SlideShare a Scribd company logo
1 of 16
Download to read offline
Work Breakdown Structure
By: Nazila Mazaheri
Artinarsing Rao
Sharmithas
Madhukumar
Sandhya Urs J
Introduction
 Dividing complex projects to simpler
and manageable tasks is the process
identified as Work Breakdown
Structure (WBS).
 Usually, the project managers use this
method for simplifying the project
execution. In WBS, much larger tasks
are broken-down to manageable
chunks of work. These chunks can be
easily supervised and estimated.
A work breakdown structure
 In project management and systems
engineering, is a deliverable oriented
decomposition of a project into smaller
components.
 A work breakdown structure element
may be a product, data, a service, or
any combination. A WBS also provides
the necessary framework for detailed
cost estimating and control along with
providing guidance for schedule
development and control
example of outlined WBS.
WBS helps manager
◦ Facilitates evaluation of cost, time, and
technical performance of the organization on
a project.
◦ Provides management with information
appropriate to each organizational level.
◦ Helps in the development of the organization.
breakdown structure which assigns project
responsibilities to organizational units and
individuals
◦ Helps manager plan, schedule, and budget.
◦ Defines communication channels and assists
in coordinating the various project elements.
few reasons for creating a WBS in
a project.
 Accurate and readable project
organization.
 Accurate assignment of
responsibilities to the project team.
 Indicates the project milestones and
control points.
 Helps to estimate the cost, time, and
risk.
 Illustrate the project scope, so the
stakeholders can have a better
understanding of the same.
Purpose of WBS
 There are three reasons to use a WBS
in your projects:
first is that is helps more accurately and
specifically define and organize the scope of
the total project.
 The second reason for using a WBS in your
projects is to help with assigning
responsibilities, resource allocation, monitoring
the project, and controlling the project
 Finally, it allows you double check all the
deliverables' specifics with the stakeholders
and make sure there is nothing missing or
overlapping.
Process of WBS
 First, let's look at what all we need to
get started. There are several inputs
you will need to get you off on the right
foot:
The Project Scope Statement
The Project Scope Management Plan
Organizational Process Assets
Approved Change Requests - (PMBOK Guide)
Process of WBS
 You will use certain tools as well:
Work Breakdown Structure Templates
Decomposition - (PMBOK Guide)
Process of WBS
 Finally, using these inputs and tools
you will create the following outputs:
Work Breakdown Structure
WBS Dictionary
Scope Baseline
Project Scope Statement (updates)
Project Scope Management Plan (updates)
Requested Changes - (PMBOK Guide)
How to build a WBS
 Begin with the Charter, focusing on Objectives
and Deliverables
 Break the main product(s) down into sub-
products
 Set the structure to match how you’ll manage the
project
 Lowest level not too detailed, not too large
 Is there a need for Integration?
 Identify support activities
 Check for completeness - is all the effort
included?
 Develop a coding structure if needed
 Assign work package managers
Pitfalls
There are common pitfalls to creating a WBS.
If you can keep these few possible, you and
your team will be much more successful at
creating a useful and accurate Work
Breakdown Structure.
 Level of Work Package Detail
 Deliverables Not Activities or Tasks
 WBS is not a Plan or Schedule
 WBS Updates Require Change Control
 WBS is not an Organizational Hierarchy
Following are a few reasons
for creating a WBS in a project
 Accurate and readable project
organization.
 Accurate assignment of
responsibilities to the project team.
 Indicates the project milestones and
control points.
 Helps to estimate the cost, time, and
risk.
 Illustrate the project scope, so the
stakeholders can have a better
understanding of the same.
Construction of a WBS
 Identifying the main deliverables of a project is
the starting point for deriving a work breakdown
structure.
 This important step is usually done by the project
managers and the subject matter experts (SMEs)
involved in the project. Once this step is
completed, the subject matter experts start
breaking down the high-level tasks into smaller
chunks of work.
 In the process of breaking down the tasks, one
can break them down into different levels of
detail. One can detail a high level task into ten
sub tasks while another can detail the same high
level task into 20 sub tasks.
Goals For WBS
 Giving visibility to important work
efforts.
 Giving visibility to risky work efforts.
 Illustrate the correlation between the
activities and deliverables.
 Show clear ownership by task leaders.
Thank you

