SlideShare a Scribd company logo
1 of 3
Anirban Chakraborty Lean Six Sigma Green Belt certified by
Phone: 91 9903595662 Skype – anirosh6
Accreditations
 Master of Engineering (MEng.) in Chemical and Materials Engineering fromthe University of Alberta, Edmonton (Canada )
 Bachelor of Technology (B.Tech)in fromthe University of Technology (Kolkata, India)
 Recipient of University of Alberta Engineering Graduate Scholarship ( in full), Awardfor Excellence in Student Governance, Finalist in TEC
Edmonton Engineering Innovation contest
 8.7 years of consulting or project leadership experience in facilities engineering and processimprovement in production
 P.Eng (expectedJuly 2016, APEGA)
 Internal Quality Audit certification,Jacobs Engineering Inc.
 Project Management Certification, Jacobs Engineering Group, California (US)
 Working know ledge of Kanban, Kaizen, KANO Model, FMEA
 In depth know ledge of variousquality systemtools and methodologies PPAP, 8D, Lean, 5 Why’s, Pareto Analysis, MSA, Process Flow
Diagrams, Control Plans, AAA, Gage R&R, Capability Studies, Correlation & Regression analysis , SAS, Minitab application
 Experience w ith computer programming to automate and analyze data extraction and to develop reports and dashboards
 Trained in Primavera P6 EPPM by Oracle Inc.
 Advanced levelknowledge and experience of businessprocess design including business analysis, Failure analysis, control and change
management
 WHMIS (Workplace Hazard & Material Information Systems), HACCP,H2S alive, CPR, cGMP, PHA certified & trained
 Strong know ledge & exerciseof CSA ,CNSA & NFPA codes
 Skilled in Value stream mapping& Continuous Improvement Process
 Experienced/working knowledge of ITIL, CMMI & other IT Services ManagementFramework
 User know ledge of Sarbanes-Oxley Enactments
 Proficient in MS Visio, MS Word, MS Excel, MS Outlook, MS Pow erPoint, MS Projects
Core Experiences/Skills
 Accountability, Integrity & Ow nership
 Demonstrated skills in client management & delivery management proved through 95% +rating in all Client feedbacksurveys
 Pioneered and produced “Benchmarked Deliverables” through statistical analysis of 550000 man-hours of Oracle data to create the first
organizational KPI for Jacobs Canada Inc. (Western region)
 Produced and assisted in creating ‘bid w inning proposals’ranging from$2.5 to $18.00 MM for Facilities Design & Engineering w ith a TIC (Total
Installed cost) over $389.00M
 Proficient user experience in design softwares as AutoDesk, Navisworks and SmartPlant
 Demonstrated expertise in internal& external stakeholder management, statistical process control (SPC),vendor management& value
engineering
 Experienced user of time & cost netw orks as CPM-PERT
 Issue & Failure Management, Mitigation plan creation, Conflict Resolution along w ith Escalation Handling for multiple teams.
 Resource management through identification of required skill sets, training recommendations & performance evaluations.
 Timeline, Effort & Cost Estimation and tracking Progress tow ards completion, using Project Plan, Metrics, and burn dow n chart etc.
 Accountable for VOC to CTQdevelopments
 Authored and issued ESA (Engineering Service Agreement)/SLA, Liability insurance,ProcurementContracts & FederalRegulatory/legal
memorandums with the Enbridge , Syncrude Canada
WORK EXPERIENCE
TUDOR ENGINEERING INC.
Project Development Engineer (Consultant) March 2016- till date
 Working w ith clients as JV Driver Canada (a multibillion dollar conglomerate operating from the US & Canada), Bennett Coleman & Co. (a
billion dollarecommerce conglomerate operating in Asia Pacific )
 Techno-commercial analysis of industrialreports for major projects in e-commerce,power,ports & civilinfrastructures
 Deliver Client Presentations on market inroads into South & South East Asian infrastructure development projects
 IT vendor management and contract creations for multi-region w orkexecutions
 Produce Scope of Work proposals w ith strategic engineering & IT infrastructure/applications deployment recommendations
and Change Management plan
JACOBS ENGINEERING CANADA
Project Engineer (FEED, Design & Construction) Aug 2012 – Jan 2016
 Demonstrated ‘Beyond Zero’culture by enforcement and commitment to safety in all internal & externalevents w ith Enbridge Canada ( a
multibillion dollar energycorporation operating in Canada & northern US)
 Led and assisted in producing the Cost Benefit analysis, Project Charter, Project Execution Plan, Communication Strategies, Project Quality
Plan, Procurement contract, Class III Estimation & Commissioning for major pipeline projects over $389 MM
 Primarily responsible for oversight of detailed engineering, procurement, and commissioning of multiple projects performed
 Used JSTEPS (Jacobs Systems To Ensure Project Success) to performScope of Workvalidation, FMEA sessions with Enbridge
 Analyzed and categorized Billable, Contingency and Non Billable project hours and set up the AFE ( Approvalfor Expense) in Oracle
