1. ProjectBrief
2. General BIMRequirements
3. Analytical BIMScope of Work
4. Modelling Road & Linearly Dependent Projects
5. Modelling MEP Utilities in Civil Projects
6. Automated Modelling QA-QC with C3D & MTO
7. Laser scanning and implementations
8. LumenRT Visualizations
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
Presentation outline:
2
๏ƒผ 2.85 km Road, Light Rail Train (LRT)
๏ƒผ Troughs, Road Tunnel, LRT Tunnel
๏ƒผ StormWater Tank, Pump Station
๏ƒผ Fire Pump Stations (2)
๏ƒผ Electrical Rooms
๏ƒผ District Cooling, Gas Cooling
๏ƒผ 66 kV Cable
๏ƒผ Potable Water, FireWater networks
๏ƒผ Storm, foul water networks
๏ƒผ Irrigation network
๏ƒผ Road lighting network
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
1. Project Brief - Scope
3
START DATE FINISH DATE
Milestone # 3
Milestone # 4
ED+180 Days
Milestone # 2
ED+555 Days
ED+617 Days
Milestone # 1
ED+407 Days
Project Completion
and Handover 29-Mar-17
29-Jul-1522-Apr-15
09-Mar-1622-Apr-15
04-Aug-1608-Jun-15
05-Oct-1607-Jul -16
120 Days for CP07-
C-1B to deliver back
Effective Date 28-Jan-15
โ€ข Completion of ELV &Telephone within
Block 1,4&5
โ€ข All Structural works for Road A3 Tunnel
including Backfilling.
โ€ข Completion of 66kV cable installation through crescent park Blocks 1,2,3,4
โ€ข 11kV,ELV&Telephone within block 2
โ€ข ELV, Telephone & Sewer within block 3
โ€ข 66 kV remaining installation
including commissioning &
energization.
Finish Date 29-Mar-17
2015 2016 2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
1. Project Brief - Schedule & Constrains
4
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
1. Project Brief - Early Stages Images
5
5
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
1. Project Brief - Late Stages Images
6
6
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
1. Project Brief - Implementation of BIM on Linearly dependent Projects (Roads, Bridges, Tunnels, etc.)
Linearly Dependent Construction Projects:
The construction projects of this type have all their construction
sub-elements depended from one (or more) linear alignments,
which are called 3D Alignments. Road layered structures, retaining
walls, base and roof slabs, tunnel tubes or bridge decks are
examples of elements on such projects.
This particular project features a 2.85 Km Road with a 607 m Road
and LRT tunnel, which revolves in space by dependency on a
horizontal and a vertical alignment. Moreover, a network of MEP
utilities cover all road length from either side of road and
occasionally above the tunnel.
Though usual in infrastructure projects, this is a particularly
difficult geometry to model aforementioned elements in 3D. The
Linear dependency required tools beyond a โ€œusualโ€ modelling
toolset, therefore the utilization Bentleyโ€™s PowerInRoadโ€™s was
obligatory.
For the MEP Utilities, a special toolset was developed to
accommodate all geometry modelling.
In both cases, after the utilisation of modelling tools, model
element properties and attributes were applied on them to โ€œcarryโ€
more than geometricalinformation.
7
7
CP07-C-1A Commercial Boulevard (Road A3) BIM Scope:
1. 3D Design Coordination (clash analysis) including identification, coordination, and resolution
of clashes between all trades; Contractor shall submit clashes resolution report for Client
approval before proceeding with respective construction work.
2. 3D Interface Coordination of utilities (wet and dry) within package and with adjacent packages
for continuity, connection, and clash resolution; Contractor shall submit interface
coordination report for Client approval before proceeding with respective construction work.
3. Construction and Site Management include, but are not limited to progress monitoring, cost
control, site and logistics planning (e.g. optimizing logistic roads layout, security accesses and
coordination of dewatering routes), reporting of testing and commissioning activities
4. Close-out Documentation handover to be used for information hand-over to CGIS and other
local authorities, and to prepare operation and maintenance of built assets.
5. The model shall be extended by Contractor to include any and all activities directly or
indirectly related to design, construction and documentation of the PROJECT all as required by
Client from time to time.
6. Contractor shall provide federated and fully coordinated BUILDING INFORMATION MODELS
representing the latest available drawings at specific PROJECT milestones, developed to an
agreed and acceptable Level of Development (LOD).
7. All BIMmilestones are conditions for approval of Contractorโ€™s invoices.
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
2. General BIM Requirements (Contract)
8
a. Early DeliverablesPhase:
1. BIMExecution Plan
2. Modelling Guidelines
3. Test Cases
4. Initial Modelling and Reporting:
I. Models and drawings register
II. Baseline model reflecting IFC drawings
b. ImplementationPhase:
1. Model Sets:
Full set of models (+NWC) of Current Revision Drawings
2. 4D/5D Databases:
Progress Databaseof Current Revision Models
