The document discusses the analysis and design of precast concrete segmental box culverts subjected to vehicular loading, noting advantages of precast construction including reduced construction time and costs. Several cases are analyzed to determine shear forces and bending moments on box culvert components under different load conditions and support configurations. The results are presented and it is concluded that a simply supported top slab can reduce wall moments at supports if culvert weight is a constraint.