DMRC CC-27 PROJECT
CONTENT
Introduction to Project CC-27
Tendering For the Project
Bore Hole Results
Vasant Vihar structure lay out
Bottom-Up Construction
Excavation/Soil stabilization
Concreting Operation& Repair
Waterproofing of Structure
Project Name-Design and construction of tunnel & underground metro stations from Janakpuri
West to Botanical Garden(CC-27)
Key Details
COST OF PROJECT(App) INR 1435 CRORES
COMPLETION PERIOD(Expected) 42 MONTHS
TENDER SECURITY AMOUNT INR 14.35 CRORES
TENDERING AGENCY DMRC
TENDER GIVEN TO L&T-SUCG-JV
Quoted Price & Final Price 1265 CRORES
Proposed Route Map for CC-27
Tendering For the Project
Tender document is further divided into volumes that define the scope
and procedure for various activities related to project. The CC-27 Tender
Document was further divided into 9 volumes
 Volume 1- Instructions for tenderer and form of tender.
 Volume 2-General conditions and special conditions for contract
 Volume 3-Emplyers Requirement about Functional, Design &
construction.
 Volume 4-Outline Design Specifications
 Volume 5-Outline Construction Specifications
 Volume 6-Tender Drawings
 Volume 7-Bill of Quantities
 Volume 8-Vonditions on Safety, Health & Environment
 Volume 9-Reference Document(Geotechnical report)
Eligibility Criteria for bidding
Work Experience
Financial Standings
a) Liquidity
b) Profitability
c) Net Worth
d) Annual Turnover
Bid Capacity Criteria
Minimum Key staff Requirement
AWARDING OF TENDER
• The most basic criteria for awarding the tender is as follows but not
limited to it
“The employer awards the contract to the tenderer whose tender has
been determined to be substantially responsive and compliant to the
requirements contained in the tender document & who has offered the
lowest evaluated tender price”
MY CONCLUSION
TENDER
A-Z Everything on site …..is done according to the tender document.
Bore Hole Data
-Before starting construction Geotechnical data was collected from various
locations along the proposed route to know about soil characteristics.
-Bore Holes were made along the proposed route up to a depth of 30m below
the existing ground level.
Next Image shows the Soil Strata available at various sections of the project.
BORE
HOLE
61
BORE
HOLE
35
Based on the samples obtained from the bore holes following tests were conducted
on the samples-
Following tests were then performed on the collected samples-
• Sieve analysis.
• Hydrometer testing
• Moisture content
• Specific gravity
• Dry Density
• Atterbergs limit
• Triaxial shear test(uu, cu, cd)
• Consolidation test
• Direct Shear Test
• Chemical analysis of both soil and water samples
The collected rock core samples(VASANT VIHAR SITE) were taken and the following tests
were conducted on them-
• Density test
• Water absorption& porosity
• Hardness
• Ucs
• Point load index
• Vasant Vihar-Hard Rock strata (Bottom-Up construction approach)
• Hauz Khas - Soft Soil strata(Top-Bottom construction approach)
Vasant Vihar Station
TOP VIEW – VASANT VIHAR
METHOD OF CONSTRUCTION- BOTTOM UP CONSTRUCTION
EAST SIDE
WEST SIDE
VASANT VIHAR PLAN
1
2
3
4
D
S.NO DESCRIPTION UNIT SCOPE
1 STATION LENGTH M 265
2 WIDTH(BOX) M 21.57
3 Launching Shafts Num 2
4 Entery/Exit Num 4
East Side
West Side
ROOF SLAB
CONCOURSE SLAB
BASE SLAB
1
2
3
4
5
6
7
8
1 BLOCK WORK
2 UPE(UNDER PLATFORM EXHAUST)
3 OTE(OVER TRACK EXHAUST)
4 PLATFORM SLAB
5 FRESH AIR DUCT(ROOF SLAB)
6 SCUPPER DRAIN(BEHIND BW)
7 FALSE CEILING BELOW CONCOURSE
8 COLUMN
9 RETAINING WALL
CROSS SECTIONAL VIEW VASANT VIHAR
9
BLOCK WORK INFRONT OF RETAINING WALL Dimension of Block– 400*200*200
Mortar-Cement sand mortar with ratio 1:4
Block Strength- 7.5 N/mm2
MIX –M15
Thickness of the bond-10mm
Joint Type-Basic English Bond(1 block thick)
CONCOURSE SLAB
ROOF SLAB
BLOCK WORK IN FRONT
OF RETAINING WALL
RETAINING WALL
INITIAL LAYER OF BLOCK WORK
BLOCK WORK FOR ROOMS
ARCHITECTURAL ROOM PLAN(CONCOURSE SLAB)
EXAMPLE
U23-SAFETY ROOM
U64-ELECTRICAL APPLIANCE REPAIR
U26-WAITING ROOM
UPE(UNDER PLATFORM EXHAUST)
BASE SLAB
UPE CUTOUT
PLATFORM SLAB
UNDER PLATFROM
EXHAUST
(UNDER PLATFROM EXHAUST ) are basically cut outs provided below the platform slab
OTE(Over Track Exhaust)
COOLING MECHANISM OF OTE
OTE LIFTING
FRESH AIR DUCTS
Ventilation systems provided below the roof slab for a constant supply
of fresh air.
ROOF SLAB
SCUPPER DRAIN(BEHIND BLOCK WORK) Water proofing material (Brush Bond Rfx)
Scupper Drain Behind Block Work
DIMENSION- .37m X .3m
PCC M15
Brush bond Rfx Coating for waterproofing of
thickness 1mm
Structural Drawing Scupper Drain
False Ceiling
Factors that determine the construction approach are
• Soil Profile- As suggested by the geotechnical investigation.
• Site Location-Weather the site is located in an isolated environment or urban dwellings.
• Cost Incurred -Depends
