SlideShare a Scribd company logo
1 of 4
Faruk O. Syed
4721 Whitehall Ct McKinney, TX 75070
faruk.syed@yahoo.com
Cell (469)4876734
SUMMARY:
• Over 10 years of experience in engineering management, marketing, procurement and quality improvement
management systems at a Fortune Global 100 company.
• Specializes at electronic, electrical, and software/ hardware tools and fixtures management.
• Engineer with the technical expertise and commitment to accurately design, evaluate and maintain
mechanical / electromechanical / electrical / electronic systems.
• Participated and led quality initiatives to meet objectives for business growth, customer satisfaction and
continual quality improvement.
EDUCATION:
Amberton University Garland, School of Business, Garland, Texas 2015
Master of Business Administration in Management
University of Texas at Dallas, School of Engineering Richardson, Texas 2009
Bachelor of Science, Electrical Engineering
Collin County Community College District - Plano, Texas 2004
Associate in Science in Engineering
Dhaka International University, School of Engineering and Science, Dhaka Bangladesh 1998
Bachelor of Science (equiv. to Engineering Degree)
CERTIFICATIONS:
• Certified Lean Six Sigma Green Belt (CSSGB)- ASQ
• Certified Manager of Quality- ASQ Section 1416
• Certified Quality Engineer- ASQ Section 1416
• Certified CMMI (v1.3) – the process Group
• Certified Lead Quality Auditor for ISO9001 , Quality Auditor for ISO13485
• Certified IEEE Medical Device Software Compliance under IEC62304
• Certified Medical gas and vacuum in the health care environment
• Certified IPC/WHMA-A-620B, IPC/J-STD-001E, IPC/WHMA-A-610
• Certified Agile – RMC Learning Solution
• Certified First Aid CPR AED Program
PROFICIENCIES:
• Standard: ISO9001:2008, CMMI,ISO/TS 16949:2009,CENELC (EN 50128), ISO13485, ISO14971 and FDA
compliance, and ISO9100.
• Operating Systems: All Windows, MS Project & Microsoft Office.
• Lean Quality Tools: FMEA, Pareto Charts, Fishbone Diagrams, 5S, 6S, 8D Methodology, Statistical Process
Control (SPC), internal/external Audit, Poka-Yoke for Mistake Proofing, Kaizen.
• Hardware: computer Peripherals, Network cards, Memory Cards, CISCO Networking analyzer Equipment
• Software: Java Script, Mat lab, Lab View, Pspice, Assembly SPAM, Linux, Logic Work, Verilog, .Net, C, C++,
MIPS Programs, Visual Studio, FrontPage, Google web toolkit.
• Database: SAP, JIRA, Jenkins, Minitab, Oracle, Agile scrum, Access, P&L, SQL, Server, Visure, alfresco.
• Software Testing: Unit , integration, system, acceptance testing, sit testing witnessing, Sanity - regression
testing, Verification and validation (V&V), Mobile end-to-end testing,
• Networking: Domain name system (DNS), Dynamic Host Configuration Protocol (DHCP), File Transfer
Protocol (FTP), Simple Mail Transfer Protocol (SMTP), TCP/IP (Transmission Control Protocol/Internet
Protocol).
PROFESSIONAL EXPERIENCE:
SEP 2013 – Present Knorr-Bremse–New York Air Brake www.nyab.com Irving TX
Senior Quality & Process Engineer
• Knorr-Bremse makes train dynamic solution globally, 40+ million revenues yearly. Working with leaders,
champions in supporting business growth.
• Ensure Project Manager are compliance with ISO and CMMI processes by verifying PM’s project plans,
schedule, PM notebook, Statement Of Work (SOW), work breakdown structure (WBS), deliverable, tollgates,
project risk, team skills, project changes, measure complexity, Agile scrum sprint meeting.
• Developed, implement, and review quality procedures/instructions to assure compliance to ISO 9001:2008.
• Prepared and execute effective internal audits per CMMI, ISO 9001 Standards.
• Successfully completed CMMI ML2 for 2015, ISO certification and International Railway Industry Standard
(IRIS).
• Performed frequent internal audits with all engineering disciplines (software, systems, mechanical, etc.) and
present final reports to senior staff and department managers.
• Drive cross-functional teams to continually identify and implement facility improvements that focus on
enhanced EH&S performance, increased reliability, increased production, cost optimization, Key Performance
Indicators (KPI) and waste minimization.
• Pro-actively review, modify and implement department Quality System procedures
• Trend and analyze warranty, Cost of poor quality (COPQ) Matrix to ensure acceptable products and services
reach the customer.
SEP 2012 – SEP 2013 (Promotion)
Product QA / Test Engineer
• Managed 22 production employees and 6 MRB team members to ensure quality inspections, production
error, reduce scrape/waste and defects are capture and recorded, training, schedule, and both process and
quality are followed.
• Managed Material Review Board (MRB), tollgate, Change Control Board, and monitored the effectiveness of
corrective action, Improved CAPA performance and Root Cause & Gap Analysis, Control & Pareto Charts
Analysis for COPQ.
• Support the manufacture and procurement for all automotives / locomotive electrical electronic components
related issues and the Production Part Approval Process (PPAP), advanced product quality planning (APQP).
• Lead all supplier visit, Troubleshoot in-process and supplier related quality issues and Coordinate with
customer and supplier. Make decisions regarding mechanical / electrical component supplier’s defect and
facilitate the solutions.