 Worked in sync w ith Project Controls for producing control mechanisms line S-curves, resource charts, resource histogram
 Recommended and ensured the deployment of software applications as Bluebeam Revu & SmartPlantP&IDleading to 20% reduction of
Quality Check time cycles
 Improvedteam communications, defects identification, ease of training and support by establishment of a centralizedwork protocol
through JPI (Jacobs Project Information Systems)
 Slashed engineering design cost till 15.5% by converting engineering draw ingsto Bill of Materials. Saved $1.5M of site construction cost
for Enbridge and gained client delight
 Designed and constructed Temporary Power GenerationFacilities project (NEB directive)in intensive coordinationwith ATCO,
Saskpower and Manitoba Hydro. Gained client delight for meeting NEB requirements w ithin a record time
 Championed MOC (Management of Change ) by effective data documentation, regular stakeholders appraisals and achieved 97% Change
Request approvals
 Strengthened Quality Control metrics through digitalization of ‘criticalissue logs’ in the Jacobs Project Information Systems
 Resolved Claims Adjustments and Invoice management for contract close outs
 Produced and authorized Design Change, Design Control Procedures and Process Waste reduction (Kaizen)
 Increased operational efficiencyby reducingre-work up to 35%throughDesign-Operations work integration
 Defined the key metrics to measure effectiveness of supply chain and vendor documentturnover process
 Introduced and implemented Incentive-Penalty based vendor management systemto reduce criticalmaterial delivery time by 22%. Gained
client delight
 Produced documentation, information and communications such as CCN (ContractChange Notices), DBI (Data Base
Information), HOPSR (Home Office Project Status Reports), DPR(Detailed Project Reviews) and ensured conformance to allpolicies
and procedures related to engineeringfunctions, labor reporting and systemsreporting
 Coauthored Jacobs Multi Office Engineering Workshare Plan estimating a cost saving of $0.5M per $1.25 M
 Supported ISO 9001 audit, gate review sand compliance efforts
 Achieved client delight for ‘fastest turnaround time’on RFIs
 Successfully led teams of 45-66 FTEs in analysis, design and delivery through issues debottlenecking in engineering, construction&
operations
PREVIOUS WORK EXPERIENCE (CANADA & OVERSEAS)
University of Alberta, Canada
Design Engineer Sept 2008- Aug 2012
Statistical modelingof hydrodynamics phenomena
 Conducted stakeholder analysis, requirements collection to create a design frameworkforConsolidation and trafficking of crude oiltailings
fromCanadian mine sites
 Researched pH-Zeta potentialdependent clay-waterdissociation, aggregation and co flocculation of clay ,oiland solvents(naphtha)in Mature
Fine Tailings (MFT) of Syncrude site ( Syncrude is a multibillion dollar mining companyoperatingin Canada)
 Computed reaction engineering & interfacialforcesbetween organic/inorganicparticlesand solvents(naphtha)
• Analyzed previousexperimentalapproaches, research data and caveatsin hydrodynamic behavior of claysolvent suspension
 Used Design of Experiments and produced a statisticalmodel to device a bio-based flocculent for the purpose of tailings consolidation for
Canadian mineral industries
 Planned the progress measurement techniques, correlation& regression analysis, variance analysis and parameters to design and
validate the experiments
 Analyzed and transferred the validated resultsin Compliance Regulation Reports ( Alberta Energy Regulator) for site implementations
 Authored and issued technicaltraining manuals
BioconversionLabs
Design Engineer
 Served on the research teamw orking in the conversion of 5 Carbon molecules (pentose) to value added productsby bioprocessremediation
 Researched and analyzed data on pentose to ethanolconversion by chemical, biochemical, thermaland catalytic methods
 Tested statisticalvalidation of experimentalresults through SAS applications
 Compiled and reported validated results for periodic performance reviewsby stakeholders
2COMS India
Process ImprovementAnalyst Sept 2007-May 2008
 Failure & Data analysis for optimization of client data (GE, Biocon, Pfizer India)
 Performed GAP analysis on current and targeted revenue plans
 Client interfacing & subcontractor management
 Maximized revenue generation by 32% thus minimizing the business incubation time. Gained client delight
Aditya Birla Group Inc. (India) July 2006- Sept 2007
Quality Engineer
 Worked w ith Aditya Birla Group IT clients (Citibank, HINDALCO) to identifyand collect processdefectsforMicrosoft Dynamics CRM users
 Engaged in collections of VOCand CSAT ratings through in depth customer interactions
 Translated client requirements into applicable technical design document w ith proposed solutions
 Collaborated w ith QA teamto ensure completion of test plans and validate End user acceptance criteria
 Nominated w ithin Aditya Birla Group for ‘Best Young Trainee’awardin Bangalore zonaloperations