• Surrounding Environment-Weather the Surrounding environment consists of existing
structures and road networks.
• Time Constrain-The total time available for completion of project.
• Availability of Material-The availability of material for filling and construction Activities
to be carried out
Vasant Vihar Station
Area-33,706 sqm
Hauz Khas Station
Area- 15,533.69sqm
Bottom Up construction Method(VASANT VIHAR)
Bottom up construction
involves
Excavation & Soil
Stabilization
Construction of Base slab,
Concourse slab & Roof slab
Construction of Columns and
Retaining wall.
Waterproofing of structure
Filling Operations
Excavation
• Excavation on site was carried out according to IS 3764:1992.
• Excavation can be done in many ways depending on the soil profile in our
case it was done using Breakers and Excavators.
• Excavation Volume= 18*265*26=124020 cum(Lump sum)
Machinery used in excavation
EXCAVATORS
 Hydraulic 220 Excavator
 Hydraulic 210 Excavator
 Hydraulic 215 Excavator
BREAKERS
Hydraulic 340 Breaker
Hydraulic 210 Breaker
HEAD ATTACHMENT FOR
BREAKER
Slope/Soil Stabilization
Soldier Pilling
Shot creting
 Shot Creting is done according to IS 9012:1978(reaffirmed 2002)
 Mix- 1:3 To 1:5 is used depending upon surface . W/c is kept at .30-.35
 Plasticizer -6% wt of cement( Glenium sky 777)
 Operating temp- 5deg to 30deg Celsius
Mesh Dia- 4mm
Mesh overlap length- 300mm
Min area for applying-300mm*300mm
Procedure For shotcreting 1)Clean the surface off the loose material
and then clean with air compressor.
2) Apply a layer of shortcrete to the surface
and wait for it to cure.
3) Apply the wire mesh on the surface and
bind it to the surface using reinforcements.
4) Now apply the second layer of the
shortcrete on the surface . Keep the nozzle
perpendicular at a distance of 1 to 1.4 m
away form surface.
Mechanism for Dry- Mix shot creting
Construction of slabs
Base Slabs
-M40 Grade Concrete was used
-Reinforcement conforming to FE500D shall be used on site.
-Water Stops –PVC water stop will be used to arrest the water leakage (at construction joints)
-Binding wire used for binding reinforcement has a core dia of 1.25mm
-Formwork ply 12mm thick coated with Formwork oil for easy removal of formwork
-Cover blocks should be used depending on clearance that needs to be provided to the reinforcement(50mm Base slab)
-Vibrator of 60mm Dia 4nos.
Mix Design of concrete M 40
MATERIAL QUANTIY(KG) TYPE
CEMENT 380 ULTRA TECH(OPC 53 GRADE)
FLYASH 80 Ashtech:IS3812(NTPC BADARPUR)
AGGREGATE(10mm) 481 Kotpulti
AGGREGATE(20mm) 666 Kotpulti
RIVER SAND 677 Yamuna Nagar
W/C RATIO .35
ADMIXTURE @ .85% 3.91 Glenium 147,Suretec(BASF)
W/P CAMPOunds@1% 4.6 MasterPel 760(BASF)
WATER 161 R.O Water at Batching Plant
Following admixture were used
Masterglenium 147 provides
 Extended workability
 Providing the ultimate high strength, especially ready.
Application
Add to the mixture 80% -90% of the calculated water for
the concrete mix and then, with the remaining water
masterglenium 147 must be added to the mixture,
Water Proofing Campound used-
Masterpel 760
 Provides resistance to water penetration either under
hydrostatic pressure or capillary absorption.
 Imparts integral water tightness to structures.
Application
MasterPel 760 is a ready-to-use powder which is
dispensed into the concrete together with the cement.
M-40 has been used for 3 slabs and retaining walls
Concreting Operations
Earth CompactorConcreting on site
Proper vibration should be provided in order
to avoid cold joints
Concrete pour sequence
• After the final set has taken place wet hessian cloth shall be placed and covered by polythene sheet. The
hessian cloth shall be kept permanently damp
• After 24Hours hessian cloth and the polythene sheet shall be removed and the area would be ponded with
water .
• For vertical curing the hessian cloth along with polythene sheet shall secure the surface for at leasdays
before next vertical pouring begins. The hessian cloth should be damp all the time.
Concourse Slab
Concrtete-M40
5.25 m below roof level
Thickness- 550mm
Formwork & scaffolding for Concourse slab
Reinforcement For concourse slab
Cut outs provided both on concourse and roof slab
Roof Slab
Sealing Of construction Joints on roof slab
Cut Outs of the roof Slab( Sattelite view
Design Mix M-40
Thickness-1.8m
Roof level
Machinery used for Concreting
Volume-6cum but loaded up to 5-5.5cum.
Rotations –Depend upon distance and Mix
BOOM PLACER
Concrete Bucket Vol 1-1.2cum
CONCRETING THROUGH PIPES
Mix Design M-50
MATERIAL QUANTIY(KG) TYPE
CEMENT 410 ULTRA TECH(OPC 53 GRADE)
MICRO SILICA 22 TAM CEM
AGGREGATE(10mm) 457 Kotpulti
AGGREGATE(20mm) 686 Kotpulti
RIVER SAND 765 Yamuna Nagar
W/C RATIO .37
ADMIXTURE @
.85%
2.16 Glenium sky 777
WATER 151 R.O Water at Batching Plant
M 50 was used for concreting of columns