• Reviewed customer proposals and contracts for quality related contractual requirements for simulator and
Leader product, source inspectors and suppliers.
• Test engineering efforts throughout the systems development life cycle (SDLC) for three separate product
lines and multiple projects.
• Analysis complexity for train systems design, test plan and procedure, and performed as a contributor.
• Standardized development of Test Plan, Test Procedures, and Test Reports to IEEE 829.
• Increased test engineering performance and efficiency by combining test execution reporting by utilizing the
requirements / test case management tools.
• Products involve: Locomotive train dynamic system (TDS). Automatic train control (ATC), communications
train control (CBTC), cab signaling, Automatic train stop (ATS), DB-60 Control Valve, EL-60 Empty & Load
Valve, air brake hose, Computer Controlled Brake
DEC 2010 – SEP 2012 Stryker Communications www.stryker.com Flower Mound, TX
Quality Engineer
• Stryker makes medic product globally, 76 + million revalue in 2011 a rapidly growing company.
• Performed engineering risk analyzed for safety-related customer complaint investigations.
• Provided engineering input to Regulatory Department for FDA reporting MDR decisions.
• Coordinated with field service technicians, technical support, sales representatives, customers, and suppliers
to gather information on product experiences. Ongoing support of critical quality issues and solves.
• Performed failure modes analysis (FMEA) to detect potential failure of the device severity and failures.
• Vendor Management and work with Suppliers on documentation of Supplier Investigation for NCRs.
• Managed Warranty Return Rate Matrix for lights and extended horizontal arms products.
• Managed and support Incoming Quality Control team with creation and update of QIPs.
• Developed internal audit and responsible for execute effective internal audits per ISO9001, ISO13485,
ISO14971 and FDA compliance.
• Monitored RMA, MRB, NCMB; CAPA & ECO processes meet all compliance requirements.
• Products involve: PSB, Boom, Router, SPI2, SPI3, Low Ceiling Light Head, Visum II Light Head, Spring Arm,
and Hydraulic Surgical Tables.
AUG 2010 – DEC 2010 Fujitsu Communications www.fujitsu.com Richardson, TX
Production Manager / Project Electrical Engineer
• Supervised production line and provided engineering support in hardware and software testing.
• Developed automated test cases, procedure and analyzed technical requirements effort associate with the 3G
microcell test systems.
• Generated various documents, schematic capture, diagnostics, flowcharts and project status reports.
• Supported production in different test activities such as BAC SERVER, DEBUG, CNE, ETHERNET testing.
• Networking includes: LAN/WAN, TCP/IP, HSI, IPTV, VoIP, Multicast, IGMP, DHCP, RADIUS, QoS, telnet, ftp,
TL1 etc. Cisco products: AT&T 3G Microcell and with GPON/FTTx product testing in labs.
JUN 2009 – AUG 2010 (Project 1)
Test Engineer
• Designed, developed and maintained test strategies for new and existing products.
• Created and executed software/hardware test plans, test cases, and test reports to benchmark performance.
• Developed and ensure software/hardware functional and diagnostic test cases to verify functionality.
• Processed yield improvements, cost reduction and new product introduction.
• Products involve: MUX, DMUX, WSS network communication optical systems and telecommunications PCB
and Processor.
JUN 2006 – MAY 2009 Sanmina-SCI www.sanima-sci.com Allen, TX
Quality Engineer
• Analyzed test results, reported and tracked via Quality Center for web-based applications i.e.
• Functionality, Compatibility, Reliability, Performance, Security, Safety
• Performed engineering activities to support customer complaints, supplier quality and process improvements
using 6S, Kaizen lean methods, etc.
• Managed equipment, inventory, and work flow throughout the manufacturing floor.
• Prepared samples, set-up test equipment, perform functional tests, and execute validation activities.
• Maintained electronics technical functions related to production test, checkout, calibration, alignment,
fabrication, modification, and assembly of electronic and electromechanical systems.
• Analyzed internal failure for Motorola, Lucent Technology, Alcatel equipment, Card cage, Omni4, Hi-pot,
Battery stand, Agilent Technologies Equipments.
• Nonconformance (NCR), RMA Reports and liaise with engineering and Material Review Board (MRB), ECR,
EBR SBR, ECCB.
• Products involve: Digital mass flow Control System, Programmable PCB, Switching and routing System,
10GBase- processor, circuit board layout ,RF Simulation and Modeling, wireless test point.
JAN 2000 – JUNE 2006 Albertsons www.albertsons.com Allen, TX
Front End Manager
• Managed and handle daily office report, store's cash accountability, sales reports and operations.
• Supervised and train employees on office duties and interview and hire cashier and assistant manager.
• Monitored usage, order and maintain inventory of front end supplies and uniforms.
• Ensured compliance with FDA standard with dress standards, sanitation, safety, security, and other policies.
• Performed all duties and responsibilities with honesty and integrity; perform other necessary and required.
REFERENCES:
Available upon request
CITIZENSHIP:
U.S Citizen

