International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1350
Investigation Effect of Outage Line on the Transmission Line for
Karbalaa-132Kv Zone in Iraqi Network
1 Rashid H. AL-Rubayi & Department of Electrical Engineering, University of Technology
2 Afaneen A. Abood & Department of Electrical Engineering, University of Technology
3 Mohammed R. Saeed AL-hendawi & Department of Electrical Engineering, University of Technology
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - System security includes practices designed to
keep the system running when components fail. Bullets to be
ejected by automatic relay may storm the damage transfer
line. If the appropriate commitment to transmission flows is
maintained when the transmission and generation obligation
is maintained, the remaining transmission lines can take the
increasing load while remaining within thelimits. Becausethe
specific times that start events that cause components to fail
are unpredictable, the system must be operated at all times in
such a way that the system will not leave in a serious situation
in the event of any event initiating credibility. Power system
equipment is designed to operate within certain limits.
Automatic devices that can cause equipment to betransferred
from the system if these limits are violated protect mostpieces
of equipment. In the event that an event occurs on a system
that leaves it working at a violation limit, the event may be
followed by a series of other actions that switch the other
equipment out of service. If this process continues with
successive failures, the entire system or large parts of it may
collapse completely. In this paper, it has been building
simulation program to study the cases outage lines of the
karbalaa-132kV network system. Tow cases adopted for the
purposes of the study. Where study and discuss those cases in
detail and its impact on network performance. It was
diagnosed lines, which causes increased power flow over the
limit in addition to the reflection of the other feeding lines.
Key Words:- contingency analysis; dc power flow;
power system security.
1.INTRODUCTION
The DC power flow simplifies the power flow by making a
number of approximations including 1) completelyignoring
the reactive power balance equations, 2) assuming all
voltage magnitudes are identically one per unit, 3) ignoring
line losses and 4) ignoring tap dependence in the
transformer reactance. Hence,thedc powerflow reduces the
power flow problem to a set of linear equations. The dc
solution load value has increased to match the total ac load
plus losses, a manner to make comparison between the ac
and dc solution results possible. The effectiveness of the
method developed is identified throughitsapplicationto the
karbalaa-132kV network system..
2. DC POWER FLOW ALGORITHM
AC power flow algorithmshave high calculationprecision
but do not have fast speed. In real power dispatch or power
market analysis, the requirement of calculation precision is
not very high, but the requirement of calculation speed is of
most concern, especially for a large - scale power system.
More simplification power flow algorithms than fast
decoupled power flow algorithms are used. One algorithm is
called “MW Only”. In this method, the Q - V equation in the
fast decoupledpowerflowmodeliscompletelydropped.Only
the following P – θ equation is used to correct the angle
according to the real power mismatch.
In the MW - only power flow calculation, the voltage
magnitude can be handled either as constant or as 1.0 during
each P – θ iteration. For the convergence, only real power
mismatch is checked no matter what the reactive power
mismatch is.Anothermostsimplifiedpowerflowalgorithmis
DC power flow. It is also an MW - only method but has the
following assumptions:
(1) All the voltage magnitudes are equal to 1.0.
(2) Ignore the resistance of the branch; i.e., the susceptance
of the branch is
……(2)
(3) The angle difference on the two ends of the branch is
very small, so that we
(4) Ignore all ground branches; that is,
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1351
Therefore, the DC power flow model will be
.. (3)
Or
…….. (4)
Where: B ′ matrix are the same as those in the XB version of
fast decoupled power flow but we ignore the matrix B ″.
That is,
…… (5)
…… (6)
The DC power flow is a purely linear equation, so only one
iteration calculation is needed to obtain the power flow
solution. However, it is only good for calculating real power
flows on transmission lines and transformers. The power
flowing on each line using the DC power flow is then
……(7)
3. SENSITIVITY FACTOR MATRICES CALCULATION
The sensitivity analyses are becoming more and more
important in practical power system operations including in
power market operations. These are analyzes and discusses
all kinds of sensitivity factors such as loss sensitivity factor,
generator shift factor (GSF), constraint shift factor, line
outage distribution factor (LODF) and responsefactorforthe
transfer path. It also addresses the practical application of
these sensitivity factors including a practical method to
convert the sensitivities withdifferentreferences.Thepower
operator uses these to study and monitor marketandsystem
behavior and detect possible problems in the operation.
These sensitivity calculations are also used to determine
whether the online capacity as indicated in the resourceplan
is located in the right place in the network to serve the
forecasted demand. If congestion or violation exists, the
generation scheduling based on the sensitivity calculations
can determine whether or not a different allocation of the
available resourcescould resolve the congestion or violation
problem [3].
The problem of studying thousands of possible outages
becomes very difficult to solve if it is desired to present the
results quickly. One of the easiest ways to provide a quick
calculation of possible overloads is to use linear sensitivity
factors. These factors show the approximate change in line
flows forchanges in generation onthenetworkconfiguration
and are derived from the DC load flow presented in the
flowing steps. These factors can be derived in a variety of
ways and basically come down to two types [3]:
1. Generation shift factors.
2. Line outage distribution factors.
Setp1:- Now calculate the from impedance as
equation
……(8)
…..(9)
We gets
……(10)
Step2:- Since bus one is a slack bus and eliminate (1st row &
the 1st column) from matrix in equation (10). We get
…….(11)
Step3:- Find the inverse of , we gets
…….(12)
Step4:- Determine the sensitivity matrix by :
……(13)
Step5:- Determine the generation shift sensitivity factor by
performing the outage of the generation connected to
selected bus (k) with connected line ( ) from the following
equation:
……(14)
Step6:- Determine of the line outage distribution sensitivity