More Related Content

Similar to workbreakdownstructureppt-130410021152-phpapp02 (1).pdf

6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docxevonnehoggarth79783
 
Subject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdfSubject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdfdeepaksatrker
 
Project scope management
 Project scope management Project scope management
Project scope managementSidraSaleem17
 
Chapter 2 Work Break down Structure1.ppt
Chapter 2 Work Break down Structure1.pptChapter 2 Work Break down Structure1.ppt
Chapter 2 Work Break down Structure1.pptssuser4f8f65
 
Chapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).pptChapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).pptssuser8cd298
 
WBSssssssssssssssssssssssssssssssssssss.pptx
WBSssssssssssssssssssssssssssssssssssss.pptxWBSssssssssssssssssssssssssssssssssssss.pptx
WBSssssssssssssssssssssssssssssssssssss.pptxRedhaElhuni
 
A Work Breakdown Structure ( Wbs )
A Work Breakdown Structure ( Wbs )A Work Breakdown Structure ( Wbs )
A Work Breakdown Structure ( Wbs )Kimberly Williams
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structureCOEPD HR
 
PositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxPositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxChantellPantoja184
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectNirtiSingla
 
Ignore Project Scope & WBS At Your Own Peril
Ignore Project Scope & WBS At Your Own PerilIgnore Project Scope & WBS At Your Own Peril
Ignore Project Scope & WBS At Your Own PerilPraveen Malik, PMP
 
Work Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxWork Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxARITRYAKUMAR
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time ManagementSabrinaScott22
 
Рынок труда
Рынок трудаРынок труда
Рынок трудаEvgeniya
 
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docxaryan532920
 
Diploma in Project Management – How to Create a Work Breakdown Structure (WBS...
Diploma in Project Management – How to Create a Work Breakdown Structure (WBS...Diploma in Project Management – How to Create a Work Breakdown Structure (WBS...
Diploma in Project Management – How to Create a Work Breakdown Structure (WBS...danieljohn810
 

Similar to workbreakdownstructureppt-130410021152-phpapp02 (1).pdf (20)

6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
 
Subject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdfSubject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdf
 
Project scope management
 Project scope management Project scope management
Project scope management
 
Wbs, gant charts
Wbs, gant chartsWbs, gant charts
Wbs, gant charts
 
Lect2
Lect2Lect2
Lect2
 
Chapter 2 Work Break down Structure1.ppt
Chapter 2 Work Break down Structure1.pptChapter 2 Work Break down Structure1.ppt
Chapter 2 Work Break down Structure1.ppt
 
Chapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).pptChapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).ppt
 
WBSssssssssssssssssssssssssssssssssssss.pptx
WBSssssssssssssssssssssssssssssssssssss.pptxWBSssssssssssssssssssssssssssssssssssss.pptx
WBSssssssssssssssssssssssssssssssssssss.pptx
 
SEN-22413 - UNIT - V.pptx
SEN-22413 -  UNIT - V.pptxSEN-22413 -  UNIT - V.pptx
SEN-22413 - UNIT - V.pptx
 
A Work Breakdown Structure ( Wbs )
A Work Breakdown Structure ( Wbs )A Work Breakdown Structure ( Wbs )
A Work Breakdown Structure ( Wbs )
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
PositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxPositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docx
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft project
 
Ignore Project Scope & WBS At Your Own Peril
Ignore Project Scope & WBS At Your Own PerilIgnore Project Scope & WBS At Your Own Peril
Ignore Project Scope & WBS At Your Own Peril
 
Work Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxWork Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptx
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
Ch05
Ch05Ch05
Ch05
 
Рынок труда
Рынок трудаРынок труда
Рынок труда
 
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 
Diploma in Project Management – How to Create a Work Breakdown Structure (WBS...
Diploma in Project Management – How to Create a Work Breakdown Structure (WBS...Diploma in Project Management – How to Create a Work Breakdown Structure (WBS...
Diploma in Project Management – How to Create a Work Breakdown Structure (WBS...
 