More Related Content

What's hot

What's hot (20)

Henry P. Agsaullo_Jr_Quality Professional
Henry P. Agsaullo_Jr_Quality ProfessionalHenry P. Agsaullo_Jr_Quality Professional
Henry P. Agsaullo_Jr_Quality Professional
 
Resume2015
Resume2015Resume2015
Resume2015
 
BRIAN D ALDRIDGE Resume 2016
BRIAN D ALDRIDGE Resume 2016BRIAN D ALDRIDGE Resume 2016
BRIAN D ALDRIDGE Resume 2016
 
CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510
 
Ignatius Prasad Guntupalli
Ignatius Prasad GuntupalliIgnatius Prasad Guntupalli
Ignatius Prasad Guntupalli
 
PradeepKombilath
PradeepKombilathPradeepKombilath
PradeepKombilath
 
Jonalyn Grandia Resume
Jonalyn Grandia ResumeJonalyn Grandia Resume
Jonalyn Grandia Resume
 
Amita_Kashyap1_CV
Amita_Kashyap1_CVAmita_Kashyap1_CV
Amita_Kashyap1_CV
 
Umesh Resume
Umesh ResumeUmesh Resume
Umesh Resume
 
Resume
Resume Resume
Resume
 
Vineeth biodata
Vineeth biodataVineeth biodata
Vineeth biodata
 
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)
 