factor by performing the outage of the line connected to bus
is called ( ) that affected on the line in bus anther line is
called from the following equation:
……. (15)
The generation shift factors are designated and have
the following definition:
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1352
…….. (16)
Where:
= line index.
i = bus index.
= change in megawatt power flow on line
when a change in generation, occurs at bus i.
= change in generation at bus i.
It is assumed in this definition that the change in generation,
, is exactly compensated by an opposite change in
generation at the reference bus,and that all other generators
remain fixed. The factorthenrepresentsthesensitivityof
the flow on line to a change in generation at bus i. Suppose
one wanted to study the outage of a large generatingunitand
it wasassumed thatall the generation lost would be madeup
by the reference generation (wewilldealwiththecasewhere
the generation is picked up by many machines shortly).Ifthe
generator in question was generating MW and it was lost,
we would represent , as [4]:
= - …… (17)
And the new power flow on each line in the network could
be calculated using a pre calculated set of “a” factors as
follows:
= for = 1.. . LL …….(18)
Where:
= flow on line after the generator on bus i fails.
= flow before the failure.
The “outage flow,” on each line can be compared to its
limit and those exceeding their limit flagged for alarming.
This would tell the operations personnel that the loss of the
generator on bus i would result in an overload on line .
The line outage distribution factors are used in a similar
manner; only hey apply to the testing for overloads when
transmission circuits are lost. By definition, the line outage
distribution factor has the following meaning:
…… (19)
= line outage distribution factor when monitoring line l
after an outage on line k.
= change in MW flow on line .
= original flow on line k before it was outaged
(opened).
If one knows the power on line and line k, the flow on line
with line k out can be determined using "d" factors.
…… (20)
Where:
= preoutage flows on lines and k,
respectively.
= flow on line with line k out.
4. RESULT and DISCUSSION:
The line and bus data of the karbalaa-132kVnetwork.The
system input data is shows in tables (1, 2, 3, 4 & 5), and
figures (1, 2 & 3).
Table 1: Name Bus in Iraqi Network and Present Work
From Bus To Bus
In Iraqi Network
In
Present
Work
In Iraqi Network
In
Present
Work
Numbe
r
Name
Numbe
r
Numbe
r
Name
Numbe
r
20302
MUS3
132.00
4 21303
KBLN
132.00
5
20302
MUS3
132.00
4 21310
KRBE
132.00
2
20313
BAB3
132.00
3 21311
HNDS
132.00
8
20313
BAB3
132.00
3 21311
HNDS
132.00
8
21301
AKDC
132.00
7 21303
KBLN
132.00
5
21301
AKDC
132.00
7 21303
KBLN
132.00
5
21302
KRBL
132.00
9 21304
KBLW
132.00
6
21302
KRBL
132.00
9 21304
KBLW
132.00
6
21302
KRBL
132.00
9 21311
HNDS
132.00
8
21302
KRBL
132.00
9 21311
HNDS
132.00
8
21303
KBLN
132.00
5 21304
KBLW
132.00
6
21303
KBLN
132.00
5 21305
KRBG
132.00
1
21303
KBLN
132.00
5 21310
KRBE
132.00
2
21304
KBLW
132.00
6 21305
KRBG
132.00
1
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1353
Table 2: Line Data
Branch
No.
From
Bus
To
Bus
Line R Line X
(pu) (pu)
1 1 5 0.009904 0.055415
2 1 6 0.007533 0.042147
3 2 5 0.003488 0.021525
4 3 8 0.002887 0.01615
5 3 8 0.002887 0.01615
6 4 2 0.010114 0.062422
7 4 5 0.013392 0.074928
8 5 6 0.002464 0.015205
9 5 7 0.04951 0.19767
10 5 7 0.04951 0.19767
11 6 9 0.002371 0.013269
12 6 9 0.002371 0.013269
13 8 9 0.005679 0.035053
14 8 9 0.005679 0.035053
Table 3: Limit and Length Line Data on The Transmission
Line
Branch
No.
From
Bus
To
Bus
Limit
(MVA)
Limit
(MW)
Length
(Km)
1 1 5 236 188.8 35.5
2 1 6 236 188.8 27
3 2 5 236 188.8 12.5
4 3 8 236 188.8 10.346
5 3 8 236 188.8 10.346
6 4 2 236 188.8 36.25
7 4 5 236 188.8 48
8 5 6 236 188.8 8.83
9 5 7 123 98.4 89
10 5 7 123 98.4 89
11 6 9 236 188.8 8.5
12 6 9 236 188.8 8.5
13 8 9 236 188.8 20.356
14 8 9 236 188.8 20.356
Table 4: Bus Data
Bus
Numbe
r
Bus
Type
Voltage
Schedul
e
(pu)
Powe
r load
(MW)
Powe
r gen.
(MW)
Max.
Powe
r gen.
(MW)
Min.
Powe
r gen.
(MW)
1
Swin
g
0.976 54.2 152.8 260 30
2 Gen. 0.98 70.2 255.6 300 30
3 Gen. 1 0 112.2 180 0
4 Gen. 1 0 58 132 0
5 Load 0.967 228.9 0
6 Load 0.971 61.2 0
7 Load 0.948 33.4 0
8 Load 0.991 36.1 0
9 Load 0.974 91 0
Table 5: Power Flow through Branches for The Karbalaa-
132kV Network
Branch
No.
Line
MW
Limit
MW
From
MW
To
Percentage
from limit
1 1-5 188.8 39.7 39.6 21.03%
2 1-6 188.8 58.9 58.6 31.20%
3 2-5 188.8 186.7 185.4 98.89%
4 3-8 188.8 56.1 55.9 29.71%
5 3-8 188.8 56.1 55.9 29.71%
6 4-2 188.8 1.5 1.5 0.79%
7 4-5 188.8 56.5 55.9 29.93%
8 5-6 188.8 18.2 18.2 9.64%
9 5-7 98.4 16.9 16.9 17.17%
10 5-7 98.4 16.9 16.9 17.17%
11 6-9 188.8 7.8 7.8 4.13%
12 6-9 188.8 7.8 7.8 4.13%
13 8-9 188.8 37.9 37.7 20.07%
14 8-9 188.8 37.9 37.7 20.07%
Figure 1: Power Flow through Branches for The
Karbalaa-132kV Network
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1354
Figure 2: Branch Percentage Limit for The Karbalaa-
132kV Network
The start simulator program (themathematicmode
that discussed in item 3) output results could be which
depends based on the following steps:-
Step 1:- Sensitivity Factor Matrices (SFM)
The sensitivity factor matrices were determined in the
simulation program. It was to get the results as shows in the
table 6.
Table 6: SFM for the Karbalaa-132kV Network
0 0 0 0 0 0 0 0 0
0
0.04
68
0.02
07
0.03
83
0.02
82
0.02
07
0.02
82
0.02
07
0.02
07
0
0.02
07
0.05
86
0.02
07
0.02
07
0.02
64
0.02
07
0.05
06
0.03
30
0
0.03
83
0.02
07
0.06
78
0.02
82
0.02
07
0.02
82
0.02
07
0.02
07
0
0.02
82
0.02
07
0.02
82
0.02
82
0.02
07
0.02
82
0.02
07
0.02
07
0
0.02
07
0.02
64
0.02
07
0.02
07
0.02
64
0.02
07
0.02
64
0.02
64
0
0.02
82
0.02
07
0.02
82
0.02
82
0.02
07
0.12
70
0.02
07
0.02
07
0
0.02
07
0.05
06
0.02
07
0.02
07
0.02
64
0.02
07
0.05
06
0.03
30
0
0.02
07
0.03
30
0.02
07
0.02
07
0.02
64
0.02
07
0.03
30
0.03
30
Step 2:- Generator Shift Factor (GSF)
The generator shift factor was determined in the
simulation program. It was to get the results as shows in the
table 7.
Table 7: GSF for the Karbalaa-132kV Network
Line
Bus
1
Bus 2 Bus 3 Bus 4
1-5 0
-
0.5086
-
0.3738
-
0.5086
1-6 0
-
0.4914
-
0.6262
-
0.4914
2-5 0 0.8645 0 0.4716
3-8 0 0 1 0
4-2 0
-
0.1355
0 0.4716
4-5 0 0.1355 0 0.5284
5-6 0 0.4914
-
0.3738
0.4914
5-7 0 0 0 0
6-9 0 0 -1 0
8-9 0 0 1 0
Step 3:- Line Outage Distribution Factor (LODF)
The line outaged distribution factor was determine
by simulation program. It was to get the results as shows in
the table 8.
Table 8: GSF for the Karbalaa-132kV Network
Line
1-
5
1-
6
2-
5
3-
8
4-
2
4-
5
5-
6
5-
7
6-
9
8-
9
1-5 1 0 0 0 0 -1 0 0 0
1-6 1 0 0 0 0 1 0 0 0
2-5 0 0 0 -1 1 0 0 0 0
3-8 0 0 0 0 0 0 0 0 0
4-2 0 0 -1 0 1 0 0 0 0
4-5 0 0 1 0 1 0 0 0 0
5-6 -1 1 0 0 0 0 0 0 0
5-7 0 0 0 0 0 0 0 0 0
6-9 0 0 0 0 0 0 0 0 0
8-9 0 0 0 0 0 0 0 0 0