MasterGlenium SKY 8777 -is the super plasticizer based on
second generation polycarboxylic ether polymers,
developed using nano-technology. The product has been
primarily developed for applications in high performance
ready-mix concrete to facilitate
 Capability of delivering high quality concrete at any
time to the job site in place.Production of concrete with
low w/c ratio that meets international guidelines for
consistency classes (EN 206-1) without loss of
workability.
TAM CEM
TamCem Micro Silica is composed of silicon dioxide
(5i02).Collected from silicon metal and ferrosilicon.
TamCem Micro Silica will react with the Calcium Hydroxide
from the cement, which will form more of the Calcium
Silicate hydrate, increasing the strength of the concrete.
Concrete Repairing
BULGED CONCRETE
Bulged Concrete – Bulging in concrete takes place due to displacement of formwork.
Surface preparation: The bulged area on concrete surface shall be hacked with chisel to
required line, level. All dirt, dust shall be cleaned with brush and water.
Repairing: Hacked area will be patched up with cement: sand mortar of proportion 1:4.
On the completion of patch up work, the exposed area shall be thoroughly cured.
Grout Loss Exposed aggregate surface created by exit of cement slurry/grout mortar from
the gaps of formwork due to excessive vibration, unsealed joint of formwork
during pouring of concrete.
Repair
-The concrete surface is cleaned and free from dust/oil/grease etc by using
broom or wire mesh by scrubbing vigorously.
-After removal of loose particles surface is washed with water.
-Patch-up is done at cleaned surface with non-shrink Grout conbextra GP2
It is due segregation of aggregates and mortar into the concrete.
Honeycomb creates in structures due to mainly improper
compaction in terms of excessive/insufficient vibration at the
time of placing.
Minor Honey Combing
Major Honeycombing
Repairing Involves-
The loose aggregate that are exposed shall be removed by
gently tapping on it. After removal of all loose aggregate,
dust, dirt etc. by wire/Soft brush then surface will be
cleaned with Water. Patchup is done by using conbextra
GP2/Rendroc which is mixed with cement and then the
paste is applied.
Waterproofing of Structure
Chemicals used for Waterproofing
-For Priming Purpose
Master Seal M2525(Provided In two component A & B)
-Waterproofing Layer
Master Seal M800(Provided In two component A & B)
Master Seal M2525-Master Emaco 2525 is a solvent free, high-performance, versatile epoxy binder that can be used to
produce a range of epoxy resin based mortars.
Used For-
 Structural bonding of new to old concrete
 Production of epoxy resin mortars to grout bolt holes
 Steel bonding
Master Seal M800
A highly elastic, solvent free, ultra-fast curing, spray applied polyurethane coating and it is used in
waterproofing applications. Master Seal M800 is a solvent free, two component substance. It is a
highly reactive two component mixture used for waterproofing in tunneling and cut & cover stations
Uses-
Waterproofing compound with a setting time of 2-3seconds
Step wise Process for Waterproofing.
-SURFACE CONDITIONS
The RCC surface shall be dry before waterproofing.
Any ingress for water seepage shall be identified and treated.
Construction Joint shall be filled with high performance water stop grout of crystalline growth.
Step 1 Surface Preparation & Filling of
any voids by Epoxy and Cement
-MIXING
• Application of Primer Involves mixing of component A and B and application on
the surface as shown MIXING OF A & B
-Thin coat of mixed primer (RESIN + HARDNER) on the surface shall be
mechanically & uniformly applied, ensuring continuous film soon after surface
preparation is complete.
-Moisture content in the substrate shall be less than 5 %.
-The drying period of primer depends on the ambient temperature and relative
humidity.
Checking moisture before application of
primer.
BASF AGGREGATES
BASF AGGREGATES are sprinkled over the primer layer immediately after application of
the primer. Aggregates help in roughening the surface of primer for proper bonding
between the primer layer and the waterproofing membrane layer.
Application of the water proofing
Layer with 2 component gun
Special 2 Component
gun used for applying
waterproofing
campound
-MasterSeal M800 is available with the Part A coloured white
and the Part B colored black.
-This results in a uniform grey colour of the sprayed material
thus giving the sprayer a visual control of the quality of the
mixing, and machine faults become immediately obvious. If
the membrane colour changes, stop spraying and check
machine .
-MasterSeal M800 is normally applied at 1.5–2.0kg/SQM this
corresponds to a thickness of 1.5–2.0mm.
Ponding test
Protective Covering to Waterproofing membrane
Backfilling Operations
THANK YOU!!!

