Control Account, Work Package, Planning
Package
Before going any forward on the clarification on the above-mentioned definitions, we need to
understand the WBS, work break down.
“A hierarchical decomposition of the total scope of work to be carried out by the
project team to accomplish the project objectives and create the required
deliverables. Each descending level of the WBS represents an increasingly detailed
definition of the project work.”
WBS is a hierarchal deliverable oriented graphical representation of all the work needed to be done
on the project. The following represent different level of this hierarchical representation.
Control Account
A control account is associated with a particular structural module in the Organizational Breakdown
Structure (OBS). Control accounts are usually positioned at selected levels in work packages. There
may be many control accounts associated with every work package, though, a control account is
linked with only one work package at a time.
A control account is an important project management tool that involves the integration of specific
and key elements of project specific constitutes. Once a successful integration takes place, a
measurement of the performance to date occurs. The elements that are frequently integrated using the
control account tool comprises of the scope of a project, the actual cost, and the project schedule.
Control accounts are typically positioned at diverse strategic points of the project’s work breakdown
structure. This is thought to be useful interchanges along with the way of the process and points at
which the work is finished in every one of these particular areas that can be integrated and
differences are addressed.
Work Package
A Work Package is a collection of related tasks in a project and they are often considered as sub-
projects in one major project.
Work packages refer to the lowest unit of work that a project can be segmented when developing
your Work Breakdown Structure (WBS). A work package typically comprises of the nature of work
involved, specific stakeholders, results of the tasks, technical material used, duration, and geographic
location where these tasks will take place. By placing all related tasks together, a work package
becomes an easier division to understand. Team members can easily see the association between
varying tasks and emphasize those elements that apply to them. As a sub-division of a work
breakdown structure, work packages offer a significant level of clarity as every block of associated
tasks can be quickly envisaged.
Work packages let for concurrent work to be performed on different components of a project that is
parallel to several teams. Every team follows a certain list of defined tasks for the work package and
completes in the given time period. As soon as the team finishes their individual work packages, the
whole project comes together with perfect integration.
The work package is the work defined at the lowest level of the WBS for which cost and
duration can be estimated and managed. The work package should be defined with a
unique identifier
Planning Package
Planning Package offers a valuable means of categorization for the project managers to efficiently
collect important elements of the project. The concept refers to the project specific work breakdown
structure that exists on the entire scheme below the decoded and already break down control account
without any detailed schedule activities. For a comprehensive understanding of a planning package, it
is helpful to evaluate the term control accounts. It can be developed at any phase of the project,
though its best to be outlined at the beginning of a project.
A planning package is a work breakdown structure component below the control account
and above the work package with known work content but without detailed schedule
activities. It holds the future work.
Before dwelling into the concept of Planning Package and Work Package, let me explain the very
important concept of project scope identification i.e progressive elaboration of scope. A detailed
scope is planned for the short term while the far/long term is planned at a high level. WBS is
segmented at different levels according to the availability of information while duration and costs are
estimated with a reasonable degree. Considering the components where details are not evident to the
degree to produce verifiable subcomponents of products, services, and outcomes. Here, we are aware
of the work through the detailed schedule activities are not possible to determine. This level of
decomposition refers to Planning Package. A planning package can be converted into a work package
with the lowest level details in defining budget and schedule. Individual work packages form the
building blocks of project deliverables and the foundation at which the project is evaluated and
monitored.
The planning package concept refers specifically to the project’s particular work
breakdown structure component which resides on the grand and total scheme below the
already deciphered and already broken down control account however lacking a carefully
crafted and elaborately detailed itemization of the project’s defined schedule activities,
yet nonetheless containing a fairly lucid delineation of
Comparison
 A control account has two or more work packages, though each work package is associated with
a single control account.
 A control account may include one or more planning packages
 A planning package will be decomposed into a work package when the needed details regarding
scope, budget and schedule are defined.
Summary
 A control account is a natural management point for planning and control since it represents the
work assigned to one responsible organizational element on one project work breakdown
structure element.
 Work packages constitute the basic building blocks used in planning, measuring
accomplishment, and controlling project work.
 Planning packages are created to describe work within a control account that will occur in the
future. Planning packages must have a work scope, schedule, and time-phased budget.