The simulation program was use to study multi
cases of line outage for karbalaa-132kV network asfollows:-
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1355
LoadGenerator
Bus. 1
KRBG
Bus. 2
KRBE
Bus. 3
BAB-K
Bus. 4
MUS-K
Bus. 8
HNDS
Bus. 7
AKDC
Bus. 9
KRBL
Bus. 6
KBLW
Bus. 5
KBLN
Figure 3: Karbalaa-132kV network
Case 1: (4-5) outage line
When the line (4-5) have outaged, the power flow will be
redistribution on other lines as shown in table (9)andfigure
(4 & 5). It was noticed that was existingproblemsbyoutaged
this line such as over power flow at line (2-5) with a
percentage value of 128.81% of its limit.
For treatment the over power flow at line (2-5), the
correction factor at generation bus-2 (KRBE) was chosen
with value of (-62.93 MW). On other side,thedecrement was
taken at generator unit which to be connected at the same
bus of value (192.67 MW); whereas this value within range.
The percentage decrement 75.38% of the real value of
(255.6 MW). In addition to above, the same value was
increased at generation slack bus (KRBG), the redistributed
of power flow after treatment the over load with outage line
(4-5) as shown in table (10), Figures (6 & 7).
Case 2: (2-5) outage line
When the line (2-5) have outaged, the power flow will be
redistributed on other lines as shown in table (11), figure (8
& 9). It was noticed that was existing problems by outaged
this line such as over power flow at line (4-5) with a
percentage value of 128.81%.
For treatment the over power flow at line (4-5), the
correction factor at generation bus-2 (KRBE) was chosen
with value of (-401.52 MW). On other side, the decrement
was taken at generator unit which to be connected at the
same bus of value under minimum generation; This value
impossible to be used to treat over power flow at these lines
because the generation at bus-2 (KRBE) would not within
range of the generator constraints.
Table 9: Power Flow at Outage Line (4-5)
BranchNo.
Line
MWLimit
Before Outage (4-
5)
After Outage (4-5)
Stateofbranch
MWFrom
MWTo
Percentag
e
fromlimit
MWFrom
MWTo
Percentag
e
fromlimit
1
1-
5
188.
8
39.
7
39.
6
21.03
%
39.
7
39.
6
21.03
%
2
1-
6
188.
8
58.
9
58.
6
31.20
%
58.
9
58.
6
31.20
%
3
2-
5
188.
8
18
7
18
5
98.89
%
24
3
24
1
128.81
%
overflow
4
3-
8
188.
8
56.
1
55.
9
29.71
%
56.
1
55.
9
29.71
%
5
3-
8
188.
8
56.
1
55.
9
29.71
%
56.
1
55.
9
29.71
%
6
4-
2
188.
8
1.5 1.5
0.79
%
58
57.
4
30.72
%
7
4-
5
188.
8
56.
5
55.
9
29.93
%
0 0 0.00%
outage
8
5-
6
188.
8
18.
2
18.
2
9.64
%
18.
2
18.
2
9.64%
9
5-
7
98.4
16.
9
16.
9
17.17
%
16.
9
16.
7
17.17
%
1
0
5-
7
98.4
16.
9
16.
9
17.17
%
16.
9
16.
7
17.17
%
1
1
6-
9
188.
8
7.8 7.8
4.13
%
7.8 7.8 4.13%
1
2
6-
9
188.
8
7.8 7.8
4.13
%
7.8 7.8 4.13%
1
3
8-
9
188.
8
37.
9
37.
7
20.07
%
37.
9
37.
7
20.07
%
1
4
8-
9
188.
8
37.
9
37.
7
20.07
%
37.
9
37.
7
20.07
%
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1356
Figure 4: Power flow at an outaged line of (4-5)
Figure 5: Branch percentage limit at an outaged line (4-5)
Table 10: Power Flow after Treatment with Outage Line
(4-5)
BranchNo.
Line
MWLimit
Outage (4-5)
Before
Treatment
Stateofbranch
Outage (4-5)
After
Treatment
Stateofbranch
MW
From
MWTo
Percenta
ge
from
limit
MW
From
MWTo
Percenta
ge
from
limit
1
1-5
188.8
39.7
39.6
21.03
%
71.7
71.6
37.98
%
2
1-6
188.8
58.9
58.6
31.20
%
89.8
89.5
47.58
%
3
2-5
188.8
243
241
128.8
1%
over
flow
189
187
100.0
0%
4 3-8
188.8
56.1
55.9
29.71
%
56.1
55.9
29.71
%
5
3-8
188.8
56.1
55.9
29.71
%
56.1
55.9
29.71
%
6
4-2
188.8
58
57.4
30.72
%
66.5
65.9
35.24
%
7
4-5
188.8
0
0
0.00
%
outag
e
0
0
0.00
%
outag
e
8
5-6
188.8
18.2
18.2
9.64
%
-13
-13
6.74
%
rever
se
9
5-7
98.4
16.9
16.7
17.17
%
16.9
16.7
17.17
%
1
0
5-7
98.4
16.9
16.7
17.17
%
16.9
16.7
17.17
%
1
1
6-9
188.8
7.8
7.8
4.13
%
7.8
7.8
4.13
%
1
2
6-9
188.8
7.8
7.8
4.13
%
7.8
7.8
4.13
%
1
3
8-9
188.8
37.9
37.7
20.07
%
37.9
37.7
20.07
%
1
4
8-9
188.8
37.9
37.7
20.07
%
37.9
37.7
20.07
%
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1357
Figure 6: Power flow after treatment with an outaged line
of (4-5)
Figure 7: Branch percentage limit after treatment with an
outaged line of (10-9)
Table 11: Power Flow at Outage Line (2-5)
BranchNo.
Line
MWLimit
Before Outage
(2-5)
After Outage (2-
5)
Stateof
branch
MW
From
MWTo
Percent
age
from
limit
MW
From
MWTo
Percent
age
from
limit
1
1-5
188.8
39.7
39.6
21.03
%
39.7
39.6
21.03
%
2
1-6
188.8
58.9
58.6
31.20
%
58.9
58.6
31.20
%
3
2-5
188.8
187
185
98.89
%
0
0
0.00
%
outag
e
4
3-8
188.8
56.1
55.9
29.71
%
56.1
55.9
29.71
%
5
3-8
188.8
56.1
55.9
29.71
%
56.1
55.9
29.71
%
6
4-2
188.8
1.5
1.5
0.79
%
-185
-184
98.09
%
rever
se
7
4-5
188.8
56.5
55.9
29.93
%
243
241
128.8
1%
over
flow
8
5-6
188.8
18.2
18.2
9.64
%
18.2
18.2
9.64
%
9
5-7
98.4
16.9
16.9
17.17
%
16.9
16.7
17.17
%
10 5-7
98.4
16.9
16.9
17.17
%
16.9
16.7
17.17
%
11
6-9
188.8
7.8
7.8
4.13
%
7.8
7.8
4.13
%
12
6-9
188.8
7.8
7.8
4.13
%
7.8
7.8
4.13
%
13
8-9
188.8
37.9
37.7
20.07
%
37.9
37.7
20.07
%
14
8-9
188.8
37.9
37.7
20.07
%
37.9
37.7
20.07
%
Figure 8: Power flow at an outaged line of (2-5)
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1358
Figure 9: Branch percentage limit at an outaged line (2-5)
5. CONCLUSION
Through study and discussion out power flow lines
for ensuring the network system, we suggest the following:
1. Control through regeneration organization in
Buses.
2. Taking into consideration when designing the
network system to the limits Permitted to lines of
power flow to avoid a collapse in the network
system.
3. Add lines to power flow in parallel-diagnosedlines,
which happens rise in the power flow outside the
limit to avoid weaknesses in the design of system
network.
4. Add secondary line of power flow parallel to the
main lines of power flow to avoid the outage occur
frequently in some lines.
REFERENCES
[1] J.Z. Zhu , “ Power System Optimal Operation , ” Tutorial of
Chongqing University,
1990 .
[2] Y. He , Z.Y. Wen , F.Y. Wang , and Q.H. Zhou , Power
Systems Analysis, Huazhong
Polytechnic University Press , 1985 .
[3] A. Keyhani , A. Abur , and S. Hao , “ Evaluation of Power
Flow Techniques
for Personal Computers , ” IEEE Trans.onPowerSystem, Vol.
4 , No. 2 , 1989 ,
pp. 817 – 826 .
[4] O. Alsac and B. Sttot , “ Fast Decoupled power flow , ”
IEEE Trans. on Power
System, Vol. 93 , 1974 , pp. 859 – 869 .
[5] R.A.M. Van Amerongen , “ A General Purpose Version of
the Fast Decoupled
power flow , ” IEEE Summer Meeting, 1988 .
[6] A. Monticelli , A. Garcia , and O.R. Saavedra , “ Decoupled
power flow,: Hypothesis,
Derivations, and Testing , ” IEEE Trans. on Power System,
Vol. 5 , No. 4 , 1990 ,
pp. 1425 – 1431 .
BIOGRAPHY:
Rashid H. AL-Rubayi
Department of Electrical
Engineering, University of
Technology
Afaneen A. Abood
Department of Electrical
Engineering, University of
Technology
Mohammed R. Saeed
AL-hendawi
Department of Electrical
Engineering, University of
Technology