CV
CVCV
CV
 
William Petcher_sat
William Petcher_satWilliam Petcher_sat
William Petcher_sat
 
Mike Leeper Resume
Mike Leeper ResumeMike Leeper Resume
Mike Leeper Resume
 
Skatiyar CV latest date 02.05.2015.doc
Skatiyar CV latest date 02.05.2015.docSkatiyar CV latest date 02.05.2015.doc
Skatiyar CV latest date 02.05.2015.doc
 
SNeshevich_2016
SNeshevich_2016SNeshevich_2016
SNeshevich_2016
 
Todd Watson Resume
Todd Watson ResumeTodd Watson Resume
Todd Watson Resume
 
Anirban chakraborty(m eng., cssgb)
Anirban chakraborty(m eng., cssgb)Anirban chakraborty(m eng., cssgb)
Anirban chakraborty(m eng., cssgb)
 
Allen Karl Revised Resume
Allen Karl Revised ResumeAllen Karl Revised Resume
Allen Karl Revised Resume
 

Viewers also liked

Office Live Workspace
Office Live WorkspaceOffice Live Workspace
Office Live WorkspacePam Despots
 
Iglesia luterana sola_fe
Iglesia luterana sola_feIglesia luterana sola_fe
Iglesia luterana sola_feguest8e19508
 
Introduction To Dallas
Introduction To DallasIntroduction To Dallas
Introduction To DallasWaterWang
 
How To Create An Organizational Chart In Word
How To Create An Organizational Chart In WordHow To Create An Organizational Chart In Word
How To Create An Organizational Chart In WordPam Despots
 
Digital Codelco Sep2011
Digital Codelco Sep2011Digital Codelco Sep2011
Digital Codelco Sep2011morellan
 
Celtic clothing
Celtic clothingCeltic clothing
Celtic clothingstephdog42
 
WelcomeToHCCC
WelcomeToHCCCWelcomeToHCCC
WelcomeToHCCCthompsofm
 
How to create an organizational chart in word
How to create an organizational chart in wordHow to create an organizational chart in word
How to create an organizational chart in wordPam Despots
 
Flow & Error Control
Flow & Error ControlFlow & Error Control
Flow & Error Controltameemyousaf
 

Viewers also liked (19)

Office Live Workspace
Office Live WorkspaceOffice Live Workspace
Office Live Workspace
 
Flappers!
Flappers!Flappers!
Flappers!
 
Ratios
RatiosRatios
Ratios
 
Allah 10
Allah 10Allah 10
Allah 10
 
Story2
Story2Story2
Story2
 
Iglesia luterana sola_fe
Iglesia luterana sola_feIglesia luterana sola_fe
Iglesia luterana sola_fe
 
Story2
Story2Story2
Story2
 
Zoom call 2
Zoom call 2Zoom call 2
Zoom call 2
 
Project2.0_ 2
Project2.0_ 2Project2.0_ 2
Project2.0_ 2
 
Story first
Story firstStory first
Story first
 
Introduction To Dallas
Introduction To DallasIntroduction To Dallas
Introduction To Dallas
 
Flappers!
Flappers!Flappers!
Flappers!
 
How To Create An Organizational Chart In Word
How To Create An Organizational Chart In WordHow To Create An Organizational Chart In Word
How To Create An Organizational Chart In Word
 
E.m ppt
E.m pptE.m ppt
E.m ppt
 
Digital Codelco Sep2011
Digital Codelco Sep2011Digital Codelco Sep2011
Digital Codelco Sep2011
 
Celtic clothing
Celtic clothingCeltic clothing
Celtic clothing
 
WelcomeToHCCC
WelcomeToHCCCWelcomeToHCCC
WelcomeToHCCC
 
How to create an organizational chart in word
How to create an organizational chart in wordHow to create an organizational chart in word
How to create an organizational chart in word
 