Recently uploaded

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 

Recently uploaded (20)

FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 

workbreakdownstructureppt-130410021152-phpapp02 (1).pdf

  • 1. Work Breakdown Structure By: Nazila Mazaheri Artinarsing Rao Sharmithas Madhukumar Sandhya Urs J
  • 2. Introduction  Dividing complex projects to simpler and manageable tasks is the process identified as Work Breakdown Structure (WBS).  Usually, the project managers use this method for simplifying the project execution. In WBS, much larger tasks are broken-down to manageable chunks of work. These chunks can be easily supervised and estimated.
  • 3. A work breakdown structure  In project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components.  A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control
  • 5. WBS helps manager ◦ Facilitates evaluation of cost, time, and technical performance of the organization on a project. ◦ Provides management with information appropriate to each organizational level. ◦ Helps in the development of the organization. breakdown structure which assigns project responsibilities to organizational units and individuals ◦ Helps manager plan, schedule, and budget. ◦ Defines communication channels and assists in coordinating the various project elements.
  • 6. few reasons for creating a WBS in a project.  Accurate and readable project organization.  Accurate assignment of responsibilities to the project team.  Indicates the project milestones and control points.  Helps to estimate the cost, time, and risk.  Illustrate the project scope, so the stakeholders can have a better understanding of the same.
  • 7. Purpose of WBS  There are three reasons to use a WBS in your projects: first is that is helps more accurately and specifically define and organize the scope of the total project.  The second reason for using a WBS in your projects is to help with assigning responsibilities, resource allocation, monitoring the project, and controlling the project  Finally, it allows you double check all the deliverables' specifics with the stakeholders and make sure there is nothing missing or overlapping.
  • 8. Process of WBS  First, let's look at what all we need to get started. There are several inputs you will need to get you off on the right foot: The Project Scope Statement The Project Scope Management Plan Organizational Process Assets Approved Change Requests - (PMBOK Guide)
  • 9. Process of WBS  You will use certain tools as well: Work Breakdown Structure Templates Decomposition - (PMBOK Guide)
  • 10. Process of WBS  Finally, using these inputs and tools you will create the following outputs: Work Breakdown Structure WBS Dictionary Scope Baseline Project Scope Statement (updates) Project Scope Management Plan (updates) Requested Changes - (PMBOK Guide)
  • 11. How to build a WBS  Begin with the Charter, focusing on Objectives and Deliverables  Break the main product(s) down into sub- products  Set the structure to match how you’ll manage the project  Lowest level not too detailed, not too large  Is there a need for Integration?  Identify support activities  Check for completeness - is all the effort included?  Develop a coding structure if needed  Assign work package managers
  • 12. Pitfalls There are common pitfalls to creating a WBS. If you can keep these few possible, you and your team will be much more successful at creating a useful and accurate Work Breakdown Structure.  Level of Work Package Detail  Deliverables Not Activities or Tasks  WBS is not a Plan or Schedule  WBS Updates Require Change Control  WBS is not an Organizational Hierarchy
  • 13. Following are a few reasons for creating a WBS in a project  Accurate and readable project organization.  Accurate assignment of responsibilities to the project team.  Indicates the project milestones and control points.  Helps to estimate the cost, time, and risk.  Illustrate the project scope, so the stakeholders can have a better understanding of the same.
  • 14. Construction of a WBS  Identifying the main deliverables of a project is the starting point for deriving a work breakdown structure.  This important step is usually done by the project managers and the subject matter experts (SMEs) involved in the project. Once this step is completed, the subject matter experts start breaking down the high-level tasks into smaller chunks of work.  In the process of breaking down the tasks, one can break them down into different levels of detail. One can detail a high level task into ten sub tasks while another can detail the same high level task into 20 sub tasks.
  • 15. Goals For WBS  Giving visibility to important work efforts.  Giving visibility to risky work efforts.  Illustrate the correlation between the activities and deliverables.  Show clear ownership by task leaders.