More Related Content

What's hot

Power System Simulation Lab (Formation of Y-Bus & Z-Bus Matrix)
Power System Simulation Lab (Formation of Y-Bus  & Z-Bus Matrix)Power System Simulation Lab (Formation of Y-Bus  & Z-Bus Matrix)
Power System Simulation Lab (Formation of Y-Bus & Z-Bus Matrix)Mathankumar S
 
POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )
POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )
POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )Mathankumar S
 
Power System Analysis unit - I
Power System Analysis unit - IPower System Analysis unit - I
Power System Analysis unit - Iarunatshare
 
Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...
Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...
Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...Venkata Gowtam Nallamothu
 
Power System Simulation Laboratory Manual
Power System Simulation Laboratory Manual Power System Simulation Laboratory Manual
Power System Simulation Laboratory Manual Santhosh Kumar
 
Online Voltage Stability Analysis using Synchrophasor Technology
Online Voltage Stability Analysis using Synchrophasor TechnologyOnline Voltage Stability Analysis using Synchrophasor Technology
Online Voltage Stability Analysis using Synchrophasor Technologyijsrd.com
 
Three Phase AC to DC Boost Converter Using D-Q Theory
Three Phase AC to DC Boost Converter Using D-Q TheoryThree Phase AC to DC Boost Converter Using D-Q Theory
Three Phase AC to DC Boost Converter Using D-Q TheoryIRJET Journal
 
Power Quality Improvement by SRF Based Control using D-STATCOM
Power Quality Improvement by  SRF Based Control using D-STATCOMPower Quality Improvement by  SRF Based Control using D-STATCOM
Power Quality Improvement by SRF Based Control using D-STATCOMIRJET Journal
 
1 ijaems oct-2015-3-design and development of novel matrix converter performance
1 ijaems oct-2015-3-design and development of novel matrix converter performance1 ijaems oct-2015-3-design and development of novel matrix converter performance
1 ijaems oct-2015-3-design and development of novel matrix converter performanceINFOGAIN PUBLICATION
 
IRJET- A Review on Three-Phase to Seven-Phase Power Converter using Transformer
IRJET- A Review on Three-Phase to Seven-Phase Power Converter using TransformerIRJET- A Review on Three-Phase to Seven-Phase Power Converter using Transformer
IRJET- A Review on Three-Phase to Seven-Phase Power Converter using TransformerIRJET Journal
 
Power System Analysis!
Power System Analysis!Power System Analysis!
Power System Analysis!PRABHAHARAN429
 
Practical of Power System Analysis (PSA)
Practical of Power System Analysis (PSA)Practical of Power System Analysis (PSA)
Practical of Power System Analysis (PSA)Aneel-k Suthar
 
Power Flow Analysis for Four Buses System by NR Method
Power Flow Analysis for Four Buses System by NR MethodPower Flow Analysis for Four Buses System by NR Method
Power Flow Analysis for Four Buses System by NR Methodijtsrd
 
Implementation of Instantaneous Reactive Power Theory for Current Harmonic Re...
Implementation of Instantaneous Reactive Power Theory for Current Harmonic Re...Implementation of Instantaneous Reactive Power Theory for Current Harmonic Re...
Implementation of Instantaneous Reactive Power Theory for Current Harmonic Re...IOSR Journals
 
IRJET- Three-Phase to Seven-Phase Power Converter using PI Controller and Tra...
IRJET- Three-Phase to Seven-Phase Power Converter using PI Controller and Tra...IRJET- Three-Phase to Seven-Phase Power Converter using PI Controller and Tra...
IRJET- Three-Phase to Seven-Phase Power Converter using PI Controller and Tra...IRJET Journal
 
IRJET- Review Paper on SVPWM Technique based D-STATCOM to Improve Power Q...
IRJET-  	  Review Paper on SVPWM Technique based D-STATCOM to Improve Power Q...IRJET-  	  Review Paper on SVPWM Technique based D-STATCOM to Improve Power Q...
IRJET- Review Paper on SVPWM Technique based D-STATCOM to Improve Power Q...IRJET Journal
 

What's hot (20)

Power System Simulation Lab (Formation of Y-Bus & Z-Bus Matrix)
Power System Simulation Lab (Formation of Y-Bus  & Z-Bus Matrix)Power System Simulation Lab (Formation of Y-Bus  & Z-Bus Matrix)
Power System Simulation Lab (Formation of Y-Bus & Z-Bus Matrix)
 
POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )
POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )
POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )
 
Power System Analysis unit - I
Power System Analysis unit - IPower System Analysis unit - I
Power System Analysis unit - I
 
Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...
Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...
Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...
 
Loadflowsynopsis
LoadflowsynopsisLoadflowsynopsis
Loadflowsynopsis
 
Power System Simulation Laboratory Manual
Power System Simulation Laboratory Manual Power System Simulation Laboratory Manual
Power System Simulation Laboratory Manual
 
Online Voltage Stability Analysis using Synchrophasor Technology
Online Voltage Stability Analysis using Synchrophasor TechnologyOnline Voltage Stability Analysis using Synchrophasor Technology
Online Voltage Stability Analysis using Synchrophasor Technology
 
Three Phase AC to DC Boost Converter Using D-Q Theory
Three Phase AC to DC Boost Converter Using D-Q TheoryThree Phase AC to DC Boost Converter Using D-Q Theory
Three Phase AC to DC Boost Converter Using D-Q Theory
 
Icraie 2014-s mishra2
Icraie 2014-s mishra2Icraie 2014-s mishra2
Icraie 2014-s mishra2
 
Power Quality Improvement by SRF Based Control using D-STATCOM
Power Quality Improvement by  SRF Based Control using D-STATCOMPower Quality Improvement by  SRF Based Control using D-STATCOM
Power Quality Improvement by SRF Based Control using D-STATCOM
 
1 ijaems oct-2015-3-design and development of novel matrix converter performance
1 ijaems oct-2015-3-design and development of novel matrix converter performance1 ijaems oct-2015-3-design and development of novel matrix converter performance
1 ijaems oct-2015-3-design and development of novel matrix converter performance
 
IRJET- A Review on Three-Phase to Seven-Phase Power Converter using Transformer
IRJET- A Review on Three-Phase to Seven-Phase Power Converter using TransformerIRJET- A Review on Three-Phase to Seven-Phase Power Converter using Transformer
IRJET- A Review on Three-Phase to Seven-Phase Power Converter using Transformer
 
Two-level inverter and three-level neutral point diode clamped inverter for t...
Two-level inverter and three-level neutral point diode clamped inverter for t...Two-level inverter and three-level neutral point diode clamped inverter for t...
Two-level inverter and three-level neutral point diode clamped inverter for t...
 
Power System Analysis!
Power System Analysis!Power System Analysis!
Power System Analysis!
 
Practical of Power System Analysis (PSA)
Practical of Power System Analysis (PSA)Practical of Power System Analysis (PSA)
Practical of Power System Analysis (PSA)
 
Power Flow Analysis for Four Buses System by NR Method
Power Flow Analysis for Four Buses System by NR MethodPower Flow Analysis for Four Buses System by NR Method
Power Flow Analysis for Four Buses System by NR Method
 
Implementation of Instantaneous Reactive Power Theory for Current Harmonic Re...
Implementation of Instantaneous Reactive Power Theory for Current Harmonic Re...Implementation of Instantaneous Reactive Power Theory for Current Harmonic Re...
Implementation of Instantaneous Reactive Power Theory for Current Harmonic Re...
 
IRJET- Three-Phase to Seven-Phase Power Converter using PI Controller and Tra...
IRJET- Three-Phase to Seven-Phase Power Converter using PI Controller and Tra...IRJET- Three-Phase to Seven-Phase Power Converter using PI Controller and Tra...
IRJET- Three-Phase to Seven-Phase Power Converter using PI Controller and Tra...
 
Computer Application in Power system: Chapter two - load flow analysis
Computer Application in Power system: Chapter two - load flow analysisComputer Application in Power system: Chapter two - load flow analysis
Computer Application in Power system: Chapter two - load flow analysis
 
IRJET- Review Paper on SVPWM Technique based D-STATCOM to Improve Power Q...
IRJET-  	  Review Paper on SVPWM Technique based D-STATCOM to Improve Power Q...IRJET-  	  Review Paper on SVPWM Technique based D-STATCOM to Improve Power Q...
IRJET- Review Paper on SVPWM Technique based D-STATCOM to Improve Power Q...
 

Similar to Outage impact on 132kV network

Influencing Factors on Power Losses in Electric Distribution Network
Influencing Factors on Power Losses in Electric Distribution NetworkInfluencing Factors on Power Losses in Electric Distribution Network
Influencing Factors on Power Losses in Electric Distribution NetworkIJAEMSJORNAL
 
Impact of Electric Vehicle Integration on Grid
Impact of Electric Vehicle Integration on GridImpact of Electric Vehicle Integration on Grid
Impact of Electric Vehicle Integration on Gridvivatechijri
 
Control of grid connected inverter system for sinusoidal current injection wi...
Control of grid connected inverter system for sinusoidal current injection wi...Control of grid connected inverter system for sinusoidal current injection wi...
Control of grid connected inverter system for sinusoidal current injection wi...ijiert bestjournal
 
Estimation of Radial Distribution Feeder Sections Average Failure Rate for Di...
Estimation of Radial Distribution Feeder Sections Average Failure Rate for Di...Estimation of Radial Distribution Feeder Sections Average Failure Rate for Di...
Estimation of Radial Distribution Feeder Sections Average Failure Rate for Di...IRJET Journal
 