3. Clash Detection Analysis on IFC Models:
a. Per Zone (Z1-Z4) all disciplines (Utilities Coordination)
b. Per Building all disciplines (MEP Coordination)
4. Clash Detection Analysis on SDR Models:
a. Per Zone (Z1-Z4) all disciplines (Utilities Coordination)
b. Per Building all disciplines (MEP Coordination)
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
3. Analytical BIM Scope of Work
9
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
3. Analytical BIM Scope of Work
Clash DetectionAnalysisSamples(withinScope):
10
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
3. Analytical BIM Scope of Work
Clash DetectionAnalysisSamples(withinScope):
11
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
3. Analytical BIM Scope of Work
Clash DetectionAnalysisSamples(cross Scope โ€“ AdjacentProjects):
12
b. ImplementationPhase (contโ€™d):
5. Monthly Deliverables:
I. Folder [100]:
[101]: WIP Models in CCC/TCC JV file format
[102]: WIP Models in Client file format (.dwg)
[103]: WIP Models in Client file format (.nwc)
II. Folder [200]:
[201]: SDR Models with Clash Detection Analysis
[202]: Clash Detection Analysis Results, Clash Markups,
QA/QC checks
[203]: BIMDeliverables Monthly Schedule
III. Folder [300]:
[301]: 4D Models with Schedule Implementation
[302]: Progress Database
[303]: Laser Scanning Point Cloud Data (.pod + .nwd)
[304]: Site Photos + Register
[304]: BIMProgress Layouts + Visualization Studies
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
3. Analytical BIM Scope of Work
13
c. Close-out/HandoverPhase:
1. 3D As-Built Model
2. Drawing register
3. As-built database
4. Documentation of executed Quality Checks
5. Laser scan point clouds
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
3. Analytical BIM Scope of Work
14
d. Internal BIM Scope of Work:
A. Visualizations
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
3. Analytical BIM Scope of Work
15
d. Internal BIM Scope of Work:
B. Progress Reports
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
3. Analytical BIM Scope of Work
16
CP07-C-1A Road & Linear DependentElementsmodelingusing PowerInRoadsV8i (SS4):
The real benefit of Bentley PowerInRoads V8i (SS4) is to create 3D objects from 2D sections extruded along a 3D alignment (3D line). These 3D objects can be
Road Elements such as Pavement layers, Junctions, Road Marking, Structural objects depended on a 3D alignment such as Blinding, Base Slabs, Retaining
Walls, Abutment Walls, Top Slabs, Waterproofing, Formwork, Cladding and even more complex geometries such as tunnels or bridges with non-standard or
varying (length depended) sections and Earthworks.
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
4. Modelling Road & Linearly Dependent Projects
17
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
4. Modelling Road & Linearly Dependent Projects
CP07-C-1A Road ElementsmodelingusingPowerInRoadsV8i (SS4):
The first step is to createhorizontal geometry from the Setting Out Plan by using the Road Centerline (C/L). (Horizontal Alignment)
18
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
4. Modelling Road & Linearly Dependent Projects
CP07-C-1A Road ElementsmodelingusingPowerInRoadsV8i (SS4):
Next task is to createvertical geometry using the stations and its elevations. (Vertical alignment)
19
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
4. Modelling Road & Linearly Dependent Projects
CP07-C-1A Road ElementsmodelingusingPowerInRoadsV8i (SS4):
By use of the Horizontal and Vertical geometries the 3D alignment is created, for the road corridor & Profile.
20
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
4. Modelling Road & Linearly Dependent Projects
CP07-C-1A Road ElementsmodelingusingPowerInRoadsV8i (SS4):
The next step is to create the library of 2D templates (and the 2D templates) to be assigned along different chainage sequences of the 3D alignment(s), by
utilizing the cross section drawings.
21
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
4. Modelling Road & Linearly Dependent Projects
CP07-C-1A Road ElementsmodelingusingPowerInRoadsV8i (SS4):
Final step is to combine the templates and 3D alignment, in order to create theintended model.
22
CP07-C-1A Civil UtilitiesToolbox:
GRAVITY STORM WATER NETWORK:
ISOMETRIC
SIDEVIEW
DETAIL
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
5. Modelling MEP Utilities in Civil Projects
23
GRAVITY STORM WATER NETWORK:
โ€ข MANHOLES
โ€ข PIPES
โ€ข GULLIES
โ€ข CONCRETE ENCASEMENT
DATA AT MANHOLES / CHAMBERS:
โ€ข UNIQUE MANHOLE ID AS PER PROJECT DRAWINGS
โ€ข INVERT LEVEL
โ€ข COVER LEVEL
โ€ข DEPTH
โ€ข EASTING AND NORTHING
โ€ข MANHOLE TYPE FOR MTO
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
5. Modelling MEP Utilities in Civil Projects
CP07-C-1A Civil UtilitiesToolbox:
24
PIPING DATA:
โ€ข PIPE DIAMETER
โ€ข AVERAGE PIPE DEPTH STORED IN DATAGROUP TYPE PROPERTY.
โ€ข PIPE MATERIAL
โ€ข PIPE ID AS PER PROJECT DRAWINGS
โ€ข PIPE THICKNESS
โ€ข LIBRARY PART
GRAVITY STORM WATER NETWORK:
โ€ข MANHOLES
โ€ข PIPES
โ€ข GULLIES
โ€ข CONCRETE ENCASEMENT
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