Flow & Error Control
Flow & Error ControlFlow & Error Control
Flow & Error Control
 

Similar to Faruk syed ee mba_asq-cssgb

Joe bartnickiresume jun4-2016
Joe bartnickiresume  jun4-2016Joe bartnickiresume  jun4-2016
Joe bartnickiresume jun4-2016Joe Bartnicki
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary Giblock
 
Resume_CHITRA_STROUP
Resume_CHITRA_STROUPResume_CHITRA_STROUP
Resume_CHITRA_STROUPChitra Stroup
 
Nilesh More_Project Manager
Nilesh More_Project ManagerNilesh More_Project Manager
Nilesh More_Project ManagerNilesh More
 
SUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docxSUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docxpicklesvalery
 
Resume of Britt Lowry_1
Resume of Britt Lowry_1Resume of Britt Lowry_1
Resume of Britt Lowry_1Britt Lowry
 
(Technologies) AI, Machine Learning, Predictive Analytics, IIOT, Cloud,Web-fr...
(Technologies) AI, Machine Learning, Predictive Analytics, IIOT, Cloud,Web-fr...(Technologies) AI, Machine Learning, Predictive Analytics, IIOT, Cloud,Web-fr...
(Technologies) AI, Machine Learning, Predictive Analytics, IIOT, Cloud,Web-fr...Farhan Tariq
 
Besander Allen FINAL 011216 mr.rev.kw
Besander Allen FINAL 011216 mr.rev.kwBesander Allen FINAL 011216 mr.rev.kw
Besander Allen FINAL 011216 mr.rev.kwAllen Besander
 
William v lucas qa resume no ph
William v lucas qa resume no phWilliam v lucas qa resume no ph
William v lucas qa resume no phBill Lucas
 
Joseph Kuttemperoor Jan2011 New
Joseph  Kuttemperoor Jan2011 NewJoseph  Kuttemperoor Jan2011 New
Joseph Kuttemperoor Jan2011 Newjtkuttem
 
Resume_Numan_latest
Resume_Numan_latestResume_Numan_latest
Resume_Numan_latestNuman Domian
 
Alan Berow Technical Support Resume
Alan Berow Technical Support ResumeAlan Berow Technical Support Resume
Alan Berow Technical Support ResumeAlanBerowLSSGBCSM
 
Process Control & CV history
Process Control & CV historyProcess Control & CV history
Process Control & CV historyacdnexpat
 
Khan Umair Resume Feb2010
Khan Umair Resume Feb2010Khan Umair Resume Feb2010
Khan Umair Resume Feb2010Umair Khan
 

Similar to Faruk syed ee mba_asq-cssgb (20)

Joe bartnickiresume jun4-2016
Joe bartnickiresume  jun4-2016Joe bartnickiresume  jun4-2016
Joe bartnickiresume jun4-2016
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
 
Resume_CHITRA_STROUP
Resume_CHITRA_STROUPResume_CHITRA_STROUP
Resume_CHITRA_STROUP
 
Nilesh More_Project Manager
Nilesh More_Project ManagerNilesh More_Project Manager
Nilesh More_Project Manager
 
SUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docxSUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docx
 
Resume of Britt Lowry_1
Resume of Britt Lowry_1Resume of Britt Lowry_1
Resume of Britt Lowry_1
 
(Technologies) AI, Machine Learning, Predictive Analytics, IIOT, Cloud,Web-fr...
(Technologies) AI, Machine Learning, Predictive Analytics, IIOT, Cloud,Web-fr...(Technologies) AI, Machine Learning, Predictive Analytics, IIOT, Cloud,Web-fr...
(Technologies) AI, Machine Learning, Predictive Analytics, IIOT, Cloud,Web-fr...
 