A Novel Approach for Allocation of Optimal Capacitor and Distributed Generati...
A Novel Approach for Allocation of Optimal Capacitor and Distributed Generati...A Novel Approach for Allocation of Optimal Capacitor and Distributed Generati...
A Novel Approach for Allocation of Optimal Capacitor and Distributed Generati...paperpublications3
 
IRJET- An Optimal and Capacitor Placement for Loss Reduction in Electrica...
IRJET-  	  An Optimal and Capacitor Placement for Loss Reduction in Electrica...IRJET-  	  An Optimal and Capacitor Placement for Loss Reduction in Electrica...
IRJET- An Optimal and Capacitor Placement for Loss Reduction in Electrica...IRJET Journal
 
IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...
IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...
IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...IRJET Journal
 
IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...
IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...
IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...IRJET Journal
 
IRJET- Sensitivity Analysis for Optimal Distributed Generation Placement in P...
IRJET- Sensitivity Analysis for Optimal Distributed Generation Placement in P...IRJET- Sensitivity Analysis for Optimal Distributed Generation Placement in P...
IRJET- Sensitivity Analysis for Optimal Distributed Generation Placement in P...IRJET Journal
 
IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...
IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...
IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...IRJET Journal
 
IRJET-Identification of Weak Bus using Load Variation
IRJET-Identification of Weak Bus using Load VariationIRJET-Identification of Weak Bus using Load Variation
IRJET-Identification of Weak Bus using Load VariationIRJET Journal
 
IRJET- Comparative Analysis of Load Flow Methods on Standard Bus System
IRJET- Comparative Analysis of Load Flow Methods on Standard Bus SystemIRJET- Comparative Analysis of Load Flow Methods on Standard Bus System
IRJET- Comparative Analysis of Load Flow Methods on Standard Bus SystemIRJET Journal
 
OPTIMAL SITING AND SIZING OF D-STATCOM USING PARTICLE SWARM OPTIMIZATION
OPTIMAL SITING AND SIZING OF D-STATCOM USING PARTICLE SWARM OPTIMIZATIONOPTIMAL SITING AND SIZING OF D-STATCOM USING PARTICLE SWARM OPTIMIZATION
OPTIMAL SITING AND SIZING OF D-STATCOM USING PARTICLE SWARM OPTIMIZATIONIRJET Journal
 
Fault Modeling and Parametric Fault Detection in Analog VLSI Circuits using D...
Fault Modeling and Parametric Fault Detection in Analog VLSI Circuits using D...Fault Modeling and Parametric Fault Detection in Analog VLSI Circuits using D...
Fault Modeling and Parametric Fault Detection in Analog VLSI Circuits using D...IRJET Journal
 
IRJET- A Unique Methodology for Transmission Line Breakage Detection and ...
IRJET-  	  A Unique Methodology for Transmission Line Breakage Detection and ...IRJET-  	  A Unique Methodology for Transmission Line Breakage Detection and ...
IRJET- A Unique Methodology for Transmission Line Breakage Detection and ...IRJET Journal
 
IRJET- Assessment of Voltage Stability in a Power System Network and its Impr...
IRJET- Assessment of Voltage Stability in a Power System Network and its Impr...IRJET- Assessment of Voltage Stability in a Power System Network and its Impr...
IRJET- Assessment of Voltage Stability in a Power System Network and its Impr...IRJET Journal
 
Modelling and Testing of a Numerical Pilot Distance Relay for Compensated Tra...
Modelling and Testing of a Numerical Pilot Distance Relay for Compensated Tra...Modelling and Testing of a Numerical Pilot Distance Relay for Compensated Tra...
Modelling and Testing of a Numerical Pilot Distance Relay for Compensated Tra...MohammadMomani26
 
IRJET- Improvement of Voltage Stability by Placing UPFC using Fuzzy Logic
IRJET- Improvement of Voltage Stability by Placing UPFC using Fuzzy LogicIRJET- Improvement of Voltage Stability by Placing UPFC using Fuzzy Logic
IRJET- Improvement of Voltage Stability by Placing UPFC using Fuzzy LogicIRJET Journal
 
Solar PV Fed-Shunt APF to enhancement of Power Quality Issues in Distribution...
Solar PV Fed-Shunt APF to enhancement of Power Quality Issues in Distribution...Solar PV Fed-Shunt APF to enhancement of Power Quality Issues in Distribution...
Solar PV Fed-Shunt APF to enhancement of Power Quality Issues in Distribution...IRJET Journal
 
FAULT DETECTION IN FIVE BUS SYSTEM USING MATLAB & SIMULINK (DISCRETE WAVELET ...
FAULT DETECTION IN FIVE BUS SYSTEM USING MATLAB & SIMULINK (DISCRETE WAVELET ...FAULT DETECTION IN FIVE BUS SYSTEM USING MATLAB & SIMULINK (DISCRETE WAVELET ...
FAULT DETECTION IN FIVE BUS SYSTEM USING MATLAB & SIMULINK (DISCRETE WAVELET ...IRJET Journal
 

Similar to Outage impact on 132kV network (20)

Influencing Factors on Power Losses in Electric Distribution Network
Influencing Factors on Power Losses in Electric Distribution NetworkInfluencing Factors on Power Losses in Electric Distribution Network
Influencing Factors on Power Losses in Electric Distribution Network
 
Impact of Electric Vehicle Integration on Grid
Impact of Electric Vehicle Integration on GridImpact of Electric Vehicle Integration on Grid
Impact of Electric Vehicle Integration on Grid
 
Control of grid connected inverter system for sinusoidal current injection wi...
Control of grid connected inverter system for sinusoidal current injection wi...Control of grid connected inverter system for sinusoidal current injection wi...
Control of grid connected inverter system for sinusoidal current injection wi...
 
Estimation of Radial Distribution Feeder Sections Average Failure Rate for Di...
Estimation of Radial Distribution Feeder Sections Average Failure Rate for Di...Estimation of Radial Distribution Feeder Sections Average Failure Rate for Di...
Estimation of Radial Distribution Feeder Sections Average Failure Rate for Di...
 
A Novel Approach for Allocation of Optimal Capacitor and Distributed Generati...
A Novel Approach for Allocation of Optimal Capacitor and Distributed Generati...A Novel Approach for Allocation of Optimal Capacitor and Distributed Generati...
A Novel Approach for Allocation of Optimal Capacitor and Distributed Generati...
 
IRJET- An Optimal and Capacitor Placement for Loss Reduction in Electrica...
IRJET-  	  An Optimal and Capacitor Placement for Loss Reduction in Electrica...IRJET-  	  An Optimal and Capacitor Placement for Loss Reduction in Electrica...
IRJET- An Optimal and Capacitor Placement for Loss Reduction in Electrica...
 
IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...
IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...
IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...
 
IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...
IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...
IRJET- A Comparative Study of Control Algorithms for DSTATCOM for Harmonic El...
 
IRJET- Sensitivity Analysis for Optimal Distributed Generation Placement in P...
IRJET- Sensitivity Analysis for Optimal Distributed Generation Placement in P...IRJET- Sensitivity Analysis for Optimal Distributed Generation Placement in P...
IRJET- Sensitivity Analysis for Optimal Distributed Generation Placement in P...
 
IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...
IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...
IRJET- Voltage Stability, Loadability and Contingency Analysis with Optimal I...
 
IRJET-Identification of Weak Bus using Load Variation
IRJET-Identification of Weak Bus using Load VariationIRJET-Identification of Weak Bus using Load Variation
IRJET-Identification of Weak Bus using Load Variation
 
IRJET- Comparative Analysis of Load Flow Methods on Standard Bus System
IRJET- Comparative Analysis of Load Flow Methods on Standard Bus SystemIRJET- Comparative Analysis of Load Flow Methods on Standard Bus System
IRJET- Comparative Analysis of Load Flow Methods on Standard Bus System
 
OPTIMAL SITING AND SIZING OF D-STATCOM USING PARTICLE SWARM OPTIMIZATION
OPTIMAL SITING AND SIZING OF D-STATCOM USING PARTICLE SWARM OPTIMIZATIONOPTIMAL SITING AND SIZING OF D-STATCOM USING PARTICLE SWARM OPTIMIZATION
OPTIMAL SITING AND SIZING OF D-STATCOM USING PARTICLE SWARM OPTIMIZATION
 
Fault Modeling and Parametric Fault Detection in Analog VLSI Circuits using D...
Fault Modeling and Parametric Fault Detection in Analog VLSI Circuits using D...Fault Modeling and Parametric Fault Detection in Analog VLSI Circuits using D...
Fault Modeling and Parametric Fault Detection in Analog VLSI Circuits using D...
 