More Related Content

What's hot

Chandana Das Resume updated
Chandana Das Resume updatedChandana Das Resume updated
Chandana Das Resume updatedChandana Das
 
ETL & Reporting Test Lead_JenishVarkeyJohn
ETL & Reporting Test Lead_JenishVarkeyJohnETL & Reporting Test Lead_JenishVarkeyJohn
ETL & Reporting Test Lead_JenishVarkeyJohnJenish John
 
QA_ETL Test Analyst_Keerthi Madusudan copy
QA_ETL Test Analyst_Keerthi Madusudan copyQA_ETL Test Analyst_Keerthi Madusudan copy
QA_ETL Test Analyst_Keerthi Madusudan copyKeerthi Sivasankaran
 
Adaptive ness casestudy
Adaptive ness casestudyAdaptive ness casestudy
Adaptive ness casestudyNess_Tech
 
Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016Ken Probst
 
johndermodyresume-ATS Results
johndermodyresume-ATS Resultsjohndermodyresume-ATS Results
johndermodyresume-ATS ResultsJohn Dermody
 
Seven step transformation blueprint
Seven step transformation blueprintSeven step transformation blueprint
Seven step transformation blueprintMarc Hornbeek
 
Johndermodyresume vop
Johndermodyresume vopJohndermodyresume vop
Johndermodyresume vopJohn Dermody
 
Bradley grigson pm 2016_perf_swa
Bradley grigson pm 2016_perf_swaBradley grigson pm 2016_perf_swa
Bradley grigson pm 2016_perf_swaBrad Grigson
 
HOMEREARLPOPE - QA2016 Lead
HOMEREARLPOPE - QA2016 LeadHOMEREARLPOPE - QA2016 Lead
HOMEREARLPOPE - QA2016 LeadHomer Pope
 
Applicant_Hema_Harchandani
Applicant_Hema_HarchandaniApplicant_Hema_Harchandani
Applicant_Hema_HarchandaniHema Harchandani
 
3-8-15 Cynthia_Winter_Resume
3-8-15 Cynthia_Winter_Resume3-8-15 Cynthia_Winter_Resume
3-8-15 Cynthia_Winter_ResumeCindy Winter
 
Resume Shwo Tsai Jason Chen
Resume Shwo Tsai Jason ChenResume Shwo Tsai Jason Chen
Resume Shwo Tsai Jason Chenjasonchen888
 
W.Hall_Resume_4_11_16
W.Hall_Resume_4_11_16W.Hall_Resume_4_11_16
W.Hall_Resume_4_11_16Warren Hall
 

What's hot (17)

Chandana Das Resume updated
Chandana Das Resume updatedChandana Das Resume updated
Chandana Das Resume updated
 