More Related Content

What's hot

62617938 launching-girder
62617938 launching-girder62617938 launching-girder
62617938 launching-girderlotuseye
 
Bitumin road construction
Bitumin road constructionBitumin road construction
Bitumin road constructionritwizkumar1
 
Construction of flexible pavement
Construction of flexible pavementConstruction of flexible pavement
Construction of flexible pavementUTU Dehradun
 
Metro ppt-180628112005
Metro ppt-180628112005Metro ppt-180628112005
Metro ppt-180628112005PRATAP MISHRA
 
Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Akhilesh Shukla
 
Metro Construction
Metro ConstructionMetro Construction
Metro ConstructionMayur Soni
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresBimenpreet Kaur
 
2.7 BRIDGE LAUNCHING.ppt
2.7 BRIDGE LAUNCHING.ppt2.7 BRIDGE LAUNCHING.ppt
2.7 BRIDGE LAUNCHING.pptPrasannaRaniB
 
Constructability of ug stations
Constructability of ug stationsConstructability of ug stations
Constructability of ug stationsPALLA NARASIMHUDU
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)Anil Gupta
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTssuser5fea8f
 
NATM ppt sumit
NATM ppt sumitNATM ppt sumit
NATM ppt sumitSuMitt MaNdla
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segmentsAxay Sharma
 
Construction Of Road
Construction Of RoadConstruction Of Road
Construction Of RoadShahid Raza
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTSatyam Anand
 
Airport Runway Construction
Airport Runway ConstructionAirport Runway Construction
Airport Runway ConstructionHafizullah Sadat
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONRising Sher
 

What's hot (20)

62617938 launching-girder
62617938 launching-girder62617938 launching-girder
62617938 launching-girder
 
Casting yard
Casting yardCasting yard
Casting yard
 
Bitumin road construction
Bitumin road constructionBitumin road construction
Bitumin road construction
 
Construction of flexible pavement
Construction of flexible pavementConstruction of flexible pavement
Construction of flexible pavement
 
Road construction report
Road construction reportRoad construction report
Road construction report
 
Metro ppt-180628112005
Metro ppt-180628112005Metro ppt-180628112005
Metro ppt-180628112005
 
Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...
 
Metro Construction
Metro ConstructionMetro Construction
Metro Construction
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and features
 
2.7 BRIDGE LAUNCHING.ppt
2.7 BRIDGE LAUNCHING.ppt2.7 BRIDGE LAUNCHING.ppt
2.7 BRIDGE LAUNCHING.ppt
 
Constructability of ug stations
Constructability of ug stationsConstructability of ug stations
Constructability of ug stations
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
 
NATM ppt sumit
NATM ppt sumitNATM ppt sumit
NATM ppt sumit
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segments
 
Construction Of Road
Construction Of RoadConstruction Of Road
Construction Of Road
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
Airport Runway Construction
Airport Runway ConstructionAirport Runway Construction
Airport Runway Construction
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTION
 

Similar to DMRC (METRO TRAINING REPORT)

Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT Amol Pawar
 
rigid and flexiable pavement design ppt
rigid and flexiable pavement design pptrigid and flexiable pavement design ppt
rigid and flexiable pavement design pptrakeshchoudhary129
 
training1 (1).pptx
training1 (1).pptxtraining1 (1).pptx
training1 (1).pptxErLavKushPrasad
 
presentation on shotcrete technology
presentation on shotcrete technologypresentation on shotcrete technology
presentation on shotcrete technologyAbhishek Paul
 
presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)alamrintu
 
Major Project ppt
Major Project ppt Major Project ppt
Major Project ppt Narayan Gupta
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentationAKASHGARG131
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessityShashank Gaurav
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxsfQyoom
 
Building construction
Building constructionBuilding construction
Building constructionnhmurad
 
Upload a presentation to download Space frame
Upload a presentation to download Space frameUpload a presentation to download Space frame
Upload a presentation to download Space frameBurkaDinka
 
Lining in tunnels
Lining in tunnelsLining in tunnels
Lining in tunnelsHimanshu Batra
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationShuBham RaNa
 
Abhishek presentation.pptx
Abhishek presentation.pptxAbhishek presentation.pptx
Abhishek presentation.pptxRAKESHPANDEY754083
 