IRJET- A Unique Methodology for Transmission Line Breakage Detection and ...
IRJET-  	  A Unique Methodology for Transmission Line Breakage Detection and ...IRJET-  	  A Unique Methodology for Transmission Line Breakage Detection and ...
IRJET- A Unique Methodology for Transmission Line Breakage Detection and ...
 
IRJET- Assessment of Voltage Stability in a Power System Network and its Impr...
IRJET- Assessment of Voltage Stability in a Power System Network and its Impr...IRJET- Assessment of Voltage Stability in a Power System Network and its Impr...
IRJET- Assessment of Voltage Stability in a Power System Network and its Impr...
 
Modelling and Testing of a Numerical Pilot Distance Relay for Compensated Tra...
Modelling and Testing of a Numerical Pilot Distance Relay for Compensated Tra...Modelling and Testing of a Numerical Pilot Distance Relay for Compensated Tra...
Modelling and Testing of a Numerical Pilot Distance Relay for Compensated Tra...
 
IRJET- Improvement of Voltage Stability by Placing UPFC using Fuzzy Logic
IRJET- Improvement of Voltage Stability by Placing UPFC using Fuzzy LogicIRJET- Improvement of Voltage Stability by Placing UPFC using Fuzzy Logic
IRJET- Improvement of Voltage Stability by Placing UPFC using Fuzzy Logic
 
Solar PV Fed-Shunt APF to enhancement of Power Quality Issues in Distribution...
Solar PV Fed-Shunt APF to enhancement of Power Quality Issues in Distribution...Solar PV Fed-Shunt APF to enhancement of Power Quality Issues in Distribution...
Solar PV Fed-Shunt APF to enhancement of Power Quality Issues in Distribution...
 
FAULT DETECTION IN FIVE BUS SYSTEM USING MATLAB & SIMULINK (DISCRETE WAVELET ...
FAULT DETECTION IN FIVE BUS SYSTEM USING MATLAB & SIMULINK (DISCRETE WAVELET ...FAULT DETECTION IN FIVE BUS SYSTEM USING MATLAB & SIMULINK (DISCRETE WAVELET ...
FAULT DETECTION IN FIVE BUS SYSTEM USING MATLAB & SIMULINK (DISCRETE WAVELET ...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 

Recently uploaded (20)