More Related Content

What's hot

5 project management project planning
5 project management  project planning5 project management  project planning
5 project management project planning
YasirHamour
 

What's hot (20)

Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)
 
Planning fundamentals - Project Management
Planning fundamentals - Project ManagementPlanning fundamentals - Project Management
Planning fundamentals - Project Management
 
5 project management project planning
5 project management  project planning5 project management  project planning
5 project management project planning
 
The Project's Network Diagram
The Project's Network DiagramThe Project's Network Diagram
The Project's Network Diagram
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Estimating Time & Costs
 Estimating Time & Costs Estimating Time & Costs
Estimating Time & Costs
 
WBS and OBS
WBS and OBSWBS and OBS
WBS and OBS
 
Project management processes Groups
Project management processes GroupsProject management processes Groups
Project management processes Groups
 
Pmp communication chapter 10
Pmp communication chapter 10Pmp communication chapter 10
Pmp communication chapter 10
 
Project / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsProject / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes Groups
 
Project management-planning and scheduling
Project management-planning and schedulingProject management-planning and scheduling
Project management-planning and scheduling
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Scheduling
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
134 work break break down structure
134 work break break down structure134 work break break down structure
134 work break break down structure
 
Project time management
Project time managementProject time management
Project time management
 
Professional Planning Engineer PPE - Advanced Planning Course
Professional Planning Engineer PPE - Advanced Planning CourseProfessional Planning Engineer PPE - Advanced Planning Course
Professional Planning Engineer PPE - Advanced Planning Course
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Schedule Updates
Schedule UpdatesSchedule Updates
Schedule Updates
 
Key Concepts for Project Mgmt
Key Concepts for Project MgmtKey Concepts for Project Mgmt
Key Concepts for Project Mgmt
 

Similar to Control account, work and planning package - PMP/CAPM from PMI

Subject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdfSubject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdf
deepaksatrker
 
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfworkbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
DipakBorse6
 
PositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxPositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docx
ChantellPantoja184
 
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
aryan532920
 
Wbs & Project Scheduling
Wbs & Project SchedulingWbs & Project Scheduling
Wbs & Project Scheduling
sslovepk
 
Work breakdown structure ppt
Work breakdown structure pptWork breakdown structure ppt
Work breakdown structure ppt
nazi2020
 
By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining
TawnaDelatorrejs
 

Similar to Control account, work and planning package - PMP/CAPM from PMI (20)

Work Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxWork Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptx
 
Wbs, gant charts
Wbs, gant chartsWbs, gant charts
Wbs, gant charts
 
The Importance of Work Packages in Project Scope.pdf
The Importance of Work Packages in Project Scope.pdfThe Importance of Work Packages in Project Scope.pdf
The Importance of Work Packages in Project Scope.pdf
 
Subject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdfSubject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdf
 
WBSssssssssssssssssssssssssssssssssssss.pptx
WBSssssssssssssssssssssssssssssssssssss.pptxWBSssssssssssssssssssssssssssssssssssss.pptx
WBSssssssssssssssssssssssssssssssssssss.pptx
 
SEN-22413 - UNIT - V.pptx
SEN-22413 -  UNIT - V.pptxSEN-22413 -  UNIT - V.pptx
SEN-22413 - UNIT - V.pptx
 
Cost baseline and cost budget
Cost baseline and cost budgetCost baseline and cost budget
Cost baseline and cost budget
 
How to create a work breakdown structure (wbs)
How to create a work breakdown structure (wbs)How to create a work breakdown structure (wbs)
How to create a work breakdown structure (wbs)
 
Engineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown StructureEngineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown Structure
 
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfworkbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
 
Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02
 
PositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxPositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docx
 
Team Final_Scope Management
Team Final_Scope ManagementTeam Final_Scope Management
Team Final_Scope Management
 
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 
Work Break Down Structure
Work Break Down StructureWork Break Down Structure
Work Break Down Structure
 
Wbs & Project Scheduling
Wbs & Project SchedulingWbs & Project Scheduling
Wbs & Project Scheduling
 