Karamjit Sekhon Resume
Karamjit Sekhon ResumeKaramjit Sekhon Resume
Karamjit Sekhon Resume
 
resume
resumeresume
resume
 
Besander Allen FINAL 011216 mr.rev.kw
Besander Allen FINAL 011216 mr.rev.kwBesander Allen FINAL 011216 mr.rev.kw
Besander Allen FINAL 011216 mr.rev.kw
 
William v lucas qa resume no ph
William v lucas qa resume no phWilliam v lucas qa resume no ph
William v lucas qa resume no ph
 
Joseph Kuttemperoor Jan2011 New
Joseph  Kuttemperoor Jan2011 NewJoseph  Kuttemperoor Jan2011 New
Joseph Kuttemperoor Jan2011 New
 
Dulan_Resume_QE
Dulan_Resume_QEDulan_Resume_QE
Dulan_Resume_QE
 
Resume_Numan_latest
Resume_Numan_latestResume_Numan_latest
Resume_Numan_latest
 
Alan Berow Technical Support Resume
Alan Berow Technical Support ResumeAlan Berow Technical Support Resume
Alan Berow Technical Support Resume
 
Process Control & CV history
Process Control & CV historyProcess Control & CV history
Process Control & CV history
 
Carlton R. Albritton QE 1
Carlton R. Albritton QE 1Carlton R. Albritton QE 1
Carlton R. Albritton QE 1
 
Khan Umair Resume Feb2010
Khan Umair Resume Feb2010Khan Umair Resume Feb2010
Khan Umair Resume Feb2010
 