Resume_Buenrostro
Resume_BuenrostroResume_Buenrostro
Resume_Buenrostro
 
ETL & Reporting Test Lead_JenishVarkeyJohn
ETL & Reporting Test Lead_JenishVarkeyJohnETL & Reporting Test Lead_JenishVarkeyJohn
ETL & Reporting Test Lead_JenishVarkeyJohn
 
QA_ETL Test Analyst_Keerthi Madusudan copy
QA_ETL Test Analyst_Keerthi Madusudan copyQA_ETL Test Analyst_Keerthi Madusudan copy
QA_ETL Test Analyst_Keerthi Madusudan copy
 
Pugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CVPugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CV
 
Adaptive ness casestudy
Adaptive ness casestudyAdaptive ness casestudy
Adaptive ness casestudy
 
Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016
 
VENKAT KALLAGUNTA_RESUME
VENKAT KALLAGUNTA_RESUMEVENKAT KALLAGUNTA_RESUME
VENKAT KALLAGUNTA_RESUME
 
johndermodyresume-ATS Results
johndermodyresume-ATS Resultsjohndermodyresume-ATS Results
johndermodyresume-ATS Results
 
Seven step transformation blueprint
Seven step transformation blueprintSeven step transformation blueprint
Seven step transformation blueprint
 
Johndermodyresume vop
Johndermodyresume vopJohndermodyresume vop
Johndermodyresume vop
 
Bradley grigson pm 2016_perf_swa
Bradley grigson pm 2016_perf_swaBradley grigson pm 2016_perf_swa
Bradley grigson pm 2016_perf_swa
 
HOMEREARLPOPE - QA2016 Lead
HOMEREARLPOPE - QA2016 LeadHOMEREARLPOPE - QA2016 Lead
HOMEREARLPOPE - QA2016 Lead
 
Applicant_Hema_Harchandani
Applicant_Hema_HarchandaniApplicant_Hema_Harchandani
Applicant_Hema_Harchandani
 
3-8-15 Cynthia_Winter_Resume
3-8-15 Cynthia_Winter_Resume3-8-15 Cynthia_Winter_Resume
3-8-15 Cynthia_Winter_Resume
 
Resume Shwo Tsai Jason Chen
Resume Shwo Tsai Jason ChenResume Shwo Tsai Jason Chen
Resume Shwo Tsai Jason Chen
 
W.Hall_Resume_4_11_16
W.Hall_Resume_4_11_16W.Hall_Resume_4_11_16
W.Hall_Resume_4_11_16
 

Similar to Anirban chakraborty(m eng., cssgb)

Resume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaResume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaarvindblr
 
Resume Jackson Lee
Resume Jackson LeeResume Jackson Lee
Resume Jackson LeeJacksonYKLee
 
Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016
Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016
Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016Katie Spangler
 
Resume Motonaga 10.20.16
Resume Motonaga 10.20.16Resume Motonaga 10.20.16
Resume Motonaga 10.20.16Ron Motonaga
 
Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer
 
Prem_Papabathini_Resume_2016
Prem_Papabathini_Resume_2016Prem_Papabathini_Resume_2016
Prem_Papabathini_Resume_2016Prem Papabathini
 
Ravi_Rajana_Mainframes
Ravi_Rajana_MainframesRavi_Rajana_Mainframes
Ravi_Rajana_MainframesRavi Rajana
 
Faruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgbFaruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgbFaruk Syed
 
Cisco Systems Case Study: The Architecture Review Process Improving the IT P...
Cisco Systems Case Study: The Architecture Review  Process Improving the IT P...Cisco Systems Case Study: The Architecture Review  Process Improving the IT P...
Cisco Systems Case Study: The Architecture Review Process Improving the IT P...Susan Bouchard
 
CVGReddy_Sr QA automation Performance specialist
CVGReddy_Sr QA automation  Performance specialistCVGReddy_Sr QA automation  Performance specialist
CVGReddy_Sr QA automation Performance specialistVenugopala Reddy
 
Lisa L Lazenby_QA Resume
Lisa L Lazenby_QA ResumeLisa L Lazenby_QA Resume
Lisa L Lazenby_QA ResumeLisa Lazenby
 
Resume - Steve Sauchelli - Lead BSA
Resume - Steve Sauchelli - Lead BSAResume - Steve Sauchelli - Lead BSA
Resume - Steve Sauchelli - Lead BSASteve Sauchelli
 