The construction method for surface drainage (housing)
The construction method for surface drainage (housing)The construction method for surface drainage (housing)
The construction method for surface drainage (housing)Adib Ramli
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
 

Similar to DMRC (METRO TRAINING REPORT) (20)

Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT
 
rigid and flexiable pavement design ppt
rigid and flexiable pavement design pptrigid and flexiable pavement design ppt
rigid and flexiable pavement design ppt
 
training1 (1).pptx
training1 (1).pptxtraining1 (1).pptx
training1 (1).pptx
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
 
presentation on shotcrete technology
presentation on shotcrete technologypresentation on shotcrete technology
presentation on shotcrete technology
 
presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)
 
Major Project ppt
Major Project ppt Major Project ppt
Major Project ppt
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentation
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessity
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
Subgrade
SubgradeSubgrade
Subgrade
 
Building construction
Building constructionBuilding construction
Building construction
 
Metroppt
MetropptMetroppt
Metroppt
 
Husam CV updated (1)
Husam CV updated (1)Husam CV updated (1)
Husam CV updated (1)
 
Upload a presentation to download Space frame
Upload a presentation to download Space frameUpload a presentation to download Space frame
Upload a presentation to download Space frame
 
Lining in tunnels
Lining in tunnelsLining in tunnels
Lining in tunnels
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 
Abhishek presentation.pptx
Abhishek presentation.pptxAbhishek presentation.pptx
Abhishek presentation.pptx
 
The construction method for surface drainage (housing)
The construction method for surface drainage (housing)The construction method for surface drainage (housing)
The construction method for surface drainage (housing)
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 

More from Sukhdarshan Singh

Pre Bid Risk Assessment
Pre Bid Risk AssessmentPre Bid Risk Assessment
Pre Bid Risk AssessmentSukhdarshan Singh
 
Study on DMRC tenders and JICA guidelines.
Study on DMRC tenders and JICA guidelines.Study on DMRC tenders and JICA guidelines.
Study on DMRC tenders and JICA guidelines.Sukhdarshan Singh
 
DESIGN PROJECT FOR PAVEMENT
DESIGN PROJECT FOR PAVEMENTDESIGN PROJECT FOR PAVEMENT
DESIGN PROJECT FOR PAVEMENTSukhdarshan Singh
 
Civil engineering material bitumen
Civil engineering material bitumenCivil engineering material bitumen
Civil engineering material bitumenSukhdarshan Singh
 

More from Sukhdarshan Singh (10)

Pre Bid Risk Assessment
Pre Bid Risk AssessmentPre Bid Risk Assessment
Pre Bid Risk Assessment
 
Study on DMRC tenders and JICA guidelines.
Study on DMRC tenders and JICA guidelines.Study on DMRC tenders and JICA guidelines.
Study on DMRC tenders and JICA guidelines.
 
DESIGN PROJECT FOR PAVEMENT
DESIGN PROJECT FOR PAVEMENTDESIGN PROJECT FOR PAVEMENT
DESIGN PROJECT FOR PAVEMENT
 
The eiffel tower (1)
The eiffel tower (1)The eiffel tower (1)
The eiffel tower (1)
 
Group presentation
Group presentationGroup presentation
Group presentation
 
Function
FunctionFunction
Function
 
Flight of geese
Flight of geeseFlight of geese
Flight of geese
 
Civil engineering material bitumen
Civil engineering material bitumenCivil engineering material bitumen
Civil engineering material bitumen
 
Group development
Group developmentGroup development
Group development
 
Steel structures
Steel structuresSteel structures
Steel structures
 

Recently uploaded

VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...Call Girls in Nagpur High Profile
 
Government polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdGovernment polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdshivubhavv
 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxmirandajeremy200221
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxjanettecruzeiro1
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...kumaririma588
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
The Art of Batik, template ppt aesthetic
The Art of Batik, template ppt aestheticThe Art of Batik, template ppt aesthetic
The Art of Batik, template ppt aestheticTiaFebriani
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation decktbatkhuu1
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 
Delhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfParomita Roy
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceanilsa9823
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja Nehwal
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Servicearoranaina404
 

Recently uploaded (20)

VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
 
Government polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdGovernment polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcd
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptx
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptx
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
The Art of Batik, template ppt aesthetic
The Art of Batik, template ppt aestheticThe Art of Batik, template ppt aesthetic
The Art of Batik, template ppt aesthetic
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 
Delhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
 
꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...
꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...
꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...
 