5. Modelling MEP Utilities in Civil Projects
CP07-C-1A Civil UtilitiesToolbox:
25
DATA AT PIPE FITTINGS:
โ€ข PIPE DIAMETER
โ€ข AVERAGE PIPE DEPTH STORED IN DATAGROUP
TYPE PROPERTY.
โ€ข PIPE MATERIAL
โ€ข FITTING ID AS PER PROJECT DRAWINGS
โ€ข PIPE THICKNESS
โ€ข LIBRARY PART
PRESSURIZED IRRIGATION NETWORK:
โ€ข PIPES
โ€ข FITTINGS
โ€ข CHAMBERS (VALVES, WASHOUT, AIR RELEASE,
DISTRIBUTION,โ€ฆETC)
โ€ข CONCRETE ENCASEMENT
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
5. Modelling MEP Utilities in Civil Projects
CP07-C-1A Civil UtilitiesToolbox:
26
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
6. Automated Modelling QA-QC with C3D & MTO
CP07-C-1A Automated Material Take Off (MTO):
All information fed into the models, when quantified, produce the Quantity Take Offs (QTOs), through the utilization of Bentley AECOSim
SS5. By automated application of the Bill Of Quantities format, the result is the MTO, as shown below.
27
27
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
6. Automated Modelling QA-QC with C3D & MTO
Due to dual (internal and client) BIM Naming conventions, Model against Data consistency QC
checks had to be performed within Common Data Environment. The tool where these checks
are automatically conducted is an In-house fullydeveloped software, called C3D. Should any of
these tests returns positive, MTO is not uploaded to C3D Database. Indicative checks:
1. MTO File Extension:should be .xlsx.
2. Number of sheets inspreadsheet. Shouldbe 1 sheet only.
3. Column naming/Invalid Columns.
4. Invalidreferenced model files.
5. Null columns.
6. Objects assigned to activities cannot be deleted. Check performed based on Deletion
Criteria.
7. Objects with progress percentage > 0 cannot be deleted. Check performed based on
Deletion Criteria.
8. Objects in modelcannot be deleted. Check performedbased onDeletionCriteria.
9. Objects in MTO not in model.
10. 0 quantitybut not anopening.
11. Same Client BOQ code, different Unit Price.
12. Same Client BOQ code, different Units.
13. Same BOQ code, different Unit Price.
14. Same BOQ code, different Units.
15. Same BOQ code, different descriptions.
16. Same Client BOQ code, different descriptions.
17. Same BOQ code, different Client BOQ CODE.
18. Same Client File Name assignedto multiple File Names.
19. Same File Name assignedto multiple Client File Names.
Image above shows MTO Database required schema by Client
CP07-C-1A Automated Model QA-QCCheckswithin in-house C3D Platform:
28
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
7. Laser scanning and implementations
Presentations:
The image to the right, shows a non-edited, completed
and post-processed colored scan of an area in the project,
capturedbefore the phase of pipe laying, inorderto:
1. Presenttrenchexcavationprogress
2. Acquire a point cloud as a basis of calculating the
earthworksfortrenches.
CP07-C-1A Laser Scanning :
Laser Scanning details were not provided in the contract, although there were an obligation to provide scans monthly. The internal uses of the Laser
Scans,aside forpresentationpurposes, istoverify constructedobjectsbysuperimposingthemwiththe ShopDrawingsBIMModel.
As- Built Checks:
Images of superimposed Point Clouds against models in
followingsection:
29
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
7. Laser scanning and implementations
Junction
JPA1
CH:0+080
CH:1+100
CP07-C-1A Laser Scanning As โ€“ BuiltChecks:
Laser Scans +Models - Zone4 - General View
30
Laser Scans +Models - Zone4 - CH0080-CH0340 - Utilities
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
7. Laser scanning and implementations
CP07-C-1A Laser Scanning As โ€“ BuiltChecks:
31
Laser Scans +Models - Zone4 - CH0080-CH0100 - ABT Detail
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
7. Laser scanning and implementations
CP07-C-1A Laser Scanning As โ€“ BuiltChecks:
32
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
7. Laser scanning and implementations
Tunnel modelled structure
coincide withconstruction
Tunnel topslabscaffolding
CP07-C-1A Laser Scanning As โ€“ BuiltChecks:
Point Cloud + Models - Zone2A/2C - CH1+900-CH2+200 Section View (Insideroad & LRT Tunnels)
RemovedTunnel topslab
scaffolding Points fromPOD
33
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
8. LumenRT Visualizations
CP07-C-1A Ancillary Structures RenderingusingBentleyLumenRT :
LumenRT is a powerful and easy to use rendering and animation software, which works from Bentley AECOSim. Results can be shown in the following
images.
StormWater Tank & Pump Room
34
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
8. LumenRT Visualizations
CP07-C-1A Ancillary Structures RenderingusingBentleyLumenRT :
35
StormWater Tank & Pump RoomDetail 1
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
8. LumenRT Visualizations
CP07-C-1A Ancillary Structures RenderingusingBentleyLumenRT :
36
StormWater Tank & Pump RoomDetail 2
Thank you for
your attention!
CCC/TCC JV LCB BIM Team
CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities
LCB BIMTeam(andothers!)
37