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 

Outage impact on 132kV network

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1350 Investigation Effect of Outage Line on the Transmission Line for Karbalaa-132Kv Zone in Iraqi Network 1 Rashid H. AL-Rubayi & Department of Electrical Engineering, University of Technology 2 Afaneen A. Abood & Department of Electrical Engineering, University of Technology 3 Mohammed R. Saeed AL-hendawi & Department of Electrical Engineering, University of Technology ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - System security includes practices designed to keep the system running when components fail. Bullets to be ejected by automatic relay may storm the damage transfer line. If the appropriate commitment to transmission flows is maintained when the transmission and generation obligation is maintained, the remaining transmission lines can take the increasing load while remaining within thelimits. Becausethe specific times that start events that cause components to fail are unpredictable, the system must be operated at all times in such a way that the system will not leave in a serious situation in the event of any event initiating credibility. Power system equipment is designed to operate within certain limits. Automatic devices that can cause equipment to betransferred from the system if these limits are violated protect mostpieces of equipment. In the event that an event occurs on a system that leaves it working at a violation limit, the event may be followed by a series of other actions that switch the other equipment out of service. If this process continues with successive failures, the entire system or large parts of it may collapse completely. In this paper, it has been building simulation program to study the cases outage lines of the karbalaa-132kV network system. Tow cases adopted for the purposes of the study. Where study and discuss those cases in detail and its impact on network performance. It was diagnosed lines, which causes increased power flow over the limit in addition to the reflection of the other feeding lines. Key Words:- contingency analysis; dc power flow; power system security. 1.INTRODUCTION The DC power flow simplifies the power flow by making a number of approximations including 1) completelyignoring the reactive power balance equations, 2) assuming all voltage magnitudes are identically one per unit, 3) ignoring line losses and 4) ignoring tap dependence in the transformer reactance. Hence,thedc powerflow reduces the power flow problem to a set of linear equations. The dc solution load value has increased to match the total ac load plus losses, a manner to make comparison between the ac and dc solution results possible. The effectiveness of the method developed is identified throughitsapplicationto the karbalaa-132kV network system.. 2. DC POWER FLOW ALGORITHM AC power flow algorithmshave high calculationprecision but do not have fast speed. In real power dispatch or power market analysis, the requirement of calculation precision is not very high, but the requirement of calculation speed is of most concern, especially for a large - scale power system. More simplification power flow algorithms than fast decoupled power flow algorithms are used. One algorithm is called “MW Only”. In this method, the Q - V equation in the fast decoupledpowerflowmodeliscompletelydropped.Only the following P – θ equation is used to correct the angle according to the real power mismatch. In the MW - only power flow calculation, the voltage magnitude can be handled either as constant or as 1.0 during each P – θ iteration. For the convergence, only real power mismatch is checked no matter what the reactive power mismatch is.Anothermostsimplifiedpowerflowalgorithmis DC power flow. It is also an MW - only method but has the following assumptions: (1) All the voltage magnitudes are equal to 1.0. (2) Ignore the resistance of the branch; i.e., the susceptance of the branch is ……(2) (3) The angle difference on the two ends of the branch is very small, so that we (4) Ignore all ground branches; that is,
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1351 Therefore, the DC power flow model will be .. (3) Or …….. (4) Where: B ′ matrix are the same as those in the XB version of fast decoupled power flow but we ignore the matrix B ″. That is, …… (5) …… (6) The DC power flow is a purely linear equation, so only one iteration calculation is needed to obtain the power flow solution. However, it is only good for calculating real power flows on transmission lines and transformers. The power flowing on each line using the DC power flow is then ……(7) 3. SENSITIVITY FACTOR MATRICES CALCULATION The sensitivity analyses are becoming more and more important in practical power system operations including in power market operations. These are analyzes and discusses all kinds of sensitivity factors such as loss sensitivity factor, generator shift factor (GSF), constraint shift factor, line outage distribution factor (LODF) and responsefactorforthe transfer path. It also addresses the practical application of these sensitivity factors including a practical method to convert the sensitivities withdifferentreferences.Thepower operator uses these to study and monitor marketandsystem behavior and detect possible problems in the operation. These sensitivity calculations are also used to determine whether the online capacity as indicated in the resourceplan is located in the right place in the network to serve the forecasted demand. If congestion or violation exists, the generation scheduling based on the sensitivity calculations can determine whether or not a different allocation of the available resourcescould resolve the congestion or violation problem [3]. The problem of studying thousands of possible outages becomes very difficult to solve if it is desired to present the results quickly. One of the easiest ways to provide a quick calculation of possible overloads is to use linear sensitivity factors. These factors show the approximate change in line flows forchanges in generation onthenetworkconfiguration and are derived from the DC load flow presented in the flowing steps. These factors can be derived in a variety of ways and basically come down to two types [3]: 1. Generation shift factors. 2. Line outage distribution factors. Setp1:- Now calculate the from impedance as equation ……(8) …..(9) We gets ……(10) Step2:- Since bus one is a slack bus and eliminate (1st row & the 1st column) from matrix in equation (10). We get …….(11) Step3:- Find the inverse of , we gets …….(12) Step4:- Determine the sensitivity matrix by : ……(13) Step5:- Determine the generation shift sensitivity factor by performing the outage of the generation connected to selected bus (k) with connected line ( ) from the following equation: ……(14) Step6:- Determine of the line outage distribution sensitivity factor by performing the outage of the line connected to bus is called ( ) that affected on the line in bus anther line is called from the following equation: ……. (15) The generation shift factors are designated and have the following definition:
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1352 …….. (16) Where: = line index. i = bus index. = change in megawatt power flow on line when a change in generation, occurs at bus i. = change in generation at bus i. It is assumed in this definition that the change in generation, , is exactly compensated by an opposite change in generation at the reference bus,and that all other generators remain fixed. The factorthenrepresentsthesensitivityof the flow on line to a change in generation at bus i. Suppose one wanted to study the outage of a large generatingunitand it wasassumed thatall the generation lost would be madeup by the reference generation (wewilldealwiththecasewhere the generation is picked up by many machines shortly).Ifthe generator in question was generating MW and it was lost, we would represent , as [4]: = - …… (17) And the new power flow on each line in the network could be calculated using a pre calculated set of “a” factors as follows: = for = 1.. . LL …….(18) Where: = flow on line after the generator on bus i fails. = flow before the failure. The “outage flow,” on each line can be compared to its limit and those exceeding their limit flagged for alarming. This would tell the operations personnel that the loss of the generator on bus i would result in an overload on line . The line outage distribution factors are used in a similar manner; only hey apply to the testing for overloads when transmission circuits are lost. By definition, the line outage distribution factor has the following meaning: …… (19) = line outage distribution factor when monitoring line l after an outage on line k. = change in MW flow on line . = original flow on line k before it was outaged (opened). If one knows the power on line and line k, the flow on line with line k out can be determined using "d" factors. …… (20) Where: = preoutage flows on lines and k, respectively. = flow on line with line k out. 4. RESULT and DISCUSSION: The line and bus data of the karbalaa-132kVnetwork.The system input data is shows in tables (1, 2, 3, 4 & 5), and figures (1, 2 & 3). Table 1: Name Bus in Iraqi Network and Present Work From Bus To Bus In Iraqi Network In Present Work In Iraqi Network In Present Work Numbe r Name Numbe r Numbe r Name Numbe r 20302 MUS3 132.00 4 21303 KBLN 132.00 5 20302 MUS3 132.00 4 21310 KRBE 132.00 2 20313 BAB3 132.00 3 21311 HNDS 132.00 8 20313 BAB3 132.00 3 21311 HNDS 132.00 8 21301 AKDC 132.00 7 21303 KBLN 132.00 5 21301 AKDC 132.00 7 21303 KBLN 132.00 5 21302 KRBL 132.00 9 21304 KBLW 132.00 6 21302 KRBL 132.00 9 21304 KBLW 132.00 6 21302 KRBL 132.00 9 21311 HNDS 132.00 8 21302 KRBL 132.00 9 21311 HNDS 132.00 8 21303 KBLN 132.00 5 21304 KBLW 132.00 6 21303 KBLN 132.00 5 21305 KRBG 132.00 1 21303 KBLN 132.00 5 21310 KRBE 132.00 2 21304 KBLW 132.00 6 21305 KRBG 132.00 1