DMRC (METRO TRAINING REPORT)

  • 1. A detailed presentation on the construction of underground Metro Station Sukhdarshan Under the guidance of Mr Tanuj Chopra L&T SUCG JV DELHI DMRC CC-27 PROJECT
  • 2. CONTENT Introduction to Project CC-27 Tendering For the Project Bore Hole Results Vasant Vihar structure lay out Bottom-Up Construction Excavation/Soil stabilization Concreting Operation& Repair Waterproofing of Structure
  • 3. Project Name-Design and construction of tunnel & underground metro stations from Janakpuri West to Botanical Garden(CC-27) Key Details COST OF PROJECT(App) INR 1435 CRORES COMPLETION PERIOD(Expected) 42 MONTHS TENDER SECURITY AMOUNT INR 14.35 CRORES TENDERING AGENCY DMRC TENDER GIVEN TO L&T-SUCG-JV Quoted Price & Final Price 1265 CRORES
  • 4. Proposed Route Map for CC-27
  • 5. Tendering For the Project Tender document is further divided into volumes that define the scope and procedure for various activities related to project. The CC-27 Tender Document was further divided into 9 volumes  Volume 1- Instructions for tenderer and form of tender.  Volume 2-General conditions and special conditions for contract  Volume 3-Emplyers Requirement about Functional, Design & construction.  Volume 4-Outline Design Specifications  Volume 5-Outline Construction Specifications  Volume 6-Tender Drawings  Volume 7-Bill of Quantities  Volume 8-Vonditions on Safety, Health & Environment  Volume 9-Reference Document(Geotechnical report)
  • 6. Eligibility Criteria for bidding Work Experience Financial Standings a) Liquidity b) Profitability c) Net Worth d) Annual Turnover Bid Capacity Criteria Minimum Key staff Requirement
  • 7. AWARDING OF TENDER • The most basic criteria for awarding the tender is as follows but not limited to it “The employer awards the contract to the tenderer whose tender has been determined to be substantially responsive and compliant to the requirements contained in the tender document & who has offered the lowest evaluated tender price”
  • 8. MY CONCLUSION TENDER A-Z Everything on site …..is done according to the tender document.
  • 9. Bore Hole Data -Before starting construction Geotechnical data was collected from various locations along the proposed route to know about soil characteristics. -Bore Holes were made along the proposed route up to a depth of 30m below the existing ground level. Next Image shows the Soil Strata available at various sections of the project.
  • 11. Based on the samples obtained from the bore holes following tests were conducted on the samples- Following tests were then performed on the collected samples- • Sieve analysis. • Hydrometer testing • Moisture content • Specific gravity • Dry Density • Atterbergs limit • Triaxial shear test(uu, cu, cd) • Consolidation test • Direct Shear Test • Chemical analysis of both soil and water samples
  • 12. The collected rock core samples(VASANT VIHAR SITE) were taken and the following tests were conducted on them- • Density test • Water absorption& porosity • Hardness • Ucs • Point load index • Vasant Vihar-Hard Rock strata (Bottom-Up construction approach) • Hauz Khas - Soft Soil strata(Top-Bottom construction approach)
  • 13. Vasant Vihar Station TOP VIEW – VASANT VIHAR METHOD OF CONSTRUCTION- BOTTOM UP CONSTRUCTION EAST SIDE WEST SIDE
  • 14. VASANT VIHAR PLAN 1 2 3 4 D S.NO DESCRIPTION UNIT SCOPE 1 STATION LENGTH M 265 2 WIDTH(BOX) M 21.57 3 Launching Shafts Num 2 4 Entery/Exit Num 4 East Side West Side
  • 15. ROOF SLAB CONCOURSE SLAB BASE SLAB 1 2 3 4 5 6 7 8 1 BLOCK WORK 2 UPE(UNDER PLATFORM EXHAUST) 3 OTE(OVER TRACK EXHAUST) 4 PLATFORM SLAB 5 FRESH AIR DUCT(ROOF SLAB) 6 SCUPPER DRAIN(BEHIND BW) 7 FALSE CEILING BELOW CONCOURSE 8 COLUMN 9 RETAINING WALL CROSS SECTIONAL VIEW VASANT VIHAR 9
  • 16. BLOCK WORK INFRONT OF RETAINING WALL Dimension of Block– 400*200*200 Mortar-Cement sand mortar with ratio 1:4 Block Strength- 7.5 N/mm2 MIX –M15 Thickness of the bond-10mm Joint Type-Basic English Bond(1 block thick) CONCOURSE SLAB ROOF SLAB BLOCK WORK IN FRONT OF RETAINING WALL RETAINING WALL INITIAL LAYER OF BLOCK WORK
  • 17. BLOCK WORK FOR ROOMS ARCHITECTURAL ROOM PLAN(CONCOURSE SLAB) EXAMPLE U23-SAFETY ROOM U64-ELECTRICAL APPLIANCE REPAIR U26-WAITING ROOM
  • 18. UPE(UNDER PLATFORM EXHAUST) BASE SLAB UPE CUTOUT PLATFORM SLAB UNDER PLATFROM EXHAUST (UNDER PLATFROM EXHAUST ) are basically cut outs provided below the platform slab
  • 20. COOLING MECHANISM OF OTE OTE LIFTING
  • 21. FRESH AIR DUCTS Ventilation systems provided below the roof slab for a constant supply of fresh air. ROOF SLAB
  • 22. SCUPPER DRAIN(BEHIND BLOCK WORK) Water proofing material (Brush Bond Rfx) Scupper Drain Behind Block Work DIMENSION- .37m X .3m PCC M15 Brush bond Rfx Coating for waterproofing of thickness 1mm