Understanding the Work Breakdown Structure.pdf
Understanding the Work Breakdown Structure.pdfUnderstanding the Work Breakdown Structure.pdf
Understanding the Work Breakdown Structure.pdf
 
Work breakdown structure ppt
Work breakdown structure pptWork breakdown structure ppt
Work breakdown structure ppt
 
Project controls outlined
Project controls outlinedProject controls outlined
Project controls outlined
 
By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining
 

More from Mudassir Iqbal

Babok2 chapter9 daxko
Babok2 chapter9 daxko Babok2 chapter9 daxko
Babok2 chapter9 daxko
Mudassir Iqbal
 

More from Mudassir Iqbal (16)

Quality assurance and control quality - PMP/CAPM by PMI
Quality assurance and control quality - PMP/CAPM by PMIQuality assurance and control quality - PMP/CAPM by PMI
Quality assurance and control quality - PMP/CAPM by PMI
 
Residual risk and secondary risk - PMP/CAPM from PMI
Residual risk and secondary risk - PMP/CAPM from PMIResidual risk and secondary risk - PMP/CAPM from PMI
Residual risk and secondary risk - PMP/CAPM from PMI
 
Free float and total float - PMP/CAPM from PMI
Free float and total float - PMP/CAPM from PMIFree float and total float - PMP/CAPM from PMI
Free float and total float - PMP/CAPM from PMI
 
Event and Non-Event Risk - PMP/CAPM from PMI
Event and Non-Event Risk  - PMP/CAPM from PMIEvent and Non-Event Risk  - PMP/CAPM from PMI
Event and Non-Event Risk - PMP/CAPM from PMI
 
EEF and OPA - PMP/CAPM from PMI
EEF and OPA - PMP/CAPM from PMIEEF and OPA - PMP/CAPM from PMI
EEF and OPA - PMP/CAPM from PMI
 
Budget and cost estimates - PMP/CAPM from PMI
Budget and cost estimates - PMP/CAPM from PMIBudget and cost estimates - PMP/CAPM from PMI
Budget and cost estimates - PMP/CAPM from PMI
 
Project scope Management - PMP/CAPM
Project scope Management - PMP/CAPMProject scope Management - PMP/CAPM
Project scope Management - PMP/CAPM
 
Project schedule Management - PMP/CAPM
Project schedule Management - PMP/CAPMProject schedule Management - PMP/CAPM
Project schedule Management - PMP/CAPM
 
Project Cost Management - PMP/CAPM
Project Cost Management - PMP/CAPMProject Cost Management - PMP/CAPM
Project Cost Management - PMP/CAPM
 
Project procurement Management - PMP/CAPM
Project procurement  Management - PMP/CAPMProject procurement  Management - PMP/CAPM
Project procurement Management - PMP/CAPM
 
Planning process group
Planning process groupPlanning process group
Planning process group
 
Executing process group
Executing process groupExecuting process group
Executing process group
 
Closing process group
Closing process groupClosing process group
Closing process group
 
Master schedule and milestone schedule
Master schedule and milestone scheduleMaster schedule and milestone schedule
Master schedule and milestone schedule
 
Quality and Grade
Quality and GradeQuality and Grade
Quality and Grade
 
Babok2 chapter9 daxko
Babok2 chapter9 daxko Babok2 chapter9 daxko
Babok2 chapter9 daxko
 

Recently uploaded

Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Dubai Multi Commodity Centre
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
seri bangash
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
zukhrafshabbir
 

Recently uploaded (20)

Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
 
Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deck
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
 
FEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service LightningFEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service Lightning
 
Raising Seed Capital by Steve Schlafman at RRE Ventures
Raising Seed Capital by Steve Schlafman at RRE VenturesRaising Seed Capital by Steve Schlafman at RRE Ventures
Raising Seed Capital by Steve Schlafman at RRE Ventures
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybrid
 
A Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettA Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob Badgett
 
Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...
Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...
Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...
 