More Related Content

What's hot

final bim
final bimfinal bim
final bim
Rajdip Das
ย 
Introduction to Revit Software from Autodesk
Introduction to Revit Software from AutodeskIntroduction to Revit Software from Autodesk
Introduction to Revit Software from Autodesk
Thomas Tate
ย 

What's hot (20)

Revit Basic Introduction
Revit Basic IntroductionRevit Basic Introduction
Revit Basic Introduction
ย 
Introduction to Building Information Modeling
Introduction to Building Information Modeling Introduction to Building Information Modeling
Introduction to Building Information Modeling
ย 
Revit Structure Training
Revit Structure TrainingRevit Structure Training
Revit Structure Training
ย 
final bim
final bimfinal bim
final bim
ย 
Building information modeling
Building information modelingBuilding information modeling
Building information modeling
ย 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
ย 
The Collaborative Power of BIM
The Collaborative Power of BIMThe Collaborative Power of BIM
The Collaborative Power of BIM
ย 
Ppt on design and modelling of residential society
Ppt on design and modelling of residential societyPpt on design and modelling of residential society
Ppt on design and modelling of residential society
ย 
Revit presentation
Revit presentationRevit presentation
Revit presentation
ย 
Advanced softwares used in civil engineering
Advanced softwares used in civil  engineeringAdvanced softwares used in civil  engineering
Advanced softwares used in civil engineering
ย 
BIM for Construction, BPMs and Owners
BIM for Construction, BPMs and OwnersBIM for Construction, BPMs and Owners
BIM for Construction, BPMs and Owners
ย 
Bim overview
Bim overviewBim overview
Bim overview
ย 
Quantity take off
Quantity take offQuantity take off
Quantity take off
ย 
Building information modelling
Building information modellingBuilding information modelling
Building information modelling
ย 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
ย 
Introduction to Revit Software from Autodesk
Introduction to Revit Software from AutodeskIntroduction to Revit Software from Autodesk
Introduction to Revit Software from Autodesk
ย 
Setting out of bridges unit 6
Setting out of bridges unit 6Setting out of bridges unit 6
Setting out of bridges unit 6
ย 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
ย 
Bim lod
Bim lodBim lod
Bim lod
ย 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
ย 

Similar to Roads, Infrastructure and BIM

Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani Portfolio
RONIEE Sparks
ย 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans
Consultrans, S.A.
ย 
Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011
Jian Shen
ย 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
BIM User Day
ย 
Electrical Draftsman
Electrical DraftsmanElectrical Draftsman
Electrical Draftsman
mohammed aly
ย 
T N MURTHY-Engineering Designer
T N MURTHY-Engineering DesignerT N MURTHY-Engineering Designer
T N MURTHY-Engineering Designer
TN MURTHY
ย 
TMR and BIM
TMR and BIMTMR and BIM
TMR and BIM
Robert Howell
ย 
CV_Anil Malagi
CV_Anil MalagiCV_Anil Malagi
CV_Anil Malagi
Anil Malagi
ย 
Smeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & RoadSmeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & Road
Barun Chatterjee
ย 

Similar to Roads, Infrastructure and BIM (20)

Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani Portfolio
ย 
Atkins BIM Capability
Atkins BIM CapabilityAtkins BIM Capability
Atkins BIM Capability
ย 
Atkins Bim Capability (3)
Atkins Bim Capability (3)Atkins Bim Capability (3)
Atkins Bim Capability (3)
ย 
Atkins Bim Capability
Atkins Bim CapabilityAtkins Bim Capability
Atkins Bim Capability
ย 
Atkins BIM Capability
Atkins BIM CapabilityAtkins BIM Capability
Atkins BIM Capability
ย 
Atkins Bim Capability
Atkins Bim CapabilityAtkins Bim Capability
Atkins Bim Capability
ย 
Atkins Bim Capability (3)
Atkins Bim Capability (3)Atkins Bim Capability (3)
Atkins Bim Capability (3)
ย 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans
ย 
Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011
ย 
IRJET- Design of a Prestressed Concrete Bridge and Analysis by CSiBridge
IRJET- Design of a Prestressed Concrete Bridge and Analysis by CSiBridgeIRJET- Design of a Prestressed Concrete Bridge and Analysis by CSiBridge
IRJET- Design of a Prestressed Concrete Bridge and Analysis by CSiBridge
ย 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
ย 
Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM
ย 
Cv of tanvir shahrier mahmud
Cv of tanvir shahrier mahmudCv of tanvir shahrier mahmud
Cv of tanvir shahrier mahmud
ย 
Electrical Draftsman
Electrical DraftsmanElectrical Draftsman
Electrical Draftsman
ย 
T N MURTHY-Engineering Designer
T N MURTHY-Engineering DesignerT N MURTHY-Engineering Designer
T N MURTHY-Engineering Designer
ย 
TMR and BIM
TMR and BIMTMR and BIM
TMR and BIM
ย 
Cv aniruddha
Cv aniruddhaCv aniruddha
Cv aniruddha
ย 
923 2 wheeler_public privat partnerships
923 2 wheeler_public privat partnerships923 2 wheeler_public privat partnerships
923 2 wheeler_public privat partnerships
ย 
CV_Anil Malagi
CV_Anil MalagiCV_Anil Malagi
CV_Anil Malagi
ย 
Smeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & RoadSmeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & Road
ย 

More from CCT International

Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
CCT International
ย 

More from CCT International (20)

BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together?
ย 
Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction Industry
ย 
BIM In Practice Seminar
BIM In Practice Seminar BIM In Practice Seminar
BIM In Practice Seminar
ย 
6.0 CURT CII - Digital Transformation of Construction Industry
6.0 CURT CII  - Digital Transformation of Construction Industry6.0 CURT CII  - Digital Transformation of Construction Industry
6.0 CURT CII - Digital Transformation of Construction Industry
ย 
Adding Intelligence to AWP
Adding Intelligence to AWPAdding Intelligence to AWP
Adding Intelligence to AWP
ย 
BIM Based Project Controls
BIM Based Project ControlsBIM Based Project Controls
BIM Based Project Controls
ย 
Leveraging C3Dยฎ to Ensure Compliance of Site Execution Teams
Leveraging C3Dยฎ to Ensure Compliance of Site Execution TeamsLeveraging C3Dยฎ to Ensure Compliance of Site Execution Teams
Leveraging C3Dยฎ to Ensure Compliance of Site Execution Teams
ย 
The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)
ย 
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle EastO&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
ย 
Contractors: Get BIM Ready!
Contractors: Get BIM Ready!Contractors: Get BIM Ready!
Contractors: Get BIM Ready!
ย 
Designing to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringDesigning to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & Monitoring
ย 
Mandated BIM! Are you ready?
Mandated BIM! Are you ready?Mandated BIM! Are you ready?
Mandated BIM! Are you ready?
ย 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
ย 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
ย 
Make BIM work for you
Make BIM work for youMake BIM work for you
Make BIM work for you
ย 
IBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCCIBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCC
ย 
AF-1438:ย Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438:ย Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...AF-1438:ย Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438:ย Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
ย 
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
ย 
Asset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset ManagementAsset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset Management
ย 
Imagine a World Without Isometric
Imagine a World Without IsometricImagine a World Without Isometric
Imagine a World Without Isometric
ย 

Recently uploaded

Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
KreezheaRecto
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 

Recently uploaded (20)

Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
ย 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
ย 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
ย 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
ย 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
ย 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 