  • 25. Factors that determine the construction approach are • Soil Profile- As suggested by the geotechnical investigation. • Site Location-Weather the site is located in an isolated environment or urban dwellings. • Cost Incurred -Depends • Surrounding Environment-Weather the Surrounding environment consists of existing structures and road networks. • Time Constrain-The total time available for completion of project. • Availability of Material-The availability of material for filling and construction Activities to be carried out
  • 27. Hauz Khas Station Area- 15,533.69sqm
  • 28. Bottom Up construction Method(VASANT VIHAR) Bottom up construction involves Excavation & Soil Stabilization Construction of Base slab, Concourse slab & Roof slab Construction of Columns and Retaining wall. Waterproofing of structure Filling Operations
  • 29. Excavation • Excavation on site was carried out according to IS 3764:1992. • Excavation can be done in many ways depending on the soil profile in our case it was done using Breakers and Excavators. • Excavation Volume= 18*265*26=124020 cum(Lump sum)
  • 30. Machinery used in excavation EXCAVATORS  Hydraulic 220 Excavator  Hydraulic 210 Excavator  Hydraulic 215 Excavator BREAKERS Hydraulic 340 Breaker Hydraulic 210 Breaker HEAD ATTACHMENT FOR BREAKER
  • 32. Shot creting  Shot Creting is done according to IS 9012:1978(reaffirmed 2002)  Mix- 1:3 To 1:5 is used depending upon surface . W/c is kept at .30-.35  Plasticizer -6% wt of cement( Glenium sky 777)  Operating temp- 5deg to 30deg Celsius Mesh Dia- 4mm Mesh overlap length- 300mm Min area for applying-300mm*300mm
  • 33. Procedure For shotcreting 1)Clean the surface off the loose material and then clean with air compressor. 2) Apply a layer of shortcrete to the surface and wait for it to cure. 3) Apply the wire mesh on the surface and bind it to the surface using reinforcements. 4) Now apply the second layer of the shortcrete on the surface . Keep the nozzle perpendicular at a distance of 1 to 1.4 m away form surface. Mechanism for Dry- Mix shot creting
  • 34. Construction of slabs Base Slabs -M40 Grade Concrete was used -Reinforcement conforming to FE500D shall be used on site. -Water Stops –PVC water stop will be used to arrest the water leakage (at construction joints) -Binding wire used for binding reinforcement has a core dia of 1.25mm -Formwork ply 12mm thick coated with Formwork oil for easy removal of formwork -Cover blocks should be used depending on clearance that needs to be provided to the reinforcement(50mm Base slab) -Vibrator of 60mm Dia 4nos.
  • 35. Mix Design of concrete M 40 MATERIAL QUANTIY(KG) TYPE CEMENT 380 ULTRA TECH(OPC 53 GRADE) FLYASH 80 Ashtech:IS3812(NTPC BADARPUR) AGGREGATE(10mm) 481 Kotpulti AGGREGATE(20mm) 666 Kotpulti RIVER SAND 677 Yamuna Nagar W/C RATIO .35 ADMIXTURE @ .85% 3.91 Glenium 147,Suretec(BASF) W/P CAMPOunds@1% 4.6 MasterPel 760(BASF) WATER 161 R.O Water at Batching Plant Following admixture were used Masterglenium 147 provides  Extended workability  Providing the ultimate high strength, especially ready. Application Add to the mixture 80% -90% of the calculated water for the concrete mix and then, with the remaining water masterglenium 147 must be added to the mixture, Water Proofing Campound used- Masterpel 760  Provides resistance to water penetration either under hydrostatic pressure or capillary absorption.  Imparts integral water tightness to structures. Application MasterPel 760 is a ready-to-use powder which is dispensed into the concrete together with the cement. M-40 has been used for 3 slabs and retaining walls
  • 36. Concreting Operations Earth CompactorConcreting on site Proper vibration should be provided in order to avoid cold joints Concrete pour sequence
  • 37. • After the final set has taken place wet hessian cloth shall be placed and covered by polythene sheet. The hessian cloth shall be kept permanently damp • After 24Hours hessian cloth and the polythene sheet shall be removed and the area would be ponded with water . • For vertical curing the hessian cloth along with polythene sheet shall secure the surface for at leasdays before next vertical pouring begins. The hessian cloth should be damp all the time.
  • 38. Concourse Slab Concrtete-M40 5.25 m below roof level Thickness- 550mm Formwork & scaffolding for Concourse slab
  • 39. Reinforcement For concourse slab Cut outs provided both on concourse and roof slab
  • 40. Roof Slab Sealing Of construction Joints on roof slab Cut Outs of the roof Slab( Sattelite view Design Mix M-40 Thickness-1.8m Roof level
  • 41. Machinery used for Concreting Volume-6cum but loaded up to 5-5.5cum. Rotations –Depend upon distance and Mix BOOM PLACER Concrete Bucket Vol 1-1.2cum CONCRETING THROUGH PIPES