Resume Shwo Tsai Jason Chen
Resume Shwo Tsai Jason ChenResume Shwo Tsai Jason Chen
Resume Shwo Tsai Jason Chenjasonchen888
 
Resume Shwo Tsai Jason Chen
Resume Shwo Tsai Jason ChenResume Shwo Tsai Jason Chen
Resume Shwo Tsai Jason Chenjasonchen888
 

Similar to Anirban chakraborty(m eng., cssgb) (20)

Resume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaResume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-california
 
Resume_LI
Resume_LIResume_LI
Resume_LI
 
Resume Jackson Lee
Resume Jackson LeeResume Jackson Lee
Resume Jackson Lee
 
Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016
Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016
Katharyne-Spangler_Mechanical_Engineer_Katie_F03_07 Dec 2016
 
Resume Motonaga 10.20.16
Resume Motonaga 10.20.16Resume Motonaga 10.20.16
Resume Motonaga 10.20.16
 
Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16
 
Kraig Kottenstette 102016.doc
Kraig Kottenstette 102016.docKraig Kottenstette 102016.doc
Kraig Kottenstette 102016.doc
 
Prem_Papabathini_Resume_2016
Prem_Papabathini_Resume_2016Prem_Papabathini_Resume_2016
Prem_Papabathini_Resume_2016
 
Ravi_Rajana_Mainframes
Ravi_Rajana_MainframesRavi_Rajana_Mainframes
Ravi_Rajana_Mainframes
 
Faruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgbFaruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgb
 
Cisco Systems Case Study: The Architecture Review Process Improving the IT P...
Cisco Systems Case Study: The Architecture Review  Process Improving the IT P...Cisco Systems Case Study: The Architecture Review  Process Improving the IT P...
Cisco Systems Case Study: The Architecture Review Process Improving the IT P...
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
CVGReddy_Sr QA automation Performance specialist
CVGReddy_Sr QA automation  Performance specialistCVGReddy_Sr QA automation  Performance specialist
CVGReddy_Sr QA automation Performance specialist
 
suman_s
suman_ssuman_s
suman_s
 
Lisa L Lazenby_QA Resume
Lisa L Lazenby_QA ResumeLisa L Lazenby_QA Resume
Lisa L Lazenby_QA Resume
 
QA Lead profile
QA Lead profileQA Lead profile
QA Lead profile
 
Resume - Steve Sauchelli - Lead BSA
Resume - Steve Sauchelli - Lead BSAResume - Steve Sauchelli - Lead BSA
Resume - Steve Sauchelli - Lead BSA
 
Resume Shwo Tsai Jason Chen
Resume Shwo Tsai Jason ChenResume Shwo Tsai Jason Chen
Resume Shwo Tsai Jason Chen
 
Resume Shwo Tsai Jason Chen
Resume Shwo Tsai Jason ChenResume Shwo Tsai Jason Chen
Resume Shwo Tsai Jason Chen
 
Sternberger CTO eArchitect CV
Sternberger CTO eArchitect CVSternberger CTO eArchitect CV
Sternberger CTO eArchitect CV
 

Recently uploaded

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 

Recently uploaded (20)

Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 

Anirban chakraborty(m eng., cssgb)