CV_Arvind Pandey
CV_Arvind PandeyCV_Arvind Pandey
CV_Arvind Pandey
 
Resume
ResumeResume
Resume
 

Recently uploaded

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 

Faruk syed ee mba_asq-cssgb

  • 1. Faruk O. Syed 4721 Whitehall Ct McKinney, TX 75070 faruk.syed@yahoo.com Cell (469)4876734 SUMMARY: • Over 10 years of experience in engineering management, marketing, procurement and quality improvement management systems at a Fortune Global 100 company. • Specializes at electronic, electrical, and software/ hardware tools and fixtures management. • Engineer with the technical expertise and commitment to accurately design, evaluate and maintain mechanical / electromechanical / electrical / electronic systems. • Participated and led quality initiatives to meet objectives for business growth, customer satisfaction and continual quality improvement. EDUCATION: Amberton University Garland, School of Business, Garland, Texas 2015 Master of Business Administration in Management University of Texas at Dallas, School of Engineering Richardson, Texas 2009 Bachelor of Science, Electrical Engineering Collin County Community College District - Plano, Texas 2004 Associate in Science in Engineering Dhaka International University, School of Engineering and Science, Dhaka Bangladesh 1998 Bachelor of Science (equiv. to Engineering Degree) CERTIFICATIONS: • Certified Lean Six Sigma Green Belt (CSSGB)- ASQ • Certified Manager of Quality- ASQ Section 1416 • Certified Quality Engineer- ASQ Section 1416 • Certified CMMI (v1.3) – the process Group • Certified Lead Quality Auditor for ISO9001 , Quality Auditor for ISO13485 • Certified IEEE Medical Device Software Compliance under IEC62304 • Certified Medical gas and vacuum in the health care environment • Certified IPC/WHMA-A-620B, IPC/J-STD-001E, IPC/WHMA-A-610 • Certified Agile – RMC Learning Solution • Certified First Aid CPR AED Program PROFICIENCIES: • Standard: ISO9001:2008, CMMI,ISO/TS 16949:2009,CENELC (EN 50128), ISO13485, ISO14971 and FDA compliance, and ISO9100. • Operating Systems: All Windows, MS Project & Microsoft Office. • Lean Quality Tools: FMEA, Pareto Charts, Fishbone Diagrams, 5S, 6S, 8D Methodology, Statistical Process Control (SPC), internal/external Audit, Poka-Yoke for Mistake Proofing, Kaizen. • Hardware: computer Peripherals, Network cards, Memory Cards, CISCO Networking analyzer Equipment • Software: Java Script, Mat lab, Lab View, Pspice, Assembly SPAM, Linux, Logic Work, Verilog, .Net, C, C++, MIPS Programs, Visual Studio, FrontPage, Google web toolkit. • Database: SAP, JIRA, Jenkins, Minitab, Oracle, Agile scrum, Access, P&L, SQL, Server, Visure, alfresco. • Software Testing: Unit , integration, system, acceptance testing, sit testing witnessing, Sanity - regression testing, Verification and validation (V&V), Mobile end-to-end testing, • Networking: Domain name system (DNS), Dynamic Host Configuration Protocol (DHCP), File Transfer Protocol (FTP), Simple Mail Transfer Protocol (SMTP), TCP/IP (Transmission Control Protocol/Internet Protocol).
  • 2. PROFESSIONAL EXPERIENCE: SEP 2013 – Present Knorr-Bremse–New York Air Brake www.nyab.com Irving TX Senior Quality & Process Engineer • Knorr-Bremse makes train dynamic solution globally, 40+ million revenues yearly. Working with leaders, champions in supporting business growth. • Ensure Project Manager are compliance with ISO and CMMI processes by verifying PM’s project plans, schedule, PM notebook, Statement Of Work (SOW), work breakdown structure (WBS), deliverable, tollgates, project risk, team skills, project changes, measure complexity, Agile scrum sprint meeting. • Developed, implement, and review quality procedures/instructions to assure compliance to ISO 9001:2008. • Prepared and execute effective internal audits per CMMI, ISO 9001 Standards. • Successfully completed CMMI ML2 for 2015, ISO certification and International Railway Industry Standard (IRIS). • Performed frequent internal audits with all engineering disciplines (software, systems, mechanical, etc.) and present final reports to senior staff and department managers. • Drive cross-functional teams to continually identify and implement facility improvements that focus on enhanced EH&S performance, increased reliability, increased production, cost optimization, Key Performance Indicators (KPI) and waste minimization. • Pro-actively review, modify and implement department Quality System procedures • Trend and analyze warranty, Cost of poor quality (COPQ) Matrix to ensure acceptable products and services reach the customer. SEP 2012 – SEP 2013 (Promotion) Product QA / Test Engineer • Managed 22 production employees and 6 MRB team members to ensure quality inspections, production error, reduce scrape/waste and defects are capture and recorded, training, schedule, and both process and quality are followed. • Managed Material Review Board (MRB), tollgate, Change Control Board, and monitored the effectiveness of corrective action, Improved CAPA performance and Root Cause & Gap Analysis, Control & Pareto Charts Analysis for COPQ. • Support the manufacture and procurement for all automotives / locomotive electrical electronic components related issues and the Production Part Approval Process (PPAP), advanced product quality planning (APQP). • Lead all supplier visit, Troubleshoot in-process and supplier related quality issues and Coordinate with customer and supplier. Make decisions regarding mechanical / electrical component supplier’s defect and facilitate the solutions. • Reviewed customer proposals and contracts for quality related contractual requirements for simulator and Leader product, source inspectors and suppliers. • Test engineering efforts throughout the systems development life cycle (SDLC) for three separate product lines and multiple projects. • Analysis complexity for train systems design, test plan and procedure, and performed as a contributor. • Standardized development of Test Plan, Test Procedures, and Test Reports to IEEE 829. • Increased test engineering performance and efficiency by combining test execution reporting by utilizing the requirements / test case management tools. • Products involve: Locomotive train dynamic system (TDS). Automatic train control (ATC), communications train control (CBTC), cab signaling, Automatic train stop (ATS), DB-60 Control Valve, EL-60 Empty & Load Valve, air brake hose, Computer Controlled Brake DEC 2010 – SEP 2012 Stryker Communications www.stryker.com Flower Mound, TX Quality Engineer • Stryker makes medic product globally, 76 + million revalue in 2011 a rapidly growing company. • Performed engineering risk analyzed for safety-related customer complaint investigations. • Provided engineering input to Regulatory Department for FDA reporting MDR decisions.
  • 3. • Coordinated with field service technicians, technical support, sales representatives, customers, and suppliers to gather information on product experiences. Ongoing support of critical quality issues and solves. • Performed failure modes analysis (FMEA) to detect potential failure of the device severity and failures. • Vendor Management and work with Suppliers on documentation of Supplier Investigation for NCRs. • Managed Warranty Return Rate Matrix for lights and extended horizontal arms products. • Managed and support Incoming Quality Control team with creation and update of QIPs. • Developed internal audit and responsible for execute effective internal audits per ISO9001, ISO13485, ISO14971 and FDA compliance. • Monitored RMA, MRB, NCMB; CAPA & ECO processes meet all compliance requirements. • Products involve: PSB, Boom, Router, SPI2, SPI3, Low Ceiling Light Head, Visum II Light Head, Spring Arm, and Hydraulic Surgical Tables. AUG 2010 – DEC 2010 Fujitsu Communications www.fujitsu.com Richardson, TX Production Manager / Project Electrical Engineer • Supervised production line and provided engineering support in hardware and software testing. • Developed automated test cases, procedure and analyzed technical requirements effort associate with the 3G microcell test systems. • Generated various documents, schematic capture, diagnostics, flowcharts and project status reports. • Supported production in different test activities such as BAC SERVER, DEBUG, CNE, ETHERNET testing. • Networking includes: LAN/WAN, TCP/IP, HSI, IPTV, VoIP, Multicast, IGMP, DHCP, RADIUS, QoS, telnet, ftp, TL1 etc. Cisco products: AT&T 3G Microcell and with GPON/FTTx product testing in labs. JUN 2009 – AUG 2010 (Project 1) Test Engineer • Designed, developed and maintained test strategies for new and existing products. • Created and executed software/hardware test plans, test cases, and test reports to benchmark performance. • Developed and ensure software/hardware functional and diagnostic test cases to verify functionality. • Processed yield improvements, cost reduction and new product introduction. • Products involve: MUX, DMUX, WSS network communication optical systems and telecommunications PCB and Processor. JUN 2006 – MAY 2009 Sanmina-SCI www.sanima-sci.com Allen, TX Quality Engineer • Analyzed test results, reported and tracked via Quality Center for web-based applications i.e. • Functionality, Compatibility, Reliability, Performance, Security, Safety • Performed engineering activities to support customer complaints, supplier quality and process improvements using 6S, Kaizen lean methods, etc. • Managed equipment, inventory, and work flow throughout the manufacturing floor. • Prepared samples, set-up test equipment, perform functional tests, and execute validation activities. • Maintained electronics technical functions related to production test, checkout, calibration, alignment, fabrication, modification, and assembly of electronic and electromechanical systems. • Analyzed internal failure for Motorola, Lucent Technology, Alcatel equipment, Card cage, Omni4, Hi-pot, Battery stand, Agilent Technologies Equipments. • Nonconformance (NCR), RMA Reports and liaise with engineering and Material Review Board (MRB), ECR, EBR SBR, ECCB. • Products involve: Digital mass flow Control System, Programmable PCB, Switching and routing System, 10GBase- processor, circuit board layout ,RF Simulation and Modeling, wireless test point. JAN 2000 – JUNE 2006 Albertsons www.albertsons.com Allen, TX Front End Manager • Managed and handle daily office report, store's cash accountability, sales reports and operations. • Supervised and train employees on office duties and interview and hire cashier and assistant manager. • Monitored usage, order and maintain inventory of front end supplies and uniforms.
  • 4. • Ensured compliance with FDA standard with dress standards, sanitation, safety, security, and other policies. • Performed all duties and responsibilities with honesty and integrity; perform other necessary and required. REFERENCES: Available upon request CITIZENSHIP: U.S Citizen