. Another way of providing bank protection is by means of flexible brick pitching For this purpose, bricks having a pair of holes across their full width are laid on the bank slope and for some distance on the river bed at the toe of the bank. A G.I. wire passes through the brick holes. The wires are knotted at their ends and suitably anchored so that the bricks are held together and also small movement of bricks is possible. Fig10:-Bank Protection
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 3397 Embankments: The floods may be prevented from submerging the country by constructing earth embankments. They are generally constructed up to a height of 12 m. They are designed and constructed in the same way as an earth dam. The embankments are generally constructed paralleltotheriver channel. Types of embankments are i. Marginal embankments or dykes or levees, ii. Retired embankments. i. Marginal embankments or dykes or levees, The marginal embankmentsareconstructedasclose to the banks as possible to restrict the flood water from submerging the area behind them. Figure showstheposition of marginal embankments. They are designed to hold up the water up to a maximum anticipated HFL without the possibility of overtopping and with a view to withstand all external pressures. This condition is met with by providing sufficient freeboard, bed width, top width and stone protection on adequate slopes. Fig9:- Marginal embankments or levees ii. Retired embankments. Retired embankmentsare constructed at a distancefromthe river banks. Thus, retired embankments are the intermediate type between the case of marginal embankments and river with no embankments. Retired embankments are generally constructed on a lower ground away from the banks. 2. Gallery of bridge Fig11:-Gallery of bridge Problem The components of gallery of bridge gets eroded. There is corrosion formed at stairs of gallery. Erosion and loosening of joints in gallery of bridge. Rehabilitation techniques The rehabilitation techniques or repairs for gallery are not suitable due to very severe damages are occurred. So, it is necessary to reconstruct the gallery of bridge. III. CONCLUSION 1.Worksof strengthening and repair are concerned with the restoration of the stability, integrity and durability of the structure together with the bridges return to service. 2.Regular general maintenance of a bridge is also important in preserving the integrity and stability and preventing further damages from incurring. By following a logical and careful process of bridge conservation and using repairing and strengthening techniques that follow conservation guidelines such as those presented in this paper, successful intervention which respects the needs for performance improvementsand cultural preservation may be performed. 3.commonly used retrofitting techniques for masonry arch bridgesand finally the suggestions regardingthedescription of retrofitting and preserving bridge side by side adopting suitable techniques along with their respective pictures. 4.In case of extreme unrepairable cracks and otherdamages, we can conduct rebuilding technique with every step of carefulness and alertness so that it does not affect the identity of the historic structures. 5.The retrofitting techniques has been discussed in this Project for Irwin Bridge are the personal suggestions after understanding the level of damages in bridge, studying the image of particular bridge. ACKNOWLEDGEMENT The authorscan acknowledge any person/authoritiesinthis section. This is not mandatory. This research was supported by Prof. C.R. Chimanna, Prof. A.A.Mahajan , and Prpf. V. G. Awasare . VTC patgaon, Miraj. We are thankful to our colleagues from Civil Department, who provided expertise that greatly assisted the research. We have to express out -appreciation to the Prof. C. R. Chimanna for shearing their pearlsof wisdomwithus during the course of research.
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 3398 REFERENCES 1) Study of literat Atkins (2010) “StructuresCondition Survey of BPRN” London Bridges Engineering Group. 2) Bhaskar S, Chellappan A, Prabakar J, andSrinivasan P, (2007, 1973) “A review on ‘Different bond test procedures and bond behaviour of rebars in concrete”, SERC Research Report No. MLP-12841- RR-02, September, 2007. Indian Standard Methods of testing bond in reinforced concrete(PartIPullout test), IS: 2770-1967, Indian Standards Institution, New Delhi. RILEM/CEB/FIP Recommendation, “Bond test for reinforcing steel”, Materials and Structures, 6(32), (1973), 97-105. 3) James A. Kerns, P.E.(1995) “What is Conditional Survey” Real State Journal, 1995, ACISP-153,25-42. 4) Krishnamoorthy T.S., Gopalakrishnan S., Balasubramanian K., Bharatkumar B.H., and Rama Mohan Rao. P., (2002) “Investigations on the cementitious grouts containing supplementary cementitious materials”, International Journal of Cement and Concrete Research, 32(9), (2002), 1395-1405. Product information sheets, Elkem materials, 2008. 5) Maria Rashidi, Peter Gibson(2011)“AMethodology for Bridge Condition Assessment” Australasian Transport Research Forum 2011, Proceedings 28 - 30 September 2011, Adelaide, Australia. 6) Springfield Illinois Publication (2011) “Bridge Condition Report Procedures & Practices” BCR Procedures & Practices – Revised December 2011. 7) Vinod Bolle1, Prof. Santhosh Kumar Banoth(2016) “Review On Railway Bridge &Track Condition Monitoring System” International Journal of Advance Research, Ideas and Innovations in Technology ISSN: 2454-132X (Volume2, Issue4). BIOGRAPHIES Mr. Anirudha Patil, pursuing B.E. in civil Engineering at Vishveshwarya Technical Campus, Patgaon, Miraj. Mr. Tushar Naik, pursuing B.E. in civil Engineering at Vishveshwarya Technical Campus, Patgaon, Miraj. Mr.Deepak Sharma, pursuing B.E. in civil Engineering at Vishveshwarya Technical Campus, Patgaon, Miraj. Mr. Vaibhav Mohite, pursuing B.E. in civil Engineering at Vishveshwarya Technical Campus, Patgaon, Miraj.