  • 1. Anirban Chakraborty Lean Six Sigma Green Belt certified by Phone: 91 9903595662 Skype – anirosh6 Accreditations  Master of Engineering (MEng.) in Chemical and Materials Engineering fromthe University of Alberta, Edmonton (Canada )  Bachelor of Technology (B.Tech)in fromthe University of Technology (Kolkata, India)  Recipient of University of Alberta Engineering Graduate Scholarship ( in full), Awardfor Excellence in Student Governance, Finalist in TEC Edmonton Engineering Innovation contest  8.7 years of consulting or project leadership experience in facilities engineering and processimprovement in production  P.Eng (expectedJuly 2016, APEGA)  Internal Quality Audit certification,Jacobs Engineering Inc.  Project Management Certification, Jacobs Engineering Group, California (US)  Working know ledge of Kanban, Kaizen, KANO Model, FMEA  In depth know ledge of variousquality systemtools and methodologies PPAP, 8D, Lean, 5 Why’s, Pareto Analysis, MSA, Process Flow Diagrams, Control Plans, AAA, Gage R&R, Capability Studies, Correlation & Regression analysis , SAS, Minitab application  Experience w ith computer programming to automate and analyze data extraction and to develop reports and dashboards  Trained in Primavera P6 EPPM by Oracle Inc.  Advanced levelknowledge and experience of businessprocess design including business analysis, Failure analysis, control and change management  WHMIS (Workplace Hazard & Material Information Systems), HACCP,H2S alive, CPR, cGMP, PHA certified & trained  Strong know ledge & exerciseof CSA ,CNSA & NFPA codes  Skilled in Value stream mapping& Continuous Improvement Process  Experienced/working knowledge of ITIL, CMMI & other IT Services ManagementFramework  User know ledge of Sarbanes-Oxley Enactments  Proficient in MS Visio, MS Word, MS Excel, MS Outlook, MS Pow erPoint, MS Projects Core Experiences/Skills  Accountability, Integrity & Ow nership  Demonstrated skills in client management & delivery management proved through 95% +rating in all Client feedbacksurveys  Pioneered and produced “Benchmarked Deliverables” through statistical analysis of 550000 man-hours of Oracle data to create the first organizational KPI for Jacobs Canada Inc. (Western region)  Produced and assisted in creating ‘bid w inning proposals’ranging from$2.5 to $18.00 MM for Facilities Design & Engineering w ith a TIC (Total Installed cost) over $389.00M  Proficient user experience in design softwares as AutoDesk, Navisworks and SmartPlant  Demonstrated expertise in internal& external stakeholder management, statistical process control (SPC),vendor management& value engineering  Experienced user of time & cost netw orks as CPM-PERT  Issue & Failure Management, Mitigation plan creation, Conflict Resolution along w ith Escalation Handling for multiple teams.  Resource management through identification of required skill sets, training recommendations & performance evaluations.  Timeline, Effort & Cost Estimation and tracking Progress tow ards completion, using Project Plan, Metrics, and burn dow n chart etc.  Accountable for VOC to CTQdevelopments  Authored and issued ESA (Engineering Service Agreement)/SLA, Liability insurance,ProcurementContracts & FederalRegulatory/legal memorandums with the Enbridge , Syncrude Canada WORK EXPERIENCE TUDOR ENGINEERING INC. Project Development Engineer (Consultant) March 2016- till date  Working w ith clients as JV Driver Canada (a multibillion dollar conglomerate operating from the US & Canada), Bennett Coleman & Co. (a billion dollarecommerce conglomerate operating in Asia Pacific )  Techno-commercial analysis of industrialreports for major projects in e-commerce,power,ports & civilinfrastructures
  • 2.  Deliver Client Presentations on market inroads into South & South East Asian infrastructure development projects  IT vendor management and contract creations for multi-region w orkexecutions  Produce Scope of Work proposals w ith strategic engineering & IT infrastructure/applications deployment recommendations and Change Management plan JACOBS ENGINEERING CANADA Project Engineer (FEED, Design & Construction) Aug 2012 – Jan 2016  Demonstrated ‘Beyond Zero’culture by enforcement and commitment to safety in all internal & externalevents w ith Enbridge Canada ( a multibillion dollar energycorporation operating in Canada & northern US)  Led and assisted in producing the Cost Benefit analysis, Project Charter, Project Execution Plan, Communication Strategies, Project Quality Plan, Procurement contract, Class III Estimation & Commissioning for major pipeline projects over $389 MM  Primarily responsible for oversight of detailed engineering, procurement, and commissioning of multiple projects performed  Used JSTEPS (Jacobs Systems To Ensure Project Success) to performScope of Workvalidation, FMEA sessions with Enbridge  Analyzed and categorized Billable, Contingency and Non Billable project hours and set up the AFE ( Approvalfor Expense) in Oracle  Worked in sync w ith Project Controls