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1353 Table 2: Line Data Branch No. From Bus To Bus Line R Line X (pu) (pu) 1 1 5 0.009904 0.055415 2 1 6 0.007533 0.042147 3 2 5 0.003488 0.021525 4 3 8 0.002887 0.01615 5 3 8 0.002887 0.01615 6 4 2 0.010114 0.062422 7 4 5 0.013392 0.074928 8 5 6 0.002464 0.015205 9 5 7 0.04951 0.19767 10 5 7 0.04951 0.19767 11 6 9 0.002371 0.013269 12 6 9 0.002371 0.013269 13 8 9 0.005679 0.035053 14 8 9 0.005679 0.035053 Table 3: Limit and Length Line Data on The Transmission Line Branch No. From Bus To Bus Limit (MVA) Limit (MW) Length (Km) 1 1 5 236 188.8 35.5 2 1 6 236 188.8 27 3 2 5 236 188.8 12.5 4 3 8 236 188.8 10.346 5 3 8 236 188.8 10.346 6 4 2 236 188.8 36.25 7 4 5 236 188.8 48 8 5 6 236 188.8 8.83 9 5 7 123 98.4 89 10 5 7 123 98.4 89 11 6 9 236 188.8 8.5 12 6 9 236 188.8 8.5 13 8 9 236 188.8 20.356 14 8 9 236 188.8 20.356 Table 4: Bus Data Bus Numbe r Bus Type Voltage Schedul e (pu) Powe r load (MW) Powe r gen. (MW) Max. Powe r gen. (MW) Min. Powe r gen. (MW) 1 Swin g 0.976 54.2 152.8 260 30 2 Gen. 0.98 70.2 255.6 300 30 3 Gen. 1 0 112.2 180 0 4 Gen. 1 0 58 132 0 5 Load 0.967 228.9 0 6 Load 0.971 61.2 0 7 Load 0.948 33.4 0 8 Load 0.991 36.1 0 9 Load 0.974 91 0 Table 5: Power Flow through Branches for The Karbalaa- 132kV Network Branch No. Line MW Limit MW From MW To Percentage from limit 1 1-5 188.8 39.7 39.6 21.03% 2 1-6 188.8 58.9 58.6 31.20% 3 2-5 188.8 186.7 185.4 98.89% 4 3-8 188.8 56.1 55.9 29.71% 5 3-8 188.8 56.1 55.9 29.71% 6 4-2 188.8 1.5 1.5 0.79% 7 4-5 188.8 56.5 55.9 29.93% 8 5-6 188.8 18.2 18.2 9.64% 9 5-7 98.4 16.9 16.9 17.17% 10 5-7 98.4 16.9 16.9 17.17% 11 6-9 188.8 7.8 7.8 4.13% 12 6-9 188.8 7.8 7.8 4.13% 13 8-9 188.8 37.9 37.7 20.07% 14 8-9 188.8 37.9 37.7 20.07% Figure 1: Power Flow through Branches for The Karbalaa-132kV Network
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1354 Figure 2: Branch Percentage Limit for The Karbalaa- 132kV Network The start simulator program (themathematicmode that discussed in item 3) output results could be which depends based on the following steps:- Step 1:- Sensitivity Factor Matrices (SFM) The sensitivity factor matrices were determined in the simulation program. It was to get the results as shows in the table 6. Table 6: SFM for the Karbalaa-132kV Network 0 0 0 0 0 0 0 0 0 0 0.04 68 0.02 07 0.03 83 0.02 82 0.02 07 0.02 82 0.02 07 0.02 07 0 0.02 07 0.05 86 0.02 07 0.02 07 0.02 64 0.02 07 0.05 06 0.03 30 0 0.03 83 0.02 07 0.06 78 0.02 82 0.02 07 0.02 82 0.02 07 0.02 07 0 0.02 82 0.02 07 0.02 82 0.02 82 0.02 07 0.02 82 0.02 07 0.02 07 0 0.02 07 0.02 64 0.02 07 0.02 07 0.02 64 0.02 07 0.02 64 0.02 64 0 0.02 82 0.02 07 0.02 82 0.02 82 0.02 07 0.12 70 0.02 07 0.02 07 0 0.02 07 0.05 06 0.02 07 0.02 07 0.02 64 0.02 07 0.05 06 0.03 30 0 0.02 07 0.03 30 0.02 07 0.02 07 0.02 64 0.02 07 0.03 30 0.03 30 Step 2:- Generator Shift Factor (GSF) The generator shift factor was determined in the simulation program. It was to get the results as shows in the table 7. Table 7: GSF for the Karbalaa-132kV Network Line Bus 1 Bus 2 Bus 3 Bus 4 1-5 0 - 0.5086 - 0.3738 - 0.5086 1-6 0 - 0.4914 - 0.6262 - 0.4914 2-5 0 0.8645 0 0.4716 3-8 0 0 1 0 4-2 0 - 0.1355 0 0.4716 4-5 0 0.1355 0 0.5284 5-6 0 0.4914 - 0.3738 0.4914 5-7 0 0 0 0 6-9 0 0 -1 0 8-9 0 0 1 0 Step 3:- Line Outage Distribution Factor (LODF) The line outaged distribution factor was determine by simulation program. It was to get the results as shows in the table 8. Table 8: GSF for the Karbalaa-132kV Network Line 1- 5 1- 6 2- 5 3- 8 4- 2 4- 5 5- 6 5- 7 6- 9 8- 9 1-5 1 0 0 0 0 -1 0 0 0 1-6 1 0 0 0 0 1 0 0 0 2-5 0 0 0 -1 1 0 0 0 0 3-8 0 0 0 0 0 0 0 0 0 4-2 0 0 -1 0 1 0 0 0 0 4-5 0 0 1 0 1 0 0 0 0 5-6 -1 1 0 0 0 0 0 0 0 5-7 0 0 0 0 0 0 0 0 0 6-9 0 0 0 0 0 0 0 0 0 8-9 0 0 0 0 0 0 0 0 0 The simulation program was use to study multi cases of line outage for karbalaa-132kV network asfollows:-
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1355 LoadGenerator Bus. 1 KRBG Bus. 2 KRBE Bus. 3 BAB-K Bus. 4 MUS-K Bus. 8 HNDS Bus. 7 AKDC Bus. 9 KRBL Bus. 6 KBLW Bus. 5 KBLN Figure 3: Karbalaa-132kV network Case 1: (4-5) outage line When the line (4-5) have outaged, the power flow will be redistribution on other lines as shown in table (9)andfigure (4 & 5). It was noticed that was existingproblemsbyoutaged this line such as over power flow at line (2-5) with a percentage value of 128.81% of its limit. For treatment the over power flow at line (2-5), the correction factor at generation bus-2 (KRBE) was chosen with value of (-62.93 MW). On other side,thedecrement was taken at generator unit which to be connected at the same bus of value (192.67 MW); whereas this value within range. The percentage decrement 75.38% of the real value of (255.6 MW). In addition to above, the same value was increased at generation slack bus (KRBG), the redistributed of power flow after treatment the over load with outage line (4-5) as shown in table (10), Figures (6 & 7). Case 2: (2-5) outage line When the line (2-5) have outaged, the power flow will be redistributed on other lines as shown in table (11), figure (8 & 9). It was noticed that was existing problems by outaged this line such as over power flow at line (4-5) with a percentage value of 128.81%. For treatment the over power flow at line (4-5), the correction factor at generation bus-2 (KRBE) was chosen with value of (-401.52 MW). On other side, the decrement was taken at generator unit which to be connected at the same bus of value under minimum generation; This value impossible to be used to treat over power flow at these lines because the generation at bus-2 (KRBE) would not within range of the generator constraints. Table 9: Power Flow at Outage Line (4-5) BranchNo. Line MWLimit Before Outage (4- 5) After Outage (4-5) Stateofbranch MWFrom MWTo Percentag e fromlimit MWFrom MWTo Percentag e fromlimit 1 1- 5 188. 8 39. 7 39. 6 21.03 % 39. 7 39. 6 21.03 % 2 1- 6 188. 8 58. 9 58. 6 31.20 % 58. 9 58. 6 31.20 % 3 2- 5 188. 8 18 7 18 5 98.89 % 24 3 24 1 128.81 % overflow 4 3- 8 188. 8 56. 1 55. 9 29.71 % 56. 1 55. 9 29.71 % 5 3- 8 188. 8 56. 1 55. 9 29.71 % 56. 1 55. 9 29.71 % 6 4- 2 188. 8 1.5 1.5 0.79 % 58 57. 4 30.72 % 7 4- 5 188. 8 56. 5 55. 9 29.93 % 0 0 0.00% outage 8 5- 6 188. 8 18. 2 18. 2 9.64 % 18. 2 18. 2 9.64% 9 5- 7 98.4 16. 9 16. 9 17.17 % 16. 9 16. 7 17.17 % 1 0 5- 7 98.4 16. 9 16. 9 17.17 % 16. 9 16. 7 17.17 % 1 1 6- 9 188. 8 7.8 7.8 4.13 % 7.8 7.8 4.13% 1 2 6- 9 188. 8 7.8 7.8 4.13 % 7.8 7.8 4.13% 1 3 8- 9 188. 8 37. 9 37. 7 20.07 % 37. 9 37. 7 20.07 % 1 4 8- 9 188. 8 37. 9 37. 7 20.07 % 37. 9 37. 7 20.07 %
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1356 Figure 4: Power flow at an outaged line of (4-5) Figure 5: Branch percentage limit at an outaged line (4-5) Table 10: Power Flow after Treatment with Outage Line (4-5) BranchNo. Line MWLimit Outage (4-5) Before Treatment Stateofbranch Outage (4-5) After Treatment Stateofbranch MW From MWTo Percenta ge from limit MW From MWTo Percenta ge from limit 1 1-5 188.8 39.7 39.6 21.03 % 71.7 71.6 37.98 % 2 1-6 188.8 58.9 58.6 31.20 % 89.8 89.5 47.58 % 3 2-5 188.8 243 241 128.8 1% over flow 189 187 100.0 0% 4 3-8 188.8 56.1 55.9 29.71 % 56.1 55.9 29.71 % 5 3-8 188.8 56.1 55.9 29.71 % 56.1 55.9 29.71 % 6 4-2 188.8 58 57.4 30.72 % 66.5 65.9 35.24 % 7 4-5 188.8 0 0 0.00 % outag e 0 0 0.00 % outag e 8 5-6 188.8 18.2 18.2 9.64 % -13 -13 6.74 % rever se 9 5-7 98.4 16.9 16.7 17.17 % 16.9 16.7 17.17 % 1 0 5-7 98.4 16.9 16.7 17.17 % 16.9 16.7 17.17 % 1 1 6-9 188.8 7.8 7.8 4.13 % 7.8 7.8 4.13 % 1 2 6-9 188.8 7.8 7.8 4.13 % 7.8 7.8 4.13 % 1 3 8-9 188.8 37.9 37.7 20.07 % 37.9 37.7 20.07 % 1 4 8-9 188.8 37.9 37.7 20.07 % 37.9 37.7 20.07 %
  • 8. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1357 Figure 6: Power flow after treatment with an outaged line of (4-5) Figure 7: Branch percentage limit after treatment with an outaged line of (10-9) Table 11: Power Flow at Outage Line (2-5) BranchNo. Line MWLimit Before Outage (2-5) After Outage (2- 5) Stateof branch MW From MWTo Percent age from limit MW From MWTo Percent age from limit 1 1-5 188.8 39.7 39.6 21.03 % 39.7 39.6 21.03 % 2 1-6 188.8 58.9 58.6 31.20 % 58.9 58.6 31.20 % 3 2-5 188.8 187 185 98.89 % 0 0 0.00 % outag e 4 3-8 188.8 56.1 55.9 29.71 % 56.1 55.9 29.71 % 5 3-8 188.8 56.1 55.9 29.71 % 56.1 55.9 29.71 % 6 4-2 188.8 1.5 1.5 0.79 % -185 -184 98.09 % rever se 7 4-5 188.8 56.5 55.9 29.93 % 243 241 128.8 1% over flow 8 5-6 188.8 18.2 18.2 9.64 % 18.2 18.2 9.64 % 9 5-7 98.4 16.9 16.9 17.17 % 16.9 16.7 17.17 % 10 5-7 98.4 16.9 16.9 17.17 % 16.9 16.7 17.17 % 11 6-9 188.8 7.8 7.8 4.13 % 7.8 7.8 4.13 % 12 6-9 188.8 7.8 7.8 4.13 % 7.8 7.8 4.13 % 13 8-9 188.8 37.9 37.7 20.07 % 37.9 37.7 20.07 % 14 8-9 188.8 37.9 37.7 20.07 % 37.9 37.7 20.07 % Figure 8: Power flow at an outaged line of (2-5)
  • 9. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1358 Figure 9: Branch percentage limit at an outaged line (2-5) 5. CONCLUSION Through study and discussion out power flow lines for ensuring the network system, we suggest the following: 1. Control through regeneration organization in Buses. 2. Taking into consideration when designing the network system to the limits Permitted to lines of power flow to avoid a collapse in the network system. 3. Add lines to power flow in parallel-diagnosedlines, which happens rise in the power flow outside the limit to avoid weaknesses in the design of system network. 4. Add secondary line of power flow parallel to the main lines of power flow to avoid the outage occur frequently in some lines. REFERENCES [1] J.Z. Zhu , “ Power System Optimal Operation , ” Tutorial of Chongqing University, 1990 . [2] Y. He , Z.Y. Wen , F.Y. Wang , and Q.H. Zhou , Power Systems Analysis, Huazhong Polytechnic University Press , 1985 . [3] A. Keyhani , A. Abur , and S. Hao , “ Evaluation of Power Flow Techniques for Personal Computers , ” IEEE Trans.onPowerSystem, Vol. 4 , No. 2 , 1989 , pp. 817 – 826 . [4] O. Alsac and B. Sttot , “ Fast Decoupled power flow , ” IEEE Trans. on Power System, Vol. 93 , 1974 , pp. 859 – 869 . [5] R.A.M. Van Amerongen , “ A General Purpose Version of the Fast Decoupled power flow , ” IEEE Summer Meeting, 1988 . [6] A. Monticelli , A. Garcia , and O.R. Saavedra , “ Decoupled power flow,: Hypothesis, Derivations, and Testing , ” IEEE Trans. on Power System, Vol. 5 , No. 4 , 1990 , pp. 1425 – 1431 . BIOGRAPHY: Rashid H. AL-Rubayi Department of Electrical Engineering, University of Technology Afaneen A. Abood Department of Electrical Engineering, University of Technology Mohammed R. Saeed AL-hendawi Department of Electrical Engineering, University of Technology