Roads, Infrastructure and BIM

  • 1. Roads, Infrastructure and BIM CP07-C-1A: COMMERCIAL BOULEVARD A3 ROAD TROUGHS, UNDERPASS TUNNEL, FXH-02 LRT STATION & UTILITIES GeorgeMylonas, Lead BIMEngineer-BIMManager, Consolidated Contractors Company (CCC), BIMAcademy, Athens, Greece
  • 2. 1. ProjectBrief 2. General BIMRequirements 3. Analytical BIMScope of Work 4. Modelling Road & Linearly Dependent Projects 5. Modelling MEP Utilities in Civil Projects 6. Automated Modelling QA-QC with C3D & MTO 7. Laser scanning and implementations 8. LumenRT Visualizations CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities Presentation outline: 2
  • 3. ๏ƒผ 2.85 km Road, Light Rail Train (LRT) ๏ƒผ Troughs, Road Tunnel, LRT Tunnel ๏ƒผ StormWater Tank, Pump Station ๏ƒผ Fire Pump Stations (2) ๏ƒผ Electrical Rooms ๏ƒผ District Cooling, Gas Cooling ๏ƒผ 66 kV Cable ๏ƒผ Potable Water, FireWater networks ๏ƒผ Storm, foul water networks ๏ƒผ Irrigation network ๏ƒผ Road lighting network CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 1. Project Brief - Scope 3
  • 4. START DATE FINISH DATE Milestone # 3 Milestone # 4 ED+180 Days Milestone # 2 ED+555 Days ED+617 Days Milestone # 1 ED+407 Days Project Completion and Handover 29-Mar-17 29-Jul-1522-Apr-15 09-Mar-1622-Apr-15 04-Aug-1608-Jun-15 05-Oct-1607-Jul -16 120 Days for CP07- C-1B to deliver back Effective Date 28-Jan-15 โ€ข Completion of ELV &Telephone within Block 1,4&5 โ€ข All Structural works for Road A3 Tunnel including Backfilling. โ€ข Completion of 66kV cable installation through crescent park Blocks 1,2,3,4 โ€ข 11kV,ELV&Telephone within block 2 โ€ข ELV, Telephone & Sewer within block 3 โ€ข 66 kV remaining installation including commissioning & energization. Finish Date 29-Mar-17 2015 2016 2017 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 1. Project Brief - Schedule & Constrains 4
  • 5. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 1. Project Brief - Early Stages Images 5 5
  • 6. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 1. Project Brief - Late Stages Images 6 6
  • 7. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 1. Project Brief - Implementation of BIM on Linearly dependent Projects (Roads, Bridges, Tunnels, etc.) Linearly Dependent Construction Projects: The construction projects of this type have all their construction sub-elements depended from one (or more) linear alignments, which are called 3D Alignments. Road layered structures, retaining walls, base and roof slabs, tunnel tubes or bridge decks are examples of elements on such projects. This particular project features a 2.85 Km Road with a 607 m Road and LRT tunnel, which revolves in space by dependency on a horizontal and a vertical alignment. Moreover, a network of MEP utilities cover all road length from either side of road and occasionally above the tunnel. Though usual in infrastructure projects, this is a particularly difficult geometry to model aforementioned elements in 3D. The Linear dependency required tools beyond a โ€œusualโ€ modelling toolset, therefore the utilization Bentleyโ€™s PowerInRoadโ€™s was obligatory. For the MEP Utilities, a special toolset was developed to accommodate all geometry modelling. In both cases, after the utilisation of modelling tools, model element properties and attributes were applied on them to โ€œcarryโ€ more than geometricalinformation. 7 7
  • 8. CP07-C-1A Commercial Boulevard (Road A3) BIM Scope: 1. 3D Design Coordination (clash analysis) including identification, coordination, and resolution of clashes between all trades; Contractor shall submit clashes resolution report for Client approval before proceeding with respective construction work. 2. 3D Interface Coordination of utilities (wet and dry) within package and with adjacent packages for continuity, connection, and clash resolution; Contractor shall submit interface coordination report for Client approval before proceeding with respective construction work. 3. Construction and Site Management include, but are not limited to progress monitoring, cost control, site and logistics planning (e.g. optimizing logistic roads layout, security accesses and coordination of dewatering routes), reporting of testing and commissioning activities 4. Close-out Documentation handover to be used for information hand-over to CGIS and other local authorities, and to prepare operation and maintenance of built assets. 5. The model shall be extended by Contractor to include any and all activities directly or indirectly related to design, construction and documentation of the PROJECT all as required by Client from time to time. 6. Contractor shall provide federated and fully coordinated BUILDING INFORMATION MODELS representing the latest available drawings at specific PROJECT milestones, developed to an agreed and acceptable Level of Development (LOD). 7. All BIMmilestones are conditions for approval of Contractorโ€™s invoices. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 2. General BIM Requirements (Contract) 8