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
Vendors of country report usefull datass
Vendors of country report usefull datassVendors of country report usefull datass
Vendors of country report usefull datass
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptx
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
 
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
 
The Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdfThe Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdf
 
Falcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small BusinessesFalcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small Businesses
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
 
Engagement Rings vs Promise Rings | Detailed Guide
Engagement Rings vs Promise Rings | Detailed GuideEngagement Rings vs Promise Rings | Detailed Guide
Engagement Rings vs Promise Rings | Detailed Guide
 
Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)
 

Control account, work and planning package - PMP/CAPM from PMI

  • 1. Control Account, Work Package, Planning Package Before going any forward on the clarification on the above-mentioned definitions, we need to understand the WBS, work break down. “A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables. Each descending level of the WBS represents an increasingly detailed definition of the project work.” WBS is a hierarchal deliverable oriented graphical representation of all the work needed to be done on the project. The following represent different level of this hierarchical representation. Control Account A control account is associated with a particular structural module in the Organizational Breakdown Structure (OBS). Control accounts are usually positioned at selected levels in work packages. There may be many control accounts associated with every work package, though, a control account is linked with only one work package at a time. A control account is an important project management tool that involves the integration of specific and key elements of project specific constitutes. Once a successful integration takes place, a measurement of the performance to date occurs. The elements that are frequently integrated using the control account tool comprises of the scope of a project, the actual cost, and the project schedule. Control accounts are typically positioned at diverse strategic points of the project’s work breakdown structure. This is thought to be useful interchanges along with the way of the process and points at which the work is finished in every one of these particular areas that can be integrated and differences are addressed. Work Package
  • 2. A Work Package is a collection of related tasks in a project and they are often considered as sub- projects in one major project. Work packages refer to the lowest unit of work that a project can be segmented when developing your Work Breakdown Structure (WBS). A work package typically comprises of the nature of work involved, specific stakeholders, results of the tasks, technical material used, duration, and geographic location where these tasks will take place. By placing all related tasks together, a work package becomes an easier division to understand. Team members can easily see the association between varying tasks and emphasize those elements that apply to them. As a sub-division of a work breakdown structure, work packages offer a significant level of clarity as every block of associated tasks can be quickly envisaged. Work packages let for concurrent work to be performed on different components of a project that is parallel to several teams. Every team follows a certain list of defined tasks for the work package and completes in the given time period. As soon as the team finishes their individual work packages, the whole project comes together with perfect integration. The work package is the work defined at the lowest level of the WBS for which cost and duration can be estimated and managed. The work package should be defined with a unique identifier Planning Package Planning Package offers a valuable means of categorization for the project managers to efficiently collect important elements of the project. The concept refers to the project specific work breakdown structure that exists on the entire scheme below the decoded and already break down control account without any detailed schedule activities. For a comprehensive understanding of a planning package, it is helpful to evaluate the term control accounts. It can be developed at any phase of the project, though its best to be outlined at the beginning of a project. A planning package is a work breakdown structure component below the control account and above the work package with known work content but without detailed schedule activities. It holds the future work. Before dwelling into the concept of Planning Package and Work Package, let me explain the very important concept of project scope identification i.e progressive elaboration of scope. A detailed scope is planned for the short term while the far/long term is planned at a high level. WBS is segmented at different levels according to the availability of information while duration and costs are estimated with a reasonable degree. Considering the components where details are not evident to the degree to produce verifiable subcomponents of products, services, and outcomes. Here, we are aware of the work through the detailed schedule activities are not possible to determine. This level of decomposition refers to Planning Package. A planning package can be converted into a work package with the lowest level details in defining budget and schedule. Individual work packages form the building blocks of project deliverables and the foundation at which the project is evaluated and monitored. The planning package concept refers specifically to the project’s particular work breakdown structure component which resides on the grand and total scheme below the
  • 3. already deciphered and already broken down control account however lacking a carefully crafted and elaborately detailed itemization of the project’s defined schedule activities, yet nonetheless containing a fairly lucid delineation of Comparison  A control account has two or more work packages, though each work package is associated with a single control account.  A control account may include one or more planning packages  A planning package will be decomposed into a work package when the needed details regarding scope, budget and schedule are defined. Summary  A control account is a natural management point for planning and control since it represents the work assigned to one responsible organizational element on one project work breakdown structure element.  Work packages constitute the basic building blocks used in planning, measuring accomplishment, and controlling project work.  Planning packages are created to describe work within a control account that will occur in the future. Planning packages must have a work scope, schedule, and time-phased budget.