for producing control mechanisms line S-curves, resource charts, resource histogram  Recommended and ensured the deployment of software applications as Bluebeam Revu & SmartPlantP&IDleading to 20% reduction of Quality Check time cycles  Improvedteam communications, defects identification, ease of training and support by establishment of a centralizedwork protocol through JPI (Jacobs Project Information Systems)  Slashed engineering design cost till 15.5% by converting engineering draw ingsto Bill of Materials. Saved $1.5M of site construction cost for Enbridge and gained client delight  Designed and constructed Temporary Power GenerationFacilities project (NEB directive)in intensive coordinationwith ATCO, Saskpower and Manitoba Hydro. Gained client delight for meeting NEB requirements w ithin a record time  Championed MOC (Management of Change ) by effective data documentation, regular stakeholders appraisals and achieved 97% Change Request approvals  Strengthened Quality Control metrics through digitalization of ‘criticalissue logs’ in the Jacobs Project Information Systems  Resolved Claims Adjustments and Invoice management for contract close outs  Produced and authorized Design Change, Design Control Procedures and Process Waste reduction (Kaizen)  Increased operational efficiencyby reducingre-work up to 35%throughDesign-Operations work integration  Defined the key metrics to measure effectiveness of supply chain and vendor documentturnover process  Introduced and implemented Incentive-Penalty based vendor management systemto reduce criticalmaterial delivery time by 22%. Gained client delight  Produced documentation, information and communications such as CCN (ContractChange Notices), DBI (Data Base Information), HOPSR (Home Office Project Status Reports), DPR(Detailed Project Reviews) and ensured conformance to allpolicies and procedures related to engineeringfunctions, labor reporting and systemsreporting  Coauthored Jacobs Multi Office Engineering Workshare Plan estimating a cost saving of $0.5M per $1.25 M  Supported ISO 9001 audit, gate review sand compliance efforts  Achieved client delight for ‘fastest turnaround time’on RFIs  Successfully led teams of 45-66 FTEs in analysis, design and delivery through issues debottlenecking in engineering, construction& operations PREVIOUS WORK EXPERIENCE (CANADA & OVERSEAS) University of Alberta, Canada Design Engineer Sept 2008- Aug 2012 Statistical modelingof hydrodynamics phenomena  Conducted stakeholder analysis, requirements collection to create a design frameworkforConsolidation and trafficking of crude oiltailings fromCanadian mine sites  Researched pH-Zeta potentialdependent clay-waterdissociation, aggregation and co flocculation of clay ,oiland solvents(naphtha)in Mature Fine Tailings (MFT) of Syncrude site ( Syncrude is a multibillion dollar mining companyoperatingin Canada)  Computed reaction engineering & interfacialforcesbetween organic/inorganicparticlesand solvents(naphtha) • Analyzed previousexperimentalapproaches, research data and caveatsin hydrodynamic behavior of claysolvent suspension  Used Design of Experiments and produced a statisticalmodel to device a bio-based flocculent for the purpose of tailings consolidation for Canadian mineral industries  Planned the progress measurement techniques, correlation& regression analysis, variance analysis and parameters to design and validate the experiments  Analyzed and transferred the validated resultsin Compliance Regulation Reports ( Alberta Energy Regulator) for site implementations  Authored and issued technicaltraining manuals BioconversionLabs Design Engineer  Served on the research teamw orking in the conversion of 5 Carbon molecules (pentose) to value added productsby bioprocessremediation  Researched and analyzed data on pentose to ethanolconversion by chemical, biochemical, thermaland catalytic methods  Tested statisticalvalidation of experimentalresults through SAS applications  Compiled and reported validated results for periodic performance reviewsby stakeholders 2COMS India
  • 3. Process ImprovementAnalyst Sept 2007-May 2008  Failure & Data analysis for optimization of client data (GE, Biocon, Pfizer India)  Performed GAP analysis on current and targeted revenue plans  Client interfacing & subcontractor management  Maximized revenue generation by 32% thus minimizing the business incubation time. Gained client delight Aditya Birla Group Inc. (India) July 2006- Sept 2007 Quality Engineer  Worked w ith Aditya Birla Group IT clients (Citibank, HINDALCO) to identifyand collect processdefectsforMicrosoft Dynamics CRM users  Engaged in collections of VOCand CSAT ratings through in depth customer interactions  Translated client requirements into applicable technical design document w ith proposed solutions  Collaborated w ith QA teamto ensure completion of test plans and validate End user acceptance criteria  Nominated w ithin Aditya Birla Group for ‘Best Young Trainee’awardin Bangalore zonaloperations