  • 9. a. Early DeliverablesPhase: 1. BIMExecution Plan 2. Modelling Guidelines 3. Test Cases 4. Initial Modelling and Reporting: I. Models and drawings register II. Baseline model reflecting IFC drawings b. ImplementationPhase: 1. Model Sets: Full set of models (+NWC) of Current Revision Drawings 2. 4D/5D Databases: Progress Databaseof Current Revision Models 3. Clash Detection Analysis on IFC Models: a. Per Zone (Z1-Z4) all disciplines (Utilities Coordination) b. Per Building all disciplines (MEP Coordination) 4. Clash Detection Analysis on SDR Models: a. Per Zone (Z1-Z4) all disciplines (Utilities Coordination) b. Per Building all disciplines (MEP Coordination) CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 3. Analytical BIM Scope of Work 9
  • 10. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 3. Analytical BIM Scope of Work Clash DetectionAnalysisSamples(withinScope): 10
  • 11. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 3. Analytical BIM Scope of Work Clash DetectionAnalysisSamples(withinScope): 11
  • 12. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 3. Analytical BIM Scope of Work Clash DetectionAnalysisSamples(cross Scope โ€“ AdjacentProjects): 12
  • 13. b. ImplementationPhase (contโ€™d): 5. Monthly Deliverables: I. Folder [100]: [101]: WIP Models in CCC/TCC JV file format [102]: WIP Models in Client file format (.dwg) [103]: WIP Models in Client file format (.nwc) II. Folder [200]: [201]: SDR Models with Clash Detection Analysis [202]: Clash Detection Analysis Results, Clash Markups, QA/QC checks [203]: BIMDeliverables Monthly Schedule III. Folder [300]: [301]: 4D Models with Schedule Implementation [302]: Progress Database [303]: Laser Scanning Point Cloud Data (.pod + .nwd) [304]: Site Photos + Register [304]: BIMProgress Layouts + Visualization Studies CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 3. Analytical BIM Scope of Work 13
  • 14. c. Close-out/HandoverPhase: 1. 3D As-Built Model 2. Drawing register 3. As-built database 4. Documentation of executed Quality Checks 5. Laser scan point clouds CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 3. Analytical BIM Scope of Work 14
  • 15. d. Internal BIM Scope of Work: A. Visualizations CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 3. Analytical BIM Scope of Work 15
  • 16. d. Internal BIM Scope of Work: B. Progress Reports CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 3. Analytical BIM Scope of Work 16
  • 17. CP07-C-1A Road & Linear DependentElementsmodelingusing PowerInRoadsV8i (SS4): The real benefit of Bentley PowerInRoads V8i (SS4) is to create 3D objects from 2D sections extruded along a 3D alignment (3D line). These 3D objects can be Road Elements such as Pavement layers, Junctions, Road Marking, Structural objects depended on a 3D alignment such as Blinding, Base Slabs, Retaining Walls, Abutment Walls, Top Slabs, Waterproofing, Formwork, Cladding and even more complex geometries such as tunnels or bridges with non-standard or varying (length depended) sections and Earthworks. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 4. Modelling Road & Linearly Dependent Projects 17
  • 18. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 4. Modelling Road & Linearly Dependent Projects CP07-C-1A Road ElementsmodelingusingPowerInRoadsV8i (SS4): The first step is to createhorizontal geometry from the Setting Out Plan by using the Road Centerline (C/L). (Horizontal Alignment) 18
  • 19. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 4. Modelling Road & Linearly Dependent Projects CP07-C-1A Road ElementsmodelingusingPowerInRoadsV8i (SS4): Next task is to createvertical geometry using the stations and its elevations. (Vertical alignment) 19
  • 20. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 4. Modelling Road & Linearly Dependent Projects CP07-C-1A Road ElementsmodelingusingPowerInRoadsV8i (SS4): By use of the Horizontal and Vertical geometries the 3D alignment is created, for the road corridor & Profile. 20
  • 21. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 4. Modelling Road & Linearly Dependent Projects CP07-C-1A Road ElementsmodelingusingPowerInRoadsV8i (SS4): The next step is to create the library of 2D templates (and the 2D templates) to be assigned along different chainage sequences of the 3D alignment(s), by utilizing the cross section drawings. 21
  • 22. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 4. Modelling Road & Linearly Dependent Projects CP07-C-1A Road ElementsmodelingusingPowerInRoadsV8i (SS4): Final step is to combine the templates and 3D alignment, in order to create theintended model. 22
  • 23. CP07-C-1A Civil UtilitiesToolbox: GRAVITY STORM WATER NETWORK: ISOMETRIC SIDEVIEW DETAIL CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 5. Modelling MEP Utilities in Civil Projects 23
  • 24. GRAVITY STORM WATER NETWORK: โ€ข MANHOLES โ€ข PIPES โ€ข GULLIES โ€ข CONCRETE ENCASEMENT DATA AT MANHOLES / CHAMBERS: โ€ข UNIQUE MANHOLE ID AS PER PROJECT DRAWINGS โ€ข INVERT LEVEL โ€ข COVER LEVEL โ€ข DEPTH โ€ข EASTING AND NORTHING โ€ข MANHOLE TYPE FOR MTO CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 5. Modelling MEP Utilities in Civil Projects CP07-C-1A Civil UtilitiesToolbox: 24
  • 25. PIPING DATA: โ€ข PIPE DIAMETER โ€ข AVERAGE PIPE DEPTH STORED IN DATAGROUP TYPE PROPERTY. โ€ข PIPE MATERIAL โ€ข PIPE ID AS PER PROJECT DRAWINGS โ€ข PIPE THICKNESS โ€ข LIBRARY PART GRAVITY STORM WATER NETWORK: โ€ข MANHOLES โ€ข PIPES โ€ข GULLIES โ€ข CONCRETE ENCASEMENT CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 5. Modelling MEP Utilities in Civil Projects CP07-C-1A Civil UtilitiesToolbox: 25