  • 42. Mix Design M-50 MATERIAL QUANTIY(KG) TYPE CEMENT 410 ULTRA TECH(OPC 53 GRADE) MICRO SILICA 22 TAM CEM AGGREGATE(10mm) 457 Kotpulti AGGREGATE(20mm) 686 Kotpulti RIVER SAND 765 Yamuna Nagar W/C RATIO .37 ADMIXTURE @ .85% 2.16 Glenium sky 777 WATER 151 R.O Water at Batching Plant M 50 was used for concreting of columns MasterGlenium SKY 8777 -is the super plasticizer based on second generation polycarboxylic ether polymers, developed using nano-technology. The product has been primarily developed for applications in high performance ready-mix concrete to facilitate  Capability of delivering high quality concrete at any time to the job site in place.Production of concrete with low w/c ratio that meets international guidelines for consistency classes (EN 206-1) without loss of workability. TAM CEM TamCem Micro Silica is composed of silicon dioxide (5i02).Collected from silicon metal and ferrosilicon. TamCem Micro Silica will react with the Calcium Hydroxide from the cement, which will form more of the Calcium Silicate hydrate, increasing the strength of the concrete.
  • 43. Concrete Repairing BULGED CONCRETE Bulged Concrete – Bulging in concrete takes place due to displacement of formwork. Surface preparation: The bulged area on concrete surface shall be hacked with chisel to required line, level. All dirt, dust shall be cleaned with brush and water. Repairing: Hacked area will be patched up with cement: sand mortar of proportion 1:4. On the completion of patch up work, the exposed area shall be thoroughly cured. Grout Loss Exposed aggregate surface created by exit of cement slurry/grout mortar from the gaps of formwork due to excessive vibration, unsealed joint of formwork during pouring of concrete. Repair -The concrete surface is cleaned and free from dust/oil/grease etc by using broom or wire mesh by scrubbing vigorously. -After removal of loose particles surface is washed with water. -Patch-up is done at cleaned surface with non-shrink Grout conbextra GP2
  • 44. It is due segregation of aggregates and mortar into the concrete. Honeycomb creates in structures due to mainly improper compaction in terms of excessive/insufficient vibration at the time of placing. Minor Honey Combing Major Honeycombing Repairing Involves- The loose aggregate that are exposed shall be removed by gently tapping on it. After removal of all loose aggregate, dust, dirt etc. by wire/Soft brush then surface will be cleaned with Water. Patchup is done by using conbextra GP2/Rendroc which is mixed with cement and then the paste is applied.
  • 45. Waterproofing of Structure Chemicals used for Waterproofing -For Priming Purpose Master Seal M2525(Provided In two component A & B) -Waterproofing Layer Master Seal M800(Provided In two component A & B) Master Seal M2525-Master Emaco 2525 is a solvent free, high-performance, versatile epoxy binder that can be used to produce a range of epoxy resin based mortars. Used For-  Structural bonding of new to old concrete  Production of epoxy resin mortars to grout bolt holes  Steel bonding
  • 46. Master Seal M800 A highly elastic, solvent free, ultra-fast curing, spray applied polyurethane coating and it is used in waterproofing applications. Master Seal M800 is a solvent free, two component substance. It is a highly reactive two component mixture used for waterproofing in tunneling and cut & cover stations Uses- Waterproofing compound with a setting time of 2-3seconds Step wise Process for Waterproofing. -SURFACE CONDITIONS The RCC surface shall be dry before waterproofing. Any ingress for water seepage shall be identified and treated. Construction Joint shall be filled with high performance water stop grout of crystalline growth. Step 1 Surface Preparation & Filling of any voids by Epoxy and Cement
  • 47. -MIXING • Application of Primer Involves mixing of component A and B and application on the surface as shown MIXING OF A & B -Thin coat of mixed primer (RESIN + HARDNER) on the surface shall be mechanically & uniformly applied, ensuring continuous film soon after surface preparation is complete. -Moisture content in the substrate shall be less than 5 %. -The drying period of primer depends on the ambient temperature and relative humidity.
  • 48. Checking moisture before application of primer. BASF AGGREGATES BASF AGGREGATES are sprinkled over the primer layer immediately after application of the primer. Aggregates help in roughening the surface of primer for proper bonding between the primer layer and the waterproofing membrane layer.
  • 49. Application of the water proofing Layer with 2 component gun Special 2 Component gun used for applying waterproofing campound -MasterSeal M800 is available with the Part A coloured white and the Part B colored black. -This results in a uniform grey colour of the sprayed material thus giving the sprayer a visual control of the quality of the mixing, and machine faults become immediately obvious. If the membrane colour changes, stop spraying and check machine . -MasterSeal M800 is normally applied at 1.5–2.0kg/SQM this corresponds to a thickness of 1.5–2.0mm. Ponding test
  • 50. Protective Covering to Waterproofing membrane