  • 26. DATA AT PIPE FITTINGS: โ€ข PIPE DIAMETER โ€ข AVERAGE PIPE DEPTH STORED IN DATAGROUP TYPE PROPERTY. โ€ข PIPE MATERIAL โ€ข FITTING ID AS PER PROJECT DRAWINGS โ€ข PIPE THICKNESS โ€ข LIBRARY PART PRESSURIZED IRRIGATION NETWORK: โ€ข PIPES โ€ข FITTINGS โ€ข CHAMBERS (VALVES, WASHOUT, AIR RELEASE, DISTRIBUTION,โ€ฆETC) โ€ข CONCRETE ENCASEMENT CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 5. Modelling MEP Utilities in Civil Projects CP07-C-1A Civil UtilitiesToolbox: 26
  • 27. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 6. Automated Modelling QA-QC with C3D & MTO CP07-C-1A Automated Material Take Off (MTO): All information fed into the models, when quantified, produce the Quantity Take Offs (QTOs), through the utilization of Bentley AECOSim SS5. By automated application of the Bill Of Quantities format, the result is the MTO, as shown below. 27 27
  • 28. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 6. Automated Modelling QA-QC with C3D & MTO Due to dual (internal and client) BIM Naming conventions, Model against Data consistency QC checks had to be performed within Common Data Environment. The tool where these checks are automatically conducted is an In-house fullydeveloped software, called C3D. Should any of these tests returns positive, MTO is not uploaded to C3D Database. Indicative checks: 1. MTO File Extension:should be .xlsx. 2. Number of sheets inspreadsheet. Shouldbe 1 sheet only. 3. Column naming/Invalid Columns. 4. Invalidreferenced model files. 5. Null columns. 6. Objects assigned to activities cannot be deleted. Check performed based on Deletion Criteria. 7. Objects with progress percentage > 0 cannot be deleted. Check performed based on Deletion Criteria. 8. Objects in modelcannot be deleted. Check performedbased onDeletionCriteria. 9. Objects in MTO not in model. 10. 0 quantitybut not anopening. 11. Same Client BOQ code, different Unit Price. 12. Same Client BOQ code, different Units. 13. Same BOQ code, different Unit Price. 14. Same BOQ code, different Units. 15. Same BOQ code, different descriptions. 16. Same Client BOQ code, different descriptions. 17. Same BOQ code, different Client BOQ CODE. 18. Same Client File Name assignedto multiple File Names. 19. Same File Name assignedto multiple Client File Names. Image above shows MTO Database required schema by Client CP07-C-1A Automated Model QA-QCCheckswithin in-house C3D Platform: 28
  • 29. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 7. Laser scanning and implementations Presentations: The image to the right, shows a non-edited, completed and post-processed colored scan of an area in the project, capturedbefore the phase of pipe laying, inorderto: 1. Presenttrenchexcavationprogress 2. Acquire a point cloud as a basis of calculating the earthworksfortrenches. CP07-C-1A Laser Scanning : Laser Scanning details were not provided in the contract, although there were an obligation to provide scans monthly. The internal uses of the Laser Scans,aside forpresentationpurposes, istoverify constructedobjectsbysuperimposingthemwiththe ShopDrawingsBIMModel. As- Built Checks: Images of superimposed Point Clouds against models in followingsection: 29
  • 30. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 7. Laser scanning and implementations Junction JPA1 CH:0+080 CH:1+100 CP07-C-1A Laser Scanning As โ€“ BuiltChecks: Laser Scans +Models - Zone4 - General View 30
  • 31. Laser Scans +Models - Zone4 - CH0080-CH0340 - Utilities CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 7. Laser scanning and implementations CP07-C-1A Laser Scanning As โ€“ BuiltChecks: 31
  • 32. Laser Scans +Models - Zone4 - CH0080-CH0100 - ABT Detail CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 7. Laser scanning and implementations CP07-C-1A Laser Scanning As โ€“ BuiltChecks: 32
  • 33. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 7. Laser scanning and implementations Tunnel modelled structure coincide withconstruction Tunnel topslabscaffolding CP07-C-1A Laser Scanning As โ€“ BuiltChecks: Point Cloud + Models - Zone2A/2C - CH1+900-CH2+200 Section View (Insideroad & LRT Tunnels) RemovedTunnel topslab scaffolding Points fromPOD 33
  • 34. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 8. LumenRT Visualizations CP07-C-1A Ancillary Structures RenderingusingBentleyLumenRT : LumenRT is a powerful and easy to use rendering and animation software, which works from Bentley AECOSim. Results can be shown in the following images. StormWater Tank & Pump Room 34
  • 35. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 8. LumenRT Visualizations CP07-C-1A Ancillary Structures RenderingusingBentleyLumenRT : 35 StormWater Tank & Pump RoomDetail 1
  • 36. CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities 8. LumenRT Visualizations CP07-C-1A Ancillary Structures RenderingusingBentleyLumenRT : 36 StormWater Tank & Pump RoomDetail 2
  • 37. Thank you for your attention! CCC/TCC JV LCB BIM Team CP07-C-1A Commercial Boulevard A3 Road Troughs, Underpass Tunnel, FXH-02 LRT Station & Utilities LCB BIMTeam(andothers!) 37